J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project...

Date post: 17-Jan-2018
Category:
Upload: barrie-osborne
View: 219 times
Download: 0 times
Share this document with a friend
Description:
J. Marr - 3 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology SIM Schedule
5
J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origin s Missio n SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet Propulsion Laboratory California Institute of Technology SIM Project Overview Salient Features 3 parallel Michelson Stellar Interferometers 10 meter baseline Visible wavelength Launch Vehicle: Atlas V or Delta IV ELV Earth-trailing solar orbit 5 year mission life with 10 year goal SIM is a JPL, Caltech, Lockheed Martin ATC, NGST, KSC, and SIM Science Team partnership Science Perform a search for other planetary systems by surveying 2000 nearby stars for astrometric signatures of planetary companions Survey a sample of 200 nearby stars for orbiting planets down to terrestrial- type masses Improve best current catalog of star positions by >100x and extend to fainter stars to allow extension of stellar knowledge to include our entire galaxy Study dynamics and evolution of stars and star clusters in our galaxy to understand how our galaxy was formed and how it will evolve. Calibrate luminosities of important stars and cosmological distance indicators to improve our understanding of stellar processes and to measure precise distance in the distant universe
Transcript
Page 1: J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet.

J. Marr - 1 SIM MMR

Spa

ce In

terf

erom

etry

Mis

sion

A NASAOriginsMission

SIM

5/14/2004Project Summary

National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology

SIM Project OverviewSalient Features • 3 parallel Michelson Stellar Interferometers• 10 meter baseline• Visible wavelength• Launch Vehicle: Atlas V or Delta IV ELV• Earth-trailing solar orbit• 5 year mission life with 10 year goal• SIM is a JPL, Caltech, Lockheed Martin ATC,

NGST, KSC, and SIM Science Team partnership

Science• Perform a search for other planetary systems by surveying 2000 nearby stars for astrometric

signatures of planetary companions• Survey a sample of 200 nearby stars for orbiting planets down to terrestrial-type masses• Improve best current catalog of star positions by >100x and extend to fainter stars to allow

extension of stellar knowledge to include our entire galaxy• Study dynamics and evolution of stars and star clusters in our galaxy to understand how our

galaxy was formed and how it will evolve.• Calibrate luminosities of important stars and cosmological distance indicators to improve our

understanding of stellar processes and to measure precise distance in the distant universe

Page 2: J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet.

J. Marr - 2 SIM MMR

Spa

ce In

terf

erom

etry

Mis

sion

A NASAOriginsMission

SIM

5/14/2004Project Summary

National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology

SIM Synoptic Schedule

Tech. Dev.

FY’98 FY’99 FY’00 FY’01 FY’02 FY’03 FY’04 FY’05 FY’06

Phase A

Phase B

Select Ind. Partners

FY’07

Design Selection

3/01ERB

IA

2/10Launch11/06

CDR

AOScience Team

Selection

FY’08

Phase C/D

FY’09

11/03SRR

8/03

7/05PDR/NAR

8/05CR

(NASAPMC)

12/05

New

Bea

m L

aunc

her D

emo

(Com

plet

e)

MA

M-1

and

Kite

at L

evel

1 (C

ompl

ete)

Nan

o te

chno

logy

Fini

shed

(STB

-3) (

Com

plet

e)

Path

leng

th F

eedf

owar

d V

erifi

catio

n (6

/05)

4/03PMSR

ICA

6/10/03ICRR

6/18/03ICR

FY’10

MA

M-1

Wid

e A

ngle

Bas

ic R

eq (C

ompl

ete)

MA

M-1

NA

Goa

l Ben

chm

ark

(Com

plet

e)

MA

M-1

WA

Goa

l B

ench

mar

k (5

/04)

ATLO = Assy, Test & Launch Ops ERB = External Review Board PMSR = Preliminary Mission & Systems Review SRR = System Requirements ReviewCA = Confirmation Assessment IA = Independent Assessment NAR = Non Advocate Review ICRR = Initial Confirmation Readiness Review (JPL GPMC)CDR = Critical Design Review I&T = Integration & Test PDR = Preliminary Design Review ICR = Initial Confirmation Review (Code S EPMC)CR = Confirmation Review (NASA PMC) NASA PMC = Programmatic Management Council

CA

8/05CRR

Pre-Phase BTech Gates

Pre-Phase CTech Gates

10/08I&T/ATLO

Start

10/09Ship toKSC

13-year Phase EStarts in 08/10Ends in 08/23

Page 3: J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet.

J. Marr - 3 SIM MMR

Spa

ce In

terf

erom

etry

Mis

sion

A NASAOriginsMission

SIM

5/14/2004Project Summary

National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology

SIM Schedule

Page 4: J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet.

J. Marr - 4 SIM MMR

Spa

ce In

terf

erom

etry

Mis

sion

A NASAOriginsMission

SIM

5/14/2004Project Summary

National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology

SIM Phase B Key Activities

Page 5: J. Marr - 1 SIM MMR Space Interferometry Mission A NASA Origins Mission SIM 5/14/2004 Project Summary National Aeronautics and Space Administration Jet.

J. Marr - 5 SIM MMR

Spa

ce In

terf

erom

etry

Mis

sion

A NASAOriginsMission

SIM

5/14/2004Project Summary

National Aeronautics and SpaceAdministrationJet Propulsion LaboratoryCalifornia Institute of Technology

Project Organization

ELV MIM (KSC) C. Malloy

= Members of Project Integrated Management Team

Outreach (NP)W.M. Green

SIM Program Executive (HQ)

L. LaPiana

Navigator Program (NP)M. Devirian - ManagerC. Beichman - Scientist

Project Manager J. MarrDeputy Project Manager B. WattersonProject Scientist M. ShaoProject Business Manager Vacant

Project System Engineering

C. Guiar - System Engr)

Mission SystemD. Bindschadler - Mgr

K. Simpson - DMgr (Act)

Mission AssuranceA. Doran - Mgr

APD (JPL)L. Simmons - Mgr

J. Van Zyl - Dep Mgr

SIM Program Scientist (HQ)

P. Crane

Launch Support Office

A. Chatterjee

ProgrammaticLineSupport

Project Technical StaffInstrument Partner Manager H. DrosdatS/C-ATLO Partner Manager M. HerriageProject Engineer/Architect J. YuProject Technologist R. Laskin

Project Business OfficeAcquisition Manager/CTM John DavidsonAdministrator/Librarian Joy HodgesProject Resource Administrator Martha CrissScheduler John Mann

Flight Segment R. Laskin - Manager

C. Bell - Dep Mgr

Instrument Spacecraft

Science OfficeS. Unwin- Mgr & DPS

SIM Science Team

Science Planning TeamA. Wehrle - Lead

SIM Science Ops SystemD. Perz -Mgr

MSC

Ground SegmentD. Biondschadler (Actg)