AEL343C
AEL645B
InstallationNGEL0146
To install SMJ, tighten bolts until orange “fulltight” mark appearsand then retighten to specified torque as required.
: 3 - 5 N·m (0.3 - 0.5 kg-m, 26 - 43 in-lb)CAUTION:Do not overtighten bolts, otherwise, they may be damaged.
SUPER MULTIPLE JUNCTION (SMJ)Installation
Terminal ArrangementNGEL0147
AEL646B
SUPER MULTIPLE JUNCTION (SMJ)Terminal Arrangement
Terminal ArrangementNGEL0148
AEL520C
FUSE BLOCK — JUNCTION BOX (J/B)Terminal Arrangement
Terminal ArrangementNGEL0149
AEL521C
FUSE AND FUSIBLE LINK BOXTerminal Arrangement
Terminal ArrangementNGEL0198
AEL523C
JOINT CONNECTORTerminal Arrangement
Terminal ArrangementNGEL0150
AEL522C
a
o
ELECTRICAL UNITSTerminal Arrangement
NOTES