Date post: | 04-Apr-2018 |
Category: |
Documents |
Upload: | oswar-mungkasa |
View: | 214 times |
Download: | 0 times |
of 41
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
1/41
In t egrat ed Pro-poor Wat er and
Wastew at er Managem ent in Sm al l Tow nsPro jec t Im p lem enta t ion in Serang
Dis t r i c t , Bant en Province , Indones ia
1
Presented atthe ESCAP Workshop on knowledge transfer and
capacity building for water and sanitation services in
Asia and the Pacific
Bangkok, 17-19 February 2009
Urban and Regional Development Institute Serang District Authority
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
2/41
Background
ESCAP is implementing the project Integrated Pro-PoorWater and Wastewater Management in Small Towns.
The overall objective of the project is to assist localgovernments in small towns in developing andimplementing integrated water and wastewatermanagement systems.
The project is being implemented on closely interlinkedregional and country-level tracks.
Under the country-level track, ESCAP is assisting localgovernment offices in Serang District and City in Indonesiato introduce pro-poor and integrated water and wastewatersystems in partnership with the Urban and RegionalDevelopment Institute (URDI).
2
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
3/41
Countryleveltrack:Indonesia
The intervention in Indonesia is built on the existing District Working Group onWater Supply and Environmental Sanitation (WSES) or Pokja AMPL led bythe State Ministry of National Development Planning (BAPPENAS) under theIndonesia Water Supply And Sanitation Policy Formulation and Action Planning
(WASPOLA) initiative.
In June 2003, six national ministries signed the Community-Based WaterSupply and Environmental Sanitation National Policy No. 23/2003. This policy
was prepared in stages by a Water Supply and Environmental Sanitation(WSES) Working Group led by the National Development Planning Agency(Bappenas) and involving the Ministries of Home Affairs, Settlement andRegional Infrastructure, Health and Finance.
In line with the spirit of decentralization and regional autonomy policies, theWSES Working Group accommodated inputs from local governments to finalizea policy document and to determine how a national policy could beimplemented at the regional level.
3
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
4/41
4
CommunityBasedWSESNationalPolicy
4
SustainabilitySustainability
Policy for theDevelopmentof CommunityBased WSES
EfficiencyEfficiency
11 Principles ofCommunity
BasedWSES Policy
11 Pr inc ip les of Com m uni tyBase d WSES Polic y
1. Water as an Economic Goodand Social Good
2. Informed Choice as a Basis forDemand Responsive Approach
3. Environmentally BasedDevelopment
4. Hygiene Education
5. Poverty Focus
6. Active Role of Women inDecision Making
7. Accountability in the
Development Process8. Government as Facilitator
9. Community Participation
10. Optimum Service and RightTarget
11. Application of Cost Recovery
Principles
Logical Framework
Learning from experiences in the past indicates thatWS&S system constructed are not functioningproperly, because community was not involved in
planning, construction operation and maintenanceactivity;
Effective use and sustainability of service is betterwhen the community is involved during thedevelopment phases;
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
5/41
5
WorkingGrouponWSES(PokjaAMPL)in
Serang
District
ESCAP and BAPPENAS have selected the District of Serang,Province of Banten, to implement the pilot project in Indonesia
The working group on WSES is composed of all the agencies at thedistrict level that have a role in this field. Members of working groupare including: (1) Local Development Planning Board, (2) HealthService, (3) Education Service, (4) Social Welfare, (5)Environmental Agency, (6) Public Works, (7) Water SupplyCompany (PDAM), (8) Religious Agency , (9) NGO (RekonvasiBhumi) and (10) Local University (UNTIRTA).
This working group has finalised a strategic plan (Renstra AMPL) forwater and sanitation in the district.
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
6/41
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
7/41
7
WSESDevelopmentTargetinSerangDistrict
Preparing local regulation in supporting community based watersupply and sanitation activities
Improving community awareness on the importance of communitybased water supply and sanitation
Improving the performance of behavior change on clean andhealthy life style
Improving active community participation through community andgovernment institutions
Provision and Betterment Community Based Water Supply andSanitation facilities
Improving the sustainability in managing Community Based WaterSupply and Sanitation
Improving community awareness on the importance of clean andhealthy life style.
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
8/41
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
9/41
ObjectiveandResults
Expected Results:
Result A: Serang authorities and in particular the members of the Working
Group (Pokja AMPL) enhance their knowledge of key concepts in pro-poorwater and wastewater management and strategic planning.
Result B: A detailed strategy on water and sanitation for one selectedsubdistrict of Serang is prepared by URDI in collaboration with SerangAuthorities and submitted for approval to the Working Group.
Result C: A pilot project where water and/or sanitation services aredelivered to the urban poor is implemented.
Result D: The formulation of the village strategic plan is documented and
disseminated.
The main objective is to provide technical assistance to the SerangDistrict Authorities by developing together a participatory, consensusoriented and integrated strategic plan for water and sanitation at the
village level, and to test its implementation through a pilot project.
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
10/41
10
CaseStudy:SerangDistrictandSerangCity
Situated about 70 km from Jakarta as Capital City of Indonesia Serang City is new local government authorities separated from Serang District
in year 2007
The pilot projects are located in two villages: Kampung Dermayon andSukawana
Sukawana
Dermayon
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
11/41
1111
WaterandSanitationConditionsinSerang
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
12/41
12
Socio-Economic Profiles
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
13/41
Coordination withPokja AMPL
National
NationalWorkshop
DevelopingBaseline Data andCommunity profile
ConductingFirst CommunityConsultation
ConductingSecond
CommunityConsultation
OverallProcessoftheProject
Preliminary
Discussions withPokja AMPL
Serang District
Series ofCommunity
Meeting
Feasibility Study
Meeting with Pokja
AMPL SerangDistrict
Construction ofwastewater
treatment plant
Piped waterconnection
Establishing Refillwater business
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
14/41
ProjectPreparation
Activity Description of Activity Actors Involved Outcome Challenges
Coordinationwith WorkingGroup at
National Level
City selectionDiscussion on projectapproach and
methodologyDefine the scope ofworks of the project
Pokja AMPLPusat
Waspola Project
Selected city National
Working Group
support theprojectimplementation
To find out howthe RenstraAMPL is
implemented atvillage level
PreliminaryDiscussion with
Serang DistrictAuthority
The discussion wasundertaken almost 4
months in order tointroduce the project aswell as get commitmentfrom the Authority
Pokja AMPLSerang District
Head of District(bupati)
Support fromPokja AMPL
Serang District LG budget
allocation in FY2008
How the projectresults could be
integrated tolocal annualdevelopmentplanningprocess
National
Workshop
The workshop is aimed
to enhance theknowledge of the teamon the key concepts inpro-poor waster andwastewater managementand strategic planning
Pokja AMPL
Pusat Pokja AMPL
Banten Province Pokja AMPL
Serang District Universities
NGOs
Agreed strategy
for projectimplementationplan
Two proposedproject locations
Coordination
mechanism inprojectimplementation,especially withSerang CityAuthority which
is newlyestablished
14
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
15/41
15
CommunityMappingandConsultation
15
Activity Description of Activity Actors Involved Outcome Challenges
DevelopingBaseline Dataand Community
Profile on Waterand Sanitation
Identifying issues andproblems on water andsanitation through
community participation(transect walk,interviews, discussion)
Community Local
government
officer Village officer
Communityprofile on waterand sanitation
Increasing theawareness ofcommunity on
WSES throughparticipatoryassessment
First CommunityConsultation
The first consultationwas discussed waterand sanitation issues andproblems, ideal conditionin the future, alternativesolutions and informedchoices (alternativetechnology).
Pokja AMPLSerang District
Water Company Waspola
Facilitator Head of Sub-
District Head of Village Community
Common issuesand problems onwater andsanitation
Communityexpectation andpotential on thefuture conditionsof WSES
To find outpossiblesolutions toaddress watsanissues and tofulfill communityneeds andexpectation
SecondCommunityConsultation
The second consultationwas discussed aboutstrategic action plans toaddress water andsanitation problems withconsidering local
potential and resources.
Pokja AMPLSerang District
Water Company Waspola
Facilitator Head of Village
Community
Proposed actionplans to addresswater andsanitation issues
Communityworking group
Furtherelaboration ofeach proposedaction plans andimplementationstrategy
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
16/41
16
Pilot Project Planning and Design
16
Activity Description of Activity ActorsInvolved
Outcome Challenges
CommunityMeetings
A series of meeting withcommunity was conducted toprepare pilot project
implementation strategyincluding priority location,target group, financing schemeand institutional arrangement
Community Village officer
Agreed prioritylocation
Identification of
target group Availability of land Target customer
for piped waterconnection
How to determinepriority locationand target group
for each actionplans
Mobilizingcommunitycontribution to theprojectimplementation
FeasibilityStudy onproposedaction plans
The feasibility study wasundertaken to further analyzetechnical and financial aspectsof each action plans and todetermine suitable project sites
Bali Fokus(TechnicalExpertise onWatsan)
Community Village officer
Technicalconsideration andoption choice forsanitation facility
DED model foreach option
Financial analysisfor construction
Limited space forwastewatertreatment plan
Meeting withPokja AMPLSerang District
The meeting was conductedbefore pilot projectimplementation to get approvalfrom Pokja on the pilot projectproposals and to discuss
possible expansion andreplications across the district
Pokja AMPLSerangDistrict
WaterCompany
Pokja approval onpilot projectproposals
Possibility toapply StrategicPlan of Watsanto other relatedprojects in the
future
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
17/41
17
Pilot Project Implementation
Activity Description of Activity ActorsInvolved
Outcome Challenges
Construction ofshared septictanks and
individual septictank
Communityparticipation inconstruction work
(digging the projectsite)
Hiring constructionworkers
Construction of sharedseptic tanks andindividual septic tanks
Bali Fokus Community Workers
6 (six) sharedseptic tanks wereconstructed
30 individualseptic tanks areunderconstruction
Land availability Physical
condition of soil
Communityshould providefamily toilet
Piped WaterConnection
Facilitating communicationwith Local WaterEnterprise to make surethere is plan for pipedwater connection toDermayon area andproviding subsidy fordown-payment
Pokja AMPL Water
company
Confirmationletter from PDAMon the plan
Survey on pipedconnectionsystem
Application formsubmitted
Accelerating theconnectionprocess andmakes surecommunityaffordability andwillingness topay
EstablishingRefill WaterBusiness
Identifying available landto construct the building,preparing institutional
arrangement and businessplan
Community Head of
Village
Building Installed Refill
water machine
Business plan
Setting upcommunitybased business
unit on refillwater 17
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
18/41
18
Pilot Project #1:
Piped Water Connection to PDAM inDermayon
Problem:
Kampung Dermayon has poor and lack ofwater resources.
Ground water quality is very poor andcontaminated.
Public hydrant provided by water company(PDAM) is only main source of drinking waterin the area.
The cost of drinking water is US$ 0.2 per m3. Average water consumption per household is
2m3. The cost of water per month ranges from US$
15-20.
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
19/41
19
Pilot Project #1:
Piped Water Connection to PDAM inDermayon
Proposed intervention:
Through consultative process with PDAMand also Pokja meeting, there is a plan topiped water connection from PDAM in year2009.
Connection Fee is about US$ 150 percustomer which can be installed in 12months.
The project will provide subsidy for
connection fee with the amount is rangedfrom US$ 50-100 depending how manypeople applied. Total fund allocated is aboutUS$ 10,000
Water Tariff: The minimum payment permonth is about US$ 5 for 10m3 water usage
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
20/41
20
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
21/41
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
22/41
2222
Pilot Project #2:
Establishing Community-BasedRefill-Water Business
Problem:
The quality of ground water in Sukawana isdeteriorated. Community use the groundwater for daily use only.
There is only one public hydrant to serve
1,013 HHs The cost of drinking water is US$ 0.2 per m3 No plan for piped water connection from
PDAM Refill water is an alternative to meet
community need of drinking water The current refill water provider is located
almost 4 km from project location, whiledemand for drinking water is increased.
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
23/41
232323
Pilot Project #2:
Establishing Community-BasedRefill-Water Business
Proposed Intervention:
As result of community consultation, there isan idea to establish water refill business toserve drinking water
The business will be managed by community-based business unit under the supervision ofvillage authority
The initial investment is about US$ 5,000including building construction, machine,equipments and start-up cost
Some portion of business profit will be
allocated for infrastructure improvement andcommunity activity
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
24/41
24
Community Based Business Unit
Board of Supervision
- Representatives fromVillage Authority andCommunity Leaders
Board of Management- Chairman, Secretaryand Treasury
Operator
Transparency andAccountability
- Organization rule-Monthly Financial
Report
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
25/41
Pilot Project #2:
Establishing Community-Based Refill-Water Businessin Sukawana
Progress to Date:
Community provided landBuilding has been constructedPurchase refill water machineBusiness plan has been
preparedSet-up community basedbusiness unit and its mechanism
Actor Involved:
Community is provided land as part ofthe initial investment, At the sametime they also are employed asworkers in the construction processand will be the customers of thebussiness provided.
Community Based Business Unit isthe community group who will managethe bussiness
Local Government is facilitate theconstruction process throughmonitoring and together withcommunity organisation as well aslocal leader monitor the bussiness
operation.
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
26/41
Cost Item UnitUnit Cost
(US$)Total Cost
(US$) Source
Land 16m2 5 80Communitycontribution
Machine Purchasing1 2,200
2,200ESCAP Project
Construction of building 1 1,600 1,600
ESCAP Project
and Community
Technical Assistance1
200 200ESCAP
Equipments
1
137.5 137.5ESCAP Project
Business start-up cost(4 months)
4 978.2782.5 ESCAP Project
Total Investment 5,000
26
Project Investment Cost
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
27/41
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
28/41
28282828
Pilot Project #3:
Improved Sanitation Facilityin Dermayon and Sukawana
Proposed Intervention:
Training on Community Total Led Sanitation(CLTS) to increase community awarenesson the importance of healthy life and reducenumber of open defecation in the area. Thistraining was organized by Pokja AMPL
Serang District.
Provision of adequate and appropriatesanitation facilities: shared septic tank and
individual septic tank
Technical assistance for community toconstruct and to improve low cost and
appropriate individual toilet
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
29/41
Pilot Project #3:
Improved Sanitation Facilityin Dermayon and Sukawana
Progress to Date:
Communities in both areas have
agreeed that shared septic tank asthe first priority for the project.
In Dermayon, 4 (four) sharedseptic tanks and 5 (five) individualseptic tanks have been built.
In Sukawana, 2 (two) sharedseptic tanks have been built.
Around 55 individual septic tanksare now under the construction(17 in Dermayon and 38 inSukawana)
Actors Involves:
Bali Fokus provide technical
assistance for designing low costbut appropriate and healthy toiletand supervising the construction.
The skilled-community involved inthe construction works
Community involve din providingland, digging and build their own
individual toilets
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
30/41
Organized by Pokja AMPL Serang District
The training was aimed: To improve understanding towards the importance of basic
sanitation To increase their awareness on water and sanitation issues
particularly on basic sanitation (toilet provision) To share their experience with other community in their area
and to stimulate the awareness of community on theimportance of healthy life
There are 5 (five) people from Dermayon and 5 (five) peeoplefrom Sukawana participated in the training program.
Trainingon
CLTS
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
31/41
TechnicalConsiderationsandRecommendationSukawana Village Kampung Dermayon
Main issues :Densely populated areaBathing and washing using water from shallowwell, river and rain waterFor defecation, most of the communities go tothe river or open space
Main issues :Densely populated areaBathing and washing using water from shallowwell, river and rain water.For defecation, most of the communities use theriver or open space
Limited space for wastewater treatment plantPoor drainage for discharging the effluent andgrey water
Technical Condition and Feasibility Result :Source of wastewater: Domestic wastewater(toilet, bathing and washing)
Land ownerships: Private ownWater resources: Public hydrant and shallowwellWater table: 50 cm below the ground surfaceDrainage condition: Flowing, no stagnant waterElevation : Slope approximately 0,5 - 1 %
Access for logistic and desludging: Accessiblefor medium size truck until the main road. Frommain road to the site, require logistic transfer
Technical Condition and Feasibility Result :Source of wastewater: Domestic wastewater(toilet, bathing and washing/ black and grey
water)Land ownerships: Own by private/individualWater resources: Public hydrant and shallowwellWater table: 30- 50 cm below the ground surfaceDrainage condition: Poor condition and Stagnant
waterElevation : Relatively flatAccess for logistic and desludging: Accessiblefor medium size truck until the main road. Andfrom main road to the site, require logistic transfer
31
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
32/41
Sukawana Village Kampung Dermayon
Technical options for sanitation:Individual septic tank using common shape ofseptic tank (rectangular)Individual septic tank using round shapeconcreteIndividual septic tank using BioFil (pre-fab)Shared septic tankPublic toiletSimplified sewerage system
Technology option for sanitation:Individual septic tank using common shape ofseptic tank (rectangular)Individual septic tank using round shapeconcreteIndividual septic tank using BioFil (pre-fab)Shared septic tankPublic toiletSimplified sewerage system
Recommendation:Individual septic tank using common shape ofseptic tank (rectangular)Individual septic tank using BioFil (pre-fab)Shared Septic Tank
Recommendation:Shared septic tank for 3-5 HHIndividual Septic Tank
Option Choiced
Individual septic tank using BioFil (pre-fab) Shared Septic Tank
Option Choiced
Individual septic tank using BioFil (pre-fab) Shared Septic Tank
32
TechnicalConsiderationsandRecommendation
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
33/41
Shared SepticTank for 35HHs(18M3)
Source:BALIFOKUS
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
34/41
IndividualSeptictankusingroundconcrete(80cm)
Source:BALI
FOKUS
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
35/41
Construction Works: Individual
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
36/41
363636
ConstructionWorks:Individual
SepticTanks
P j t I t ti t B i S it ti
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
37/41
ProjectInterventiontoBasicSanitation
ImprovementNumber of House House with
Toilet% Target UNESCAP
Beneficiaries
Village Sukawana*
RT 01B 109 8 7.3 16
RT 01A 89 4 4.5 13
RT 04 200 5 2.5 16
Kp. Dermayon
RT 04194 88 45
15RT 05 121 62 51 13
RT 06 124 48 39 16
Note:The intervention consist of Share septic tank (serve for 3-5 Houses) and individual Septic tank(serve for 1 house)Currently 6 share septic tanks (4 in Dermayon and 2 in Sukawana) and 5 individual septic tanks(in Dermayon) have been constructed.
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
38/41
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
39/41
39
Community participation has came into an essential meaning whenthere is balance combination between process and implemented actionin the project
The project approach has been combined the importance of projectprocess and stakeholder capacity building as well as the pilotimplementation which provide direct benefit to the community.
Increasing community contribution to the project implementation suchas: voluntarily work for digging the land and provision of individual toilets
The project result in preparing strategic action plan on WSES at villagelevel could be adapted to other similar projects in the future
Pokja AMPL will propose the strategic action plan on WSES in
Dermayon and Sukawana as instrumen tto integrate other similar projectinterventions in the area
There is an effort from Pokja AMPL to integrate other project with thepilot project intervention (i.e: in case of piped water connection, the LGhas allocated budget in FY 2009 to expand the PDAM service in
surrounding Dermayon area)
SomeLessonLearned (2)
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
40/41
7/31/2019 Integrated Pro-poor Water and Wastewater Management in Small Towns Project Implementation in Serang District, Banten Province, Indonesia
41/41
ContactDetail:
UrbanandRegionalDevelopmentInstitute(URDI)
RukanRoyalPalaceBlockC3
Jl.Prof.dr.Soepomo,SHKav.178A
MentengDalam,
Jakarta
12870
Indonesia
Telp:+62218312087,83785532
Fax:+62218312196
Homepage:www.urdi.org
Email:[email protected]
THANKYOU
ThankYou
41