Integrated Photonic Systems Roadmap (IPSR)
Bob PfahlDirector of RoadmappingNovember 2, 2016
Sponsors & Participants
1
Sponsor
Lead Participants
Overview of IPSR
Roadmapping Process and Scope
Participants in Roadmap as of October 1, 201616 Countries, 590 Individuals, 231 Organizations
IPSR-AIMPhotonicsRoadmapping/ProjectPlanningProcess
3
Manufacturing System Plan (TWGs & PEGs)
Product Sector Requirements
Integrated Photonic Systems Roadmap
Gap Analysis
AIMPhotonicsImplementationPlan
AIMPhotonicsProjects
OpenRoadmapping
Closed Project Planning
Red=PSMROrange=AIM PhotonicsBlue=AIM & PSMR
Roadmap Structure
4
iNEMI Member Testimonials
• Mark Morizio (IBM)• “We rely on a vertically integrated organization like iNEMI where
we can develop technologies with others in the industry to accelerate our time to market and reduce development expenses.”
• Jean-Luc Pelissier (Universal Instruments)• “[The iNEMI Roadmap] gives us an opportunity to develop the
right product at the right time for the right people.”
• Murwad Kurwa (Flextronics)• “We can accelerate completion of projects with joint participation
from different members on the common need of the industry, benefitting both Flextronics and the industry.”
1. MonolithicIntegrationTWG:LionelKimerling,MIT– Chips:siliconphotonics, InP– Tradeoffs forcost,bandwidthdensity,powerefficiency, andfunctional latency
2. Electronic-PhotonicSystemPackaging:BillBottoms,ThirdMillenniumTestSolutions:
– Cost,materials, heat,footprint, portcount,bandwidth,integration,functionality
3. Connector&SubstrateTWG:JohnMacWilliams,U.S.Competitors– Connectors includes:allseparable interfaces withinthesystem scope
4. AssemblyandTestTWG:DickOtte,PromexIndustries– DesignforManufacturing– Assembly andTest– SupplyChainTradeOffs
EightIPSRTechnologyWorkingGroups(TWGs)
iNEMI Member Testimonials
• Mark Morizio (IBM)• “We rely on a vertically integrated organization like iNEMI where
we can develop technologies with others in the industry to accelerate our time to market and reduce development expenses.”
• Jean-Luc Pelissier (Universal Instruments)• “[The iNEMI Roadmap] gives us an opportunity to develop the
right product at the right time for the right people.”
• Murwad Kurwa (Flextronics)• “We can accelerate completion of projects with joint participation
from different members on the common need of the industry, benefitting both Flextronics and the industry.”
5. PhotonicSensorsTWG:BenMiller,U.ofRochester;AnuAgarwal,MIT
– PhotonicSensorsforawiderangeofmarkets
6. EPDA(Electronic-PhotonicDesignAutomation)TWG:BretAttaway,AIMPhotonics
– IntegratedSystemSimulationandDesignTools
7. SubstrateTWG:VoyaMarkovich,MicroelectronicAdvancedHardwareConsulting
– Includesallsubstratesexternaltothepackage8. TestTWG:DickOtte,PromexIndustries(acting)– PhotonicandElectricalTestatalllevels
EightIPSRTechnologyWorkingGroups(TWGs)
7
Two IPSR Product Emulators
1. Data Centers: High Bandwidth, Low Latency, Efficient Power– E to O and O to E– Applications focus on IT and Data
Communications2. IoT: Low Bandwidth, “High” Latency, Low
Power– Primarily E to O– Applications include IoT, Sensors
ThreeBenefitsfromParticipatinginRoadmapping
• IntheRoadmappingProcessyoumeetwithyoursupplychainfromtoptobottom.– Includesequipment,material,andcomponentsuppliers
• TheIntegratedPhotonicSystemsRoadmappingProcess:1. Identifiesandquantifiesintegratedphotonicmarketopportunities
tothesupplychain.Thusreducingtheriskofdevelopingnewproductsforthis
2. IdentifygapsoutsidethescopeofAIMPhotonicsthatpartnershipsorconsortiumcanaddress(COBO,iNEMI,HIR,HDPUG,etc.)Possible Subjects
StandardsDevelopmentDesignStandardsReliabilityStudiesTestingMethodsWarpage
3. AttractsfirmstoAIMPhotonics
8
Participants in Roadmap as of October 1, 201616 Countries, 590 Individuals, 231 Organizations
Activities and Work ProductsTWG Meetings by WebExWebinars on Key OutcomesTwo Workshops Each YearRoadmapParticipants in Roadmap as of October 1, 201616 Countries, 590 Individuals, 231 Organizations
FacilitateTwoRoadmappingWorkshops
• SpringworkshopincludedintroductoryworkshopsbytheSensorsandEPDATWGs,andMilitaryApplicationsPEG.– TechnicalPresentationsonFutureTechnologyNeedsandLeadingResearchwilladdress“NEXTSTEPSFORSUPPLYCHAINSUSTAINABILITY.”
• FallIPSRworkshop“BuildinganIndustry:PartII”(Oct31-Nov2)willincludepresentationsbythePhotonicSensorsandEPDATWGs– TheRoadmapTWGleaderswillpresentalistofCriticalChallengesforAIMProjectPlanning.
– TechnicalPresentationswilladdressFutureTechnologyNeedsforLIDARandotheremergingmarkets
10
UpcomingMonthlySeminarSeries
11
BoardLevelOpticalInterconnect10/20Dr.TerrySmith:3MJohnMacWilliams:BishopAssociateAbstract:Dr.SmithandMr.MacWilliamswillpresentaproposaltodevelopasinglemode,expanded-beammoduleinthenext18monthsforfutureapplicationssuchasmid-boardtransceivermodules,IOports,disaggregatedserver.Theprojectisdesignedtodeterminemanufacturabilityandcostreduction.
KeyChallengesIdentifiedbytheIPSRRoadmap11/17ProfessorLionelKimerling:MITAbstract:ProfessorKimerlingwillpresentthekeytechnologyneedsidentifiedbythe2016IPSRRoadmapandparticularlyfocusongapsthatAIMphotonicsshouldconsiderfor2017projects.