Work Breakdown Structure
http://www.mekonginstitute.org/
Planning Processes
Work Breakdown Structure with RAM
Estimate Duration and Resources
Network Analysis
Schedule Development
Project Baseline
http://www.mekonginstitute.org/
A deliverable-oriented grouping of project elements that organizes and defines the total work scope of the project. Each descending level represents an increasingly detailed definition of the project work.
PMBOK® Guide Definition
WBS Definition
http://www.mekonginstitute.org/
The tool for breaking down a project into its component parts.
It is the foundation of project planning and one of the most important techniques used in project management.
Work Breakdown Structure
http://www.mekonginstitute.org/
Project X
Work Breakdown Structure
http://www.mekonginstitute.org/
Software Development
PrepareFunc.Specs.
Approve Requirements
PrepareTest plan
PrepareTest data
ConductTesting
Code Programs
CustomerRequirements
AcceptanceTesting
Testing Training
WBS in Graphical Form
http://www.mekonginstitute.org/
1. Software Development
1.1 Customer Requirements
1.1.1 Approve Requirements
1.1.2 Prepare Functional Specifications
1.2 Code Programs
1.3 Testing
1.3.1 Prepare Test Plan
1.3.2 Prepare Test Data
1.3.3 Conduct Testing
1.4 Training
1.5 Acceptance Testing
WBS in Outline Form
http://www.mekonginstitute.org/
1.2.2.1Dig
trenches
1.2.2.1Dig
trenches
1.2.2.2Installpipe &
hardware
1.2.2.2Installpipe &
hardware
1.2.2.3Cover
sprinklersystem
1.2.2.3Cover
sprinklersystem
1.2.3.1Removedebris
1.2.3.1Removedebris
1.2.3.2Prepare
soil
1.2.3.2Prepare
soil
1.2.3.3Plantlawnseed
1.2.3.3Plantlawnseed
1.3.2.1Mark
fence line& post
1.3.2.1Mark
fence line& post
1.3.2.2Installpost
1.3.2.2Installpost
1.3.2.3Install
fencing& gates
1.3.2.3Install
fencing& gates
1.3.2.4Paintfence
1.3.2.4Paintfence
1.3.1Acquirefence
material
1.3.1Acquirefence
material
1.3.2Construct
fence
1.3.2Construct
fence
1.2.1Acquire
lawnmaterial
1.2.1Acquire
lawnmaterial
1.2.2Install
sprinklersystem
1.2.2Install
sprinklersystem
1.2.3Plantgrass
1.2.3Plantgrass
1.2.4Plant
shrubs
1.2.4Plant
shrubs
1.1Designhome
landscape
1.1Designhome
landscape
1.2Put inlawn
1.2Put inlawn
1.3Buildfence
1.3Buildfence
1.0Home
Landscapeproject
1.0Home
Landscapeproject
WBS in Graphical Form
http://www.mekonginstitute.org/
1.0 Home Landscaping Project 1.1 Design home landscape 1.2 Put in lawn 1.2.1 Acquire lawn material 1.2.2 Install sprinkler system 1.2.2.1 Dig trenches 1.2.2.2 Install pipe and hardware 1.2.2.3 Cover sprinkler system 1.2.3 Plant grass 1.2.3.1 Remove debris 1.2.3.2 Prepare soil 1.2.3.3 Plant lawn seed 1.2.4 Plant shrubs 1.3 Build fence 1.3.1 Acquire fence material 1.3.2 Construct fence 1.3.2.1 Mark fence line and post 1.3.2.2 Install post 1.3.2.3 Install fencing and gates 1.3.2.4 Paint fence
WBS in Outline Form
http://www.mekonginstitute.org/
Provides a detailed illustration of the project scopeCreate accurate cost and schedule estimatesMonitor progress easilyBasis for building project teams
Advantages of WBS
http://www.mekonginstitute.org/
WBS Decomposition
http://www.mekonginstitute.org/
WBS Organized by Product
http://www.mekonginstitute.org/
WBS Organized by Phase
http://www.mekonginstitute.org/
WBS must be broken down starting at the topWork packages must add up to the summary taskEach summary task and work package must be named an activity that produces a product (use SMART Technique)
Criteria for a Successful WBS
http://www.mekonginstitute.org/
specific
measurable
agreed upon
realistic
time-bound
Criteria for a Successful WBS
http://www.mekonginstitute.org/
Create your Project’s WBS
Workshop Time
http://www.mekonginstitute.org/
Tasks Duration Responsible Persons/ Team
Remark
Simple Work plan