+ All Categories
Home > Documents > Information System/Information Technology Management Pertemuan 09-10

Information System/Information Technology Management Pertemuan 09-10

Date post: 19-Mar-2016
Category:
Upload: love
View: 52 times
Download: 0 times
Share this document with a friend
Description:
Information System/Information Technology Management Pertemuan 09-10. Matakuliah: F0174 / Audit Laporan Keuangan Berbasis Komputer Tahun: 2008. Developing strategic Plans. 3. Strategic Plans. - PowerPoint PPT Presentation
Popular Tags:
62
Transcript
Page 1: Information System/Information Technology Management Pertemuan 09-10
Page 2: Information System/Information Technology Management Pertemuan 09-10

Information System/Information Technology Management

Pertemuan 09-10

Matakuliah : F0174 / Audit Laporan Keuangan Berbasis KomputerTahun : 2008

Page 3: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Developing strategic Plans

3

Page 4: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Strategic PlansStrategic Plans: One of the most important

responsibility of management, as this proccess serves as the primary guideline for allocating scarce resources throughout the firm and keeping the organization headed in profitable direction.

Strategic Planning begins with a vision or an image of future, Vision translated to mission, wich serves guiding light for developing a set of objective

Page 5: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Page 6: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Mission statements guide the establishment of business objectives. For instance, the IT function described might develop the following set of objectives:

1. Create an atmosphere that embraces innovation and change2. Apply computer hardware and software technologies to

opportunities that promote prosperity3. Incorporate an enterprise-wide information system to

facilitate the intracompany coordination of business activities.

4. Develop a technology-based communications network capable of linking suppliers, customers, and employees in to a seamless, virtual and extended enterprise.

Page 7: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Managing development project

7

Page 8: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

The acqisition of software from outside vendors, in house development og application and modification of existing computer programs are all example of IT projects.

A project may be deemed to be a failure if it was delivered later than estimated, cost considerably more than budgeted, did not offer the functionality desired, or failed to meet the quality expected.

Page 9: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Page 10: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Phase in Project Life Cycle:1. Planning the project2. In Managing projects is to schedule the specific

sequencing and timing of each activity and associated resources.

3. Involves monitoringof activities.4. Controlling-concerns the development of specific

actions aimed at keeping a project moving forward in the most efficient and effective manner possible, considering unexpected issues, delays, and problem that arise.

5. Project manager needs to properly close out the project

Page 11: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Page 12: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Acquiring Software Application To ensure that software acquisitions are being made

in the best interest of the company, the client should develop and follow a formal software application acquisition policy:

A software acquisition poliy should be formulated by first mapping upcoming application needs to strategic plan.

1. A specific individual should be assigned the overall responsibility for finding and comparing alternative software application.

2. Identify and compare alternative solution.3. Total cost of ownership for each application should

be considered

Page 13: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Considering Additional Systems Development Issues

The project team should pay close attention to additional key development issues:

1. Business Process Analysis2. Development & Testing3. Security and Controls4. Conversions and Intervace5. Implementation Testing6. Training and Documentation

Page 14: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Key development Risk Indicators1. Development projects are not aligned with the strategic

plan.2. Feasibility studies do not consider the following areas:

1. Technical feasibility2. Financial Feasibility3. Cultural Feasibility

3. Senior management and users are not involved4. Business process analyses are not performed5. Alternative designs are not compared6. Separate development, test, and production libraries are

not used7. Security and control features are not designed into the

system8. Conversion and interface issues are not taken into account9. System testing is inadequate10.Training and documentation are poor

Page 15: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Changing software application

It seems as though existing software applications are in a perpetual state of change. The reasons for changing applications are many, but for the most part they reflect the volatility.

Page 16: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Key System Change Risk Indicators1. A structure system change methodology is not in place

2. A Software change request procedure is not use3. Change requests are not reviewed/prioritized by a

representative group4. Feasibility studies are not performed when appropriate5. Alternative software change designs are not

considered6. Separate development, test, and production libraries

are not used7. Security and controls implication are not considered8. Integration issues are not taken into account9. Testing is inadequately conducted10.Application changes are poorly documented.

Page 17: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

IT Project management

Page 18: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Introduction

The Audit Process

The Audit Components

Summary

Audit Management - Content

Page 19: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit – Definition and Value Proposition

Value Proposition An audit is used to determine whether the

specification requirements of a service, process, system, or product were met, and whether these requirements are suitable to achieve your desired objectives.

Page 20: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management with SAP

SAP has developed a powerful and easy-to-use tool for Audit Management. It supports you in performing any kind of audit…

…no matter what industry sector you work in……from the planning phase, through audit

execution, to the evaluation phase.

SAP Solution

Page 21: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

• “A tool to support you when performing audits - from the planning phase, through audit execution, to the evaluation phase.“

Audit Management – Benefits for the Customer

Helps you fulfill the requirements of various quality standards such as QS 9000; ISO 9001:2000; ISO 14011; GMP (FDA)

Monitor corrective and preventive actions Improvement potentials Benchmarking Share information company-wide

Page 22: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Introduction

The Audit Process

The Audit Components

Summary

Audit Management - Content

Page 23: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management - The Process

Processing

Valuation

Corrective andPreventive Actions

Documentation

Evaluation

Planning

Audit Circle

Page 24: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Planning – Import/export of question lists

• SAP provides ready-to-run example xls + xml screen

– Copy function for question lists

Microsoft Excel

XML

SAP

Page 25: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Planning – Summary Flexible, user-defined time planning

(for example, annual plan, monthly plan, ...) Display the planned audits in Microsoft Project Tracking of all rescheduled audit dates Display of previous audits and relevant documentation in

preparation for an impending audit Assign/display documents Different lists of questions can be created or combined Question texts in multiple languages Status management

Page 26: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management - The Process

Processing

Valuation

Corrective andPreventive Actions

Documentation

Evaluation

Planning

Audit Circle

Page 27: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Processing – Online Recording

Page 28: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Download of Questions Download of Audits Recording with

MS EXCEL MS Pocket Excel or

Upload into SAP

Audit Processing – Offline Recording

Page 29: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Processing – Document Assignment Flexible folder and document assignment

Page 30: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management - The Process

Processing

Valuation

Corrective andPreventive Actions

Documentation

Evaluation

Planning

Audit Circle

Page 31: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Valuation for Each Question

Attributive valuation, for example: Not effectively proven, . . . effectively proven Yes or No No deviation, significant deviation, critical, etc. Customizing

Quantitative valuation, for example:

0 points, 2 points . . . 10 points 20%, 40% … 100% Customizing

Page 32: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Element Validation Using SAP Graphic

Page 33: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Valuation of Audit

Standard valuation schemes: ready-to-use VDA 6.x, ISO 9001:2000, QS9000

Individual valuation schemes Customizing

Page 34: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Valuation - SummaryStoring minimum results

– Weighting questions– Prioritizing questions

Valuation and calculation– VDA 6.1 and 6.3, VDE, QS9000, ISO 9001:2000

Valuation based on selection list for question/elements– The content of the list can be freely defined and sorted– A certain number of points are assigned to each answer

Quantitative confirmation– Points or percentages by specifying a “to/from” scale with increments

Page 35: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management - The Process

Processing

Valuation

Corrective andPreventive Actions

Documentation

Evaluation

Planning

Audit Circle

Page 36: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management - The Process

Processing

Valuation

Corrective andPreventive Actions

Documentation

Evaluation

Planning

Audit Circle

Page 37: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Documentation Predefined Smart Forms for audit report, audit plan, and corrective actions Print and/or send by e-mail

Page 38: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Collaboration

Supplier

Audit Execution

CorrectiveActions

Review Audit ReportShare Information

Assign Corrective Actions

Create the Audit ReportAudit Report

Monitor Corrective Actions

Send the Audit Report

Complete Corrective Actions

CorrectiveActions

Audit Report

Page 39: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management - The Process

Processing

Valuation

Corrective andPreventive Actions

Documentation

Evaluation

Planning

Audit Circle

Page 40: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Monitor: Benchmark Supplier Performance

Page 41: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Evaluation Benchmarking

Compare a process in different sectors/plants Graphical display

Monitor supplier performance Graphical display

Compare the same production lines Company-wide information sharing Customer satisfaction over a time

period Various reporting types

Page 42: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Monitor Actions For example, Worklist of all oustanding actions

Page 43: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Monitor Actions in HTML

Page 44: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Pro-Active Tracking of Outstanding Actions

Automaticsendingof e-mails!

Page 45: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Introduction

The Audit Process

The Audit Components

Summary

Audit Management - Content

Page 46: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Question listAudit planAudit Components – Overview

Audit Monitor

AuditAudit questions

Actions

Plan

ning

Proc

essi

ngM

onito

ring

Page 47: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management – Ease of Use

Worklist

Navigation

Audit

Actions

Question list

Audit plan

Page 48: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Components - OverviewQuestion List Audit Plan

Audit Question List

Action

Audit

Audit Report

Page 49: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Question ListHeader- Status- Partner- Texts- Hierarchy Profile- Valuation Profile

Item- i.e. element or question,

dependent on hierarchy profile

- Texts- Valuation profile

Audit Check List

- Approved

- Responsible: Mr. X

- Audit Questions acc. QS-9000

- Elements / Question

- Fulfillment in %

Element 4.11: Test equipment control

Question 4.11.12 Calibration Documentation

Does the supplier retain records on the calibration of test equipment?

Valuation acc. Fulfillment in %

Valuation proposal: 80Audit Question

List

Question List

Page 50: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Question ListQuestion List

Header - Texts - Hierarchy

profile - Valuation profile

Item - i.e. Element or

question/add. question (dep. on hier. profile)

- Texts - Valuation profile

Actions

System audit acc. to QS 9000

Audit check list

Get the actual requirements

Element / Question

Fulfillment in %

Element 4.11 Test Equipment Control

Question 4.11.12 Calibration Documentation

Does the supplier retain records on the calibration of test equipment?

Add. Question 4.11.X1 ANOVA

Does the supplier use the ANOVA-Method?

Keep calibration history for more than 5 years!

Audit Question

List

Page 51: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

AuditAudit Plan

Actions

Audit type:

Supplier system audit

Audit Item:

Supplier X, Plant Y

Dates:

Start – End / Planned - Actual

Participants:

Lead auditor A, Responsible B

Valuation:

Fulfillment 95 %

Rating profile 0-30-60-90-100

Rating “Approved“

Status:

Valuated

Outstanding Actions

Audit question listQuestion list

Add. questions

Audit-Audit type und trigger

-Audit item

-Dates

-Participants

-Texts

-Valuation specs.

-Result

-Status

Page 52: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Corrective and Preventive ActionsQuestion list Item

Action- Text- Dates- Partner- Status

Text:

Confirm the calibration results with digital signature!

Date:

From 1. 1. 2002

Partner:

Person responsible: . . .

Status:

Being processed since 1. 8. 2000

Page 53: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit - Customizing

Additional BAdI‘s Valuation Profiles Audit objects and more ...

Page 54: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Introduction

The Audit Process

Audit – The Audit Components

Summary

Audit Management - Content

Page 55: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Audit Management - The Added Value “Audit management with SAP supports you in continuously improving your services, systems, processes, and products. It helps you to achieve your goals more efficiently.”

Continuous improvement Greater effectiveness Benchmarking Best Practices – company-wide Easy to learn and use Multi-lingual Flexible – supports various (quality) requirements Monitor pending actions

Page 56: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Availability Delivered in 3rd Quarter of 2001

Stand-alone functionality –easy to implement (going live within 4 weeks...)

Page 57: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

ACL for Windows memiliki utility konversi yang memungkinakan proses transformasi ke data berformat ACL ( .acl/.fil)

Utility untuk mentransformasi tersebut disebut dengan:

IFD(Input File Definition)

Transformation Delimited Data File

57

Page 58: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Input File DefinitionIFD adalah:Menu yang digunakan untuk menggambarkan struktur

dan isi dari sebuah file data.

ACl menggunakan IFD untuk membaca data di dalam file tanpa merubah file data yang asli.

Menu IFD muncul otomatis ketika membuka project baru

Page 59: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

MENU IFD

Page 60: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

JENIS DATAJenis Data File yang dapat dibaca ACL:

1. Flat Sequential2. DBASE (ekstensi DBF)3. Text (extension TXT)4. Delimited5. Print6. ODBC7. Tape

Page 61: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

DELIMITED FILE

Banyak file data berisi field yang tidak memiliki posisi tetap dalam suatu record. Di file delimited field dipisahkan oleh sebuah karakter pemisah field yang dinamakan delimited files. ACL mendeteksi dan kemudian mengkonversi delimited files.

Page 62: Information System/Information Technology Management Pertemuan 09-10

Bina Nusantara

Contoh Delimited Fule


Recommended