PRACTICE NOTE 1 II ACEI ASSOCIATI ONOF CONSULTING ENGINEERS OF IRELAND ([1 ENGINEERS II IRELAND CHARTERED SURVEYORS IRELAND ANCILLARY 1. In order to satisfY the requirements of the Building Control (Amendment) Regulations, SI No. 9 of 2014, Ancillary Certificates have been developed and agreed. 2. Ancillary Certificates have been developed and agreed by the RIAl, ACEI, Engineers Ireland and SCSI to be used by Consultants, Specialists and Unregistered Consultants vvho have been commissioned to provide professional design services and an appropriate Inspection Plan. 3. Ancillary Certificates have been developed by the CIF and agreed by the RlAI, ACEI, Engineers lreland and SCSI, to be used by Sub-Contractors, Specialist Contractors and Sub-Sub-Contractors who have been assigned to construct, supervise and certil}r their sub-contract or sub-sub-contract works. 4. When design work only is undertaken by a party appointed by a Contractor I Builder, and that _ party does not subsequently undertake the related c9nstruction work, then that party would sign one of the Certificates prepared by the Professional Bodies. 5. The CIF Ancillary Certificates have been developed and agreed between the c on stitu ent as so c iations to be used by Subcont r actors and Sub-Sub-Contractors who und e rtak e con struction and supervision work and related elements of design for that wor k. 6. The vv ording of the Ancillary Certificates cannot be altered without the collective approval of all the organisations by which the Ancillar:y Certificates have been a gr ee d. NOVEMBER 2014
Transcript
Page 1: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

PRACTICE NOTE 1

II ACEI ASSOCIATIONOF CONSULTING ENGINEERS OF IRELAND

([1 ENGINEERS II IRELAND

SOCI~TVOF

CHARTERED SURVEYORS IRELAND

ANCILLARY CER1~IFICATES

1. In order to satisfY the requirements of the Building Control (Amendment)

Regulations, SI No. 9 of 2014, Ancillary Certificates have been developed and

agreed.

2. Ancillary Certificates have been developed and agreed by the RIAl, ACEI,

Engineers Ireland and SCSI to be used by Consultants, Specialists and Unregistered

Consultants vvho have been commissioned to provide professional design services

and an appropriate Inspection Plan.

3. Ancillary Certificates have been developed by the CIF and agreed by the RlAI,

ACEI, Engineers lreland and SCSI, to be used by Sub-Contractors, Specialist

Contractors and Sub-Sub-Contractors who have been assigned to construct,

supervise and certil}r their sub-contract or sub-sub-contract works.

4. When design work only is undertaken by a party appointed by a Contractor I

Builder, and that_ party does not subsequently undertake the related c9nstruction

work, then that party would sign one of the Certificates prepared by the Professional

Bodies.

5 . The CIF Ancillary Certificates have been developed and agreed between the

constituent associations to be used by Subcontractors and Sub-Sub-Contractors who

undertake construction and supervision work and related elements of design for that

w ork.

6. The vvording of the Ancillary Certificates cannot be altered without the collective

approval of all the organisations by which the Ancillar:y Certificates have been

agreed.

NOVEMBER 2014

CREMINS
Typewritten Text
PAC32-R-1064(ii) C
Page 2: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULnNG ENGINEERS OF IRELAND

\)) ENGINEERS u· IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND

ANCILLARY CERTIFICATES

• The wording of the Follo·wing· Ancillary Certif1cates has been developed by the RIAl, ACEI, EI and SCSI and

cannot be altered without the col lective approval of the four proFessional bodies.

An An.cillar:y Certificate is provided to be signed by the Architect For situations where the Architect is not the

lalulor ' Design Certifier. This situation may ar·ise where the Architect is part of a design team on a Civil

Eng·ineering project, such as a pumping station etc., to which the building regulations still apply.

ANCILLARY CERTIFICATE OF COMPLIANCE: DESIGN

(C01\tUV1ENCE1\tlENT NOTICE I 7 DAY NOTICE)

'I'U RE CUtlll'DETI!J) ll'/flBRE '111EJUU..'JII'J'RC1'1S N01' TilE S1~· 1'J'( t1'URY DESJG'tv' CF.JU'JFJER

Additionally it is proposed that the following· Ancillary Certificates will be required LO be signed by the Archi tect r()l' the ir· Design at Completion Stage. This provide two Ancillary Certifi cates which are appcndeJ to Part B of the

Statutory Certifi cate of Completion under Schedule 6 of th e Building· ontr I (Amendment) Reg·ulations S.l 9 of

2014. This has been recommended by the RIAl even if th e D esign Certifier and Assign JJ Certifter are the same

individual.

ANCILLARY CERTIFICATE OF COMPLIANCE: DESIGN

( OMPLETION)

TOllE COA!PLETEJJ BY THE 1 !RCH/TECT

ANCILLARY CERTIFICKfE OF CO.l\t1PLIANCE: INSPECTION

(COMPLETION)

TO BE CO.tlfPLETED BY THE lRCHITECT

The following Ancillary Certificates ,.viii be requ-ired to be s igned by the Eng·in ee r for their Design at D es ign Stage

and at Completion Stage. Note there are l-wo certificates required at Completion tage, one covering Design and t he

other covering Inspection.

An illary Design Certificate

ANCILLARY CERTIFlCATE OF COMPLIANCE: DESIGN

(Commencement Noti ce I 7 Day Noti ce)

ANCILLARY CERTIFICATE OF COMPLIANCE ON COlVlPLETION

(.ANClLLARY COMPLETiON CERTIFiCATE)

DES!Cl.JV OF THR IT70R.f(S

ANCILLARY CERTIFICATE OF COMPLIANCE ON COMPLETION

(ANCILLARY COMPLETION CERTIFICATE)

INSPECTION PLAN

1 of3

Page 3: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS OF IRELAND

m.j \\/1~ ENGINEERS -~r IRELAND

s o cleTvOF CHARTERED SURVEYORS IREI-ANO

ANCILLARY CERTlFICATES

• The following Ancillary Certificates ·will be required to be signed by the Building Surveyor for their Design at

D esign Stage and at Completion Stag·e. Note there are two certificates required at Completion Stage, one covering

Design and the other covering In, pection.

ANCILLARY CERTIFICATE OF COMPLIANCE: DESIGN

(Commencement Notice I 7 Day Notice)

TO Bl:. COLiiP£/il'fiD WI I liRE Tllli B( lfLDf.N I ' { lRVIiYOR IS NOT 1'1!6' \];-!'J.'(ITORY D!::S'JGN ( 't:RT!Ff liR

ANCILLARY CERTIFICATE OF COMPLIANCE DESIGN

(COMPLETION)

ANCILLARY CERTIFICATE OF COMPLIANCE ON COMPLETION

INSPE TJON

It is proposed t hat the following Ancillar Cer tificates wil] be required to be signed by competent persons or

specialists (i.e. Facade Designer, Fire Systems Designer, Lift Specialist, etc.) for their Design at Design Stage and at

Completion Stage. Note there are two certificates required at Completion Stage, one covering D esign and the other

covering Inspection.

ANCILLARY CERTIFICATE OF COMPLIANCE:- DESIGN

(COM1V1ENCE1V1ENT NOTICE I 7 DAY NOTICE)

TO BE COA!PLETED BY A SPECI.ti.L!ST OR UNREGISTERED CONSULTANT

ANCILLARY CERTIFICATE OF COMPLIANCE: DESIGN

(COMPLETION)

TO BE CO~f1PLETED BY i SPECIALIST OR UNJi~EGJSTERED ONSOLT.ANT

ANCILLARY CERTIFICATE OF COMPLIANCE ON COMPLETION

(ANCILLARY COMPLETION CERTIFICATE -INSPECTION-)

TO BE COtl!PLETRJJ BY r1 SPECIALIST OR UNREGISTERED CONS[.![1ANT

2 of3

Page 4: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATIOI~ OF CONSULTING ENGINEERS OF IRELAND

I ((K)) ENGINEERS -u IRELAND

SOCit:T'VOf"

CHARTERED SURVEYORS IRELAND

ANCILLARY CERTIFICATES

II

Ancillary Certibcates have been deve loped by the CTF and agreed by the RIAl. ACE I, Eng-ineers Ireland and SCSI,

to be used by Sub-Contractors, Specialist Contractors and Sub-Sub-Contractor s who have been assigned to

co nstruct, superv ise and cert-ity their sub-contract or sub-sub-contract works.

ANCILLARY CERTIFICATE OF C01VlPLIANCE ON COMPLETION

CERT!FIC.'ATE .SIGNED BY SUB-CONTRACTOR I SPECJA.LIST CONTRACTOR

ASSIGNJJLJ BY THE BUILDER I AWN CONTRACTOR ON CO!l!PLETION

ANCILLARY CERTIFICATE OF COMPLIANCE ON COMPLETION

{ c_ERT!FJC~TEFOR SUB-SUB CONTRACTOR TO

SUB-CONT!vlCTOR I SPEC!ALJST SUB-CONTRA 'TOR e.) BUILDER I illrlFN CO TR,J ~TOR

Each oF the Ancillar,v Certificates developed by t.he lF consists oF both th e certificate and an Annex to the

cettiftcate. Both of these -lements nmst be comple ted.

3of5

Page 5: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

AcE I ASSOCIATION OF CONSULTING ENGINEERS OF IRELAND

[}f)) ENGINEERS l( IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND II

ANCILLARY CERTIFICATE OF C~OMPLIANCE: DESIGN

( COMMENCElVIENT NOTICE I 7 DAY NOTICE )

Tt1 be completed wbere the Arc!Jitect i,t NOT the Statutory Dc,IL!Jil Certifier

BUiLDING CONTROL AUTHORITY:----------·-------

PRE-VALIDATION REF NO.:--------------------

l. This certificate relates to the following Building \Vorks:

-----------------------------------(project name)

at ____________________________________________________________ (address)

2. This certi.ficate has been prepared in accordance with the Code of Practice for Inspecting and Certifying· Buildings and Works [as published by the Minister under section 3(7) of the Building· Control Act 1990] or equivalent.

3. We confirm that we have been commissioned by (insert as appropriate) to provide proFessional design services in accor-dance with our Conditions of Engagement to carry out the architectural design and/or specification of certa-in elements oF the works, being those elements covered by our plans and pecifications included in the documentation accompanying the Commencement Notice I 7 Dav Notice, and to certifY our design . Our design has been carried out by or under the supervision and direction of Registered Architect(s) named on a reg~ster maintained by the Royal Institute of the Architects of Ireland, pursuant to Part 3 of the Building· Control Act 2007, who are competent to carry out our desig·n.

4. We confirm that our plans, calculations, specifications and particulars included in the Schedule to the Commencement I 7 Day Notice to which this certificate is relevant, and which have been prepared exer·cising reasonable skill, care and dilig·ence, have been prepared to demonstrate compliance with the requirements of the Second Schedule of the Building Regulations in so far as they appl, to the building works concerned.

5. Under our Conditions of Engagement we are responsible f~r co-·ordinating and -integrating \vithin our overall desig·n of desig·nated elements of the works the design oC such parts of the works as wil l be des-igned to the requirements of our performance specifications by specialist suppliers and/or sub-contractors and our certification is con6ngent on the design of such parts and propr-ietary products being in compliance '>\r-ith the requirements of our performance specifica6ons and of the Second Schedule to the Building Regulat-ions insoFar as the apply to the elements concerned.

6. We certif;y, having exercised reasonable skill, care and diligence that, having regard to plans, calculations, and specifications which have been prepared by us and having relied on ancillary certificates and partlC'ula.rs referred to at 4 and 5 above, our proposed design oF those elements of the works for which -v e are responsible to the owner is in compliance with the requirements of the Second Schedule to the Building Regulations insofar as they apply to the elements concerned.

Company Name & Address: -------------------------------------------------

Date: _____ _ Tel: _____ _ Fa.;x:: ------ E-1V1ail :

Company or Practice Reg~strat-ion No. ·---------------------(where relevant) Company or Practi ce Stamp

Signature (to be signed by a Principal or Director) Name: Signed:

Page 6: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACEI ASSOCIAT IOI OF CONSULTING ENGINEERS OF HlFlAND

L

If

ENGINEERS IRELAND

SOCIETVOF

CHARTERED SURVEYORS IRELAND II

ANCILLARY CERTIFICATE OF COMPLIANCE: DESIGN

(COMPLETION)

To be complett!d f,y the Architect

£3UlLDLNG CONTROL AUTHORITY:-----------------

COlVuvtENCEMENT/7 DAY NOTICE REF NO. : --------------

1. This certiflcale relates to the Following Building Works:

-----------------------------------(project name)

at ----------- - ---------------------- (addn~ss)

2. Th is certif1cate has been prepared in accordance with the Code ol' Practice for Inspecting and Certilying Buildings and Works [as published by the lVlinister under section 3(7) of the Building Control Act 1990] or equivalent.

3. Vv'e confirm that we have been commissioned by (insert as appropt;ate)

to provide professional des ign services in acc01·dance wiLh our Conditions of Engagement to carry out the architectural design and/or specification of' certain element of Lh works, being those elements overed by our plans and specifications included in the documentation accompanying the Commencement Notice// Day Notice and Completion Certificate, and to certik'y our design . Our de ig·n ha been carried out by or under the supervision and direction of Registered Architect(s) named on a regi 'ter maintained by the Royal Institute of the Architects of Ireland, pursuant to Part 3 or th Building Contl·ol Act 2007, \ ho are compete nt to carry out our design.

4. \Ve confirm that our plans, cnlcul Lions. speciGcations ancl particulars included in the Schedule to the Commencement I 7 Day Notice and the Completion r·tirtcnte to which this certitteate is re levant, and which have been prepared exercising rea enable -ki ll , care and dilig·en e, have been pr pared to demonstrate compliance with the requirements of the Second chedule of the Building R gulations in o far as they apply to the building works

concerned.

. . h. Uncler our Conditions oC Engagement we are responsible ((u· co-ordinating and integrating wit hin our overall desig·n

or desig·nated elements· or the works the design of such parts or the works as wer·e designed to the requirements or our performance specification by spec ialist suppliers a nd/or sub-contractors and our certification is contingent on the design of' such part and proprietary products being in compliance with the requirements of our perFormance peciflcations and ol' the Second 'chedule to the Building Regulations insofar as they appl r to the eleme nts

concerned.

6. 'vle certifY, having· exerci ed reasonable skill , care and diligence that, having regard to plans, calculation -, and peciflcations which have been prepa1·ed by us and hav ing relied on ancillary ce rtificates and particulars referred to

at 4 and 5 above, our design oC t hose elements of th works For which we are responsible to the owne1· i - in com pliance with the requirements or the Second Schedule to the Building Regulations insofar as t hey apply to the eleme nts concerned.

Company Name & Address: --------------------------

Date: ____ _ Tel: ____ _ Fa. ... c _____ _ E-1V1ail:

Company or Practice Registration No. -------------(where 1·elevant) Company or Pt·acrice Stamp

Signature (to be signed by a Principal or Director) Name: S1gned:

Page 7: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS OF IRELAND

J ~ ENGINEERS u IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND •

ANCILLARY CERTIFICATE OF COMJPLIANCE: INSPECTION

( COMPLETIO:N)

To be completed by the !lrchitat

BUILDING CONTROL AUTHORITY :-----------------

COM.l\tl.ENCEMENT/7 DAY NOTICE REF NO. : --------------

1. This certiflcate relates to the following· Building Work :

--------------------------·--------(project name)

at ___________________________________ (address)

2. This certi.flcate has been prepared in accordance with the Code of Pract;ce For Inspecting· and Certi(ying· Buildings and Works [as published by the l\llinister under section 3(7) of the Building Control Act 1990] or equivalent.

3. Under our Conditions of Engagement we undertook to prepare, in re pect of those elements which ·we designed I specified, an appropriate Preliminary Inspection Plan . We conflrm that, taking into account the Code of Practice for Inspecting and CertifYing Buildings and Works and exercising reasonable skill, care and diligence, we prepared a Preliminary Inspection Plan which we g-ave to the Assigned Certifier for inclusion in the overall Preliminary Inspection Plan. vVe also speci.fied, by reference to national standards or otherwise, for inclusion in the building contract(s) where applicable, testing to be carried out by contractors/suppliers to demonstrate compliance oF building materials, elements and workmanship.

4. We now con6rm that our Inspection Plan drawn up having regard to the Code of Practice For Inspecting· and Certifving Buildings and Works, or equivalent, referred to above has been undertaken by us, having exercised reasonable skill, care and diligence, and/or, where appropriate, by other competent persons, on the basis that all have exercised reasonable skill, care a-?d dilig·ence.

5. Based on the above and on "Part A " of' the Completion Certificate, and relying on the ancillary certi.ficates scheduled and the test results, we now certif , having exercised reasonable skill, care and diligence, that those elements of the project works which we designed/specified are i.n compliance with the requirem nts of the Second Schedule to th.e Building Regulations in so tar as they appl r lo the elements concerned.

Company Name & Address: -------------------------

Date: ____ _ Tel: ____ _ Fa..'C ----- E-Mail:

Company or Practice Reg·istrati.on No. ·----------- (where relevant) Company or Pracrice Stamp

Signature (io be signed by a Principal or Director) Name: Signed: -----------

Page 8: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF . CONSULTING ENGINEERS

OF IRELAND

~1 «JD) ENGINEERS -u· IRELAND

S OCIETY O F

CHARTERED SURVEYORS IRE LAND •

ANCILLARY CERTIFICATE OF COMPLIANCE: (DESIGN)

( CO.Ml\tlENCEl.YlENT NOTICE I 7 DAY NOTICE)

BUILDING CONTROL AUTHORITY:----------------

PRE-VALIDATION REF NO.: --------------------

1. This certificate relates to the following Building Works:

-----------------------------------(project name)

at---------------------------------- (address)

2. T his certificate has been prepared in acco rdance ·with the Code of Practice foe Inspecting and Certi~ ing Buildings and Works [as published by the Mjnister under section 3(7) of the Building Co.ntrol Act 1 990] or equivalent.

3. Vle confir m that we have been commissioned by (insert as approp1-iate) to provide pro Fes ional design services in accordance with our Conditions of Engagement to carry out the _ _______________ ___ (insert as appropriate) design and/or spec if1cation of certain elements of

the works. being those elements covered b,v our plans and speciftca.Lions included .in the documentation accompanying t he Con.unencement I 7 Day Notice, and to certi(v ouc design. Our desig·n has bee n carried out by oc under the supervision and direction of Chartered Eng·i..neer(s) n~ned on a register maintained pursuan t to Section 7 of the Institution of Civil Engineers of Ireland (Charter AmendmenL) Act 1969, who ar competent to carry out our desig·n.

4. We confirm that our plan ' , calculations, speci[l.cations and particulars included in the Schedule to the Commencement/ 7 Day Notice i.o which this certifica te is relevant", a nd w hich have been prepared exercising reasonable skill, care and diligence, have been prepared to demonstrate compliance with the requirements oC the Second Schedule of the Building R egulations in so {ar as they appl_v to the building works concerned.

!l. Under our Conditions of Eng·agement we are responsible for co-ordinating and integrating within oue overall design oF designated element oC the works the design of· such parts of the works as wi.ll be designed to the requirements of our performance specification by specialist supplier and/or sub-contractors anJ our certificat ion is conti. ng·ent on the design of such parts a nd pr:oprietary products being in complia nce with the requirements oF our per~ormance specifications and ol' the S cond Schedule to the Building Regula1ions insofar as they a pply to the elements concerned.

fi. We certi(v, havin g exercised reasonable skill , care and diligence that. having· regard to plans, calC'u lations, and spe i..fications which have been prepared by us a.nd having relied on ancil lary certificates and particu lars reFened to at 4 and 5 above, our proposed design of those elements oF the works for which vve are responsible to the owner is in compliance witb the r·eguirement's oF the Second Schedule to the Building Regulations insol-ar a they apply to the element concerned.

Company Name & Address: --------------------------

D ate : _____ _ Tel: ____ _ Fa.'<:------ E-Mall:

Company or Practice Registration No . -------------(where relevant) Company or Practice Stamp

Signature (to be signed by a Pri.ncipal or Director) Name: Signed : __________ _

Page 9: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS OFIRI::LAND

L ((]D) ENGINEERS If IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND II

ANCILLARY CERTIFICATE OF COMPLIANCE ON COMPLETION (ANCILLARY COMPLETION CERTIFICATE)

- DESIGN OF THE WORKS

BUILDING CONTROL AUTHORITY : _________________ _

COM.l\llENCEMENT NOTICE I 7 DAY NOTICE REF NO. : __________ _

l. This certificate relates to the Following· Building vVorks:

----------------------------------(project name)

at---------------------------------- (address)

E o ·· . •', - --1

~J~Lt~!~~~bl?~

2. This certificate has been prepared i.n accordance with the Code of Practice for Inspecting· and Certil:ying Buildings and Works [as publi hed by the Minister under section 3(7) of the Building Control Act 1990] or equivalent.

3. We confirm that we have been commissioned by (insert as appropt;ate)

to provide professional design services in accordance vvith our Conditions of Engagement to carry out the __________________ (insert as appropriate) design and/or specification of certain elements of

the works, being those elements covered bv our plans and specifications included in the documentation accompanying the Commencement I 7 Day Notice and t·he Completion Certificate, and to certiiy our design. Our design has been carried out by or under the supervision and direction of Chartered Eng·ineer(s) named on a register maintained pursuant to Section 7 of the Institution of Civil Engineers of Ireland (Charter Amendment) Act 1969, who are competent to carry out our design.

4. Vle confirm that our plans, calculations, specifications and particulars included in the Schedule to the Commencement I 7 Day Notice and the Completion Certificate to which this certificate is relevant, and which have been prepared exercising· reasonable skill, care and dilig·ence, have been prepared to demonstrate compliance ·w-ith

the requirements of the Second Schedule of the Building Regulations in so tar as they apply to the building work concerned.

5. Under our Conditions of' Engagement we were responsible for co-ordinating and integ·rating within our overall design of designated elements oF the ·works the design of such parts of the works as were designed to the requirements of our performance specifications by specialist suppliers and/or sub-conb·actors and our cerli£cation is contingent on the desig·n of such parts and proprietary products being in compliance with the requirements of our performance speciEcations and of the Second Schedule to the Building· Reg·ula·tion i.nsofar as they apply to the elements concerned.

6. \Ve certifY, having exercised reasonable skill, care and diligence that, having regard to plans, calculations, and pecifications ·which have been prepared by u - and having relied on ancillary certificates and particulars referred to

at 4 and 5 above, our design of those elements of the works for which we are respon ible to the owner i in compliance with the requirements of the Second Schedule to the Building Regulations insotar as they apply to the elements concerned.

Company Name & Address: ---------------------------

Date: ____ _ Tel: ____ _ Fa,-x.: ____ _ E-1\1aiJ:

Company or Practice RegistTation No. ·----------- (where relevant) Company or PraCLice Stamp

Signature (to be signed by a Principal or Director) Name: SigneJ:

Page 10: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS OF IRELAND

SOCIETY 01"

CHARTERED SURVEYORS IRELAND II

ANCILLARY CERTIFICATE OF COMPLIANCE ON COMPLETION (ANCILLARY COMPLETION CERTIFICATE)

- INSPECTION PLAN

BUILDING CONTROL AUTHORITY: _____________ ___ _

C MMENCEMENT/7 DAY NOTICE REF NO. : --------------

INSPECTION PLAN

1. This certificale relates to the following Building Works:

--------------------------------(project name)

at -------------------------------- (address)

2. This certificate has been prepared in accordance vvith the Code of Practice for Inspecting· and CertifYing Buildings and Wades [as published by the Mini ter under section 3(7) of the Building Control Act 1990] or equivalent.

3. Under our Conditions of Engagement we undertook to prepare, in re peel oft ho e elements which ·we designed I specified, an appropriate Preliminary Inspection Plan. V..Te confirm that, taking into account the Cod of Practice for Inspecting· and Certifying BuJdings .:md Works and exercising rea ·onable skill, care anc.l diligence, we prepared a

Preliminary lnspec1~on Plan which w e gave to the A signed Ccrtiller l'or inclusion in the o erall Preliminary Inspection Plan. We also specified, by reference to national tandards or oLh rwise, lor inclusion in the building contract(s) '"'here applicable, te ling· to be C.:lrried out by contractors/suppliers to demonstr.:ll complian ce ol' building materials, elements .:Lnd wod<.manship .

4. We now confirm that our In peclion Plan drawn up hGving regard lo the Code ol' Practice tor Inspecting and Certi(ving Buildings and 'Narks, or equivalent, rel'erred to above has been und rtaken by us, having exercised reasonable skill , care and diligence, and/or, where appropriate, by Resident Engine ring Staff. on the basis that all . have exercised reasonable skill. care and diligence.

5. B.1 ed on the above and on "Part A" ol' the Completion Certificate, and relving on the ancillary certi£.cates scheduled and the test result , we now certifv, having exer·cised reasonable skill, care and c}jligence, that those elements of th e project vvork which we designed!specifJed are in compliance with the requirements of the Second Sc hedule to the Building Regulations in so tar as they app ly to the element concerned.

Company Name & Address: -------------------------

Date: ____ _ Tel: ____ _ F a.:'C: ____ _ E-.. MaiJ: ____ _

Company or Practice Registracion No . ------------(where relevant) Company or Pracrice Stamp

Signature (to be signed by a Principal or Oil-e('tor) Name: Signed: ----------

Page 11: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACEI ASSOCIATIONOF CONSULTING ENGINEERS OF IRELAND

m ENGINEERS ~( IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND •

ANCILLARY CERTIFICATE OF COMPLIANCE: DESIGN

( COMMENCElVIENT NOTICE I 7 DAY NOTICE)

BUILDING CONTROL AUTHORITY :------------------- =-----=---v,._., -· ... -,j-:-•:- .. -.,f•,••'1

~'1'~n~~..._~.f ~~-~,..~i!i

PRE-VALIDATION REFERENCE NUMBER. :---------------------

l. This certificate relates to th e following; Building \\Torks:

-----------------------------------(project name)

at __________________________________ ___ addres )

element----------------------------- (insert as app ropriate )

2. This ce1i-ificate has been prepared in accordance with the Code of Practice 1:-'or Inspecting and Cert~rjing Buildings

and Works [as published by the Minister under section 3(7) ofthe Building Control Act 1990] or equivalent.

3. V/e confirm that we have been commissioned by (insert as appropriate)

to design, in conjunction with other , the works described above -in 1 and to cert-ifY our design.

4. We confirm that we are competent to carry out our design and to coordinate and integrate the design with that of

others as (insert" specialist skill) : based

on -------------------------------~~rt~cred~~n~dbas~~wm~~~~

5. We confirm that vve have the Professional Indemnity Insurance required in ou1· appointment: the renewal date of

this policy is (date)

6. We confirm that our p lans, calculations, specifications and particulars .included in the Schedule to the

Commencement I 7 Day Not-ice to which this certi.ficate is relevant, and w hich have been prepared exercis-ing

reasonable kill, care and dilig·ence, have been p1·epared to demonstrate compliance with the requirements of the

Second Schedule oF the Building Regulations in so far as they a_pp[.v to the building works concerned.

7. Under our Condit~ons of Engag·ement we are responsible For co-ordinating and integrating within our overall design

of designated elements of the works the desig·n of sucb parts of the works as will be designed to the requirements oC our performance specihcqt-ions by specialis t suppliers a nd/or sub-contractors and our certifi~ation is contingent on

the design of such parts and proprietary products being in cornpliance with the r·equirements of our perFormance

specifications and of the Second Schedule to the Building Reg·ulations insoFar as they apply to the elements

concerned.

8. We certifY, having exercised reasonable skill, ca1·e and diligence that, having regard to plans, calculations, and

specifications which have been prepared by us and having relied on .:mcillary certificates and particulars referred to

at 6 and 7 above, our proposed design of those elements oF the vvorks for which we are re ponsible to the ovmer is in

compliance with the requirements of the Second Schedule to the Building Reg·ulations insoFar as they apply to the

elements concerned.

Compan.v Name & Address:--------------------------

Date: _____ _ Tel: ____ _ Fax: ______ _ E-Mail:

Company or Prac tice Reg·istration No. -------------(where relevant) Company o•- Practice Stamp

Signature (to be signed by a Principal or Director) Name: Signed:

Page 12: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACEI ASSOCIATIONOF CONSULTING ENGINEERS OF IRFLAND

J ((][}) ENGINEERS

u IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND •

ANCILLARY CERTIFICATE OF COMPLIANCE: DESIGN

(COMPLETION)

BUILDING CONTROL AUTHORITY :-----------------

COMlvlENCEMENT/7 DAY NOTICE REF NO.:--------------

1. Tl-lis ertificate relates Lo t he following Building vVorks:

----------------------------------- (project name)

a l _ _________________________________ (address )

element: ________________________________ (insert as appropriate)

2. This certiEcate has been p1·epared in accordance w ith the Code ol' Practice Cor Inspecting· and Certi(ying Buildings and Works [as published by the l'v1inister und · r section 3(7) of the Building Control Act 1990] or equivalent.

3. vVe confirm that vve have been commissioned by (insert as appropriate) to design, in conjunction with olhe1· , the work de cribed above in 1 and to cert ifY our design.

4. We confirm that we are competent to carr.v out our design and to coordinate and integrate the design with that of others as (insert specialist kill) : based on

-------------------------------(insert a credi taGon andba~sofcompeten ce)

5. V•/e confirm that \Ve h.:J.Ye the Profcs ·ional Indemnity Insurance required in our appointment: the renewal date of this policy is (date)

6. 'V\Te co nfirm that our p lans, calculations, specill.cations and particulars included in the Schedule to the Commencement Notice I 7 Day Notice and Completion Certificate to which this certificate is relevant, and vvhich hav been prepared exercising reasonable skill, care and dilig· nee, have bee n prepared to demonstrate compliance with the I'equirement or the Second Schedul or the Building R egulations in so Far as they apptv to the building works concerned.

7. Under our Conditions of Engagement we a1·e responsible for co-o1·dinati ng a nd integrating within our overaiJ design or designated elements of the works the de ig·n of such parts or the\!\ orlcs as were designed to the requirements of our performance speciflcation by speciali l suppliers a nd/or sub-contractot·s and our certif1cation is contingent on the design oF such part and proprietary product- being in compLiance with the requirements oF our performance pecifications and ol' the Second Schedul to the Building· Regulations insofar as t hey apply to t he elements

concerned.

8. 'V\Te certi(v, having exercised t·easonable skill, care and diligence that, having 1·egard to plans, calcu lations, a nd speciflcalion "vhich have been prepared by u and having relied on anciiJary ce rtifi ates and pai·ticulat·s referred to at 6 and 7 above, our design of those elements of' the works f'or which we are responsible to the owner is in compliance "vith the requirements of the econd chedule to the Bu ild ing Regulations insofar as they apply to the elements concerned .

Company Name & Addre~s: --------------------------

Date: ____ _ Tel: ____ _ F a..x: _____ _ E-Mail :

Company or Practice R eg·istration No . Company or Practi ce Stamp ·

-------------(where relevant)

Signatul"e (to be signed by a Principal or Director) Name: Signed:

Page 13: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS OF IRELAND

~ » ENGINEERS -u IRELAND

SOCIETVOI=

CHARTERED SURVEYORS IRELAND II

ANCILLARY CERTIFICATE OF COMPLIAlNCE ON COMPLETION

(ANCILLARY COMPLETION CERTIFICATE- INSPECTION)

To be cornp!etet) by a Speciah1t or Unre!J':'tercd Con .. ILI!trmt

BULLDLNG CONTROL AUTHORITY :------------------

COM_MENCEMENT/7 DAY NOTICE REF NO. : ---------------

1. This certificate relates to the following· Building Works:

-----------------------------------(project name)

at---------------------------------- (address)

element of work ---------------------------- (inseli as appropriate)

2. This certi.Ecate ha_ been prepared in accordance with the Code oF Practice for Inspecting and CertifYing Building·s and Works [as published by the Minister under section 3(7) of the Building· Control Act 1990] or equivalent.

3. We confirm that we have been commis ioned b, ___________________ (insert as approp,;ate)

to design, in conjunction with others, the work described above in ] and to certi(y our desig·n .

4. We confirm that we are cmnpetent to carry out our desig·n and to coordinate and integrate the design ·with that of others a.s (insert specialist skill) : based on

(insert accreditation and basis of competence )

5. vVe confirm that we have the Professional Indemnity Insurance required in our appointment: the renewal date of this policy is (date)

6. Under our Conditions o[ Engagement we undertook to prepare, in respect of those element which vve designed I specified, an appropriate Preliminar:y inspection Plan. We confirm that, taking into account the Code of Practice for Inspecting and Certifying Building·s and Worlcs and exercising 1·easonable skill, care and diligence, we prepared a Preliminaty Inspection Plan which we gave to the Assigned Ce,·tifter for inclusion in the overall Preliminary Inspection Plan. Vve also specified, by reference to national standards or otherwise for inclusion in the building contract(s), testing to be carried out by contractors/suppliers lo demonstmte compliance oF building materials, elements and workmanship.

7. We now confirm that our Inspectio n Plan drawn up having· regard to the Code of' Practice for Inspecting and Certifying Building and Works, or equivalent, referred to above has been undertaken by us, having exercised reasonable skill, care and diligence, and/or, where appropriate, by othe1· competent persons, on the basis that all have exercised reasonable skill, care and diligence.

8. Ba.sed on the above and on "Part A" oF the Complet'on Certificate, and relying on the ancillary certificates scheduled and the test results, we now certify, having exercised reasonable skill, care and diligence, that those elements of the project works which we designed/-pecified are in compliance with the requirements of the Second Schedule to the Building Regulations in so Far as they apply to the elements concerned.

Company Nrune & Addres : --------------------------

Date: ____ _ Tel : ____ _ Fa:·c ____ _ E-Mai.l:

Company or Pra tice R gistration No. ·----------- (where relevant) Company or Practi ce Stamp

Signature (to be signed by a Principal or Director) Name: Signed:

Page 14: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS OF IRELAND

_ _.L

~ JD) ENGINEERS ' 11 IRELAND

S O CIETY OF

CHARTERED SURVEYORS IRELAND •

ANCILLARY CERTIFICATE OF COMPLIANCE: DESIGN

( COMMENCEMENT NOTICE I 7 DAY NOTICE)

BUILDlNG CONTROL AUTHORITY:-----------------

PRE-VALIDATION REF NO.:--------------------

1. This certificate ~-elates to the Following Building Work

-----------------------------------(project name)

at---------------------------------- (address)

2. This certificate ha been peepared in accordance with the Code of Practice for Inspecting and Certi1ying Buildings and Works [a published by the M.inister under section 3(7) of the Building Control Act 1990] or equivalent.

3. We confinn that we have been commis-ioncd by (insert as approp1;ate)

to provide prof'e sional design services in accordance with our Conditions ol' Engagement to carT]' ou1. the ________________________________________ (insert as appropriate)

desig·n and/or spec ification of certain clcm nt. of the works, being those elements covered by our plans and specification included in the documentation accompanying the Commencement Notice/7 ay Notice, and lo certi(y our des:ign. Our design ha been carried OLIL by 01" under the supel ision and dir ction or Regislei·ed Building

urveyor(s) nametl on a register maintained by the Society ol' Chartered Sur·veyors Ireland pursuant to Part 5 ol' the Building Conti'OI Act 2007, vvho are compe tent Lo can-y out our design .

4. \Ve confirm that our plans, calculations, specillcations and part~culars included in the Schedule to the Con1mencement Notice/7 Day Notice to which this ertiGcate is relevant, and whi h have been prepared exercising r a.son:able skilL car and diligence, have been prepared to demonstrate ·compliance with the requirement of the

econd Schedule ol' the Building Reg·ula.tions in so l'ar as they applv to the: building worb concerned.

5. Under our Conditions oF Engagement we are re ponsible For co-ordinating and integrating within our overall design or designated el ment ol' the works the design of such parts ol the works as will be designed to the requit·ements or our performance speciflcal;on by pecialisl supplier·s and/or sub-contractor-s and our certification is con6ngent on the design of such parts and proprietary products being in compliance with the requirements of our perFormance pecifications and ol' the Second S hedule to the Building Regulations insoFar as they apply to the elements

concerned.

6. Vve certity, having exercised reasonable skill, care and diligence that, having 1·ega1-d to plans, calculations, and pecificaLions which have been prepar·ed by us and having relied on ancillary certilicates and particulars ,·eFerred to

at 4 and 5 above, our proposed design of those elements or the works For which we are 1·esponsible to the owner is in compliance wit·h the requirements ol' the econJ Schedule to the Building Regulations insofar as the , appl,, to the element concerned.

Company Name & Addres

Date: _____ _ Tel: ____ _ Fa.x: _____ _ E-J\11ail:

Company or Practice Registration No. _____________ (where relevant) Company or Practice Stamp

Signatw·e (to be signed b,v a Principal or Director) Name: Signed: -----------

Page 15: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS Of IRELAND

l

ljJ_ ENGINEERS - IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND II

ANCILLARY CERTIFICATE OF C~OMPLIANCE: DESIGN

( COMPLETION)

To be mmp!dec) by the Bwldi1~9 'lurc>ey{lr

BUlLDlNG CONTROL AUTHORITY:----------·-------

COMl\t1ENCElV1ENT/7 DAY NOTICE REF NO. : ---------------

l. This ce1·tiflcate relates to the following· Building Works:

----------------------------------------------------------------------(pr~ectname)

at--------------------------·--------- (address)

element: ________________________________________________________ (1 nsert as appropriate)

2. This certi6cate has been prepared in accordance with the Code oF Practice for Inspecting and Certil}ri11g Buildings

and Works [as published by the Mlnister under section 3(7) oF t he Building Control Act 1990] or equivalent.

3. V·le confirm that we have been commissioned by (insert as appropt-iate)

to provide professional design service in accordance with our Conditions oF Engagement to carry out

-----------------------------------------------------·------------------------(insert as approp t-iate) design and/or speciftcation of certain elements of the works, being those elements covered by our plans and

specifications included in the documentation accompanying the Commencement I 7 Day Notice and the Completion

Certiflcate, and to certifY our design. Our d esign has been carr-ied out by or under the supervision and direction of

Registered Building Surveyor(s) named on a reg;ster maintained b. the Society of Chartered Surveyors Ireland

pursuant to Part 5 of the Building Control Act 2007, who are competent to carry out our design.

4. We con6rm that our plans, calculations, specifications and particulars included in the Schedule to the

Commencement I 7 Day Notice and the Completion Certificate to which this certificate is relevant, and which have

been prepared exerci:sing reasonable skill, care and diligence, h ave been prepared to de!fionstrate compliance with the requirements of the Second Schedule of the Building· Regulations in so tar as they apply to the building· works

concerned.

5. Under our Conditions of Engag·ement we were y·esponsibl e Cor co-ordinating and integrating within our overall

design of desig·nated elements of the works the design oF _;uch parts of the works as were designed to the

requirement of our performance specillcations by specialist suppliers and/or sub-contractors and our certification is

contingent on the design of such parts and propri tary products being in compliance with the requirements of our

performance specifications and of the Second Schedule to the Building· Regulation s insofar as they apply to the

elements concerned.

6. We certi.fY, having exercised reasonable skill, care and diligence that, having regard to plans, calculations, and

speci6cations which have been prepared by us and having relied on ancillary certificates and particulars referred to

at 4 and 5 above, our design at' tho e elements of the works for which we are responsible to the owner is in

compliance with the requirements of the Second ScheduJe to the Building Regulations insofar as they apply to the

e lements concerned.

Company Name & Address:--------------------------

Date: _________ _ Tel: ____ _ Fax: _________ _ E-lVlail:

Company or Practice R egistration No. ·----------------------(where relevant) Company or P1·acti.ce Stamp

Signature (to be signed by a Principal or Director) Name: Signed: ------------------

Page 16: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS OF IRE NO

«JD) ENGINEERS -,1 IRELAND

SOCieTY OF

CHARTERED SURVEYORS IRELAND II

ANCILLARY CERTIFICATE OF COMPLIANCE ON COMPLETION

( INSPECTION)

To f1e compfded by the Bai!rJing )uri'eyor

DUlLDlNG CONTROL AUTHORITY:-----------------

COMiYlENCEMENT/7 DAY NOTICE REF NO. : --------------

1. Thi certificate relates to the follo-wing- BuiJding Works:

----------------------------------(project name)

al _________________________________ (address)

2. This certificate has bee n prepared in accordance -with the Code of Practice For Inspecting and Certifying Building· and Works [as published b.Y the Mini ter· under· e tion 3(7) oF the Building Control Act 1990] or eguivalenl.

3. Under our Conditions of Engag"ment we und rtook to prepare, in respect oC those elements , hich we designed I speciGed, an appmpr·iale Preliminary Inspection lan. \Ve confi rm that, taking into account the Code of Practice for Inspecting and CertiL-)ring· Building and Work and exercising reasonable skill, care and dilig'cnce, we prepared a Preliminar.v Inspec tion Plan which we g'ave to the Assigned Certifier for· inclusion in the ove1·all Preliminary Inspection I Ian. vVe also specified. by r·eference to nalional slandards or oLhervvise, lor inclusion in the building contract(s) wher·e applicable, testing to be carried out by conlractors/:suppliers to clcmonst1·ate compliance or building materials, element and workman 'hip.

4. We now confirm tba.t our Inspection Plcm drawn up having reg·ard to the Code oC Practice f'or Inspecting and Certil~ring Builwngs and Works, or equivalent, referred to above has been undertaken b,y us, having exercised r asonable skill, care and dil-igence, and/or, w here appropriate, by other competent per" ons, on the basis that all have exercised rea onable skill, care and diligence.

5. Based on the above and on "Part A" of the Completion Certificate, and relying· on the ancillary cei·tihcates chedu lecl and the te t results, we now certifY, having exercised reasonable skill, care and diLigence, that those

clements oF the project works which we designed I specifted are in complian ce with the requir-ements of the Second Schedule to the Building Regulations in so far as they apply to the elements concerned .

Company Name & Address: --------------------------

Date: ____ _ Tel: ____ _ Fa.x: _____ _ E-Mail:

Company or Practice Regi ' lration No. ------------- (-where relevant) Company 01· Pra<'tice Stamp

Sigoatw·e (to be signed by a Principal or Director) Name: Signed: -----------

Page 17: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS OF IRELAND

j « Jr» ENGINEERS

I I IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND •

ANCILLARY CERTIFICATE OF COMJ>LIANCE ON COMPLETION

Cert{/icate digned by Sub-Colltractor I Spt:cia/t:Jt Contractor

ilMigned by t/.1c Builder I Jlfain Contrndor 011 Completioll

BUILDING CONTROL AUTHORITY :

COlVllvlENCEMENT/7 DAY NOTICE REF NO. : ------------------

From: ________________________ _ (Name oF Sub Contractor/ Specialist Contractor)

Main Contract: _____________________ _ ("the .M.ain-Contract")

Sub-Contract: _____________________ _ (the Sub-Contract")

Description of the Sub-Contractor I Specialist Contractor buildings or works:

This cer6Ecate relates to the buildings or works, the subject of the Sub-Contract as described above, as detailed in the attached Annex (the ''Sub-Contract Works").

Without prejudice to the rights and obligations of the Builder/Main Conb·actor and the Sub-ContractodSpecialist Contractor under the Sub-Contract, in consideration of the payment of one euro (£1) by the Builder/Main Contractor to the Sub-Contractor/Specialist Contractor, (the receipt of which the Sub-Contractor/Specialist Contractor hereby acknowledges), the Sub-Contractor/Specialist Contractor warrants as follows:-

Sub-Contractor/Specialist Contractor's Confirmations:

1. I confirm that I am the Sub-Conb·actor/Specialist Contractor assigned by the Builder/Main Contractor to construct, supervise and ce1·tif-~v the Sub-Contract Works.

2. I certify, having exercised reasonable skill. care and diligence, that the Sub-Contract Works as completed have been constructed in accordance ·wi.th the plans, specifications, calculations, ancillary certificates and particulars as issued to me relevant to the Sub-ContTact Works, and such other documents relevant to compliance with the requirements of the Second Schedule to the Building Regulations as shall be r·etained by me as outlined in the Code of Practice for Inspecting and Cer6J~yi.ng Buildings and Works.

3. Reliant on the l:oregoing, I certifv that the Sub-Contract \Vorlcs are in compliance with the requirement ~ of the Second Schedule to the Building Regulations insofar as they apply to the Sub-ContTact Works concerned.

Signanrre: ________________________________________ __ Date: _______ _

(to be signed by a Principal or Director on behalf of tbe Sub Contractor I Specialist Contractor only)

Name:

Address: ______________________________________________________________________ _

Tel: _________ __ Fax:------·---- E-lV\ail:

Construction Industry Register Ireland Reg-istration No.------------------

316-450-4.2

Page 18: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

AcE I ASSOCIATION OF CONSULTING ENGINEERS OF IRELAND

. J

«J\» ENGINEERS 11 IRELAND

ANNEX

SOCIE1"YOP

CHARTERED SURVEYORS IRELAND •

Table of Drawings, Calculations, Specifications, Ancillary Certificates and Particulars used for the purpos of' construction and demonstrating compliance with the requirements ol' the Second Schedule to the Building Regulali.ons .

(Details of relevant plans etc. may be listed below and attached hereto)

1. Drawing. , aJculations, Speci.fications and particu lars provided by the Builder/Main Contractor.

SCHEDULE

2. Associated desig·n undertak n by Sub-Contractor/Specialist Conlractor· necessary for completion of the works in accordance with the Building Regulation .

SCHEDULE

3164504.2

Page 19: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

,. . ACE I ASSOCIATION OF

CONSULTING ENGINEERS OF IRELAND

J. OD ENGINEERS n IRELAND

SOCIETY OF

CHARTERED SURVEYORS IRELAND II

ANCILLARY CERTIFICATE OF COMI,LIANCE ON COMPLETION

Cc:rt?/icatcfor Suf,-Sub Co11tmctor to Sub-Contractor I Speciali..!l Sub-Contractor d Builder I J!Iatiz Colltractor

BUILDING CONTROL AUTHORITY:

COMMENCEMENT/7 DAY NOTICE REF NO. : ------------------

To: __________________________________________________________________________________________ __

(Name of Sub-Contractor/Specialist Sub-Contractor all(l of Builder/Main Contractor)

Frorn: ________________________________________________________________________________________ __

(Name of Sub-Sub Contractor)

lVlain Contract: ______________________________________ _ ("the Main-Contract'')

Su b-Contracr: ______________________________________ _ ("the Sub-Contract")

Sub-Sub-Contract: _______________________ ("the Sub-Sub-Conh·act")

Description oF the Sub-Sub-Contractor's buildings or works:

This certificate relates to the buildings or works, the subject of the Sub-Sub-Contract as described above, as detailed in the attached Annex (the "Sub-Sub-Contract 'Vorks").

In consideration of the payrnent oF one euro (€1) by each of the Builder/Main Contractor and the Sub-Contractor/ Specialist Sub-Contractor to the Sub-Sub-Contractor (the receipt of which the Sub-Sub-Contractor hereby acknm..,rledges), the Sub-Sub-Contractor warrants:-

Sub-Sub-Contractor Confirmations:

1. I confirm that I am the Sub-Sub-Contractor ass.ig·ned by the Sub-Contr actor/Specialist Sub-Contractor to consLTUct, supervise and certiLy the Sub-Sub-Contract Works.

2. 1 certify, ·having exercised reasonable skill, care and dilig-ence, that the Sub-Sub-Contract Works a completed have been onstructed in accordance with the plan , specifications, calculations, ancillary certificat s and particulars as issued to me relevant to the Sub-Sub-Contract vVorks. and such other documents relevant to compliance with the requirements of the Second Schedule to the Building Regulations as shall be retained by me as outlined in the Code of Practice for Inspecting· and Certif:Ylng Build-ings and vVorks .

3. Reliant on the foreg-oing, I certi(y that the Sub-Sub-Contract \Vorlcs are in compliance with the requirements oF the Second Schedule to the Building Regulations insofar as they apply to the Sub-Sub-Contract \Vorlcs concerned .

Signature: ________________________________________ _ Date: _______ _

(to be signed by a Principal or Director on behalf of the Sub-Sub-Contractor only )

Name:

Address: _________________________________________________________________________ __

Tel: _________ _ Fax : __________________ _ E-Mail:

Construction Industry Reg-ister Ireland Registration No.---------------------------------

3164757.2

Page 20: II ACEI OF IRELAND CONSULTING ENGINEERS · OF IRELAND ([1 ENGINEERS II IRELAND SOCI~TVOF CHARTERED SURVEYORS IRELAND ANCILLARY CER1~IFICATES 1. In order to satisfY the requirements

ACE I ASSOCIATION OF CONSULTING ENGINEERS or IRELAND

«J ENGINEERS rr IRELAND

ANNEX

SOCIETY OF

CHARTERED SURVEYORS IRELAND II

Table of Drawings. Calculations, Specir1ca6ons, Ancillary Certificates and Particulars used for the purpose or construction and demonstrating compliance wit h Lhe requirements of the Second Schedule to the Building Regulations.

(Details of relevant plans etc. may be listed below and attached hereto)

1. Drawings, Calculations, Specifications and particulars provided by the Sub-Contractor·/Specialist Sub-Contractor.

SCHEDULE

2. ssociated desig·n undertaken by the Sub-Sub- on tractor nee ssar,y l'or completion oF the Sub-Sub-Contract works in accordance with the Building Regulations.

SCI I EDULE

3164757.2

. '