IT Infrastructure Management IT Infrastructure Library Best Practice
Transcript
Page 1: IT Infrastructure Management IT Infrastructure Library Best Practice.

IT Infrastructure Management

IT Infrastructure Library

Best Practice

Page 2: IT Infrastructure Management IT Infrastructure Library Best Practice.

2

Sources

IT Infrastructure LibraryOGC Service Desk Rosebery Court St Andrews Business Park Norwich NR7 0HS Tel: +44 (0) 845 000 4999Email:[email protected] Web site: http://www.ogc.gov.ukhttp://www.itil.co.uk

Page 3: IT Infrastructure Management IT Infrastructure Library Best Practice.

3

Authors

Paul Graham Amplecom Ltd

Sjoerd Hulzinga PinkRoccade

Colin Rudd IT Enterprise Management Services Ltd

Annemieke van Dijk Hewlett Packard

Rob van Winden Perot Systems

Page 4: IT Infrastructure Management IT Infrastructure Library Best Practice.

4

Table of Contents

IT Deployment ManagementIT Operations Management

Page 5: IT Infrastructure Management IT Infrastructure Library Best Practice.

5

Deployment process (Definition)

The Deployment process is concerned with the implementation and rolling out of the business, and/or ICT, solution as designed and planned, with minimum disruption to the operations of the business processes

Page 6: IT Infrastructure Management IT Infrastructure Library Best Practice.

6

A deployment project

Recognise and maintain the standards and proceduresDefine and maintain the roles and responsibilities necessary Ensure that documentation and guidance regarding standards, procedures and architectures based on Design and Planning process Provide suitable documentation, guidance and direction so as to coordinate effectively

Page 7: IT Infrastructure Management IT Infrastructure Library Best Practice.

7

A deployment project

Provide guidance and direction to support the interfaces with existing Service Support and Service Delivery processes

Define and maintain suitable management reporting in order to monitor and track progress.

Page 8: IT Infrastructure Management IT Infrastructure Library Best Practice.

8

IT Deployment ManagementBasic Concepts

Initiation

Planning

Execution

Close-down

Page 9: IT Infrastructure Management IT Infrastructure Library Best Practice.

9

Page 10: IT Infrastructure Management IT Infrastructure Library Best Practice.

10

Deployment Objectives

create, maintain and manage a plan that contains clear statements on scope, schedule and resourcesset up a team of professionals with the right skill set and cultural outlook address Risk Management throughout the whole lifecycle of the programme or project ensure that the deliverables of the programme or project meet the requirements

Page 11: IT Infrastructure Management IT Infrastructure Library Best Practice.

11

Objectivesexecute the programme or project as specified in the plan including the transition from the old situation to the new situation ensure that the knowledge that is built up within the team is transferred to the Operations organisation report the status of the programme or project in accordance with the organisation’s standards and methods ensure that the necessary documentation is available for Operations and Technical Support.

Page 12: IT Infrastructure Management IT Infrastructure Library Best Practice.

12

Deployment Costs

an increased need for competent project managers able to manage depl. project the development of processes and procedures to conduct deployment projects in a repeatable, and defined manner adoption and tailoring of tools to support the defined process, for example, Project Management tools, test tools, etc. the establishment and maintenance of appropriate test environments

Page 13: IT Infrastructure Management IT Infrastructure Library Best Practice.

13

Deployment Costs

the implementation of process improvement and cultural change

appropriate training and professional development of staff involved in deployment projects.

Page 14: IT Infrastructure Management IT Infrastructure Library Best Practice.

14

Possible problems

a lack of management commitment inadequate resources in terms of skills and competencies a lack of proper planning and reluctance to accept predicted time-scales poor relationship management and the lack of necessary role interaction and task coordination inappropriate tools or inadequate training in their effective use

Page 15: IT Infrastructure Management IT Infrastructure Library Best Practice.

15

Possible problems

lack of project monitoring and inappropriate project metrics

over-commitment of resources and the inability of the deployment project to deliver to planned time-scales and budget.

Page 16: IT Infrastructure Management IT Infrastructure Library Best Practice.

16

The roles and responsibilities

Deployment Process Owner

Deployment project manager

Deployment Coordinator

Deployment Analyst

Deployment Team Member

Page 17: IT Infrastructure Management IT Infrastructure Library Best Practice.

17

External interfaces

Configuration Management

Change Management

Release Management

Service Desk

Page 18: IT Infrastructure Management IT Infrastructure Library Best Practice.

18

Change Management

The goal of the Change Management process is to control and manage all changes concerned with CIs. While the Deployment process is the process that is concerned with the rolling out of ICT solutions, the Change Management process is, by definition, used within the Deployment lifecycle, specifically in the roll-out phase.

Page 19: IT Infrastructure Management IT Infrastructure Library Best Practice.

19

Change ProcessFlow

Page 20: IT Infrastructure Management IT Infrastructure Library Best Practice.

20

Management processes involved

Metrics identify variances and trends that may

have an impact on the project

The benefits provide early warning of risks and

problems become a catalyst for corrective action communicate variances and trends to

stakeholders.

Page 21: IT Infrastructure Management IT Infrastructure Library Best Practice.

21

MetricsProgress metrics Progress metrics measure the progress of a

delivery engagement by comparing actual activity and product delivery dates against planned targets.

Performance metrics Performance metrics measure delivery

performance by comparing actual costs and elapsed time against planned targets.

Quality metrics Quality metrics measure product and service fitness

by comparing defects at various stages

Page 22: IT Infrastructure Management IT Infrastructure Library Best Practice.

22

Processes and deliverables

Design phase Functional design

specifications that form the functional requirements acceptance criteria

Processes and organisation processes that are involved in the roll-out of the ICT

solution, and in the Operations phase Technical design

such as network protocol usage, systems configurations, versions, platform specific issues

Page 23: IT Infrastructure Management IT Infrastructure Library Best Practice.

23

Processes and deliverables

Working environments development environment test environment acceptance environment production environment

Page 24: IT Infrastructure Management IT Infrastructure Library Best Practice.

24

Processes and deliverables

Build phase Building the ICT infrastructure solution

Creating the actual ICT infrastructure solution, aspects might need attention:

planning the usage of the development and/or test environments

version control during the development process, controlling the way to hand over new versions for acceptance testing

controlling the setting of parameters and access rights to ICT components

environmental issues, e.g., space, cooling, power, fire precautions, etc.

accessibility and security measures safety measures

Page 25: IT Infrastructure Management IT Infrastructure Library Best Practice.

25

Processes and deliverables

Build phase (cont.)

Standardisation and integration aspects

ICTIM standards can facilitate integration at several levels

event integration (messaging systems) data integration functional integration

Documentation Training

Page 26: IT Infrastructure Management IT Infrastructure Library Best Practice.

26

Processes and deliverables

Acceptance testing Testing methodologies Functionality tests Performance and volume tests Documentation Reporting

Page 27: IT Infrastructure Management IT Infrastructure Library Best Practice.

27

Processes and deliverables

Roll-out phase Define a roll-out strategy

the ‘big bang’ scenario;a staged transition scenario Roll-out plan consist of:

overview of the parties involved description of the ICT solution to be rolled out roll-out strategy migration strategy back-out scenarios and procedures risks and Risk Management decision tree

Page 28: IT Infrastructure Management IT Infrastructure Library Best Practice.

28

Processes and deliverables

Roll-out plan consist of (cont.) :

necessary changes managed by Change Management

migration plan overview of necessary resources roll-out schedule site surveys provision for feedback of early roll-out

experience.

Page 29: IT Infrastructure Management IT Infrastructure Library Best Practice.

29

Processes and deliverables

Roll-out phase (cont.) Testing

Roll-out affect the production environment directly

Execute the roll-out plan After-care period

Page 30: IT Infrastructure Management IT Infrastructure Library Best Practice.

30

Processes and deliverables

Handover Post-project evaluation Project sign-off

a point where new business and initiatives can start

Page 31: IT Infrastructure Management IT Infrastructure Library Best Practice.

31

Hand Over

Post-project evaluation repors: it documents the results of the post-project

evaluation meeting it provides a comparison of project results with

project objectives it provides an evaluation of the project deliverables it documents best practices and lessons learned

from the project it details the project handover and shutdown

activities it documents project participants throughout the life

of the project.

Page 32: IT Infrastructure Management IT Infrastructure Library Best Practice.

32

Tools

Project Management toolsDevelopment toolsTest tools


Recommended