    Airfield Pavement Construction

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

    Lauri van Run MSc., EUR ING

    General Manager/Technical Director (Airports)

    Scott Wilson Sdn Bhd

  • 7/30/2019 ICAO Construction

    2/58

    Airport Pavement Types

    Rigid Pavements Runways, Aprons, Taxiways, Holding Points

    Flexible Pavements

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

    Runways, Taxiways Block Pavements

    Aprons

    Composite Pavements

    All

  • 7/30/2019 ICAO Construction

    3/58

    Case Study

    NEW BANGKOK INTERNATIONAL AIRPORT

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    4/58

  • 7/30/2019 ICAO Construction

    5/58

    CONSTRUCTION OF RIGID PAVEMENTS Pavement Design

    Specifications

    Contractors construction method statement Laboratory and Materials

    Mix designs

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

    Placing Plant

    Aggregates

    Chemical Additives (plasticizers, retarders, etc.)

    Curing Method

    Trials

    Construction Supervision

  • 7/30/2019 ICAO Construction

    6/58

    Pavement Design

    Pavement Structure

    450 mm PQC (Tensile Strength 5,5 Mpa)

    720 mm CTB (Compressive Strength Min 8 Mpa)

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

    mm rus e one

    800mm sand blanket

    12 meters Ground Improvement

  • 7/30/2019 ICAO Construction

    7/58

    Construction Starts

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    8/58

    Ground Improvements

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    9/58

    Principle of PVD

    Surcharge Load(Preloading Embankment)

    Sand Blanket

    Pump

    Manhole

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

    Soft Clay

    Medium Clay/ Stiff Clay

    Drain

    Water Flow

  • 7/30/2019 ICAO Construction

    10/58

    CTB Construction West Runway

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    11/58

    Cement Treated Base 720mm

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    12/58

    PQC Construction with Slipform Paver

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    13/58

    Materials

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    14/58

    Stock Pile

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    15/58

    Concrete Specifications

    Concrete Strength - 5.5 Mpa

    Smoothness - max. 5 mm under 3 meter straight edgefor Aprons

    Max ambient temperature 33 degrees Celcius

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

    Testing requirements Slump requirement 15 - 25mm at location of construction

    Curing compound

    Joint details Joint sealant

    Protection of pavement during 28 days of curing

  • 7/30/2019 ICAO Construction

    16/58

    PQC Batching Plants

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    17/58

    Slip Form Paver

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    18/58

    Construction Sequence

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    19/58

    Surface Finish by Auto Float

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    20/58

    Start of In-Fill Construction

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    21/58

    Apron Grated Drain

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    22/58

    Apron Drainage Channel

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    23/58

    Form Work attached to Drainage Channel

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    24/58

    Pilot Lanes Completed

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    25/58

    Apron Construction Curing in Progress

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    26/58

    Box Out for Fuel Hydrant

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    27/58

    Bird Eyes View of Completed Apron

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    28/58

    Block Paving

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    29/58

    Integrated Apron Design

    Drainage Systems

    Fuel Hydrant Airfield Lighting

    Passenger Loading Bridge

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

    Apron Markings Apron Flood Lighting

    400Hz

    PCA Etc.

  • 7/30/2019 ICAO Construction

    30/58

    Airfield Lighting

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    31/58

    Design Coordination

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    32/58

    Construction Supervision

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    33/58

    Joint Cutting Out of Line

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    34/58

    Slump Problems Sagged Edge

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    35/58

    Saw Cutting Problems

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    36/58

    Spontaneous Uncontrolled Crack

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    37/58

    Rejected and Break Out!!!

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    38/58

    Paving Train Method

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    39/58

    Joint Problems

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    40/58

    Dowel Problems

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    41/58

    Design Issue Shrinkage Stress Crack

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    42/58

    Design Issue

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    43/58

    Corner Crack

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    44/58

    Dowel problem

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    45/58

    Hand Laid Method with Form Work

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    46/58

    Vibration

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    47/58

    Surface Finishing

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    48/58

    Broom Finish

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    49/58

    Curing with Wet Sand

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    50/58

    PE sheet Application

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    51/58

    Preparation for Next Concrete Pour

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    52/58

    Localized Repairs of Broken Slabs

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    53/58

    Excellent Crack

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    54/58

    Advise Your Pilots on Construction Work

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    55/58

    Disaster Can Strike in a Second

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    56/58

    Send out NOTAM for any Work on Airside

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

    Work on Airside is Serious Business

  • 7/30/2019 ICAO Construction

    57/58

    Work on Airside is Serious Business

    Safety First

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable

  • 7/30/2019 ICAO Construction

    58/58

    THANK YOUTHANK YOU

    www.scottwilson.compassionate | ambitious | collaborative | knowledgeable


Recommended