SCHOOL OF ARCHITECTURE, BUILDING & DESIGN

Foundation of Natural and Built Environment (March 2015)

Introduction to the Construction Industry [QSB30105]

FINAL PROJECT

Development Proposal

NAME : Boon Li Ying NAME : Ch’ng Phei Woon

Student ID : 0323839 Student ID : 0323842

Lecturer : Ann See Peng

Page 2: Ici final project

Content

1.Introduction of the site

2.Site Images

3.Site Plan

4.Site Analysis

5.Individual Proposal (Boon Li Ying)

6.Individual Proposal (Ch’ng Phei Woon)

Page 3: Ici final project

Introduction to the site

The plot of land that we have chosen upon is an unused

and undeveloped piece of overgrown with weeds land at

Jalan Pandan Mewah 1, 56100 Kuala Lumpur, Selangor.

Moreover, we think about that this plot of land was a really

good area to be developed since it is near to lots of

commercial area, residential area and it is near to

Hospital Ampang.

There are many reasons why we actually choose this site

to develop, but the main reason is because of the prime

location to set up practically anything we wanted to.

Page 4: Ici final project

Images of the site

Page 5: Ici final project

Site Plan

Page 6: Ici final project

Site Analysis

Size Context Images HEALTH CENTRE

Hospital Ampang

EDUCATION AREA

Sekolah Jenis

Kebangsaan (C) On Pong 2

Sekolah Menengah Kebangsaan Pandan Mewah

SHOPPING MALL

Page 7: Ici final project

Paragon Point shopping

centre

Mid point shopping centre

BANK

Alliance Bank

CIMB Bank

Page 8: Ici final project

Hong Leong Bank

Public Bank

RELIGIOUS AREA

Masjid Al-ubudiah

Masjid Al-adzim

Page 9: Ici final project

BOON LI YING

PROPOSAL

Page 10: Ici final project

Introduction

In this final project, we are given a task to find an empty

land with the size between 50m x 50m (2500m²) – 50m x

70m (3500m²) to initiate a small construction project and

have to produce the individual development proposal.

I decided to build a sport recreation centre on this empty

land for my individual proposal.

Rationale

To provide a recreation and leisure area for the

residents in Jalan Pandan Mewah 1

To provide a sports recreation centre for the

residents

To provide a high quality of sports environment for

residents with the complete facilities of exercise

To provide an area for the residents to relax through

a healthy way

Page 11: Ici final project

Benefits

To provide a good mind, body and spirit

To improve the fitness and weight goals

To lower the chance of getting obesity and

osteoporosis

To create friendships

To extend the social network of residents

To encourage the residents to be more active in

sports

To improve the interests in sports especially among

the teenagers so that they will not involve in

unhealthy activities such as smoking, drink and even

take drug

Impacts

Sound pollution will be happen during the

construction project

Air pollutants will be occur such as dust will waft

throughout the site during the construction project

Traffic jam will be happen because of the increasing

of traffic

Page 12: Ici final project
Page 13: Ici final project

sport recreation centre building

Page 14: Ici final project
Page 15: Ici final project

main gym

lobby & reception counter

Café

Page 16: Ici final project

yoga studio

locker room

shower room

Page 17: Ici final project
Page 18: Ici final project
Page 19: Ici final project
Page 20: Ici final project
Page 21: Ici final project

rock climbling wall

Page 22: Ici final project

List of professions that involved

in project and their tasks

Client

To ensure that the suitable management

arrangements are made for the project

To ensure that the competence and resources of all

appointees

To ensure that the sufficient time and resources are

allowed for all stages of the project

To provide the pre-construction information

To verify the sufficiency of the construction phase

plan

To make sure that the adequate welfare facilities

have been provided

To ensure that the co-operation and co-ordination

between the client’s employees and client

contractors with the project contractors where the

client’s work activities overlap the construction work

and to enable others to perform their duties

To ensure that the arrangements which the

contractor agreed to make to control key risks on site

have been implemented

Page 23: Ici final project

Architect

To develop ideas, discussing the objectives,

requirements and budget of the project with the client

To advise the client on the practically of the project

To apply for planning permission from governmental

new build or legal departments

To provide and present feasibility reports, design

proposals, applications and contracts to client

To make sure that the project design match the

clients need, functional and safe

To control the project from the start to finish

To have an awareness of commercial and financial

considerations for the project

To choose the materials to be used and specifying

the requirements for the project

To have a consulting with other professionals about

the project

To negotiate with contractors

To help the contractors with coordinate of their work

To have a regular site visit for ensure that the project

is running according to schedule and budget

To adapt the plans according to circumstances and

resolve any problem or issued that may arise during

construction

To ensure that the environmental impact of the

project is manage

Page 24: Ici final project

Project Manager

Responsible for the planning, management,

coordination and financial control of a project

To ensure that the project is completed on time and

within budget

To agree the objective of project

To represent the client’s interests

To provide the advice on the management of project

To carry out the risk assessment

To oversee the administrative needs of the project

such as accounting, budgeting or costing, billing and

funding

Construction Manager

Responsible for running and managing of the

construction site

To prepare the site and meeting with clients,

architects, contractors, engineers and surveyors

before construction work starts

To develop the programme of work and strategy for

making the project

To ensure that the materials are delivered on time

and storage of equipment are available on site

To have a safety inspections of the site when project

is underway

To oversee the running of project

Page 25: Ici final project

Contractor

To plan, manage and monitor the construction

project

To ensure that the planning, managing and

monitoring have been proportionate to the size, the

complexity of the project and the nature of risks have

involved

To ensure that the safety precaution are appropriate

To comply with direction and construction phase plan

of project

To appoint the workers and ensure that the

appropriate supervision is provided for the workers

who under their control

To prevent unauthorised access to the site

Page 26: Ici final project

Quantity Surveyor

To manage all aspects of the contractual and

financial side of the construction projects

To prepare the contract documents including the bills

of quantities with the architect or client

To minimise the costs of a project and enhance the

value of money

To carry out the feasibility study

To perform the risk, value management and cost

control

To provide the advice about the cost of project

To provide the advice on procurement strategy

To provide and analysis the costing for tenders

To provide the advice on contractual claims

To have an arrangement of the payments to supplier

and contractor

To offer the advice on property taxation

To provide the advice on the maintenance costs of

specific building

Page 27: Ici final project

Structural Engineer

To design, plan, and oversee the construction of

buildings, bridges

To analyse the configuration of the basic structural

components of building or other structure

To design the structures to withstand stresses or

pressures imposed through human use and

environmental conditions such as weather and

earthquake

To make calculation about loads and stresses

To ensure that the buildings and other structures

does not deflect, rotate, vibrate excessively or

collapse

To select the appropriate construction materials such

as brick, concrete, steel, timber, and masonry

To consider the strength of various materials

To involve in inspecting the project and advising

contractors

To obtain the building regulation approval

To examine the structures at risk of collapse and

advise how to improve the structural integrity such as

recommending, removal, repair of defective parts

and rebuild the entire structure

Page 28: Ici final project

CH’NG PHEI WOON

PROPOSAL

Page 29: Ici final project

Introduction :

This is the empty land that I have chosen, Below shows the boundary

line of the land and the measurement .It is located at Jalan Pandan

Mewah 1, 56100 Kuala Lumpur, Selangor

My suggestion is to propose a commercial area based more on food

Rationale :

Since around the area is residential area and nearby the site, there is

a fast food chain restaurant which is Mc Donald. From time to time,

there is a lot of people having their meal there. Mostly family with

children and students/ teenagers.

Community go there due to the short distance.

Page 30: Ici final project

The one which is in red circle is food area

Site

Page 31: Ici final project

Benefits of the project to Client:

Gets more profits from rental fee

Impact of the project:

Need to hire worker for weekly maintenance

Trim grass and trees monthly

Benefits of the project to the surrounding community:

Easier to get food source

Healthier food

Few minutes walk to the area

More opportunity for job to the community

Page 34: Ici final project

Lawn

Having a 2-storey food court and a restaurant will have a variety of

food selection to choose.

There is more space for community to park their cars, ample parking

spaces.

There is also lawn with tree to have a better environment for the

community and also boost the look of the site giving the environment

a comfortable feeling.

Page 35: Ici final project

Bubble diagram of the proposal

Page 36: Ici final project

Profession involved in this project :

Client

heck competency of designers, contractors and individuals doing

the work

Give information about the site or premises in advance of the

works

Co-operate with the contractor to allow them to discharge their

duties

Co-ordinate their own work so it does not affect the safety of

those doing the job

Give the contractor adequate time for planning and preparation

between their appointment and the start of the work

Architect

To provide the client with sound clear advice at the outset of the

project about: the design/development potential; approximate

building costs; the need for various statutory consents; project

programming and likely time scales; the need to engage the

services of other professional consultants and specialists.

To respond as accurately and appropriately as possible to the

client’s brief

To advise generally on pertinent aspects of the client’s brief

To advise the client on matters relating to building contracts and

building procedures

Page 37: Ici final project

Landscape Architect

Determines the location, design, and arrangement of pools,

walls, steps, trellises, canopies, and other features.

Designs and arranges land forms and develops outdoor spaces

such as public parks, trails, playgrounds, cemeteries, home and

school grounds, and industrial or recreational sites.

Structural Engineer

Designs and analyses load-bearing structures or structural

elements, such as buildings, bridges, or roadways

Conducts site investigations and inspections of structural

engineering projects; provides suggestions for structural

engineering projects to ensure that standards and requirements

are met.

Prepares, maintains and reviews technical documentation such

as blueprints, specifications and reports for structural

engineering projects.

Page 38: Ici final project

Mechanical and Electrical engineer

Manages the planning, design, construction and maintenance of various mechanical systems, including Heating Ventilation and Air Conditioning (HVAC) and rain gutter systems, in buildings and structures.

Performs the evaluation and inspection of mechanical engineering projects to ensure that standards and requirements are met.

Prepares, maintains and reviews technical documentation, such as drawings and specifications, for mechanical engineering projects.

Uses various equipment and tools to manage the design, construction and maintenance of various electrical systems and components, including power distribution and telecommunications, in buildings and structures.

Performs the evaluation and inspection of electrical engineering projects to ensure that standards and requirements are met.

Prepares, maintains and reviews technical documentation, such as drawings and specifications, for electrical engineering projects.

Page 39: Ici final project

Main Contractor

Planning, managing, monitoring and coordinating the

construction phase of a project.

Consulting and engaging with workers.

Coordinating the work of contractors.

Ensuring that the contractors under their control cooperate with

each other.

Quantity Surveyor

managing the finances

working to keep the project on time

working to keep the project within the budget

making sure that construction costs and production are

managed as efficiently as possible

resolving disputes between contracting parties