Variation of River Bed Elevation (Mean/Deepest) -30 -20 -10 0 10 20 30 40 Mean River Bed ('00) Mean River Bed ('86) Deepest River Bed ('86) Deepest River Bed ('00) - 10 - 5 0 5 10 15 20 0 20 40 60 80 100 120 140 160 180 Distance from River Mouth (km) -2.4m ('00) -2.6m ('86) -1.7m ('00) -2.1m ('86) 6.8m ('00) 6.6m ('86) 13.0m ('86) 13.0m ('00) Variation of Average River Bed Elevation (Mean) for the Past 14 years
Transcript

Variation of River Bed Elevation (Mean/Deepest)-30

-20

-10

0

10

20

30

40

Mean River Bed ('00)Mean River Bed ('86)

Deepest River Bed ('86)

Deepest River Bed ('00)

-10

-5

0

5

10

15

20

0 20 40 60 80 100 120 140 160 180Distance from River Mouth

(km)

-2.4m ('00)

-2.6m ('86)

-1.7m ('00)-2.1m ('86)

6.8m ('00)6.6m ('86)

13.0m ('86)13.0m ('00)

Variation of Average River Bed Elevation (Mean) for the Past 14 years

Cross-S

ectio

nal V

aria

tion

The F

easibility Study of the Flood C

ontrol Project

for the Low

er Cagayan R

iverin the R

epublic of the Philippines

JAPA

N IN

TE

RN

AT

ION

AL

CO

OPE

RA

TIO

N A

GE

NC

Y

Fig

ure 2

.5.7

Babuyan Channel

Aparri

Linao

Tallungan

Zanja

Bisagu

Paruddun Sur

Mbangug

Macanaya

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the Philippines

JAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.5.8

Variation of Sandbar near River Mouth

Scale0 0.5 1 2 km

Legend

Topographic Map (1979)

Aerial photographs (1996)

Aerial photographs (2000)

Nassiping

Alcala

Amulung

Solana

Tuguegarao

Iguig

Enrile

Meandering rate (S) Year AB CD S (km) (km) (AB/CD)1953 87.0 41.0 2.121979 78.0 41.0 1.901996 74.8 41.0 1.822000 74.4 41.0 1.81

Meandering rate

Meandering rate (S) = AB / CD

AB : Channel length CD : Straight line length

CA

Channel

DB

0 10 20 30 40 50 60

0 10 20 30 40 50 60

0.0

0.2

0.4

0.6

0.8

0.0

0.2

0.4

0.6

0.8

1950 1960 1970 1980 1990 2000 2010

Meandering rate (S)

( S=

AB

/CD

)

2.4

2.2

2.0

1.8

1.6

Meandering rate

Stra

ight

line

leng

th =

41.

0 km

Legend

Topographic map (1947 - 1953)

Aerial photographs (1979)

Aerial photographs (1996)

Aerial photographs (2000)

Road

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the PhilippinesJAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.5.9Meandering Rate in the Reach from Alcala to Tuguegarao

N

0 2 4 6 8 10 kmScale

Aparri

Lal-lo

Magapit Br.Magapit

Gattaran

Nassiping

Tuao

Alcala

Iguig

Amulung

SolanaBuntun Br.

Enrile

Cabagan

Tumauini

Cauayan

Ilagan

Magat Dam

Mallig

Tuguegarao

Echague

Santiago

Pangal Norte

Jones

Babuyan Channel

Dummon R.

Caga

yan

R.

Pared R.

Chico R

.

Tuguegarao R.

Sier

ra M

adre

Mou

ntai

ns

Sier

ra M

adre

Mou

ntai

ns

Pinacanauan R.

Tumauini R.

Caga

yan

R.

Magat R.

Ilaga

n R.

Siffu R.

Mallig

R.

Cord

iller

a M

ount

ains

Mag

at R.

Caga

yan

R.

1011

12

15

13 23

22

26

2524

14

16

19

3231

20

21

35

34

37 49

33

36

2928 27

30

18

17

1

3

45

6

78

9

2

50 73

0 10 20 30 kmScale

Critical Bank Erosion Sites

N

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the PhilippinesJAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.6.1

Bank erosion

River CourseRoadBasin BoundarySubbasin of MajorTributary

LEGEND

Inu

nd

atio

n A

rea M

ap

The F

easibility Study of the Flood C

ontrol Project

for the Low

er Cagayan R

iverin the R

epublic of the Philippines

JAPA

N IN

TE

RN

AT

ION

AL

CO

OPE

RA

TIO

N A

GE

NC

Y

Fig

ure 2

.6.2

Babuyan Channel

Dummon R.

Cagayan R

.

Pared R.

Chic

o R

. Tuguegarao R.

SIE

RR

A M

AD

RE

MO

UN

TA

INS

SIE

RR

A M

AD

RE

MO

UN

TA

INS

Pinacanauan R.

Tumauini R.

Cagayan R

.

Mag

at R

.Il

agan R

.

Siffu R.

Mal

lig R

.

CO

RD

ILL

ER

A M

OU

NTA

INS

Addalam R.

Magat R

.

Cagayan R

.

Cagayan R

.

Babuyan Channel

Dummon R.

Cagayan R

.

Pared R.

Chic

o R

. Tuguegarao R.

SIE

RR

A M

AD

RE

MO

UN

TA

INS

SIE

RR

A M

AD

RE

MO

UN

TA

INS

Pinacanauan R.

Tumauini R.

Cagayan R

.

Mag

at R

.

Ilagan R

.

Siffu R.

Mal

lig R

.

CO

RD

ILL

ER

A M

OU

NTA

INS

Addalam R.

Magat R

.

Cagayan R

.

Cagayan R

.

Babuyan Channel

Dummon R.

Cagayan R

.

Pared R.

Chic

o R

. Tuguegarao R.

SIE

RR

A M

AD

RE

MO

UN

TA

INS

SIE

RR

A M

AD

RE

MO

UN

TA

INS

Pinacanauan R.

Tumauini R.

Cagayan R

.

Mag

at R

.

Ilagan R

.

Siffu R.

Mal

lig R

.

CO

RD

ILL

ER

A M

OU

NTA

INS

Addalam R.

Magat R

.

Cagayan R

.

Cagayan R

.

N

River Course

Road

Basin Boundary

Inundation Area

Subbasin of Major

Tributary

LEGEND

Oct.1998 FloodNov.1980 FloodNov.1973 Flood

Source:

1973 Flood and 1980 Flood:

FINAL REPORT FOR THE MASTER PLAN STUDY

ON THE CAGAYAN RIVER BASIN WATER RESOURCES

DEVELOPMENT / SUPPORTING REPORT/ AUGUST 1987

1998 Flood:

OCD Region II Office and Interview Survey by the Study Team0 10 20 30 40 50 km

Scale

Regional Director/Police Chief SuperintendentRegional Disaster Coordinating Council

RDCC OPLAN BAGYO/LAYOSsupported by

PRO2 LOI LA NINA and LOIKALIGTASAN

Provincial Disaster Coordinating CouncilsCity/Municipality Disaster Coordinating Councils

Barangay Disaster Coordinating Councils

Disaster Affected Areass

Committees

Source: Integrated Regional Disaster Management, RDCC Region 2

Note: The symbol "*" indicates the lead agency.

Communication and WarningServices

( *PIA, PNP, BUTEL, NTC, PAGASA, Radio Stations, OCD, REACT, Pugad Lawin, PLDT, CSC )

Health and Medical Services

(*DOH, PNP & PNRC, DILG)

Transportation Services

( *LTO, PNP, DPWH, ATO, PPC, CASF 2, 5ID PA, LTFRB )

Welfare and RehabilitationServices

( *DPWH, DSWD, DOH, NFA, DA, DECS, NTC, TELOF, PCIC, PNP, NGOs )

Price Stabilization Services

( *DTI, PNP, BIR, NAPOLCOM, DA, DOH, NGOs, LGUs )

Relief Services

( *DSWD, DOH, NFA, DAR, DA, PNRC, PNP, NGOs)

Rescue and Recovery Services

(*PNP, DOH, PNRC, DA, DPWH, LTO, 5ID PA, BFP, PPC, CASF 2, NGOs)

Training Services

( *OCD, DILG, DSWD, PNRC, PNP, DOH, DA, DPWH, PAGASA, BFP, DOLE, TESDA, DOST )

Tumauini

Pared

ChicoRive

ParetRiverPinacanau

an

River

Pa

ng

olBrookRiver

CagayanRive

r

IlaganRive

r

Ca

gayanRiver

r

Casigna

n

River

Ma

ga

tRiver

Figure 2.6.4

N

10 0 10 20 30 40 50km

SCALE

122°00'121°00' 121°30'

18°00'

17°30'

17°00'

16°30'

16°00'

Cagayan River

Tumauini

Pared

CagayanRiver

ChicoRive

Pa ret

RiverPina can aua n

River

Pa

ng

olBrookRiver

CagayanRive

er

IlaganRive

r

Ca

gayanRiver

Rapids RiverCagay

anRiver

Cagayan Ri ve

r

Casigna

n

River

Ma

ga

t River

Figure 2.7.1

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the PhilippinesJAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.8.1

Elevation Map

Source: “Philippine Land and Soils Management Atlas for Cagayan Valley, Region II, 1995” BSWM and“Elevation Map, Land Use Assessment for Potential Agri-Environmental Development andInvestment for CAR”, Nov. 1990, BSWM. CAR

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the PhilippinesJAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.8.2

Slope Map

Source: “Philippine Land and Soils Management Atlas for Cagayan Valley, Region II, 1995” BSWM and“Slope Map, Land Use Assessment for Potential Agri-Environmental Development andInvestment for CAR”, Nov. 1990, BSWM. CAR

0~3

3~8

8~18

18~30

30~50

>50

Slope Class (%)

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the PhilippinesJAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.8.3

Soil Map

0 1 2 3 4 5km

SCALE

LEGEND

Survey Area BoundaryRiver

Soil Areas MappingCode

Soil Type

119

109

256

82

393

96

68

148

388

Santa Rita Clay Loam

Quingua Clay Loam

Isabela Clay

San Manuel Silt Loam

San Juan Sandy Loam

San Manuel Sandy Loam

San Fernanda Clay

Barcelona Clay

San Juan Sandy Clay Loam

Source: Prepared by the JICA Study Team in 2000

IGUIG

SOLANA

TUGUEGARAO

ENRILE

STA MARIA

CABAGAN

PENABLANCA

ALCALA

AMULUNG

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the PhilippinesJAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.8.4

Land Use Map

Source: “Philippine Land and Soils Management Atlas for Cagayan Valley, Region II, 1995” BSWM and“Land Use/Vegetation Map, CAR”, BSWM. CAR

Forest Area

Land use category Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec

Irrigated Rice Field

Rice Rice

95 % 100 %

Corn &Rainfed Rice Field Other crops Rice

27 % 100 %Rice

Upland Rice Field (some other crops)

Corn Field

Corn Corn (some other crops)

96 % 100 %

Temporay crops Vegetables: Tropical and temperate vegetables & flowers, etc.

Permanent cropsTree crops: Coconut, Coffee, Mango, Banana, etc.

Monthly mean rainfall Tuguegarao gauging station 356.7(1985-1999)

263.4 269.5218.6

150.4 170.7120.0 113

53.232.8 16.2 29.2

Source: Barangay Screening Survey, BAS 1997

���

���

���

���

���

���

���

���

���

���

����

������������

�������������

�������������

�������������

�������������

�������������

�������������

�������������

�������������

�������������

��������������

����

�����

�����

�����

�����

�����

�����

�����

������

���

����� �

���

��

��

��

��

��

���

���

����

����������

����������

����������

����������

����������

����������

����������

����������

����������

������

������

��

��

��

��

��

��

��

��

��

��

���

��

���

���

���

���

���

���

���

������������������

���������������

���������������

���������������

���������������

���������������

���������������

���������������

���������������

������������������

������������������

������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

The Feasibility Study of the Flood Control Project for the Lower Cagayan River in the Republic of the Philippines

JAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.8.5 Present Cropping Pattern in the Cagayan River Basin

100

300

200

Figure 2.8.6 V

icious Cycle of Farm

er's L

ivelihood in L

ower C

agayan River A

rea

Preparation of Farming

Nursery and Seedling

Planting and Raising

Harvesting

Drying

Less Selling Products

Natural Calamity by Flooding and

Drought

Shortage of Food

Less Harvest

Less Income

Shortage of Dryers, Stores

Shortage of Labor

Shortage of Capital

Loans from Landowner / Traders with interest of 3 - 10

%/M

Buy Food from NFA

Leave for Jobs in Urban Area

Leave Farmland become landless

Buy Farm Inputs

Employ Labor /Machinery

Sell Products to Traders in Cheap Price due to High Moisture Content, Low

Bargaining Power of Farmers

Repayment of Loans

Traditional Crop Sharing of Landowner vs. Tenant, 1/3 -

5/6 by Farming condition

Many Landless Farmers No Written Agreement of Tenant

Farming

Damages

Damages

The Feasibility Study of the Flood

Control Project for the L

ower C

agayan R

iver in the Republic of the Philippines

JAPA

N IN

TERN

ATIO

NA

L CO

OPER

ATIO

N

AG

EN

CY

Sta. Fe

AlfonsoCastañeda

Nastipunan

Aritao

KayapaBambang

Dupax DelSur

Dupax Del Norte

Kasibu

Ambaguio

Bayombong Quezon

Solano

Villa VerdeBagabag

DiadiDiffun

CabarroguisAglipay

Saguday

San Agustin

Jones

Echague

San Isidro

SantiagoCordon

Ramon

San Mateo

Alicia

Cauayan

CabatuanAurora

San Manuel

PotlaMayaoyaoBanaueBauko

Sabangan

Hungduan

AsipuloLamut

Lagawe

Sagada

Bontoc

Barlig

Natonin

TanudanTinglayan

Lubuagan

Pasil

Paracelis

Balbalan

Pinukpuk

Conner

RizalPiat

Tuao

Rizal

Solana

Enrile

Sta.Maria

Sto.Tomas

Quezon

Magsaysay

Quirino

Mallig

Roxas

BurgosGamo

Luna

Ilagan

Naguilan

ReinaMercedes

San Mariano

BentonSoliven

SanGuillermoAngapanan

Cabagan

Tumauini

Maconagan

Divilacan

Palanan

Tuguegarao

Peña blanca

San Pablo

Iguig

Amulung

AlcalaSto. Niño

Lasam Gattaran

Baggao

Lallo

Allcapan Camalaniugan

Aparri

Dinafigui

Dilasag

Casiguran

Dinalongan

Sadanga

Aguinaldo

Kiangan

Timoc

Kabugao

Hinyon

Maddela

Sta.Praxedes

ClaveriaSanchez

Mira

Pamplona

Abulug

Ballesteros

Buguey

Sta.Teresita Gonzaga

Sta. Ana

Calanasan

LunaSta.

Marcela

Pudtol Flora

Besao

Tadian

Dipaculao

San Luis

Baler

1716

JAPAN INTERNATIONAL COOPERATION AGENCY

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the PhilippinesFigure 2.11.1 Locations of Protected Areas in Cagayan Valley

Casecnan Watershed ForestReserve

Northern Sierra MadreNational Park

Dupax Watershed ForestReserve

Salinas Salt SpringsReserve/Salinas Deer

Refure

Bangan HillNational Park

Mt. PulogNational Park

Diadi MunicipalForest Park

Mt. Sto. DominoForest Reserve

CentralMayoyao Forest

Reserve

Natonin-TanudanForest Reserve

Chico RiverForest Reserve

Babalasang--BalbalanNational Park

Central ConnerForest Reserve

Magapit GameRefuge and Bird

Sanctuary

Tumauini WatershedForest Reserve

Fuyot SpringsNational Park

Callao Caves National Parks

Peña lanca ProtectedLandscape

Tabuk

Legend

Regional Boundary

Prov'l. Boundary

Municipal Boundary

Basin Boundary

Protected Area

Municipal Capital

JAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.11.2 Distribution Map of Aquatic Organisms in Cagayan River System

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the Philippines

PhilippineSea

Pinacanuan River

Sta. Fe River

Balasig River

Ganano River

BabuyanChannel

Tumauini River

Alimit River

0 5 10 15 20 25(km)

Scale

18o00'

17o30'

17o00'

16o30'

16o00'

kmdDf g

UCXh

HjFcEVA

N d

h P h

jh

JL V

P

BNOM

a

ZYSPj

ACD

FQ

P

C

hP

GV K

Nh

IKV

HP

iV

j

U

V

Vj

h

Gi

JL

e

V

JLCh

UHiK

N

Distribution LegendClass PiscesA - Anchovies/AnurawB - Araro/LiwaloC - AyunginD - BakulawE - BagsayF - BanakG - Carp (Cyprinus Carpio)H - Carp (Carassius sp.)I - Carp (silver)J - Catfish (freshwater)K - Catfish (manila)/KurilawL - Catfish/Paltat/HitoM - Croaker/TwelN - Eel/IgatO - Gizzard Shad/KabasiP - Goby/Bunog/BiyaQ - GouramiR - Grouper/Lapu-lapuS - IgatT - KansusuwitU - Mudfish/DalagV - Mullet/LudongW - Mullet/PurongX - Mullet/PasgaY - Seabass/Perch/Kakak/ ApahapZ - Shark/Yua - Slipmouth/Ikuran/Sapsap/ Bagsangb - Snappersc - Spadefish/Kapigedd - Surgeonfishe - Talakitokf - Tarpoon/Bulan-bulang - Tilapiah - Tilapia (black)i - Tilapia (white)Class Crustaceaj - Ulang/Udangk - Shrimp (white)/Pasayanl - Prawn /Padawm - Mudcrab/Alimangon - Crab (black rice)o - Crab/rasap - Crab/kappi

F

Sta. Fe

AlfonsoCastañeda

Nastipunan

Aritao

KayapaBambang

Dupax DelSur

Dupax Del Norte

Kasibu

Ambaguio

Bayombong Quezon

Solano

Villa VerdeBagabag

DiadiDiffun

CabarroguisAglipay

Saguday

San Agustin

Jones

Echague

San Isidro

SantiagoCordon

Ramon

San Mateo

Alicia

CauayanCabatuan

Aurora

San Manuel

PotlaMayaoyaoBanaueBauko

Sabangan

Hungduan

AsipuloLamut

Lagawe

Sagada

Bontoc

Barlig

Natonin

TanudanTinglayan

Lubuagan

Pasil

Paracelis

Tabuk

Balbalan

Pinukpuk

ConnerPiat

Tuao

Solana

Enrile

Sto.Tomas

Quezon

Quirino

Mallig

BurgosGamo

Ilagan

Naguilan

Reina MercedesSan Mariano

BentonSoliven

SanGuillermoAngapanan

Cabagan

Tumauini

Maconagan

Divilacan

Palanan

Tuguegarao

Peñablanca

San Pablo

Iguig

AmulungAlcalaSto. Niño

Lasam Gattaran

Baggao

Lal-lo

AllcapanCamalaniugan

Aparri

Dinapigue

Dilasag

Casiguran

Dinalongan

Sadanga

Aguinaldo

Kiangan

Timoc

NUEVA VIZCAYAPROVINCE

IFUGAOPROVINCE

MOUNTAINPROVINCE

KALINGAPROVINCE

APAYAOPROVINCE

Kabugao

QUIRINOPROVINCE

Hinyon

Maddela

Sta.Praxedes

ClaveriaSanchez

Mira

Pamplona

Abulug

Ballesteros

BugueySta.

Teresita Gonzaga

Sta. Ana

Calanasan

LunaSta.

Marcela

Pudtol Flora

Besao

Tadian

Dipaculao

San Luis

Baler

AURORAPROVINCE

ISABELAPROVINCE

CAGAYANPROVINCE

LegendRegional BoundaryProv'l. BoundaryMunicipal BoundaryBasin BoundaryProvincial CapitalMunicipal CapitalStation of Navigation RouteFlood Prone Area

1

23

45

9

11

1213

1516

JAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.11.3 List of Ferry Transportation on the Lower Cagayan River

The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the Philippines

NAVIGATION ROUTE1. Apagonan - Linao & Paruddun Norte, Aparri, Cagayan2. Catotoran - Mabanguc & Paruddun, Aparri, Cagayan3. Bangungayan - San Antonio & Fabrica, Lal-lo, Cagayan4. Centro, Gattaran - Callao, Lasam, Cag.5. Aggunetan - Nabariongan, Gattaran, Cagayan6. Nassiping I - Matalao Sto. Niño, Cag.7. Nassiping II - Dungao Sto. Niño, Cag.8. Tupang - Malalatan, Alcala, Cagayan9. Argui - Abolo, Amulung, Cagayan10. Bayo - Cattaran, Solana, Cagayan11. Ballacayu - Bangad Sta. Maria, Isabela12. Cabagan - San Rafael, Sto. Tomas, Isa.13. Anao - San Rafael, Sto. Tomas, Isabela14. Magayu - San Antonio, Magsaysa, Isa.15. Calamagui - Lullutan, Ilagan, Isabela16. Ilagan - Naguilian, Ilagan, Isabela17. Turayong - Mabantad, Cauayan,Isabela18. Maguilling, Piat - Alabiao, Tuao

6 78

10

17

14

Sta. Maria

Magsaysay

18

f

l

h

8

i

j

10

d

Legend

Regional Boundary

Prov'l. Boundary

Municipal Boundary

Basin Boundary

Historical & Cultural Heritage

Recreational Spot

4

6

JAPAN INTERNATIONAL COOPERATION AGENCY

Figure 2.11.4The Feasibility Study of the Flood Control Projectfor the Lower Cagayan River

in the Republic of the Philippines

List of Sites

1. The Miraculous Lady of Piat2. Iguig Calvary Hills and the Parish of St. James the Greater3. St. Peter's Cathedral4. Alcala's St. Philomene Church5. St. Hyacinth Ermita church6. St. Pablo Church7. Parish Church of St. Mathias8. St. Dominic Cathedral9. Dupax del Sur Church10. Banaue Rice Terraces11. Kiangan War Memorial12. Archeological Reservation

21

12

3 5

7

abc

k m

e

9

(Recreational Spots)

a. Callo Caves Tourist Zoneb. Jackpot Cavec. Odessa-Tumabali Cave Systemd. Sta. Victoria Cavese. Mt. Pulog National Parkf. Dalton Passg. Salinas Salt Springh. Alayan Cave at Malabing Valleyi. Nagbukel Cavej. Aglipay Cavesk. Governor Rapidsl. Victoria Fallsm. Bisangal Warefall

g

11

Locations of Historical and Cultural Heritagesand Recreational Spots in the Cagayan Valley

(Heritages)

The Feasibility Study of the Flood Control Project

for the Lower Cagayan River

in the Republic of the Philippines JA

PAN

INTERN

ATION

AL C

OO

PERATIO

N A

GEN

CY

Figure 2.12.1 Functional R

elationship for W

ater Related W

orks

POLICY-MAKING

NEDA

Coordination/Regulatory

NWRB

WATER QUALITY& SANITATION

EMB DOHBRK ENS

WATERSHEDMANAGEMENT

FMB BSWMNIA NPC

MWSS

INTEGRATED AREADEVELOPMENT

LLDA RDCBOI

DATA COLLECTION

NWRB NAMRIA BRSMGSB LWUA NIAPAGASA MWSS

RESEARCH

BRSPCAFMRRD

CLOUDSEEDING

OCD PAIBSWM

WATER SUPPLY

DPWH PMO-RWSMWSS DILG

IRRIGATION

NIA DA

HYDRO-POWER

NPC DOENEA OEA

FLOOD CONTROL

DPWH PMO-SWIMPMO-MFCP

PORTS &NAVIGATION

PPA

FISHERIES &RECREATION

BFAR PTA

The Feasibility Study of the Flood Control Project

for the Lower Cagayan River

in the Republic of the Philippines JA

PAN

INTERN

ATION

AL C

OO

PERATIO

N A

GEN

CY

Figure 2.12.2 O

rganizational Relationship for

Water R

elated Works

OFFICE OF

THE PRESIDENT

NEDA Infrastructure

Staff

DPWH

NWRB PMO-MFCP NWSS PMO-SWIM LWUA PMO-RWS BRS

DA

BSWM BFAR NIA

DENR

FMB NAMRIA EMB MGSB LLDA

DOE

NPC NEA OEA

DOH

EMS BRL

DOTC

PPA

DILG

LGUs PMO-WS&S

DOST

PAGASA PCAFNRRD

DTI

BOT

DND

OCD PAF

DOT

PTA

The Feasibility Study of the Flood Control Project

for the Lower Cagayan River

in the Republic of the Philippines JA

PAN

INTERN

ATION

AL C

OO

PERATIO

N A

GEN

CY

Figure 2.12.3 O

rganizational Chart D

epartment

of Public Works and H

ighways

SECRETARY Attached AgenciesLWUA, TRB & NWRB

UndersecretaryFor Technical Support

Service

BOCDirector

BOEDirector

BOMDirector

Asee. *For Plng.MIS, & Operation in

CAR, I, II & III

Asee. *For AMMS& Opt’n in NCR,IV-A, IIV-B & V

Asee. For Comp.,Financial Mgt.

Service

Asee. ForLegal Service

UndersecretaryFor Technical Support

Service

UndersecretaryFor Administrative

Finance & Legal Serv.

UndersecretaryFor Operation in

Visayas and Mind.

BRSDirector

BODDirector

PlanningServiceDirector

CFMSDirector

LegalServiceDirector

LASDirector

MISDirector

AMMSDirector

ECSECDirector

CAR & RegionsI, II and III

Reg’l Director

PMO Projects**In CAR &

Reg. I, II & III

NCR, IV-A,IV-B & V

Reg’l. Director

PMO Projects**NCR, IV-A &

IV-B

Reg. VI, VII, VIIIIX, X, CARAGA,

XI & XII

PMO Proj. in VI,VII, VIII, IX, X,

XI & XII

DE OfficesDistrict Engr.

Reg’l. EquipmentServices

DE OfficesDistrict Engr.

Reg’l. EquipmentServices

DE OfficesDistrict Engr.

Reg’l. EquipmentServices

* Reports to the concerned Undersecretary for matters on Services under them and directly to the Secretary for matters concerning regional operations.** PMO Heads report to the Undersecretary and two Assistant Secretaries for operations depending on the specific geographic jurisdiction of their projects.

The Feasibility Study of the Flood Control Project

for the Lower Cagayan River

in the Republic of the Philippines JA

PAN

INTERN

ATION

AL C

OO

PERATIO

N A

GEN

CY

Figure 2.12.4 O

rganizational Chart M

ajor Flood Control

and Drainage Project C

luster II

Republic of the Philippines

Department of Public Works and Highways

Project Management Office

DPWH SECRETARY

Project Manager/s LRBFCSP

ADMINIS- TRATIVE

TECHNICAL

Project Manager/s LCRFC

ADMINIS- TRATIVE

TECHNICAL

Project Manager/s AARURP

ADMINIS- TRATIVE

TECHNICAL

Project Manager/s MPHUMP

ADMINIS- TRATIVE

TECHNICAL

Project Manager/s CDPMV

ADMINIS- TRATIVE

TECHNICAL

Project Manager/s LADP

ADMINIS- TRATIVE

TECHNICAL

PROJECT DIRECTOR MFCDP-PMO

Cluster II

UNDERSECRETARY FIELD OPERATION “B”

ASST. SECRETARY FIELD OPERATION “A”

ASST. SECRETARY FIELD OPERATION “C”

COA Project Consultant/s

LRBFCSP - Laoag River Basin Flood Control and Sabo Project LCRFC - Lower Cagayan River Flood Control AARURP - Agno and Allied River Urgent Rehabilitation Project MPHUMP - Mt. Pinatubo Hazard Urgent Mitigation Project CDPMV - Comrehensive Disaster Prevention around Mayon Volcano LADP (CARBDP) – Lower Agusan Development Project

The Feasibility Study of the Flood Control Project

for the Lower Cagayan River

in the Republic of the Philippines JA

PAN

INTERN

ATION

AL C

OO

PERATIO

N A

GEN

CY

Figure 2.12.5 O

verall Organization of the R

egional Office

OFFICE OF THE REGIONAL DIRECTOR

REGIONAL DIRECTOR

MONITORING/MANAGEMENT STAFF

ASSISTANT REGIONALDIRECTOR

LEGAL STAFF

ASSISTANT REGIONALDIRECTOR

PLANNING AND DESIGNDIVISION

CONSTRUCTIONDIVISION

MATERIALS & QUALITYCONTROL AND HYDROLOGY

DIVISIONMAINTENANCE DIVISION

COMPTROLLERSHIP &FINANCIAL MANAGEMENT

DIVISION

ADMINISTRATIONDIVISION

PLANNING &PROGRAMMING SECTION

SURVEY &INVESTIGATION

HIGHWAY DESIGNSECTION

ARCHITECTURALSECTION

STRUCTURALSECTION

ROADS & RUNWAYSSECTION

FLOOD CONTROL &WATER SUPPLY SECTION

BRIDGESECTION

BUILDINGSECTION

PORTS & HARBORSECTION

MATERIAL BTESTINGSECTION

MATERIAL QUALITYCONTROL SECTION

HYDROLOGYSECTION

ROADS & BRIDGESSECTION

BUILDINGSERVICES

HYDRAULICSSECTION

BUILDINGSECTION

COMPTROLLERSHIP &FINANCIAL MGT.

ACCOUNTINGSECTION

BUDGETSECTION

CASHIER’SSECTION

PERSONNELTRANSACTION

FACILITIES &MAINTENANCE

PROCUREMENTSECTION

MANPOWERDEVELOPMENT

RECORDSSECTION

BATANES EDBasco, Batanes

CAGAYAN 1stED Aparri

CAGAYAN 2nd EDAbulug, Cagayan

CAGAYAN 3rd EDTuguegarao, City

ISABELA 1st EDIlagan, Isabela

ISABELA 2nd EDCauayan, Isabela

ISABELA 3rd EDSan Manuel,

Isabela

ISABELA 4th EDBatal, Sanchago

City

NUEVA VIZCAYAED

Bayonbong, NuevaViscaya

QUIRINO EDCabarruguis,

Quirino

RES Solana, CagayanArea I-BayonbongArea II-ReinamercedesArea III-Dummun, Gatt, CQuirino Sub area-Cab. QuirinoEach District Engineers Office

Having Similar Organization

Planning & DesignSection

ConstructionSection

AdministrativeSection

Finance &Accounting

Section

Materials &City Control

Section

MaintenanceSectopm

OFFICE OF THE CHIEF

REGIONAL EQUIPMENT ENGINEER

AREA II-1AREA EQUIPMENT ENGINEER

ADMINISTRATIVE &FINANCIAL SECTION

PLANNING & REPAIRSECTION

PlanningUnit

Base ShopUnit

AREA II-2AREA EQUIPMENT ENGINEER

ADMINISTRATIVE &FINANCIAL SECTION

PLANNING & REPAIRSECTION

PlanningUnit

Base ShopUnit

AREA II-3AREA EQUIPMENT ENGINEER

ADMINISTRATIVE &FINANCIAL SECTION

PLANNING & REPAIRSECTION

PlanningUnit

Base ShopUnit

QUIRINO AREA SHOP

PLANNING, MAINTENANCE& REPAIR SECTION

PLANNING & REPAIRSECTION

PLANNING & CONTROLUNIT

BASE SHOPUNIT

ADMINISTRATIVE &GENERAL SERVICES

SECTION

FINANCE & ACCOUNTINGSECTION