Integrated Photonic Systems Roadmap (IPSR) Bob Pfahl Director of Roadmapping November 2, 2016
Transcript
Page 1: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

Integrated Photonic Systems Roadmap (IPSR)

Bob PfahlDirector of RoadmappingNovember 2, 2016

Page 2: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

Sponsors & Participants

1

Sponsor

Lead Participants

Page 3: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

Overview of IPSR

Roadmapping Process and Scope

Participants in Roadmap as of October 1, 201616 Countries, 590 Individuals, 231 Organizations

Page 4: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

IPSR-AIMPhotonicsRoadmapping/ProjectPlanningProcess

3

Manufacturing System Plan (TWGs & PEGs)

Product Sector Requirements

Integrated Photonic Systems Roadmap

Gap Analysis

AIMPhotonicsImplementationPlan

AIMPhotonicsProjects

OpenRoadmapping

Closed Project Planning

Red=PSMROrange=AIM PhotonicsBlue=AIM & PSMR

Page 5: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

Roadmap Structure

4

Page 6: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

iNEMI Member Testimonials

• Mark Morizio (IBM)• “We rely on a vertically integrated organization like iNEMI where

we can develop technologies with others in the industry to accelerate our time to market and reduce development expenses.”

• Jean-Luc Pelissier (Universal Instruments)• “[The iNEMI Roadmap] gives us an opportunity to develop the

right product at the right time for the right people.”

• Murwad Kurwa (Flextronics)• “We can accelerate completion of projects with joint participation

from different members on the common need of the industry, benefitting both Flextronics and the industry.”

1. MonolithicIntegrationTWG:LionelKimerling,MIT– Chips:siliconphotonics, InP– Tradeoffs forcost,bandwidthdensity,powerefficiency, andfunctional latency

2. Electronic-PhotonicSystemPackaging:BillBottoms,ThirdMillenniumTestSolutions:

– Cost,materials, heat,footprint, portcount,bandwidth,integration,functionality

3. Connector&SubstrateTWG:JohnMacWilliams,U.S.Competitors– Connectors includes:allseparable interfaces withinthesystem scope

4. AssemblyandTestTWG:DickOtte,PromexIndustries– DesignforManufacturing– Assembly andTest– SupplyChainTradeOffs

EightIPSRTechnologyWorkingGroups(TWGs)

Page 7: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

iNEMI Member Testimonials

• Mark Morizio (IBM)• “We rely on a vertically integrated organization like iNEMI where

we can develop technologies with others in the industry to accelerate our time to market and reduce development expenses.”

• Jean-Luc Pelissier (Universal Instruments)• “[The iNEMI Roadmap] gives us an opportunity to develop the

right product at the right time for the right people.”

• Murwad Kurwa (Flextronics)• “We can accelerate completion of projects with joint participation

from different members on the common need of the industry, benefitting both Flextronics and the industry.”

5. PhotonicSensorsTWG:BenMiller,U.ofRochester;AnuAgarwal,MIT

– PhotonicSensorsforawiderangeofmarkets

6. EPDA(Electronic-PhotonicDesignAutomation)TWG:BretAttaway,AIMPhotonics

– IntegratedSystemSimulationandDesignTools

7. SubstrateTWG:VoyaMarkovich,MicroelectronicAdvancedHardwareConsulting

– Includesallsubstratesexternaltothepackage8. TestTWG:DickOtte,PromexIndustries(acting)– PhotonicandElectricalTestatalllevels

EightIPSRTechnologyWorkingGroups(TWGs)

Page 8: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

7

Two IPSR Product Emulators

1. Data Centers: High Bandwidth, Low Latency, Efficient Power– E to O and O to E– Applications focus on IT and Data

Communications2. IoT: Low Bandwidth, “High” Latency, Low

Power– Primarily E to O– Applications include IoT, Sensors

Page 9: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

ThreeBenefitsfromParticipatinginRoadmapping

• IntheRoadmappingProcessyoumeetwithyoursupplychainfromtoptobottom.– Includesequipment,material,andcomponentsuppliers

• TheIntegratedPhotonicSystemsRoadmappingProcess:1. Identifiesandquantifiesintegratedphotonicmarketopportunities

tothesupplychain.Thusreducingtheriskofdevelopingnewproductsforthis

2. IdentifygapsoutsidethescopeofAIMPhotonicsthatpartnershipsorconsortiumcanaddress(COBO,iNEMI,HIR,HDPUG,etc.)Possible Subjects

StandardsDevelopmentDesignStandardsReliabilityStudiesTestingMethodsWarpage

3. AttractsfirmstoAIMPhotonics

8

Participants in Roadmap as of October 1, 201616 Countries, 590 Individuals, 231 Organizations

Page 10: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

Activities and Work ProductsTWG Meetings by WebExWebinars on Key OutcomesTwo Workshops Each YearRoadmapParticipants in Roadmap as of October 1, 201616 Countries, 590 Individuals, 231 Organizations

Page 11: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

FacilitateTwoRoadmappingWorkshops

• SpringworkshopincludedintroductoryworkshopsbytheSensorsandEPDATWGs,andMilitaryApplicationsPEG.– TechnicalPresentationsonFutureTechnologyNeedsandLeadingResearchwilladdress“NEXTSTEPSFORSUPPLYCHAINSUSTAINABILITY.”

• FallIPSRworkshop“BuildinganIndustry:PartII”(Oct31-Nov2)willincludepresentationsbythePhotonicSensorsandEPDATWGs– TheRoadmapTWGleaderswillpresentalistofCriticalChallengesforAIMProjectPlanning.

– TechnicalPresentationswilladdressFutureTechnologyNeedsforLIDARandotheremergingmarkets

10

Page 12: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

UpcomingMonthlySeminarSeries

11

BoardLevelOpticalInterconnect10/20Dr.TerrySmith:3MJohnMacWilliams:BishopAssociateAbstract:Dr.SmithandMr.MacWilliamswillpresentaproposaltodevelopasinglemode,expanded-beammoduleinthenext18monthsforfutureapplicationssuchasmid-boardtransceivermodules,IOports,disaggregatedserver.Theprojectisdesignedtodeterminemanufacturabilityandcostreduction.

KeyChallengesIdentifiedbytheIPSRRoadmap11/17ProfessorLionelKimerling:MITAbstract:ProfessorKimerlingwillpresentthekeytechnologyneedsidentifiedbythe2016IPSRRoadmapandparticularlyfocusongapsthatAIMphotonicsshouldconsiderfor2017projects.

Page 13: IPSR Benefits of Roadmapping · Title: IPSR Benefits of Roadmapping Author: Cynthia Williams Created Date: 11/9/2016 5:55:38 PM

For additional information:

Bob [email protected]

www.photonicsmanufacturing.org


Recommended