    Operations & Maintenance OptimizationOperations & Maintenance Optimizationfor Smart Grids using CIM.for Smart Grids using CIM.

    Laurent Schmitt, Alstom Grid, VP Smart Grid SolutionsFrédéric Bauchot, IBM, Chief Architect E&U Solutions Center

     - , ,

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    2/11

    Alstom & IBM: two major actors of Smart GridAt IBM, we are:

    Accelerating the adoption of SG worldwidethrough the Global Intelligent Utility NetworkCoalition.

    Aiding utilities in the development of SG bycreating the Smart Grid Maturity Model.

    Collaborating in the GridWise Alliance and similarorganizations around the world to promote SG

    Participating in the DoE Advisory Committee and

    At AG, we are :

    Contributing to Smart Grids standardization

    convergence efforts worldwide

    A world leader in critical Grid Power Electronics,Automation & Control Room IT

    Participating to several demonstration projectsacross the world  . .

    electric system

    Exploring how to turn millions of electric vehiclesinto a distributed storage system.

    Delivering SG solutions around the world:

     

    Want to make Smart Grid a reality today

    Are sharing a Joint IT architecture with IBM SAFE

    C  DC  DC  DC  D

    P P P P 

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    3/11

    Need to accelerate Standardisation Convergence

    TC8Electrical Systems

    TC17HV/MV Equipments

    TC69Electrical Vehicule

    TC205PV Converters

    T&D Europe

    ETSI

    EuropeanCommission

    ENTSOe

    EFET

    ERGEGCEN/Cenelec

    JTC1Joint Techical

    Commitee

    TC65Process Control

    TC205Home Automation

    TC247Building Automation

    Organlime

    Eurelectric

    GridwiseAlliance

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    4/11

    Good CIM Adoption in Europe / Transmission Utilities

    First IEC-ETSO Meeting (Market) April 2006

    Beginning of CIM ETSO Convergence March 2007

    Issue of first draft CME Europe ETSO Profile June 2007

    First IEC-UCTE Meeting (Load flow) April 2008

    Acce tance b UCTE to oin IEC a roach June 2008

    P P P P 

    S S S S 

    FFFF

    P P P P 

    TODA 

    CIM A CIM A CIM A CIM A 

    CIMCIMCIMCIM

     

    Paper at next CIGRE D2-C5 September 2008

    Finalisation of New Work Item Proposal October 2008

    Interop test – UCTE Model Exchange March 2009

    Official ENTSO-E adoption December 2009

    Interop Test March 2011

     

    S S S S 

    IIII

    C C C C 

    E E E E 

    UCTE  UCTE  UCTE  UCTE

    MMMM

    E E E E 

    IIII

    TODA 

    Convergence methodology established and demonstrated

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    5/11

    IBM / Alstom Grid joint Value Proposition

    Customer Issues 

    Increasing operational challenges related to themanagement of their network assets

    Optimizing the use of current assets

    Maintaining and replacing ageing assets

    Managing the aging workforce and knowledge retention

    Improving responsiveness to outages and customercomplaints

    High cost due to equipment failure andmaintenance

    Benefits for Transmission and DistributionUtilities

    Business process improvements

    Increase consistency and integration betweenbusiness processes

    Enforce safety rules

    Improve data management scheme

    Improve visibility

    5

    Key Features of joint approach 

    Combine Alstom Grid state-of-the art solutions incondition monitoring and grid management withIBM best-in-class asset management solutions

    Lever the available condition monitoring data to improvegrid operations and asset management

    Optimize grid operations and asset management byexchanging information between both systems

    Work jointly with the utilities to design most valuable usecases

    Operations efficiency

    Reduce the number of unplanned outages andminimize the impact of all outages

    Maximize the use of assets (push to the limits)

    Financial gain

    CAPEX reduction: a few percents improvementrepresent a huge saving for TSO

    OPEX and inventories reduction thanks tooptimized maintenance

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    6/11

    Reference Smart Grid Architecture

    IIIIN A   L D E  N A   L D E  N A   L D E  N A   L D E  

    R M DE R MS  R M DE R MS  R M DE R MS  R M DE R MS  

    G MG MG MG M

    C   RC   RC   RC   R

    E MS E MS E MS E MS DMS DMS DMS DMS MMS  MMS  MMS  MMS  

    E  E  E  E  

    C IMC IMC IMC IM

    IIII

    6

    S  S  S  S  

    DDDD E MS E MS E MS E MS 

    E   GE   GE   GE   G

    S   MS   MS   MS   M

    GGGG

    DDDD E MS E MS E MS E MS 

    B  B  B  B  

    DDDD E MS E MS E MS E MS 

    DDDD

    DDDD E MS E MS E MS E MS 

    M E MS M E MS M E MS M E MS 

    E   E MS E   E MS E   E MS E   E MS 

    C  C  C  C  

    A  A  A  A  

    E   E C  E   E C  E   E C  E   E C  

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    7/11

    SAFE/IUN Conceptual Solution Architecture

    OperationalMonitoring and Security

    Analytics Engine

    Geo-spatial DataMining

    Statistics/KPIs

    Third party Apps

    Complex EventProcessing

    Correlation Reporting/Workflow

    Portals

    Grid Applications

    Asset Mgt

    Remote Asset Mtrg.

    Remote Device Mgt

    Planning

    Enterprise Content Mgt

    Mobile Workforce

    IEC CIM Data

    Warehouse – DB2 Pure XML

    Distribution M t S stems

    OperationalMonitoring

    & Security

    Informed Decision Making

    Enterprise Service Bus

    ETL service

    MaximoEAM

    WebSphere ESB

    7 IBM Confidential

    Line mounted

    sensors

    Field ForceSubstation (IED relays, servers, video,

    security, local weather, Comm

    Equipment

    sensors

    Smart

    metering

    E  S B 

    Data Historian

    High-performance archiver

    (Time-series data, SoE)

    Complex EventProcessing,

    High PerformanceAnalytics

    Field Network

    PHEVsDistributed

    Generation

    Local Intelligence

     

    Outage Management

    Demand Side Mgt.

    State Estimator

    Power Systems Simulator

    SCADA, DCS, PLC

    GIS

    AMM

    OperationalMonitoring and Security

    OperationalMonitoring and Security

    Time-Dependent Operations Middleware (WebSphere Real Time, MQ Low Latency)

    SG Asset

    e-terraplatform

    e- erra

    EMS-DMS

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    8/11

    Solution Architecture Overview

    Network Operations

    Asset & Work Mgmt

    8

    (*) IEC 61970 / 61968

    IBM Maximo EAMAlstom Grid e-terra DMS/EMSWebSphere ESB

    CIM (*)

    CIMCIM CIMCIM

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    9/11

    How EAM can be used to improve Grid Operations

    Use Case 1: A Transformer Buchholz Alarm is raised at SCADA level

    Operator has to decide whether the Transformer needs to be put out of Service or not

    Grid Operations Work & Asset

    Operations

    Request

    Information

    RequestWork

    Tag

    Benefits :- Optimized Reaction to abnormal Conditions

    - Reduced Outages- Lower operational Cost- Consistent and up-to-date Information across

    Grid Operations and EAMDemonstration

    24

    3

    9

    Mobile Field Force

    Alarm

    equence :

    1. A Transformer Alarm is reported2. Operator retrieves Work History, planned

    Work and/or Asset Information from EAM3. Operator decides to de-energize the

    Transformer and to request Work into EAM4. A Tag with Work Order Information is placed

    on DMS/EMS screen5. Maintenance is carried out6. EAM notifies DMS/EMS on ongoing Work

    progresses7. DMS/EMS generates an Alarm when Work is

    completed.

    8. Operator re-energize the Transformer

    Work UpdateCompleted !

    AssignWork

    Work

    Update

    Re-energize

    De-energize

    1

    3

    5

    6

    7

    8

  • 8/19/2019 IBM Alstom OperationsandMaintenanceOptimization

    10/11

     

    10

    Demonstration is available at the IBMLa Gaude E&U Solutions Center