INTERNATIONAL FABRICATION COMPANY
INDUSTRIAL FABRICATION COMPANY
S I N C E 1 9 7 6
Head Office: 19 KM, Multan Road - Lahore Tel +92 42 37499390~92 Fax:+92 42 37511156
Email: [email protected] URL: http//www.ifc.com.pk
Designing Fabrication Installation Erection Commissioning Maintenance
Co
mp
an
y p
ro
file
INTERRNATIONAL FABRICATION COMPANY
: Head Office : 19 km Multan Road Lahore
Phone : + 92 42 3749-9390~92
Fax : + 92 42 3751-1156
E-Mail : [email protected]
URL : http://www.ifc.com.pk
Type of
Organization : SOLE PROPRIETORSHIP
Year of Establishment : 1976
Engineering :19 - KM Multan Road Lahore.
Works.
Maintenance Works : 24 - KM Multan Road Lahore
B R I E F H I S T O R Y
International Fabrication Company is an ISO-9001-2000 certified & well established organization,
headed by a team of dedicated and dynamic professional engineers; having a background of long
term association with the organization.
International Fabrication Company was established in 1976 and serving the nation in the field of
mechanical engineering. IFC has won a good repute in Fabrication, Erection and commissioning of
Industrial projects & Fabrication of Vessels, Storage Tanks, Heat Exchangers, Steam Boilers, LPG
Bowsers, Bulk transportation equipment, Conveyors, Cyclones, Vacuum drums, Hatchery Plants,
Kiln shell, ducts, structure and verity of other equipments including civil works.
IFC has a strong edge on project / product planning, monitoring, controlling and evaluation. Its
QA/QC department remains in close contact in all phases while execution of various mega
industrial projects and takes great care of all relevant issues. They make it sure that all executions
are in accordance with latest applicable standards and customer needs by keeping in focus on all
the potential nonconformities. In case of finding any non conformance at any stage, they put heart
and sole to dig out the root cause and right solution without loosing time and energy.
Its R&D department remains active to help them on all critical stages of the project, while its PPC
department took great care and ensure timely follow up to avoid any major hold up that could be a
cause of project delay.
Its our commitment with our valued customers, which forces us to deliver the product well in time.
IFC having a history to achieve the targets even within very short time schedule.
A series of mega industrial projects on its list is a sign of its growth and standing in the market. It is
all due to; as we observe things closely, depicts them beautifully and control them artistically.
Message from C.E.O.
The Mechanical Engineering as a business field was selected in order to provide high
quality fabricated products like; Pressure Vessel, Storage Tanks, Steam Boilers, LPG
Bowsers, Conveyors, Structures, Plant Fabrication & Installation and special purpose
machinery here in Pakistan in a quality manners.
I personally believe that with the adaptation of latest technologies and techniques; we
won the confidence of our valued customers. This key factor is our asset. In the
meantime we are consistently providing same standard of services to boost the
economy of Pakistan. The long term association of the people with this organization
shows that how importantly I believe in team efforts. My team has played an anchor
role to place IFC at this high level.
All departments are working like a family and share their experiences at all level, this
helped to improve the overall system of the organization. Qualifying for ISO-9001
certification is a result of our team efforts.
IFC is committed to achieve customer satisfaction by providing them “Quality”
products in a cost effective way and we achieve this target by developing team efforts,
using modern techniques & reducing non conformities.
LIST OF TECHNICAL STAFF
Sr.No. Name Designation Qualification Experience
1 Mriza Muhammad Yousaf Baig. CEO Diploma in Machine Design. 45 Years.
2 Dr. Naeem ul Zaman Head Engineering PhD. Solvent Extraction 40 Years
3 Hamad Baig Head Works BSc. Mech Engineering 13 Years
4 Mian Muhammad Ramzan Manager Design & Development B.Sc Mechanical Engg. 18 Years
5 Dawood Anjum Head Planning B.Sc Mechanical Engg. 09 Years
6 Zafar Iqbal Manager Projects B.Sc Civil Engg. 27 Years
7 M. Shoaib Raiz Senior Planning Engineer B.Sc Mechanical Engg. 09Years
8 Shahzad Baig Head Business Process Improvement MBA 14 Years
9 Waqas Baig Head Projects and Services BBA 08 Years
10 M. Akmal Sherazi Head BD MBA 15 Years
11 Muhammad Shafiq Project Engineer First Class Boiler Engineer 15 Years
12 Mushtaq Ahmad Instrumentation Technician D.A.E. Electrical 10 Years
13 Shahzad Makhdoom QC Inspector ASNT-Level-2 NDT 12 Years
14 Ch.Khalid Site Engineer Civil Engineering D.A.E Civil 18 years
15 Ghulam Haider Assistant Proposal Engineer D.A.E Mechanical 2 years
16 Hafiz Ikram Ali
Quantity Surveyor
D.A.E Mechanical 2 years
17 Kanwar Hafeez Zulifqar Quantity Surveyor D.A.E Mechanical 4 years
18 Sana Ullah Sr. Design Draftsman 02 Year Certification in Drafting 19 Years
19 Ali Ahmad Ullah Khan Design Draftsman 02 Year Certification in Drafting 06 Years
20 Shahid Mehboob Design Draftsman 02 Year Certification in Drafting 06 Years
21 Faisal Khan Design Draftsman 02 Year Certification in Drafting 06 Years
CEO
Advisor to CEO
Head Engineering Head Works Head Commercial Head BD & M Head BPI Head Projects
& Services
Proposal & Est.
Engr.
Design Engr. Manager Works.
I/C Production.
I/C Fabrication. I/C M/c Shop.
Production Unit-
A
Production Unit-
B
Leadman M/C
shop
Accounts
Officer
Mechanical
Draftsmen
Quantity
Surveyor
(*)
Sr. Accountant
.
Document
Controller.
(*)
Business
Development
Engr.
(*)
Research &
Development
(*)
I/C
Procurement
Procurement
Co-ordinator
Working Crew.
1- Turner.
2- Machinist.
Admin Works
I/C
Maintenance. Riggning Unit
Project
Planning,
Corodination &
Control
Manager PPC.
PPC Engineer
(*)
Stores &
Inventory
HR & Admin
QMS /QA / QC.
HSE Engineer.
(*)
Project
Managers.
(*)
Project
Engineers
(*)
Project
Supervisors.
(*)
Project Work
Force.
(*)
Welding Unit
ORGANAIZATION CHART
Material Stacking. Yards
Distiller Vessels
Dying Machines
Road Tanker
Falling File Evaporators
Dyeing Machines
Sheet Rolling Machines
Sheet Shearing Machines
Cloth Inspection Machines
Over head Cranes
Tow Cans
Creel Beams
Bleacher Deodorizers
Grain Masters
LPG Bowsers
Steam Boilers
Heat Exchanger
Pressure Vessels
Civil Constructions
Knock-Out Drums
Kiln Shells
Cyclones
Hatchery Plants
Milk Silos
Vacuum Drums
Belt Conveyors
Drag Chain Conveyors
Pan Conveyors
Screw Conveyors
Bucket Elevators
Columns.
Gantries
Hot Water Generators
Impellers
Induced Draft Fans
All Kind of Steel Structure
Mingling Boxes.
Special Purpose Machinery
Current Products Range
• Valued Customers
Customers from Government Sector
AWT - Army Welfare Trust
HIT – Heavy Industries Taxila
HMC – Heavy Mechanical Complex
NDC – National Development Complex
OGDC – Oil & Gas Develop. Corporation
PAEC – Pakistan Atomic Energy Commission
PR – Pakistan Railways
SCC – State Cement Corporation
SNGPL – Sui Northern Gas Pipe Line
SSGPL – Sui Southern Gas Pipe Line
WAPDA – Water & Power Development Authority
PARCO - Pak Arab Refinery . Customers from Private
Sector.
Nishat Group of Companies
Dewan Group of Companies
Engro Group of Companies
ICI Pak Limited
Sitara Group of Companies
Nestle Milk Pak Limited
Shell Pakistan Limited
Pak American Fertilizers.
Pak Arab Fertilizers.
Lucky Cement
Dandot Cement
Gharibwal Cement
Maple Leaf Cement
Dhan Fiber
Ibrahim Fiber
National Fiber
Rupali Polyester.
Rafhan Maize Products.
Sam Pak Paper Mills
Century Paper Mills
Kohat Cement Company.
SPECILISED FIELDS
IFC Storage Tanks
Field Erected / Shop Welded.
Design : API-650 & API -12 F. Raw Mat : As per Need.
Capacity. : As per Need.
Pressure. : As per Need.
Salient Features.
IFC has an additional edge to design, supply, installation, erection & commissioning of Field Erected
and Shop Welded Tanks.
The Field Erected tanks normally provided with all civil foundation design and construction facilities.
These tanks are supported with top roof, man-holes, access ladders, float level, insulation / cladding.
walkways and internal reinforcing arrangements.
Water fill test, Vacuum test and HPT is also carried out as per design / customer need.
Independent Third party inspection is also carried out in case of contract requirements, however
internal high standard QA/QC set up ensures the design adequacy till the commissioning / delivery of
the product.
Available Models.
S.N.
Model Cap.M3 Delivery Mod
1- IFC-S101~ 1.5 ~ 5 Ex. Shop Decimal Ends
2- IFC-S201~ 1.5~10 Ex Shop Flat Ends.
3- IFC-S301~ 1.5~10 Ex Shop 1 Decimal 1Cone end
4- IFC-S401~ 1.5~5 Ex. Shop Conical Ends.
5- IFC-S501~ 1.5 ~5 Ex. Shop Elliptical Heads.
6- IFC-S601 1.5~10 Ex. Shop Flat end /Steam Coiled.
7- IFC-F101~ 15 ~ 250 Field Ere. Open Top
8- IFC-F201~ 15 ~ 250 Field Ere. Roof Caped
9- IFC-F301~ 15 ~ 250 Field Ere. Floating Roof.
Mega Project Handling. Plant Handled : Cement, Power, Fertilizers, Chemicals, Sugar etc.
Maximum Fabrication on single site : 8500 Tons.
Maximum Erection on single site : 19,700 Tons.
Maximum Piping on single site : 380,000 dia “.
Maximum Man-hours on single site : 3,060.000.
Major Activities.
Fabrication.
Supply
Installation.
Erection.
Electrification.
Construction.
Commissioning.
Major Areas.
Supply, Fabrication, Erection & Commissioning of
Equipment i.e
Cyclones, Kiln Shells, TDF Calciners, Ducts,
Pre heater, Silos, Storage Bins, Chimneys, Structure,
Heavy lifts, Heavy Erections
Erection of complete plant on turn key basis.
Equipment Erection.
Process piping
Civil Construction.
Sand Blasting
Insulation / Painting.
Preventive Maintenance
Material Handling Systems.
Commissioning.
Shutdowns
Salient Features.
IFC is a pioneer in giving turnkey solutions to complete mega industrial projects. A group of
professionals is dedicated to get 100 % true results even in tight schedules. These professional
are driving a skilled force to make is sure that all executions are in accordance with the
requirements and real contract obligations.
A series of mega projects on its execution history list; is an indication of professionalism.
We believe in do right first time and every time. A comprehensive experience to handle heavy
lifts is a star in our crown of success.
QUALITY
ASSURANCE
TPI Certification.
Mill Test Certificate.
In Process Inspection.
WPS, PQR, WQR.
Inspection Data.
Calibration.
NHA Standard.
IFC ADVANTAGES.
Quality Product.
Top Class After Sales
Services.
Standard
Workmanship.
Internal QA/QC
Timely Delivery.
Standard Practices
conforming to Code's).
MARKET EDGE.
In house
manufacturing of:
Internal Valves.
Globe Valves.
Roto Gauges.
Landing Legs
Landing Gears.
Axel Assembly.
Design : ASME Sec-VIII Div.-1 (2004)
Raw Material :ASTM A-516/70, 60 N
NDE : 100 % RT supported with
WPS, PQR and WQR
Design Pressure : 250 PSI
Test Pressure : 325 PSI
Working Pressure : 160~ 210 PSI.
Available Size : 25 ~ 45 MT.
Horizontal mounted, fabricated with hemispherical dish heads. Special
arrangement of internal baffles. Necessary mounting and safety devices
i.e
Internal Valves.
Globe Valves.
Roto Gauges.
Pressure Gauges.
Pressure Relief Valves.
Sun Roof.
King Pin Arrangement.
Landing Legs with Landing Gears.
Manufacturing of Axle and mounting System. PHT is also available (if
required.). External finish with sand blasting SA2.5 and enameled with
Standard Color.
LPG
SOLUTIONS
Available Capacity.
S.N.
Model Capacity/HR Fire System Efficiency.& Work Pressure
1- Igneous-FT- 1.1 1 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
2- Igneous-1.2 1.5 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
3- Igneous-1.3 2 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
4- Igneous-1.4 2.5 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
5- Igneous-1.5 3 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
6- Igneous-1.6 4 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
7- Igneous-1.7 5 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
8- Igneous-1.8 6 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
9- Igneous-1.9 7 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
10- Igneous-1.10 8 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
11- Igneous-1.11 10 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
12- Igneous-1.12 12 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
13- Igneous-1.13 15 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
14- Igneous-1.2 20 TPH 3 Pass Wet Back @ 150, 200, 250 & 300 Psi
Design: BS 2790 (Latest Edition)
Raw Material : ASTM A516/70 N.
NDE : 100 % RT,UT & MT.
Working Pressure : 150 ~ 300 PSI.
Design Pressure :157.6 ~ on ward.
HPT : 236.35 to ~
Salient Features.
The IGNEOUS Steam Boilers are design
to BS2790 Latest Edition. A three pass
wet back design is most popular world
wide due to its efficiency. This logic
reduces the fuel consumption and
increases the energy. In the same way our
WHR Boilers are well renowned in the
market.
The international collaboration of sharing
expertise in this field; is a force to declare
it “ The Power to Compete” Our design
mechanism saves 10% fuel cost as
compare to conventional burners.
Complete customer satisfaction is
guaranteed through our QA/QC system
and comprehensive after sales and back
up support system.
The above mentioned process flow
indicates, how closely and deeply
understand & deliver a quality product.
IGNEOUS STEAM BOILERS
IFC ADVANTAGES.
Quality Product.
High Class After Sales
Services.
Standard Workmanship.
Internal QA/QC
Timely Delivery.
Standard Practices
conforming to Code's).
IFC Material Handling Systems. Conveyors
Design (DIN) Boomer
Raw Mat. : As per need.
Capacity. : As per need.
Available Types. Belt Conveyors.
Pan Conveyors.
Apron Conveyors.
Screw Conveyors.
Roller Conveyors.
Bucket Elevators.
Stackers
Salient Features. Specially designed Rollers & Parts. i.e
Return Rollers.
Idler Rollers.
Impact Rollers
Self Align Devices.
Auto Tensioning
Guide Rollers.
Chain Driven.
Belt Driven.
Special Buckets.
Boot Sections..
In / Out Chutes.
Dust proof Housings.
Self Align Bearings
Supporting Structure.
Covering Roof.
Walkways.
Access Ladders.
• IFC Civil Constructions. • Salient Feature :
• International Fabrication & Construction Company is registered with PEC in Category C-1 and performing its services in CIVIL, MECAHNICAL and ELECTROCAL sectors. IFC executes a number of projects relating to mega civil construction. A well established and skilled team of professionals is available with us to handle any type of civil work. IFC has a joint venture with some reputable organizations to handle mega projects like dam construction, Canals, Tunnels high rise buildings etc. Normally IFC engaged in construction work like excavation, dumping, filling , Compaction, RCC, PCC , PC, Brick Working, finishing, pave ring, flooring, Ceilings, Shed Coatings, painting, barricading etc. The followings are its major contributory wings.
• Road Construction
• Bridge construction
• Over head and & Under Passes.
• Dam Construction
• Tunnel Construction
• Multi Story Buildings.
• Housing Colonies.
• Residential Houses
• Commercial Plazas.
• Power houses.
• Land Development
• Water Reservoirs
• Cattle Forms.
• Factory Halls.
• Sewerage Systems
• Pumping & Decanting Stations.
• Boundary Walls.
• Fish Ponds.
• Swimming Pools.
• Raw Meal Silos.
• Bulk Storage Yards
• IFC has an edge on other concerns due to its combined solutions to our valued customers. A dedicated team is well equipped with latest tools to get customer satisfaction through quality work.
• A series of civil work projects on its track record; is a sign of customer’s trust on us.
Honors and Affiliations
LIST OF ON GOING PROJECTS
LIST OF JOBS IN HAND
SR.
NO. CLIENT SCOPE OF WORK LOCATION
Expected
Completion Date Amount(Rs.)
1 Jeans Company Pvt .Ltd Construction of New jeans Garments factory
having covered area of 215000 Ft² Lahore June 2015 950,000,000/-
2 OIL and Gas Development
Corporation(OGDCL)
Replacement of 26" dia-15 KM, Long under
ground sale gas pipe line UCH, Blochistan 15th February 2015 107,300,170/-
HISTORY OF MEGA
PROJECTS
Sr.
No. CLIENT SCOPE OF WORK LOCATION YEAR
Re
m
ar
ks
1 Pak Arab Fertilizers
Company Limited
Erection of Mechanical Equipment, Tanks, Cooling Towers, Fabrication and
Erection of Process Piping, Insulation, Testing and Commissioning of
Ammonia Plant
Multan 1978
2 Pakistan Atomic Energy
Commission Fabrication and Erection of Stainless Steel Piping Kundian 1979
3 Flora Textile Limited Fabrication, Erection and Installation of All Process Piping including Pipe
Support, Insulation, Testing and Commissioning Faisalabad 1979
4 Hazara Urea Fertilizer Ltd. Fabrication and Erection of Welded Steel, Pressure Vessels, Pipes and Pipe
Fittings Haripur 1980
5 Pakistan Railways Erection of Mechanical Equipment for Concrete Sleeper Factory Kohat 1981
6 Gharibwal Cement Limited Improvement of stock Hall, Fabrication and Erection of Drag chain conveyor Gharibwal,
Distt. Jhelum 1981
7 National Fibres Limited Fabrication & Supply of Grating Panels, Fabrication and Erection of Process
Piping, pipe support, pipe bridges, in-plant piping Karachi 1981
8 WAPDA (Khan Pur Dam) Fabrication and supply of MS Welded Steel Pipes Khan Pur 1982
9 ICI Pakistan Limited
Fabrication and erection of welded steel pressure vessels, tanks, steel
structure fabrication and erection of 3 ton capacity overhead travelling crane,
fabrication and supply of SS tanker barrel.
Sheikhupura 1982
10 Pak Arab Fertilizers
Company Limited
Erection and installation of mechanical equipment for Nitro Phosphate Plant
modification project Multan 1982
11 Dandot Cement Company
Limited
Complete Mechanical Erection of 1000 Tons per day process Dandot project
including Erection of raw material Cement Transportation system,
Construction of concrete shed of pre- homogenizing bed 150 Ft x 1000 Ft
Dandot 1983
12 Punjab Urban Transport
Corporation Erection and installation of compressed air system at VOLVO workshop Lahore 1983
13 Pakistan Atomic Energy
Commission Fabrication Erection and installation of thickener units Islamabad 1983
14 Pakistan Atomic Energy
Commission Fabrication erection and installation of extraction unit Islamabad 1983
15 SAMPAK Paper Mills
Limited Erection and installation of equipments Sheikhupura 1983
S.No. CLIENT SCOPE OF WORK LOCATIO
N YEAR
Rema
rks
16 Premier Paper & Board
Mills Limited Erection of machinery and equipment, eretion of (gantry) Moving crane Sheikhupura 1984
17 Bahawalpur Paper & Board
Mills
Erection of Imported Machinery and Fabrication & Erection of locally
manufactured machinery & equipment Sheikhupura 1984
18 Rupali Polyester Limited Fabrication and installation of air conditioning, ducting and steel structure Sheikhupura 1985
19 UBE Industries Limited Fabrication and supply of 7 Km long raw material Transportation system at
D.G.Khan Cement Co. Ltd. D. G. Khan 1985
20 Mustehkam Cement Limited Replacement of Kiln Shells Abbotabad 1985
21
D. G. Khan Cement
Company
Limited
Complete mechanical Erection of 2000 tons per day dry process cement
plant D. G. Khan 1986
22 Oil & Gas Development
Corporation Limited
Complete erection of de-Hydration unit including erection 02 no gas
turbines along with process piping at Dakni Development field Texila 1986
23 Mustehkam Cement Ltd. Replacement of Kiln Shells Abbotabad 1986
24 WAPDA (Gas Turbine
Power Station)
Construction of (Fabrication and erection including associated civil work)
of 3 Nos. Fuel oil storage tanks cap. 8000 M3 100 Dia x height 40 ft along
with allied piping work.
Kot Addu 1986
25 Pak Arab Fertilizer
Company Limited
Complete Mechanical Erection of 300 Ton per day Urea Plant, Nitric Acid
Plant, Chromate Removal Plant and Hydrogen Recovery Plant Multan 1986
26 WAPDA (Gas Turbine
Power Station)
Construction of (fabrication erection including civil work) 2 nos. 700 M3
Water tank Kot Addu 1986
27 WAPDA (Gas Turbine
Power Station)
Construction of (fabrication erection including civil work) of 15000 Gallon
Cap. 35 Meter High overhead Storage tanks. Kot Addu 1986
28 Pak Cement Company
Limited
Complete Mechanical Erection of 600 tons per day wet process cement
plant Iskanderabad 1988
29 Hazara Phosphate Fertilizer
Design, Fabrication, Supply erection, commissioning of 14 belt conveyors,
bucket, elevator, heat changer, combustion chamber, bins blow down
drums
Harripur 1988
30 Mustehkam Cement Limited Replacement of Kiln Shells and raw mill shells Abbotabad 1989
S.No. CLIENT SCOPE OF WORK LOCATION Year Rema
rks
31
Oil & Gas Development
Corporation
Limited
Construction of (fabrication & civil work) 3 x 3500 Bbls crude oil storage Islamabad 1989
32 WAPDA (Gas Turbine
Power Station)
Construction of (fabrication erection including associated civil work) of 4
Nos. fuel oil storage tank cap. 8000 M3 Dia 100 ft. height 40 ft. along
with allied piping work.
Kot Addu 1990
33
Oil & Gas Development
Corporation
Limited
Fabrication supply of 15 Nos. curde oil storage tanks size 40' x 10' x 8' Islamabad 1990
34 Associated Cement Limited Replacement of shell pieces of kiln No.5 Wah Cantt. 1990
35 Sui Northern Gas Pipeline
Limited Erection of heavy vessels for purification plant
Sui Purification
Plant 1990
36 D. G. Khan Cement
Company Limited Construction of furnace oil storage tanks 2x3500 M3 D. G. Khan 1990
37 National Cement Industries
Limited Replacement of kiln shell, girth gear raw mill angular flange Dandot 1990
38 Exxon Cehmical Pakistan
Limited
Erection of 02 nos waste heat recovery boilers capacity 50 Tons each
along with 02 nos. gas turbines capacities 7 MW each. Fabrication and
Erection of ducts, pre heaters, super heaters etc. for heat recovery steam
generating system,
Daharki
(Sukkar) 1991
39 Heavy Mechanical Complex Mechanical works De-hydration plant Dakhni 1991
40 Dewan Salman Fibre
Limited
Fabrication of 200 Nos. Toe Canes, creel beams, MEG Road Tankers and
Piping work Hattar 1991
41 Dewan Salman Fibre
Limited
Fabrication and erection of two Nos. MEG Storage tanks capacity 4000
M3 and CS & SS piping work
Port Qasim,
Karachi 1991
42 Rafhan Maize (PVT)
Limited
Supply, fabrication, installation & commissioning of Bucket Elevators (
02 Nos. 96' ) & Belt Conveyors 215' Faisalabad 1991
43 Rafhan Maize (PVT)
Limited
Supply, fabrication, installation & commissioning of feed conveyor ( 45'
), Silo discharge Conveyors 50', Dumping scale discharge conveyor 40' &
Steeps filling conveyor 150'
Faisalabad 1991
44 Rafhan Maize (PVT)
Limited Supply, fabrication & erection of knock out drum & de-odourizer Faisalabad 1991
Rafhan Maize (PVT) Supply, fabrication & erection of centrifugal Fan ( 02 Nos.), Bleacher &
S.No. CLIENT SCOPE OF WORK LOCATION YEAR Rema
rks
46 Rafhan Maize (PVT)
Limited
Supply, fabrication & installation of screw conveyors, feed suction fan &
gluten suction fan Faisalabad 1991
47 Rafhan Maize (PVT)
Limited Supply, fabrication & installation of seed dryer fan Faisalabad 1991
48 Rafhan Maize (PVT)
Limited Supply, fabrication & installation of Mingler Box & Mixer Box Faisalabad 1992
49 Rafhan Maize (PVT)
Limited Supply, fabrication & erection of crystallizer Faisalabad 1992
50 Engro Chemicals
Pakistan Limited
Fabrication and Erection of CS and SS interconnecting piping, along with
civil works
Daharki
(Sukkar) 1993
51 Sitara Chemical Fabrication & installation of falling Film evaporators along with heat
exchangers for caustic Soda Concentration. Faisalabad 1993
52 Sui Northern Gas
Pipeline Limited Laying of 6" ND 24 miles long Joharabad KCP Gas pipeline Joharabad 1994
53 Dewan Salman Fibre
Limited Fabrication of 200 Nos. Toe Canes, Creel beams and PTA Silos. Hattar 1994
54 Dhan Fibres Limited Erection and installation of equipments Hattar 1995
55 Sitara Energy Limited Complete Erection, installation and commissioning of of 48 MW ( Furnace
oil) power plant. Faisalabad 1995
56 Dhan Fibres Ltd.(Power
plant)
Complete Erection, installation and commissioning of 18 MW (Furnace
oil) Power Plant. Hattar 1996
57 D. G. Khan Cement
Company Limited Construction of furnace oil storage tanks 2x3500 M3 D. G. Khan 1996
58 Shell Pakistan Limited Construction of Filling Gantries, Unloading Gantries and RCC Hard
Standing Machike 1997
59 D. G. Khan Cement
Company Limited
Mechanical Erection and Fabrication of Pre-heater Steel Structure
(Expansion Project) D. G. Khan 1998
60 Pak American Fertilizers
Limited
Fabrication & Erection of complete Above Ground Piping of 600 Tons/day
Ammonia and 1050 Tons/day Urea Plant Iskanderabad 1998
S.No. CLIENT SCOPE OF WORK LOCATION Year Remar
ks
61 Pak American Fertilizers
Limited
Complete Erection of Rotary and Static Equipments of 600 Tons/day
Ammonia and 1050 Tons/day Urea Plant Iskanderabad 1998
62 ICI Pakistan Limited Supply, Fabrication and installation of Distiller Vessels-I Khewra 1999
63 ICI Pakistan Limited Supply, Fabrication and installation of Distiller Vessels - II Khewra 1999
64 Haji Aslam & Sons Fabrication of Boom for coles Crane Cap. 250Tons, 500 Lg. Lahore 1999
65 Ravi Gas (PVT) Limited Fabrication, Hydro static testing & painting of LPG transport vessels ( 02
Nos. ) Cap. 20 ton Lahore 2000
65 Attock Petroleum Limited Fabrication and installation of APL Pump Wedges Rawalkot 2000
66 Ravi Gas (PVT) Limited Fabrication, Hydro static testing & painting of LPG storage tank. ( 02
Nos. )Cap. 36 Ton Lahore 2000
67 ICI Pakistan Limited Fabrication and Erection of FL Stock Tank Khewra 2000
68 ICI Pakistan Limited
i. Supply & fabrication of Air Receiver
ii.Supply, fabrication & installation of platform ( universal Tank) &
construction of civil foundation
Khewra 2001
69 ICI Pakistan Limited
i.Dismantling, supply, fabricaton & installtion of MOL tank (BPP)
ii. Dismantling, supply, fabrication & installtionof Ash mixing tanks (02
Nos.)
iii.Dismantling, supply, fabrication & erection of Kiln Gas Duct.
iv. Dismantling, supply, fabrication & installation of Coke Hopper
Khewra 2002
70 Ravi Gas (PVT) Limited Fabrication, Hydrostatic testing & painting of LPG storage tank ( 06
Nos. ) cap. 60M.Tons each Lahore 2002
71 Engro Chemicals Pakistan
Limited
Supply & manufacturing of Rubber lined rollers for belt conveyor dia
90mm
(125 Nos.)
Karachi 2002
72 Century Paper & Board
Mills
Repair of TSP rotor & machining of vaccum pump bearing housing nash
pump Lahore 2002
S.No. CLIENT SCOPE OF WORK LOCATIO
N YEAR
Rem
arks
73 Century Paper & Board
Mills
Supply & manufacturing of Pin for TSP pump ( 24 Nos. ), Gland packing
housing for TSP pump ( 04 Nos. ), sealing water ring for TSP pump ( 08
Nos. ), stuffing box for chlorine filter suction side & stuffing box gland
bush for chlorine filter suction side
Lahore 2002
74 D. G. Khan Cement
Company Limited Fabrication and supply of 04 nos. Exhaust Gas Bellows D. G. Khan 2002
75 D. G. Khan Cement
Company Limited Fabrication and supply of 04 nos. Exhaust Gas Bellows D. G. Khan 2003
76 Rafhan Maize Products
Limited Supply & Fabrication of equipment Faisalabad 2003
77 Progas Pakistan (PVT)
Limited
Design, Fabrication,testing,painting and supply of LPG Storage tank
capacity 30 metric ton Karachi 2003
78 Century Paper & Board
Mills Fabrication and Supply of 07 nos, Stainless Steel Tanks Lahore 2004
79 National Development
Complex Fabrication, supply and testing of horizontal air vessel Islamabad 2004
80 Cres LPG (Pvt) Limited Fabrication, Hydrostatic testing & painting of LPG Bowzer cap. 27 M.
Tons Lahore 2004
81 Cres LPG (Pvt) Limited Design, Fabrication, Hydrostatic testing & painting of LPG storage tanks
( 02 Nos. ) cap.137 M. Tons each Lahore 2004
82 Progas Pakistan (PVT)
Limited
Welding, Installation, Testing and Commissioning of 02 nos. LPG
Storage Spheres(capacity 1000 M.T ons each) Karachi 2004
83 Cres LPG (Pvt) Limited Design, Fabrication, Hydrostatic testing & painting of LPG storage tanks
( 01 Nos. ) cap.27 M. Tons Lahore 2004
84 D. G. Khan Cement
Company Limited
Dismantling of Coal Pre heater structure and equipment.
Fabrication and erection of Pre heater Steel Structure and Equipment at
D.G.Khan Cement Up-gradation Project-Unit 1
D. G. Khan 2004
85
Engro Asahi Polymer and
Chemicals
Limited
Design,Fabrication and Supply of Evicas Feed Tank Karachi 2004
Sr.No. CLIENT SCOPE OF WORK LOCATION YEAR Remarks
86 ICI Pakistan Ltd. Fabrication and Supply of Break Pressure Tank Khewra 2004
87 ICI Pakistan Ltd. Fabrication, Erection and Installation of Piping Khewra 2004
88 Engro Chemicals Pakistan Ltd. Fabrication and supply of Carbon Steel Buckets Karachi 2004
89 Engro Chemicals Pakistan Ltd. Construction of 20 KT Raw Material Bulk Storage Shed. Karachi 2005
90 Engro Chemicals Pakistan Ltd. Design, Fabrication, Installation and Commissioning of 110 M. Ton per
Hour capacity Raw Material Handling System Karachi 2005
91 Links International Design, Fabrication & Supply of 10 Nos. LPG Bowzers (Capacity: 24 M.
Tons each) Lahore 2005
Sr.
No CLIENT SCOPE OF WORK LOCATION YEAR
Rem
arks
92 Mohammad Gas
Company
Design, Fabrication, Supply and Testing of 01 no. LPG Storage Tank
capacity 62 M. Ton Lahore 2005
93 Koh Suleman Contractors Design, Fabrication and Supply of 02 nos. LPG Bowzers Muzaffar Garh 2005
94 Punjab Carriage
Contractors Design, Fabrication and Supply of 02 nos. LPG Bowzers Muzaffar Garh 2005
95 Progas Pakistan (Pvt)
Limited
Fabrication & Supply of 12 nos. LPG Bowzers (Capacity 24 M.Tons
each) Karachi 2005
96 Iqra Gas (Pvt) Limited Design, Fabrication and Supply of 02 nos. LPG Storage Tanks Gujranwala 2005
97 AR-Rehman Glass (Pvt)
Limited Design, Fabrication and Supply of 02 nos. Ammonia Bowzers Shiekhupura 2005
98 Cress LPG (Pvt) Limited Fabrication & Supply of 05 nos. LPG Bowzers (Capacity 24 M. Tons
each) Lahore 2005
99 ICI Pakistan Limited
Laying of 10” Dia 15 KM long under ground water line from
jehlem river to ICI soda ash including all associated civil
works
Khewra 2005
100 ICI Pakistan Limited Supply ,Fabrication & Installation of Tubes for WHB #
2,Supply,fabrication and installation of economizer. Khewra 2005
101 Pioneer Gas (PVT) Limited Design, Fabrication and Supply of 02 nos. LPG Storage Tanks,
capacity 50M.Tons each Lahore 2005
102 Cres Gas Carriers
Fabrication & Supply of 05 nos. LPG Bowzers (Capacity 24 M. Tons
each) Lahore 2006
103 DG - Cement Company Fabrication, erection and Commissioning of Equipments i.e Preheater,
Klin Shell, Silos etc. Kallar Kahar 2006
104 Al- Moize Sugar Mills Supply, fabrication and erection of various equipments such as
Vacuum Pans and Separators. DI Khan 2006
105 Sweet Water Pak Pvt.
Limited
Construction of dairy sheds, roads, floors, building and laying of
underground pipe line. Lahore 2006
106 Hassan Zaman Pvt.
Limited Installation and commissioning of GRC Plant Jarawala 2006
S.No. CLIENT SCOPE OF WORK LOCATION YEAR Remarks
107 Heavy Electrical Complex Fabrication supply and testing of 102 nos tubular
type radiators Lahore 2005
108 Rukkan LPG (Pvt.)Limited Design, fabrication and supply of 02 nos.LPG
storage tanks capacity 60M.Tons each Mandi Bahauddin 2007
109 Olympia Chemical (Pvt.)Limited
Supply, fabrication, installation and commissioning
of Brine Settler, Three layer slurry tank, Ca and Mg
Reactors
Qaida bad 2007
110 Azgard 9 (Pvt) Limited Design, fabrication, supply and installation of steel
Mezzanine floor area 10000Ft² Lahore 2008
111 Azgard 9 (Pvt) Limited Design, fabrication, supply and installation of steel
Mezzanine floor area 18000Ft² Lahore 2008
112 Fatima fertilizer (Pvt) Limited supply and fabrication of V-hangers for foundation
structure of cooling towers sadiqabad 2008
113 Kohat Cement Limited
Fabrication and erection of equipments and steel
structures(Complete clinker manufacturing system,
including fabrication and erection of 105 Mtrs. high
Pre-Heater structure)of 6700 TPD cement plant
Kohat 2008
114 Millat Tractors(Pvt) Limited Design, Fabrication ,supply and installation of air
vessel capacity 4 M³ Lahore 2009
115 Mustehkum cement Limited
Fabrication and installation of equipment, steel
structure and material handling system. Dismantling
of equipments, fabrication and erection of utility
piping(raw mill, lime stone crusher, cement mill,
bagging house, raw material storage shed areas)
Taxila 2009
116 Kirby Steels kuwait Fabrication, welding and painting of steel joists for
Metro cash and carry Pakistan Lahore 2009
117 Tuwairqi Steel Mills Karachi
Fabrication, erection and commissioning of DRI and
Oxide handling systems. Fabrication, installation and
commissioning of clarifier tank
Karachi 2009
118 Azgrd 9 (Pvt) Limited Design, Fabrication ,erection and testing of 02 nos,
Natural gas Buffer Vessels Lahore 2009
119 Heavy Electric Complex(HEC) Fabrication supply and testing of 36 nos. tubular type
radiators Taxila 2010
120 Eitehad Energy Pvt Limited Design, Fabrication, testing and commissioning of 02
nos.LPG storage tanks capacity 155M.Tons each Lahore 2010
Sr.No. C LIENT SCOPE OF WORK LOCATION YEAR Remarks
121 Askari cement limited
Fabrication , installation and commissioning of
cement transport system capacity(250 TPH) along
with associated civil works/foundations
Wah Cannt. 2011
122 Cress Gas Carrier Capacity enhancement of 18 nos. LPG Bowzers of
various sizes Lahore 2011
123 Foundry service centre(SMEDA)
Fabrication , installation and commissioning of
overhead crane (capacity 5Tons) along with tri pot
capacity 5 Tons
Lahore 2012
124 Foundry service centre(SMEDA)
Fabrication and supply of foundry equipments,
including mould boxes, formers , molten metal
ladles, sand riddle, wheel barrows, weighing scale
etc.
Lahore 2012
125 My Energy Pvt. Limited Design , Fabrication and testing of Air vessel
capacity 4 M³ Lahore 2012
126 Cress LPG(Pvt.) Limited Design , Fabrication and testing of 07 no.LPG
Bowzers capacity 14 M.Tons each Lahore 2012
127 Liaqat steel Pvt. Limited Design, Fabrication ,installation and commissioning
of waste Tyre pyrolysis plant capacity 10 Ton. Lahore 2012
128 ITS waste to energy Design, Fabrication ,installation and commissioning
of waste Tyre pyrolysis plant capacity 10 Ton. Lahore 2012
129 New Light House LTD
Design, Fabrication ,installation and commissioning
of waste Tyre pyrolysis plant capacity 10 Ton.
Lahore
2013
130 SH Enterprises Design, Fabrication ,installation and commissioning
of waste Tyre pyrolysis plant capacity 10 Ton. Lahore 2013
131 Lalyani Pyrolysis oil Design, Fabrication ,installation and commissioning
of waste Tyre pyrolysis plant capacity 10 Ton. Lahore 2013
132 Ravi Gas Pvt. Limited Design, Fabrication, testing and commissioning of 01
nos.LPG storage tanks capacity 155 M.Tons Islamabad 2013
Sr.No. CLIENT SCOPE OF WORK LOCATION YEAR Remarks
133 Cress LPG(Pvt.) Limited Design , Fabrication and testing of 10 no.LPG Bowzers
capacity 28 M.Tons each Lahore 2014
134 Ravi Gas Pvt. Limited Design, Fabrication, testing and commissioning of 02
nos.LPG Bowzers tanks capacity 32 M.Tons Islamabad 2014
CLIENTS’S CERTIFICATES
List of Tools and Equipment
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
1 SRM-01 Sheet Rolling Machine 2.5Mx6mm (th) England 1
2 SRM-02 Sheet Rolling Machine 3.5Mx50mm (th) Italy 1
3 SRM-03 Sheet Rolling Machine 2.1Mx10mm (th) Russia 1
4 SRM-04 Sheet Rolling Machine 2.5 M x 25 mm (th) England 1
5 PBM-01 Plate folding/bending m/c 3Mx6mm (th) Italy 1
6 PBM-02 Plate folding/bending m/c 2.5Mx5mm (th) Germany 1
7 SER-01 Section Rolling L 100x100x2mm (th) Italy 1
8 SER-02 Section Rolling L 70x70x8mm (th) England 1
9 SER-03 Section cutting m/c L120x120x13 Cheecko Slovakia 1
10 SHM-01 Shearing m/c 3Mx10mm (th) England 1
11 SHM-02 Shearing m/c 3Mx7mm (th) Germany 1
12 SWM-01 Sub merged arc welding Set 400 Amps. Germany 1
13 MWM-01 Mig Welding Set 400 Amps. Murex 1
14 TAW-01 Tig Argon Welding Sets 300 Amps. 1
15 DWG-01 DC Welding Generators (with motors) 500 Amps. 1
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
16 DWG-02 DC Welding Generators (with motors) 350 Amps. 1
17 DWG-03 DC Welding generators (with engines) 400 Amps. 1
18 DWP-01 Dc welding plant (rectifier) 430 Amp England Germany 1
19 DWP-02 Dc welding plant (rectifier) 430 Amp England Germany 1
20 DWP-03 Dc welding plant (rectifier) 430 Amp England Germany 1
21 DWP-04 Dc welding plant (rectifier) 430 Amp England Germany 1
22 DWP-05 Dc welding plant (rectifier) 430 Amp England Germany 1
23 DWP-06 Dc welding plant (rectifier) 430 Amp England Germany 1
24 DWP-07 Dc welding plant (rectifier) 430 Amp England Germany 1
25 DWP-08 Dc welding plant (rectifier) 430 Amp England Germany 1
26 DWP-09 Dc welding plant (rectifier) 430 Amp England Germany 1
27 DWP-10 Dc welding plant (rectifier) 430 Amp England Germany 1
28 DWP-11 Dc welding plant (rectifier) 430 Amp England Germany 1
29 DWP-12 Dc welding plant (rectifier) 430 Amp England Germany 1
30 DWP-13 Dc welding plant (rectifier) 430 Amp England Germany 1
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
31 DWP-14 Dc welding plant (rectifier) 430 Amp England Germany 1
32 DWP-15 Dc welding plant (rectifier) 430 Amp England Germany 1
33 DWP-16 Dc welding plant (rectifier) 430 Amp England Germany 1
34 DWP-17 Dc welding plant (rectifier) 430 Amp England Germany 1
35 DWP-18 Dc welding plant (rectifier) 430 Amp England Germany 1
36 DWP-19 Dc welding plant (rectifier) 430 Amp England Germany 1
37 DWP-20 Dc welding plant (rectifier) 430 Amp England Germany 1
38 DWP-21 Dc welding plant (rectifier) 430 Amp England Germany 1
39 DWP-22 Dc welding plant (rectifier) 430 Amp England Germany 1
40 DWP-23 Dc welding plant (rectifier) 430 Amp England Germany 1
41 DWP-24 Dc welding plant (rectifier) 430 Amp England Germany 1
42 DWP-25 Dc welding plant (rectifier) 430 Amp England Germany 1
43 DWP-26 Dc welding plant (rectifier) 430 Amp England Germany 1
44 DWP-27 Dc welding plant (rectifier) 430 Amp England Germany 1
45 DWP-28 Dc welding plant (rectifier) 430 Amp England Germany 1
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
46 DWP-29 Dc welding plant (rectifier) 430 Amp England Germany 1
47 DWP-30 Dc welding plant (rectifier) 430 Amp England Germany 1
48 MMW-01 Micro mig welding m/c (semi automatic plant) 160 Amp,26 V Japan 1
49 MMW-02 Micro mig welding m/c (semi automatic plant) 160 Amp,26 V Japan 1
50 MMW-03 Micro mig welding m/c (semi automatic plant) 160 Amp,26 V Japan 1
51 MMW-04 Micro mig welding m/c (semi automatic plant) 160 Amp,26 V Japan 1
52 MMW-05 Micro mig welding m/c (semi automatic plant) 160 Amp,26 V Japan 1
53 MMW-06 Micro mig welding m/c (semi automatic plant) 160 Amp,26 V Japan 1
54 MMW-07 Micro mig welding m/c (semi automatic plant) 160 Amp,26 V Japan 1
55 MMW-08 Micro mig welding m/c (semi automatic plant) 160 Amp,26 V Japan 1
56 GCM-01 Automatic Gas Cutting Machine 1
57 Gas Cutting & Welding Torches 20
58 APM-01 Air Plasma Cutting Machine 50mm 1
59 HPP-01 Hydralulic press (semi auto with heating arrangement) 50 ton Bipel, England 1
60 HPP-02 Hydralulic press (semi auto with heating arrangement) 80 ton Bipel, England 1
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
61 HPP-03 Power press with auto strip feeder 80 ton CRIMAR, France 1
62 HPP-04 Press mannual 05 ton Sweden 1
63 HPP-05 Press mannual 05 ton Sweden 1
64 HPP-06 Press mannual 05 ton Sweden 1
65 HPP-07 Press mannual 05 ton Sweden 1
66 HPP-08 Hydraulic press 100 ton Sweden 1
67 HPP-09 Hydraulic press 100 ton Sweden 1
68 HPP-10 Hydraulic press 100 ton Sweden 1
69 HPP-11 Hydraulic press 50 ton Sweden 1
70 HPP-12 Hydraulic press 50 ton Sweden 1
71 HPP-13 Hydraulic press 30 ton Sweden 1
72 HPP-14 Hydraulic press 30 ton Sweden 1
73 COM-01 Compressor 650 CFM England 1
74 FH-01 Fordge hammer Medium size Sweden 1
75 HKS-01 Hacksaw Medium size Sweden 1
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
76 HKS-02 Hacksaw Medium size Sweden 1
77 HKS-03 Hacksaw Medium size Sweden 1
78 HKS-04 Hacksaw Medium size Sweden 1
79 M/c dent remover England 1
80 CSP-01 Crank shaft re metaling plant (crank weld) 500 Amp Petersons U.S.A 1
81 MLB-01 Man line boring m/c Large size Berlo Italy 1
82 CSG-01 Crank shaft grinding m/c Large size Matra 1
83 CSG-02 Crank shaft grinding m/c Large size Russia 1
84 CSG-03 Cam shaft grinding m/c Large size Russia 1
85 CSG-04 Cam shaft grinding m/c Large size Italy 1
86 BHF-01 Block and head facer Large size Italy 1
87 BHF-01 Block and head facer Large size Matra 1
88 BBM-01 Block boring m/c Large size China 1
89 HOM-01 Honning m/c Large size Tokyo, Japan 1
90 HOM-02 Honning m/c Potable Barco, Italy 1
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
91 SLG-01 Slew grinding m/c Large size England 1
92 BHM-01 Boring and Honing m/c Large size Matra 1
93 CRB-01 Connecting rod boring m/c Large size Schou Denmark 1
94 PPG-01 Pressure plate grinding m/c Large size BEM Paris, France 1
95 BTG-01 Brake drum turning & grinding m/c Large size Muller France 1
96 BTG-02 Brake drum turning & grinding m/c Large size Muller France 1
97 BTG-03 Brake drum turning & grinding m/c Large size Muller France 1
98 BTG-04 Brake drum turning & grinding m/c Medium size BEM Paris, France 1
99 WFG-01 Wall facer & grinding m/c Large size Block & Decker,
England 1
100 WFG-02 Wall facer & grinding m/c Large size Block & Decker,
England 1
101 WFG-03 Wall facer & grinding m/c Large size Block & Decker,
England 1
102 ETB-01 Engine test bench Borgi saveri Italy 1
103 ETB-02 Engine test bench Borgi saveri Italy 1
104 CLM-01 Central lathe m/c Bed length 3' Peco 1
105 CLM-02 Central lathe m/c Bed length 5' Peco 1
S.No
.
Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
106 CLM-03 Central lathe m/c Bed length 8' Peco 1
107 CLM-04 Central lathe m/c Bed length 8' Peco 1
108 CLM-05 Central lathe m/c Bed length 8' Peco 1
109 CLM-06 Central lathe m/c Bed length 8' , BE-165 Germany 1
110 CLM-07 Central lathe m/c Bed length 8' , GS-210 Storebro, Sweden 1
111 CLM-08 Central lathe m/c Bed length 12', CL-250 Beco 1
112 CLM-09 Central lathe m/c Bed length 12', CL-200 Peco 1
113 CLM-10 Central lathe m/c Bed length 12', CL-200 Peco 1
114 CLM-11 Central lathe m/c Bed length 16', CL-305 Beco 1
115 CLM-12 Central lathe m/c Bed length 5' England 1
116 CLM-13 Central lathe m/c Bed length 5' England 1
117 MLM-01 Universal milling m/c Medium size Pak-Oerlikon 1
118 MLM-02 Universal milling m/c Medium size Adcock-Shipley Lakester,
England 1
119 MLM-03 Vertical milling m/c Medium size Stankoimport, Russia 1
120 SHM-01 Shaper m/c Stroke L 18" Peco 1
S.No
.
Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
121 SHM-02 Shaper m/c Stroke L 18" PECO 1
122 SHM-03 Shaper m/c Stroke L 36" Buller, England 1
123 RDM-01 Nc radial drill m/c (numerical control) with jig boring
attachment
Radial arm 8', 80mm driling
capacity Germany 1
124 RDM-02 Drilling m/c 50mm (driling capacity) Peco 1
125 RDM-03 Drilling m/c 50mm (driling capacity) NIPPEI, England 1
126 PDM-01 Piller or padestol type drill m/c 30mm (driling capacity) PD-20 Peco 1
127 PDM-02 Piller or padestol type drill m/c 30mm (driling capacity) PD-20 Peco 1
128 PDM-03 Piller or padestol type drill m/c 30mm (driling capacity) PD-20 Peco 1
129 PDM-04 Piller or padestol type drill m/c 30mm (driling capacity) PD-20 Peco 1
130 PDM-05 Piller or padestol type drill m/c 30mm (driling capacity) PD-20 Peco 1
131 CGM-01 Cylndrical gridnding m/c 400mmx2M l Length Nauten U.S.A 1
132 BGM-01 Baby cylndrical grinding m/c Internal & External Small size Churchel England 1
133 TGM-01 Teeth grinder or special m/c heavy duty for multi
purpose Heavy duty Norton England 1
134 SGM-01 Surface grinder Heavy duty England 1
135 PLM-01 Planner m/c Stroke 16' width 6' England 1
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
137 DPG-01 Diesel Power Generator 630 KVA 1
138 DPG-02 Diesel Power Generator 125 KVA 1
139 DPG-03 Diesel Power Generator 50 KVA 1
140 MCM-01 Mobile Compressor 60 HP 2
141 MCR-01 Mobile Crane 60 Ton Cap. 150 Ft
Boom COLLES 1
142 MCR-02 Mobile Crane Type B 40 Tons 1
143 MCR-03 Mobile Crane 15 Tons Avant 1
144 MCR-04 Mobile Crane 15 Tons Avant 1
145 MCR-05 Mobile Crane 15 Tons Avant 1
146 MCR-06 Mobile Crane 5 Tons FWD 1
147 MCR-07 Mobile Crane 30 Tons
148 MCR-08 Crawler Crane 80 ton Lama 1
149 BRM-01 Break Press 10 Ft W x 250 Ton Cap. 1
150 BRM-02 Break Press 8Ft W x 150 Ton Cap. 1
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
151 BRM-03 Break Press 13Ft W x 50 Ton Cap. 1
152 MGA-01 Mobile Gantry 5 Tons Cap, 1
153 RDM-04 Radial Drill Machine 10 Ft. Arm 1
154 CPF-01 Coupla Furnace 2
155 HIF-01 High Frequency Induction Furnance 1
156 SPL-01 Spectro Lab 1
157 OCR-01 Over-Head Crane 25 Tons COLLES 1
158 OCR-02 Over-Head Crane 27 Tons COLLES 1
159 CMS-01 Concrete Mixer Single Load - Local 8
160 CMD-01 Concrete Mixer Double Load - Local 5
161 RPB-01 Rope Pulley Block 5 Tons Cap, China 4
162 DWG-01 Double Wheel Grinder 8" - England 12
163 BG-01 Bench Grinder 8 " dia - China 6
164 ABG-01 Angle Bench Grinder dia 8" - China 6
165 WP-01 Water Pupms 4" Head Suction - Local 5
S.No. Equip.
No. DESCRIPTION CAPACITY ORIGIN QTY
166 WP-02 Water Pupms 3" Head Suction Local 4
167 E-0101 Excavator Model 100 EX -Hitachi - Hitachi 2
168 L-0101 Loader 950 D Cat. - Catterpiller 1
169 L-0102 Loader 814 E V - Volvo 1
170 RR-01 Road Rollers DYNAPAC & STATIC - Komo 2
171 TM-01 Tractor Messay Forgosson 375 - Messay 4
172 TM-02 Tractor Ford 4000 Ford 3
173 D-0101 Dumper Trolleys Local 7
PM-01 Paver Machine Italy 2
174 WT-01 Water Tankers 5000 L cap. Local 3
175 CV-01 Concrete Viberator 2" & 1.5" Electric Driven 8
176 CV-02 Concrete Viberator 2" & 1.5" Petrol Driven 6
177 VPC-01 Vibratory Plate Compactor Gr-3 6
178 FG-01 Frog Jumper 2
179 Leveling Equipment (theodolite, Y- Level etc.) 4 sets.