    OFFSHORE

    By

    Raj KumarSr. Manager

    Delivering excellence through people

    Offshore Pipeline Systems

    Slide Number - 1 of 70

  • 7/28/2019 Installation Pipelaying Offshore

    2/71

    ENGINEERSENGINEERS

    EPC and Total SolutionsEPC and Total Solutions

    Consultancy OrganizationConsultancy Organization

    Petroleum Refineries

    Petrochemicals

    Offshore Platforms

    Gas Processin

    Metallurgy

    Infrastructure

    Offshore Pipeline Systems

    Slide Number - 2 of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    3/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    -

    35%

    Pipelines 32% 25%30%

    Pipelines

    oa an ers

    Rail Tankers 26% 10%

    15%Road Tankers

    Rail Tankers

    Water Carriers

    Water Carriers 10%0%

    5%

    % Share

    Offshore Pipeline Systems

    Slide Number - 3 of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    4/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    ComponentsComponents

    Pipeline ProjectPipeline Project

    ,,CommissioningCommissioning

    VideoVideo

    Offshore Pipeline Systems

    Slide Number - 4 of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    5/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    SaferSaferWhy pipelines?

    Environment friendlyEnvironment friendly

    Least ener re uirementLeast ener re uirement

    Lowest maintenance costsLowest maintenance costs

    Minimal impact on land use patternMinimal impact on land use pattern

    Negligible loss of product in transitNegligible loss of product in transit

    High reliabilityHigh reliability

    Offshore Pipeline Systems

    Slide Number - 5 of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    6/71

  • 7/28/2019 Installation Pipelaying Offshore

    7/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Submarine i elinesSubmarine i elinesOnshore i elinesOnshore i elines

    Trunk linesTrunk lines

    Cross Country TrunkCross Country Trunk

    Infield pipelinesInfield pipelinesp pe nesp pe nes

    Spur LinesSpur Lines--

    Offshore terminals (SPM andOffshore terminals (SPM andGathering & Distr ibutionGathering & Distr ibutionlineslines

    Effluent outfallsEffluent outfalls

    Offshore Pipeline Systems

    Slide Number - 7 of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    8/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    a or s ore e s o n a

    SouthSouth BassienBassien, Tapti, Tapti

    ,, ,, ,,

    RavvaRavva

    Cauvery BasinCauvery Basin

    KG BasinKG Basin

    DhirubhaiDhirubhai AmbaniAmbani FieldField

    Offshore Pipeline Systems

    Slide Number - 8 of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    9/71

    OFFSHORE FIELDS OF INDIA (West Coast)

    HAZIRA

    BOMBAY HIGH FIELD PANNA FIELD

    BASSEIN FIELD

    URANNEELAM FIELD

    Offshore Pipeline Systems

    Slide Number - 9 of 70Engineers India Ltd Delivering excellence through peopleHEERA FIELD

  • 7/28/2019 Installation Pipelaying Offshore

    10/71

    OFFSHORE FIELDS OF INDIA (East Coast)

    DA FIELDDA FIELD

    KG BASIN

    Offshore Pipeline Systems

    Slide Number - 10of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    11/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Well HeadPlatform

    LivingQuarters

    an e

    Offloading

    Sub SeaOnshore Gas

    Offshore Pipeline Systems

    Slide Number - 11of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    12/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Offshore Pipeline Systems

    Slide Number - 12of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    13/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Platform

    Riser

    J acket

    Pipeline Riseren

    Offshore Pipeline Systems

    Slide Number - 13of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    14/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    NLM11

    NLM10

    NLM8NLM9

    N

    NLM7

    NLM5

    NLM4

    NLWSBM

    NLF

    NLP

    NLM3

    NLM1WN1

    WN2NLM2

    W I LINESW F LINES

    LEGEND

    HUT PIPELINES

    HOL

    HGL

    CRUDE OIL LINESPLATFORM

    SBM

    EXISTING PIPELINES

    Offshore Pipeline Systems

    Slide Number - 14of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    15/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Loading/UnloadingLoading/Unloading JettiesJetties

    SingleSingle Point Mooring Systems(SPMPoint Mooring Systems(SPM))

    Offshore Pipeline Systems

    Slide Number - 15of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    16/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Offshore Pipeline Systems

    Slide Number - 16of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    17/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Offshore Pipeline Systems

    Slide Number - 17of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    18/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Offshore Pipeline Systems

    Slide Number - 18of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    19/71

    SPM-Hose Configurations

    Offshore Pipeline Systems

    Slide Number - 19of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    20/71

    Hoses

    1.1. First/ Second OffFirst/ Second Off--buoy hosebuoy hose2.2. Mainline hoseMainline hose 1.1. End connectionEnd connection

    3.3. Taper hoseTaper hose4.4. Tail hoseTail hose5.5. Rail hoseRail hose

    .. an ne osean ne ose

    Offshore Pipeline Systems

    Slide Number - 20of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    21/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Crude OilCrude Oil

    Well FluidsWell Fluids

    atura asatura as

    nec on a enec on a e

    Offshore Pipeline Systems

    Slide Number - 21of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    22/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    zz Lower DeckLower Deck

    zz Cellar DeckCellar Deck

    zz Top DeckTop Deck

    zz HeliHeli DeckDeck

    Offshore Pipeline Systems

    Slide Number - 22of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    23/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Stages of an Offshore Pipeline Project

    Offshore Pipeline Systems

    Slide Number - 23of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    24/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    DnV OS-F101 Det Norske Veritas,Rules for Submarine Pi eline S stems

    ASME B 31.8 Gas Transmission and Distribut ion Piping

    SystemsASME B 31.4 Liquid Transportation Systems for

    Hydrocarbons, LPG and Anhydrous

    API 1104 Standard for Welding Pipelines andRelated Facil ities

    API 1110 Pressure Testing of Liquid PetroleumPi elines

    NACE MR 0175 Material Requirements Sulphide StressCracking Resistant Materials for Oil FieldEquipment

    ns u e o e ro eum Pipeline Safety Code

    Offshore Pipeline Systems

    Slide Number - 24of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    25/71

  • 7/28/2019 Installation Pipelaying Offshore

    26/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Establish System RequirementEstablish System Requirement Evaluate Constraints on System DesignEvaluate Constraints on System Design

    Identify Interface With Other SystemsIdentify Interface With Other Systems

    Develop Design Data RequirementsDevelop Design Data Requirements Assess Construction MethodologyAssess Construction Methodology

    Finalize the ConceptFinalize the Concept

    Offshore Pipeline Systems

    Slide Number - 26of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    27/71

  • 7/28/2019 Installation Pipelaying Offshore

    28/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    FinaliseFinalise Process Scheme & EquipmentsProcess Scheme & Equipments

    EnvironmentalEnvironmental & Process Data Review& Process Data Review PipelinePipeline Routing & Size OptimizationRouting & Size Optimization

    Establish Requirements forEstablish Requirements for

    zz Surveys and InvestigationsSurveys and Investigationszz Material of ConstructionMaterial of Construction

    zz Preliminary AnalysisPreliminary Analysis

    ,,

    Develop Implementation ScheduleDevelop Implementation Schedule

    Offshore Pipeline Systems

    Slide Number - 28of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    29/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    nv ronmen a arame er an o a anv ronmen a arame er an o a a

    Pipeline StabilityPipeline Stability

    Shore ApproachesShore Approaches

    Safety of Existing FacilitiesSafety of Existing Facilities

    Offshore Pipeline Systems

    Slide Number - 29of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    30/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Route Engineering & SurveysRoute Engineering & Surveys

    Engineering analysis and CalculationsEngineering analysis and Calculations

    Specification and Job StandardsSpecification and Job Standards

    Engineering for ProcurementEngineering for Procurement

    Installation analysis and ProceduresInstallation analysis and Procedures

    Offshore Pipeline Systems

    Slide Number - 30of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    31/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Design Codes and StandardsDesign Codes and Standards

    Operation and maintenance philosophyOperation and maintenance philosophy

    Environmental CriteriaEnvironmental Criteria

    zz InstallationInstallation

    zz OperationOperation

    CriteriaCriteria for engineering analysisfor engineering analysis

    Offshore Pipeline Systems

    Slide Number - 31of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    32/71

  • 7/28/2019 Installation Pipelaying Offshore

    33/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    zz Hoop StressHoop Stresszz BuckleBuckle InitialtionInitialtionzz uc e ropaga onuc e ropaga onzz Collapse BuckingCollapse Bucking

    zz Local BucklingLocal Buckling Pipeline Stress ChecksPipeline Stress Checks

    zz Hoop StressHoop Stress

    Analysis ToolsAnalysis Toolszz PC Based Software PC Based Software PipecalcPipecalc

    Offshore Pipeline Systems

    Slide Number - 33of 70Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    34/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    or s ore pe nes

    t = PD + corrosion allowance

    2.SMYS.a

    where

    .

    S is the specified minimum yield strength

    D is the pipe outside diameter in inches.

    t is the nominal wall thickness in inches.a is the design factor (0.72 for pipeline and 0.5 for riser)

    Offshore Pipeline Systems

    Slide Number - 34of 70Engineers India LtdDelivering excellence through people

    O S O S S SO S O S S S

  • 7/28/2019 Installation Pipelaying Offshore

    35/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Design Condition StressClassification

    Allowable Stress (% SMYS)

    Zone 1 Pi eline Zone 2 Riser

    Installation : 1 yearEnvironmental Equivalent Stress 85 85

    Functional Hoop Stress

    Equivalent Stress

    72

    72

    50

    50Functional + 100year EnvironmentalLoading

    Hoop Stress

    Equivalent Stress

    72

    85

    50

    67

    Hydrotest + 1 yearEnvironmentalLoading

    Hoop Stress

    Equivalent Stress

    90

    90

    90

    90

    Offshore Pipeline Systems

    Slide Number - 35of 70Engineers India LtdDelivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    36/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Seamless u to 16Seamless u to 16

    LSAW 18 and aboveLSAW 18 and above

    Offshore Pipeline Systems

    Slide Number - 36of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    37/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Pipeline ExpansionPipeline Expansion

    RiserRiser

    Anal sis ToolsAnal sis Toolszz PC Based Software PC Based Software PipecalcPipecalc

    Offshore Pipeline Systems

    Slide Number - 37of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    38/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    -

    zz Coal Tar EnamelCoal Tar Enamelzz

    Selection CriteriaSelection Criteria

    zz Service ConditionsService Conditionszz Performance RecordPerformance Record

    zz Ease of RepairEase of Repair

    zz Cost EffectivenessCost Effectivenesszz Compatibility with Concrete CoatingCompatibility with Concrete Coating

    Offshore Pipeline Systems

    Slide Number - 38of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    39/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    TypeType

    zz zz Buried Pipelines (Single / Multiple)Buried Pipelines (Single / Multiple)

    Offshore Pipeline Systems

    Slide Number - 39of 70

    Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    40/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    41/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    PIPECALC Sub sea Pipeline Calculations

    J P Kenny

    PRISE Riser Analysis J P Kenny

    gnmen ee enera on raw ngManagement J P Kenny

    OFFPIPE Pipeline/Riser Installation Analysis Robert J. Malahy Jr.SPAN Riser Span Evaluation - EIL

    -

    CAESER II Piping Stress Analysis - COADE

    Offshore Pipeline Systems

    Slide Number - 41of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    42/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Design Reports Drawings Procurement/ Tenders

    Design Basis Field Layout Material

    SpecificationsRoute Selection Alignment Sheets Material Requisi tions

    Stabil ity Crossing Details Vendor Data Review

    Pipeline/Riser Spans Riser Location Survey Tenders

    Crossings Riser make-up Installation BidPackage

    Risers/Flexibi lity Clamp Details ContractorsInstallation Procedure

    ev ew

    In-situ stress analysis PLEM/ Lateral/ SpoolDetails

    Cathodic Protection

    Offshore Pipeline Systems

    Slide Number - 42of 70

    Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    43/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    44/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    RisersRisers

    Main PipelineMain Pipeline

    Pipeline End Manifolds (PLEMs)Pipeline End Manifolds (PLEMs)

    Electrical & Instrumentation SystemElectrical & Instrumentation System

    Offshore Pipeline Systems

    Slide Number - 44of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    45/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    SBHL-3BPB

    PLATFORMPOINT

    42" SBHT PIPELINE

    30"24" 24" 24" 24" 24" 24"

    SBHL-1 SBHL-2

    SBHL-4

    SBHL-5 SBHL-6 SBHL-7

    "PLATFORM PLEM

    SV-1 SV-2 SV-3

    HAZIRA

    RECIEVING

    TERMINAL

    LANDFALL

    POINT

    14" 14" 14" 14"14"14"

    HYDRAULIC ACTUATEDBALL VALVE

    GAS ACTUATED BALLVALVE

    GAS ACTUATED PLUG

    Offshore Pipeline Systems

    Slide Number - 45of 70

    Engineers India Ltd Delivering excellence through people

    MINDHOLA

    RIVER

    TAPI

    RIVEROFFSHORE

    SECTION

    ONSHORE

    SECTION

    CHECK VALVE

    INSULATING JOINT

    VALVE

    Alignment Sheet

  • 7/28/2019 Installation Pipelaying Offshore

    46/71

    Sample Alignment Sheets (Offshore)Sample Alignment Sheets (Offshore)g e t S eet

    I

    Offshore Pipeline Systems

    Slide Number - 46of 70

    Engineers India Ltd Delivering excellence through people

    Sample Riser DrawingsSample Riser Drawings

  • 7/28/2019 Installation Pipelaying Offshore

    47/71

    Sample Riser DrawingsSample Riser Drawings(Riser GAD)(Riser GAD)

    Offshore Pipeline Systems

    Slide Number - 47of 70

    Engineers India Ltd Delivering excellence through people

    Riser Drgs.

    Sample Riser DrawingsSample Riser Drawings

  • 7/28/2019 Installation Pipelaying Offshore

    48/71

    Sample Riser DrawingsSample Riser Drawings(Riser Approach Drawing)(Riser Approach Drawing)

    Offshore Pipeline Systems

    Slide Number - 48of 70

    Engineers India Ltd Delivering excellence through people

    Riser Drgs.

  • 7/28/2019 Installation Pipelaying Offshore

    49/71

    OFFSHORE PIPELINE SYSTEMOFFSHORE PIPELINE SYSTEM

    Delivering excellence through people

    Offshore Pipeline Systems

    Slide Number - 49of 70

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    50/71

    ,

    CoatingCoatingzz Welding and Joint CoatingWelding and Joint Coating

    zz Pipeline LayingPipeline Laying

    zz SpecialtySpecialty Items InstallationItems Installation

    zz Riser InstallationRiser Installation

    zz Pipeline Crossing InstallationPipeline Crossing Installation

    , ,, ,

    and Commissioningand Commissioning

    Offshore Pipeline Systems

    Slide Number - 50of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    51/71

    Installation Techni ues

    Conventional Installation bConventional Installation bLaybargeLaybarge

    Installation by J LayInstallation by J Lay

    Tow TechniquesTow Techniques

    Installation byInstallation by ReelshipReelship

    Offshore Pipeline Systems

    Slide Number - 51of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    52/71

    Pi ela Bar e

    Offshore Pipeline Systems

    Slide Number - 52of 70

    Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    53/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    54/71

    Pipeline laying operation done by Lay Barge by SPipeline laying operation done by Lay Barge by S--laylaymethodmethod

    PipelayPipelayAnalysis done using OFFPIPE software for PipeAnalysis done using OFFPIPE software for PipeStress Control at different de ths and environmentalStress Control at different de ths and environmentalconditionsconditions

    Offshore Pipeline Systems

    Slide Number - 54of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    55/71

    La Vessel Re uirements

    Material HandlingMaterial Handling

    ConveyorsConveyors Field J oint CoatingField J oint Coating

    Pi e DavitsPi e Davits LineLine--up Stationup Station

    Welding StationsWelding Stations

    Pipe Roller SupportsPipe Roller Supports

    Stin er S stemStin er S stem PipePipe TensionersTensioners

    A/R WinchA/R Winch Mooring SystemMooring System

    XX--Ray InspectionRay Inspection

    Offshore Pipeline Systems

    Slide Number - 55of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    56/71

    Pi e Tensioner

    Offshore Pipeline Systems

    Slide Number - 56of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    57/71

    La Vessel Re uirements - Stin er

    Offshore Pipeline Systems

    Slide Number - 57of 70

    Engineers India Ltd Delivering excellence through people

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

  • 7/28/2019 Installation Pipelaying Offshore

    58/71

    Installation Pi e La Procedures

    ContinuousContinuous PipelayPipelay

    PipelayPipelay DownDown

    (Abandonment)(Abandonment)

    Riser InstallationRiser Installation

    Offshore Pipeline Systems

    Slide Number - 58of 70

    Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    59/71

  • 7/28/2019 Installation Pipelaying Offshore

    60/71

  • 7/28/2019 Installation Pipelaying Offshore

    61/71

    OFFSHORE PIPELINE SYSTEMSOFFSHORE PIPELINE SYSTEMS

    Pi li P t ti b T hi

  • 7/28/2019 Installation Pipelaying Offshore

    62/71

    Pi eline Protection b Trenchin

    To Enhance/Improve StabilityTo Enhance/Improve Stability

    OperationsOperations

    To Avoid Span CorrectionTo Avoid Span Correction

    Offshore Pipeline Systems

    Slide Number - 62of 70

    Engineers India Ltd Delivering excellence through people

    Lay barge VMGL Regina 250Lay barge VMGL Regina 250

  • 7/28/2019 Installation Pipelaying Offshore

    63/71

    Offshore Pipeline Systems

    Slide Number - 63of 70

    Engineers India Ltd Delivering excellence through people

    StingerStinger

  • 7/28/2019 Installation Pipelaying Offshore

    64/71

    Offshore Pipeline Systems

    Slide Number - 64of 70

    Engineers India Ltd Delivering excellence through people

    Pipeline LayingPipeline Laying

  • 7/28/2019 Installation Pipelaying Offshore

    65/71

    Offshore Pipeline Systems

    Slide Number - 65of 70

    Engineers India Ltd Delivering excellence through people

    Field Joint CoatingField Joint Coating

  • 7/28/2019 Installation Pipelaying Offshore

    66/71

    Offshore Pipeline Systems

    Slide Number - 66of 70

    Engineers India Ltd Delivering excellence through people

    FitFit up for installationup for installation

  • 7/28/2019 Installation Pipelaying Offshore

    67/71

    Offshore Pipeline Systems

    Slide Number - 67of 70

    Engineers India Ltd Delivering excellence through people

    Lifting operations in Lay bargeLifting operations in Lay barge

  • 7/28/2019 Installation Pipelaying Offshore

    68/71

    Offshore Pipeline Systems

    Slide Number - 68of 70

    Engineers India Ltd Delivering excellence through people

    Pipeline Laying VideoPipeline Laying Video

  • 7/28/2019 Installation Pipelaying Offshore

    69/71

    Offshore Pipeline Systems

    Slide Number - 69of 70

    Engineers India Ltd Delivering excellence through people

    LSAW PIPE MANUFACTURINGLSAW PIPE MANUFACTURING

  • 7/28/2019 Installation Pipelaying Offshore

    70/71

    Offshore Pipeline Systems

    Slide Number - 70of 70

    Engineers India Ltd Delivering excellence through people

  • 7/28/2019 Installation Pipelaying Offshore

    71/71

    Thank You

    www.engineersindia.com

    Offshore Pipeline Systems

    Slide Number - 71of 70

    Engineers India Ltd Delivering excellence through people


Recommended