General 3 Use 3 Application example 3
Description 3
Warning 3
Warranty 3 Structure of the stratified charging station 4
Technical Data 5
Installation and Commissioning 6 Installation 6 Positioning 6 Wall mounting 6 Drilling plan 7 Buffer mounting 8 Hydraulic connections 9 Electrical connections 9 Commissioning 9 Fillingandflushingofcollectorcircuit 10
Regulations 11
Pump characteristic lines 11
InstallatIon and operatIng manual Stratified Charging Station
3Typesetting, printing errors and technical modifications reserved
general
Beforeyouinstallyournewstratifiedchargingstation,pleasereadallchaptersthoroughlyandpayspecialattentiontowar-nings provided in chapter "Warning". Incorrect handling can result in damage to the installation.
Use
TheSL50Estratifiedchargingstationenablestheloadingofabuffertankdependingonthetemperature.Stratifiedlayerloadingisspeedregulated,energyefficientandsuitableforlargebuffertanks.
application example
S3
S1
S5
S7Speicher 1
V1
(P2)(P1)
R4
R3R1
S2
S11 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
S2 S3 S4 S5 S6 S7 S8
R4
R5
IP20
R5 N
R1-R4
100 ... 240 V~50-60 Hz
T4A
1 (1) A (100 ... 240) V~4 (1) A 240 V~4 (1) A 24V
R5
R3
R2
R1 L' L
Temp. Sensor
RPD
N
Isolate mains before removing cover!Vor Öffnen Gerät spannungslos schalten!
Use ground common terminal blockMasse-Sammelklemme benutzen
Use neutral conductor common terminal blockNeutralleiter-Sammelklemme benutzen!
Use PE Common terminal blockSchutzleiter-Sammelklemme benutzen
VFD
DeltaSol® BX Plus V2
KIOTO Clear Energy AGA - 9300 St. Veit a.d. Glan
S9V40
S10V40
PWMA0-10V
PWMB0-10V
PWMC0-10V
PWMD0-10V
17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32
CS10 VBus
description
TheSL50Estratifiedchargingstationisusedforconnectingasolarcollectorsystemofupto50m²toabuffertank.Thesolarheatfromthecollectorsystemistransferredtothebuffersystemwithhighly-efficientheatexchangers.Thereby,itprovidesanintelligentcontrolsystem,dependentonsunlight,foroptimuminteractionbetweenthesolarandbufferloadingpumpandguaranteeshighheattransfercapacity.Thestationisspeedregulatedfromthebuffersideanddependentonthetemperatureoftherespectivetanktemperaturezone.
Warning
• Installationandoperationshouldbeexecutedinaccordancewiththelocallyapplicablespecificationsandstandardpractices.• Onlyqualifiedtechnicalpersonnelmaycarryoutinstallation,maintenanceandcleaningofthelayerloadingstation.• Unauthorisedmodificationsorchangesarenotpermittedforsafetyreasonsandwillinevitablyleadtothevoidingofthe
warranty for the machine.• Theoperatingpressuresprovidedmaynotbeexceeded!• Ifanyerrorsoccur–nomatterofwhattype–pleasecontactyourinstaller.Pleasedonotcarryoutanyrepairsyourself,
sincethesearenotpermittedbylawandyoucanexposeyourselftohazardsasaresult.
Warranty
The manufacturer provides a warranty of 2 years from the date of delivery on the supplied products and components.Unauthorisedmodificationsorchangesarenotpermittedforsafetyreasonsandwillinevitablyleadtothevoidingofthewarrantyforthemachine.
Forfurtherinformationseewww.kiotosolar.com
4 Typesetting, printing errors and technical modifications reserved
3
7
5
8
9
4
1
2
6
F G E
D
CABH
10
11
12
13
14
1 Temperaturesensorbufferflow2 Actuator (electrical)3 Plate heat exchanger4 Resetvalvebuffercircuit5 High-efficiencypumpbuffercircuit6 Flowmeterbuffercircuit(electronic)7 Pressurereliefvalve6bar8 Resetvalvesolarcircuit,returnflow9 Manometer10 High-efficientpumpsolarcircuit11 Flow meter solar circuit (mechanical)12 Solar vent13 Valvesolarflow14 TemperaturesensorsolarflowlineConnectionsA KFEvalveAfillingnozzlesolarB KFEvalveBdrainingnozzlesolarC Buffer returnD BufferflowlinecentreE BufferflowlinetopF SolarflowlineG Solar return lineH Expansiontank
Structure of the stratified charging station
Duetotechnicaladvancements,wereservetherighttomakeconstructionalchangesonourproducts.Eachofthesechangesaretakenintoconsiderationintheoperatingmanualbyreplacingtherespectivepages.Thestationappearancemaysometimesvaryfromtheillustration!
InstallatIon and operatIng manual Stratified Charging Station
5Typesetting, printing errors and technical modifications reserved
technical data
Stratified charging Station SL 50 eWidth x Height x Depth [mm] 496 x 930 x 325Cover ePP blackSolar piping [mm] Copper pipe - Ø 22 x 0,8Buffer piping [mm] Metal hose stainless steel 1.4404 - Ø 26,2 x 0,18Weight [kg] 25ConnectionsAKFEvalvefillingnozzle G ¾" AGBKFEvalvepurgingnozzle G ¾" AGCBufferreturnlinecoldballvalve G1" AGDBufferinflowlinewarmballvalve G1" AGEBufferinflowlinehotballvalve G1" AGFSolarinflowline G1" AGG Solar return line G1" AGHExpansiontank G¾" AGMaximum operating pressureCollectorcircuit[bar] max. 6Buffercircuit[bar] max. 3Solar pump Yonos Para hU 25/7.0Nominalvoltage[VAC/Hz] 230 / 50Nominaloutput[W] 3 - 45max.deliveryheight[m] max. 7Buffer charging pump Yonos Para hU 25/7.0Nominalvoltage[V/Hz] 230 / 50Nominaloutput[W] 3 - 45max.deliveryheight[m] max. 7Plate heat exchanger (glycol/water)Power[kW] 26Inlettemperature[°C](glycol/water) 60 / 29Outlettemperature[°C](glycol/water) 35 / 54Flowrateamount[l/h] 1000
6 Typesetting, printing errors and technical modifications reserved
Installation and Commissioning
installation
Theerectionandinstallationmustbedonebyanapprovedtechnicalfacility.Thisfacilitywillalsotakeontheresponsibilityforcorrectinstallationandcommissioning.Adry,frost-freeroomthatprovidessufficientspaceformaintenanceworkis requried as the installation site.Thestratifiedchargingstationmustbeinstalledsothatitisprotectedfromsplashingwaterandmayonlyberunatroomtemperaturesbelow40℃.
Positioning
Itisrecommendedthatinstallationtakeplacenearthebuffertankinordertopreventheatloss.Thisshouldtakeplaceonalevelandstructurallysuitablesurfacethatisprovidedforlevelingadjustablestandfeet.
Pulling too hard on the installation screws damages the isolation.Wall installation
Wallinstallationtakesplaceasfollowswiththeincludedattachmentmaterial(3xM8stairbolts,M8nutsand3M8washers):
• Drill at least 8 cm deep on the designated drill points with a ø 10 mm drill according to the drillling template included.• Afterwards,insertthewallplugintotheholeandscrewthestairboltsintothewalluntilthewallplugthreadsarenolongervisible.• Now,hangthestratifiedchargingstationonthethreadedstudsandinstallitwithnutsandwashers.
InstallatIon and operatIng manual Stratified Charging Station
7Typesetting, printing errors and technical modifications reserved
drillling template for wall installation
496
930
154
745
591
12035,7
31,8
8 Typesetting, printing errors and technical modifications reserved
tank installation
Thebuffersensorinthebufferterminalblockismountedbeforethestationisassembled.
• Step 1Beforemountungthestratifiedstationthebuffersensorshavetobemounted.
• Step 2Installandtightenthe3threadedboltsandthe3corrugatedtubeincl.sealsontotherespectivetankconnectors.
• Step 3Slidethestratifiedchargingstationoverthecorrugatedtubesandthethreadedboltsandfastenthestationtothetankusing washers and nuts.
• Step 4Tightenthe3corrugatedtubestothestationwiththeseals.
max. 70 Nm
max. 10 Nm
max. 70 Nm
Dichtung immer zwischenKugelhahn und Ringwellschlauch
1
3
2
4
Schnitt C-CM1 : 6
C
S7
S2
TRENNBLECH
InstallatIon and operatIng manual Stratified Charging Station
9Typesetting, printing errors and technical modifications reserved
Hydraulic connection
Lineconnectiontakesplaceaccordingtotheinstallationlayoutinthismanual,(see"Applicationexample")
• Thelinepathstothebuffershouldbeasshortaspossible!• We recommend steel or copper piping as line material.
Theinstallationorderhastobefollowedforalllinesandfittingsinordertopreventelectro-chemicalcorrosion.• Installationofagravitationalheatingsystemisnotpermitted!• Connectionofthecollectioncircuitexpansiontankmusttakeplaceasadirectconnection.• Installationofshut-offvalves(exceptforsuitablemaintenancemoduleslikecapvalves)isnotpermitted!• Connectionshavetobetightenedonlyafterthetubinghasbeensealed.Tighteningtorqueand/orforceeffectson
preinstalledstationcomponentsandjointsmustbeavoided!
Additionally,checkallflatsealingscrewsforproperswivelnuttighteningtorque(screwscanbecomelooseduringtransport!).
electrical connections
Internalwiringofelectricalequipmentisconductedonsite.Connectiontothepowersupply(230V/AC,50Hz)takesplacebymeansofthepreclampedsupplycable.Thebuffersensorsincludedareinstalledontherespectivebuffertankmeteringpointsandconnectedtotheaffectedcontrolclampsaswellasthecollectorsensorincludedinthescopeofdelivery.Detailledinformationabouttheintegratedcontrolinthestationcanbefoundinthecontrollermanual.
Workonlivestationpartsmustonlytakeplaceunderconsiderationfortherespectiveguidelinesofthepowercompanyandvalid,correspondingstandards.
Commissioning
Onlyusewaterpreparedaccordingtothestandards(e.g.ÖNORMH5195-1:2010).Alllinesmustbediffusionresistant.
Fillingandcommissioningmustbedonebyanapprovedtechnicalfacilityandconcessionarypersonnel.Here,thefunctionandtightnessagainstleaksoftheentireplantincludingthepartsassembledinthemanufacturingworksshouldbechecked.Safetyvalvefunctionalityhastobecheckedatregularintervals.Annualmaintenancebyanapprovedtechnicalfacilityisrecommended.Slowlyopeningtheballvalveonthestationinletsandoutletspreventspressureblowsduringcleaningmode.Usethecleaningconnectionsprovidedforfillingthecollectorcircuit.See"Stucture".
Thefillingandrinsingmustbecarriedoutuntilitisensuredthatthesystemiscompletelyde-aerated.Flownoisesduringbuf-ferpumpoperationindicatethatthereisstillairinthemachinethatcanberemovedviathepumpandmanualprimer.
Closethecollectorreturnlineattheendofthefillingprocessandadjustthesystempressuretoapprox.3bar(thisappliestoexpansiontankswithasystempressureof2.5bar,thestaticheightofthemachinemustbetakenintoconsiderationaswell).
Beforeopeningthecontrolboxhousing,ensurethatitisdisconnectedfromthepowersupply!
Donotfillindirectsunlight,becausethiscanleadtosteamhammering!
10 Typesetting, printing errors and technical modifications reserved
Cleaning and filling the collector circuit
Thefillingandrinsingmustbecarriedoutuntilitisensuredthatthesystemiscompletelyde-aerated.Flownoisesduringcollectorpumpoperationindicatethatthereisstillairinthemachinethatcanberemovedviathemanualprimer
Beforestartingwiththecleaningand/orfillingprocess,pleasereadcarefullythroughthefollowingpointsthoroughly!
Solar-side (collector side)
• Onlyglycolwatermixtures(frost-resistanttoatleast-25°)maybeusedforfillingthesolarcircuit• Beforestartingwithcleaningandfilling,ensurethatallconnections(solarforward/returnflows,etc.)
are provided with correct seals and are tightly connected.• ConnectthefillpumpforwardflowtoKFEvalveA(fillingnozzle).• ConnectthefillpumpreturnflowtoKFEvalveB(purgingnozzle).• First,openKFEvalveA(handleinflowdirection).• Now,openKFEvalveB(handleinflowdirection).• Startthecleaningprocessofthesolarcircuitbyswitchingonthefillingpump.• Letthepumprununtiltheglycolwatermixtureflowsbackintothetankwithoutbubbles.• CloseKFEvalveB(handleagainstflowdirection).• Pay attention to the gauge.• Whenthegaugehasreachedthedesiredoperatingpressure,closeKFEvalveA(handleagainstflowdirection).• Now,thepumpcanbeswitchedoffandthefillingpumpconnectionscanbedisconnectedfromtheKFEvalvesAandB.• Thesolarcircuitisnowcompletelyfilledandreadyforuse.• Shouldairnoisebediscoveredinthecircuitduringoperation,thenbeginwithpoint1again.
Buffer-side
• OnlyheatingwatermustbeusedaccordingtonormÖNORMH5195-1:2010forfillingthebuffercircuitandbuffertank.• Beforestartingtoconnecttheconnectionlinesfromthestationtothebuffertank,
closeballvalvesC,DandE(handleagainstflowdirection)onthestation• Beforestartingthefilling,makecertainthatallconnectionsareprovidedwithcorrectsealsandaretight.• Now,openallvalvestotheconnectionlinesonthebuffertank.• Now,openvalveC,thenvalveDandfinallyvalveEonthestation.• Ifnowaternoiseisheard,switchthebuffercircuitpumponmanually.• Letthisprocessrunforseveralminutes.Afterwards,switchthepumpoff.• Ventthebuffertankandtop-offwithheaterwaterifnecessary.• Thebuffercircuitisnowcompletelyfilledandreadyforuse.
InstallatIon and operatIng manual Stratified Charging Station
11Typesetting, printing errors and technical modifications reserved
Pump characteristic lines
regulations
Thestationistobeconnectedwithconsiderationtothefollowingnorms,country-specificguidelinesand local water company regulations.
• DINEN12828 Heatingsystemsinbuildings• DIN1988 Technicalrulesfordrinkingwatersupplyinstallation• DIN 4708 Central heat water installations• DIN 4751 Heating system safety equipment• DIN4753 Waterheaterandwaterheatingsystemfordrinkingwaterandservicewater• DIN 4757 Solar heating and solar-thermal systems• DIN 18380 Central heating systems and service water systems• DIN18381 Gas,wateranddrainageinstallationworks• DIN18382 Electricalcableandwiringsystemsinbuildings• DIN EN 12975 Thermal solar systems and their components• VDE 0100 Setting up electrical operating equipment• VDE 0185 General notes for setting up lightning protection systems• VDE 0190 Main potential equalisation of electrical systems• ÖNORMENISO9488 Solarenergy–Vocabulary(ISO9488:1999)• ÖNORM ENV 12977-1 Thermal solar system and their components – customised systems• ÖNORMM7700 Solarenergy-termswithdefinitions• ÖNORM M7701 Solar engineering systems - approximation methods for measuring • flatcollectorsinhotwatertreatmentsystems• ÖNORM M7731 Solar heating plants for heating water – requirements and tests
12 Typesetting, printing errors and technical modifications reserved
Contact:Art.nr:20000391