J. Marr - 1 SIM MMR
Spa
ce In
terf
erom
etry
Mis
sion
A NASAOriginsMission
SIM
5/14/2004Project Summary
National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology
SIM Project OverviewSalient Features • 3 parallel Michelson Stellar Interferometers• 10 meter baseline• Visible wavelength• Launch Vehicle: Atlas V or Delta IV ELV• Earth-trailing solar orbit• 5 year mission life with 10 year goal• SIM is a JPL, Caltech, Lockheed Martin ATC,
NGST, KSC, and SIM Science Team partnership
Science• Perform a search for other planetary systems by surveying 2000 nearby stars for astrometric
signatures of planetary companions• Survey a sample of 200 nearby stars for orbiting planets down to terrestrial-type masses• Improve best current catalog of star positions by >100x and extend to fainter stars to allow
extension of stellar knowledge to include our entire galaxy• Study dynamics and evolution of stars and star clusters in our galaxy to understand how our
galaxy was formed and how it will evolve.• Calibrate luminosities of important stars and cosmological distance indicators to improve our
understanding of stellar processes and to measure precise distance in the distant universe
J. Marr - 2 SIM MMR
Spa
ce In
terf
erom
etry
Mis
sion
A NASAOriginsMission
SIM
5/14/2004Project Summary
National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology
SIM Synoptic Schedule
Tech. Dev.
FY’98 FY’99 FY’00 FY’01 FY’02 FY’03 FY’04 FY’05 FY’06
Phase A
Phase B
Select Ind. Partners
FY’07
Design Selection
3/01ERB
IA
2/10Launch11/06
CDR
AOScience Team
Selection
FY’08
Phase C/D
FY’09
11/03SRR
8/03
7/05PDR/NAR
8/05CR
(NASAPMC)
12/05
New
Bea
m L
aunc
her D
emo
(Com
plet
e)
MA
M-1
and
Kite
at L
evel
1 (C
ompl
ete)
Nan
o te
chno
logy
Fini
shed
(STB
-3) (
Com
plet
e)
Path
leng
th F
eedf
owar
d V
erifi
catio
n (6
/05)
4/03PMSR
ICA
6/10/03ICRR
6/18/03ICR
FY’10
MA
M-1
Wid
e A
ngle
Bas
ic R
eq (C
ompl
ete)
MA
M-1
NA
Goa
l Ben
chm
ark
(Com
plet
e)
MA
M-1
WA
Goa
l B
ench
mar
k (5
/04)
ATLO = Assy, Test & Launch Ops ERB = External Review Board PMSR = Preliminary Mission & Systems Review SRR = System Requirements ReviewCA = Confirmation Assessment IA = Independent Assessment NAR = Non Advocate Review ICRR = Initial Confirmation Readiness Review (JPL GPMC)CDR = Critical Design Review I&T = Integration & Test PDR = Preliminary Design Review ICR = Initial Confirmation Review (Code S EPMC)CR = Confirmation Review (NASA PMC) NASA PMC = Programmatic Management Council
CA
8/05CRR
Pre-Phase BTech Gates
Pre-Phase CTech Gates
10/08I&T/ATLO
Start
10/09Ship toKSC
13-year Phase EStarts in 08/10Ends in 08/23
J. Marr - 3 SIM MMR
Spa
ce In
terf
erom
etry
Mis
sion
A NASAOriginsMission
SIM
5/14/2004Project Summary
National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology
SIM Schedule
J. Marr - 4 SIM MMR
Spa
ce In
terf
erom
etry
Mis
sion
A NASAOriginsMission
SIM
5/14/2004Project Summary
National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology
SIM Phase B Key Activities
J. Marr - 5 SIM MMR
Spa
ce In
terf
erom
etry
Mis
sion
A NASAOriginsMission
SIM
5/14/2004Project Summary
National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology
Project Organization
ELV MIM (KSC) C. Malloy
= Members of Project Integrated Management Team
Outreach (NP)W.M. Green
SIM Program Executive (HQ)
L. LaPiana
Navigator Program (NP)M. Devirian - ManagerC. Beichman - Scientist
Project Manager J. MarrDeputy Project Manager B. WattersonProject Scientist M. ShaoProject Business Manager Vacant
Project System Engineering
C. Guiar - System Engr)
Mission SystemD. Bindschadler - Mgr
K. Simpson - DMgr (Act)
Mission AssuranceA. Doran - Mgr
APD (JPL)L. Simmons - Mgr
J. Van Zyl - Dep Mgr
SIM Program Scientist (HQ)
P. Crane
Launch Support Office
A. Chatterjee
ProgrammaticLineSupport
Project Technical StaffInstrument Partner Manager H. DrosdatS/C-ATLO Partner Manager M. HerriageProject Engineer/Architect J. YuProject Technologist R. Laskin
Project Business OfficeAcquisition Manager/CTM John DavidsonAdministrator/Librarian Joy HodgesProject Resource Administrator Martha CrissScheduler John Mann
Flight Segment R. Laskin - Manager
C. Bell - Dep Mgr
Instrument Spacecraft
Science OfficeS. Unwin- Mgr & DPS
SIM Science Team
Science Planning TeamA. Wehrle - Lead
SIM Science Ops SystemD. Perz -Mgr
MSC
Ground SegmentD. Biondschadler (Actg)