Date post: | 06-Mar-2016 |
Category: |
Documents |
Upload: | anna-atkinson |
View: | 219 times |
Download: | 5 times |
OdAN INTRODUCTION TO OD GROUP
WELCOME The Od Group was founded in 2004 to work alongside many of the professional bodies in the interiors
market delivering high quality interior projects across commercial, residential, and leisure sectors.
Over the past decade, steady growth and the consistent delivery of projects through some of the UK’s most
exciting and challenging times has resulted in OD Projects gaining respect from not only the professional
bodies that we work with but also our peers and the wider business community.
Od is one of the Capital’s leading integrated design, project management and construction companies. With
our partners we undertake various different projects in terms of scale and complexity for a diverse client base.
We genuinely enjoy working with a diverse range of companies from large multinationals to private clients,
taking care that each solution we design and implement reflects the individual needs of the client.
Od currently enjoys a 95% level of repeat business; a testament indeed to the professionalism and dedication
of all our staff, which is something we believe that sets us apart in the market. Our trademark is combining
high quality interior design and commercial acumen with best practice delivery in the market place.
The Od Management team is extremely passionate about what we do and supports all the staff within our
business who enable us to deliver beyond our client’s expectations. What each client has in common, is a
desire that their project is undertaken with complete attention to detail, is within budget, and delivered on
time by a professional team. They also wish for the project, which can often be the cause of great stress
within an organisation, to be as pleasurable an experience as possible.
At Od, we genuinely believe we can exceed all of our client’s needs and expectations.
• OD Projects client list includes Arsenal FC,
Scott Brownrigg, AYH, and Price & Myers.
• Recruitment of Commercial Director
(Managing Surveyor of top fit out company)
• Recruitment of Construction Director (BCO
& FX Quality Award Winner)
• AIB framework contractor.
• OD Projects currently employ 25 staff.
• Achieve British Council for offices corporate member status.
• Sign 5 year lease and fit out Moorgate HQ.
• Jon Kearney finalist for G4_ New Generation Awards –
Entrepreneurship Award.
• Rolls Royce Framework contractor
• Green Apple Award for Digitas
Saatchi & Saatchi
• Instutute of Chartered Accountants
Framework contractor
• Awarded Vogue /Condenast HQ fitout
• Education sector expansion with successful
fitout projects for Partnerships For Schools
and North Herts College
• Savills approved contractor
• High end residential team acknowledged as
leading contractor within sector
• Awarded refurbishment for Royal Albert Hall
2004 2005 2006 2007 2008 2009 2010 2011 2012
In January
Jon Kearney
founds OD Projects.
• Client base expanded to include Royal &
Sun Alliance, O2, AIB, Morley Fund, and GIS
Interpublic.
• Consultants include Gensler, Cushman &
Wakefield, Barr Gazetas, and Leslie Clark.
• Royal & Sun Alliance approved
contractor status.
• OD Projects complete £4 million,
107 Leadenhall, fit out.
• OD Projects achieve ISO9001 status.
• Forecast record turnover of circa £20m in with
Business Plan.
• Official launch of aftercare team ‘ZEROdEFECTS’.
• Successful completion of first Irish project for
Marcus Evans HQ in Dublin.
• Notable project wins for clients such as
Finchatton, BMB Property, United Continental
Airlines, Safestay and Royal London Asset
Management.
• Commitment to sustainability – BREEAM ‘Excellent’ achieved on refurbishment of RLAM property in Crawley, LEED silver certification
achieved for Harris Williams fit out in Mayfair,
SKA silver certificate achieved for Paradigm
Housing in High Wycombe.
• Rebrand of Od which defines our focus and
disciplined approach to achieving quality.
• Od appointed on Savills Estate Agency office
fitout framework
• Repeat business levels at 70% of turnover
and growing
• Notable project wins for Dow Jones, Royal
London Asset Management, Fendi,National
Australia Group and Berkeley Group
Marketing Suites
• Od completes its first hotel refurbishment for
launch of exciting new venture for Safestay in
London
• Od working on over 50000sqft of
Londons super prime residential projects in
Knightsbridge, Kensington & Hampstead
• Od Group formed, divisions focused on
Commercial Fitout, Super prime Residential
and Commercial Design & Build
• OD Expand office space to take another
floor at Sun St HQ
COMPANY HISTORY Founded in 2004 by Jon Kearney (Managing Director). OD Projects has over 50 years collective experience as London and South
East’s leading High Quality fitout contractor and we are keen to demonstrate our team player approach by working closely with all
members of professional teams on their projects.
We believe we have the best team of individuals available who have extensive knowledge and experience. These benefits will ensure
a smooth delivery that will exceed a project team’s expectations.
182 8 10 12 14 164 60
(Turnover £m April-April)
2011/2012
20 2422 26
2012/2013
Secured2013/2014 (Projected)
(Turnover £m April-April)
OD Solutions
Secured
Secured OD Interiors
OD Projects
2013/2014 (Projected)
2 8 10 12 144 60
OD GROUP TURNOVER
Secured
Secured2014/2015 (Projected)
TURNOVERRecently Od were delighted to announce the formation of the Od Group (Od Holdings)
This has provided a transparent platform for our service to continually improve, allowing our key staff to drive their core skills specifically within their respective specialist division
The group organisation commenced from the 2013/ 2014 financial period and is currently forecasting an overall turnover of £24million, £12 million of our forecast was secured
prior to commencement of the new April to Apil financial period.
Procurement: Design & Build
Architect Gensler
Project Manager Gensler
Quantity Surveyor Montie
Duration 11 Weeks
Value £600,000
Size 3000 sq ft
SAPINDALEVEL 5, 25 PARK LANE, W1
• New Cellularized Offices,
• New Meeting and Board rooms,
• High spec stone reception,
• Stone flooring,
• Specialist joinery,
• New Lighting inclusive of feature
lighting installed throughout into the
existing suspended ceiling and the new
plasterboard.
Strip out and new fit out of existing occupied offices in two separate phases.
The works undertaken comprised:
Procurement: Design & Build
Project Manager Gensler
Architect Gensler
Duration 10 weeks
Value £535,000
Size 7000 sqft
HARRIS WILLIAMSLEVEL 2, BROOK STREET MAYFAIR
• High quality bespoke joinery,
• Mechanical & electrical modifications,
• Double glazed BENE partitions & doors,
• Handmade carpet flooring,
• Audio visual installations.
CAT B fit out of the first floor newly refurbished occupied building to provide a high quality office.
The works comprised:
Project Manager: AYH
Architect: Hamilton
Quantity Surveyor: AYH
Services Engineer: AWA
Interior Design: Keech Green
Duration: 48 weeks
KENWOOD PLACEHAMPSTEAD
• New mechanical & electrical services
• Audio visual & IT networks
• Specialist joinery
• Extensive stonework
• High quality finishes.
The fit out of a penthouse apartment with 3 bedrooms and bathrooms comprising:
Works included:
Architect: Originate Architects Ltd
Quantity Surveyor: Vincent & Partners
Services Consultant: Chapman Bathurst
Structural Engineer: Michael Alexander
Duration: 63 weeks
Value: £5,000,000
RUTLAND GARDENSKNIGHTSBRIDGE
• Complete demolition & soft strip
• Secant piling to the site boundaries
• A complicated temporary support system &
10m deep basement formation, carried out
as CDP
• High quality stonework
• Whole house ventilation, air-conditioning,
i-Light systems audio visual package
The demolition of an existing two storey property with this prime location in Knightsbridge,
forming a 16m deep basement to the entire site.
FINANCIALSAPINDA DEAUTSCHLAND GMBH
NATIONAL AUSTRALIA GROUP
DOW JONES
LEGALSIMPSON THATCHER BARTLETT
MCCARTHY TETRAULT
RESIDENTIALGROSVENOR ESTATE
FINCHATTON
BERKELEY HOMES
MEDIASAATCHI & SAATCHI
VOGUE/CONDE NAST
FINAL CUT
AUTOMOTIVEROLLS ROYCE
KIA MOTORS
LANDMARK BUILDINGSTHE ROYAL ALBERT HALL
THE LANESBOROUGH
CANADIAN PACIFIC HOUSE
PREVIOUS CLIENTS
1 Sun Street
London
EC2A 2EP
Od