CREDENTIALS Licensed Architect, CA No. C33237 NCARB Cerficaon No. 112331 LEED AP BD+C No. 10661254 EDUCATION Texas Tech University, 2002 Master of Architecture magna cum laude J A R E D E T H A N SELECTED PROFESSIONAL WORK COMMERCIAL THE AK HOTEL PROPOSAL THE OLYMPIC STUDIO REFUGE ON NORTH CACHE MULLIN AUTOMOTIVE MUSEUM PLANET BLUE S.O.W.D. LAW RESIDENTIAL THATCHER SCHOOL DORMITORY SPLIT HOUSE YALE RESIDENCE MANHATTAN EASTERN COURT PANEL HOUSE A R C H F O L I O
Transcript
Page 1: Jared E Wright Portfolio

CREDENTIALSLicensed Architect, CA No. C33237

NCARB Certification No. 112331 LEED AP BD+C No. 10661254

EDUCATIONTexas Tech University, 2002

Master of Architecture magna cum laude

J A R E D E T H A N S E L E C T E D P R O F E S S I O N A L W O R K

COMMERCIALTHE AK HOTEL PROPOSALTHE OLYMPIC STUDIOREFUGE ON NORTH CACHEMULLIN AUTOMOTIVE MUSEUMPLANET BLUE S.O.W.D. LAW

RESIDENTIAL THATCHER SCHOOL DORMITORYSPLIT HOUSEYALE RESIDENCEMANHATTANEASTERN COURTPANEL HOUSE

AR

CH

F

O

L

IO

Page 2: Jared E Wright Portfolio

2

SHORT-LISTED AND WINNING DESIGN PROPOSAL FOR A DE-VELOPMENT LOCATED ON THE FAMED AB-BOT KINNEY BOULEVARD IN VENICE, CA

Page 3: Jared E Wright Portfolio

3

T H E AK H O T E LP R O P O S A L

THE FUNDAMENTAL PURPOSE OF THIS PROPOSAL WAS TO PRESENT AN IDEA OF WHAT A PLACE COULD BE - RATHER THAN FORCE A PRECONCEIVED NOTION OF WHAT IT SHOULD BE. THE UNDERLY-ING ETHOS OF THIS IDEA IS THAT A NEW HOTEL IN VENICE SHOULD BE OF VENICE NOT JUST IN VENICE. FROM MATERIAL TO LAYOUT, FROM AESTHETIC TO VIBE, EVERY ELEMENT MUST SPEAK OF VENICE. THE HOTEL PROPOSAL THEN BECAME A CONGLOMERATION OF LIFESTYLE PHO-TOS, MATERIAL SAMPLES, AND MOST IM-PORTANTLY: A LESSION IN HISTORY AND SURROUNDING CONTEXT; ALL THE WHILE STRESSING COMMUNITY AND STAKE-HOLDER INVOLVEMENT. ULTIMATELY THIS PROPOSAL WON THE COMMISSION OF A 70,000 SF MIXED-USE HOTEL ON ONE OF THE MOST FAMED STREETS IN ALL OF LOS ANGELES AND THE WEST COAST.

Page 4: Jared E Wright Portfolio

4

This project and “research stati on” to not only showcase a 25-year commitment to environmentally conscious design,

but to also act as a positi ve example for the surrounding community by creati ng a zero net energy solar powered and

carbon neutral architecture fi rm. The building is a creati ve adapti ve reuse of two existi ng buildings, formally a Taco

Stand and a Mexican Market, on a prominent corner in Santa Monica, CA. Unifying the two buildings to create a sin-

gular statement, the scope of work remained within the original footprint and saved over 90% of the original structure

and turned the site from 100% impervious to 100% pervious.

The main architectural interventi on and innovati on, is an elevated aluminum clad roof monitor, which fl oats above the

bow truss ceiling, which was exposed. The roof monitor serves three primary functi ons: to provide for a fl at roof to

accommodate the “Open Energy” integrated building photovoltaic roofi ng membrane, as a daylight harvester which

uses the white cool roof to refl ect diff used daylight into the space off its aluminum ceiling and as a solar chimney with

four thermostati cally controlled actuator windows that regulate natural venti lati on and passive cooling.

Page 5: Jared E Wright Portfolio

5

PROJECT INVOLVEMENTproject manager for david hertz faia architects

all phases, pre-design through constructi on

PROJECT DESCRIPTIONarea: 3,600 sf

type: single story adapti ve re-usestatus: completed, 2010

CREDENTIALSLEED Certi fi ed Plati num

Santa Monica Certi fi ed Green Businesspilot project for Santa Monica’s Green Building Program

grant recipient for the Community Energy Independence Initi ati vegreen roof research stati on monitored by non-profi t Earth Pledge (NY)

ENVIRONMENTAL FEATURESreused 90% of original structure

100% impervious to 100% perviouszero net energy user

natural day-lighti ngnatural venti lati on

100% white cool roof membranedenim exterior wall insulati on

thermostati cally controlled operable windowsrainwater collecti on system

solar pv panel arraybuilding integrated solar pv membrane

green roof planti ngautomated lighti ng controls

whole building batt ery back-uprecycled, reused and re-purposed content

drought tolerant landscapingzero VOC paints and adhesives

formaldehyde free milworkFSC certi fi ed wood products

hybrid vehicle parkingelectric bikes for employees

close proximity to public transit

MEDIA RECOGNITIONSundance Channel’s The Green:

Big Ideas For a Small Planet, 2007HGTV’s Designer’s Portf olio, 2007

LA Design magazine, 2007

THE OLYMPIC STUDIOLEED PLATINUM ARCHITECT’S OFFICE

SANTA MONICA, CA

BEF

OR

E

Page 6: Jared E Wright Portfolio

6

Mon

day,

Sep

tem

ber 1

8, 2

006

Shirl

ey

On:

10:3

9 AM

Last

Plo

tted

By:

1

23

SYNDESISSTUDIO

Santa MonicaCA 90404

0602D

PROPOSEDFLOOR PLAN

CITY SUBMITTAL SET04/26/06

05/01/06 DEMO PERMIT SET

1920 Olympic

CITY SUBMITTAL SET

1 PLAN CHECK CORRECTIONS

06/15/06

6/12/06

4

PLAN CHECK CORRECTIONS2 7/11/06

PERMIT REVISION SET

CITY RE-SUBMITTAL SET07/11/06

5 CITY RE-SUBMITTAL SET07/13/06

6 07/17/06

A1.59/18/2006

7 PERMIT REVISION RESUBMITTAL

PLAN CHECK CORRECTIONS3 8/02/06

08/08/06PERMIT REVISION RESUBMITTAL

8

PLAN CHECK CORRECTIONS4 8/14/06

08/18/06

9 08/25/06 M.E.P. SUBMITTAL

EXISTING MASONRY WALL

WALL LEGEND

EXISTING 2x4 WALL

NEW 2x4 PARTITION WALL (PER PERMIT #06PC0540)

NEW 2x4 WALL, 4'-2" HIGH W/ GLASS ABOVE TO CEILING

2PROPOSED FLOOR PLAN

1/4" = 1'-0"

(N) ROOF MONITOR ABOVE

104-1

F

F

108-1

110-1

111-1

107-1

109-1

104-B

101-1

103-B103-A

115-E

115-A

115-D

115-B

115-

F11

5-G

115-

H11

5-I

104-

A

107-

A

109-A

111-A

112-A

108-A

112-1

110-2

107-2

106-1

103-1

114-1

1A2.1

4A2.1

3A2.1

1A3.1

1A3.1

2A2.1

1A4.1

5A4.1

6A4.1

4A3.1

4A3.1

5A3.1

5A3.1

3A3.1

3A3.1

2A3.1

2A3.1

5'

4'

1'

4'-1

0"

15'-6

1/2

"

2'-3

"4'

-1"

2'-3

"

2' 7'

7'

3'-1

0"

5'-2 3/4"

3'-6

1/2

"

28'-1

1"

4'-7

"1'

-6"

4'-1

0"

4'-1

0"

9'-8

"

6'-2" 4'-7"

2'-2 3/4"

4'-1

0"

3'17'-10"

4'-2

"

10'

3'-2 3/4" 7'-6"7'-6"

7'-9"

3'-7 1/2"

6'-6"

10'-3

"

1'-4" 2'-5"1'-10"

10'-7 3/4"

1'-1

1 5/

8"

10'-4

1/2

"14

'-6 1

/2"

13'-5"

7'-1

"3'

10'-1

"8'

-7"

10'-3

"

48'-9 11/16"

3'7'

-3"

2'-8 1/2"

3'-4

5/8

"6'

-1"

3'-7

"

15'-3"15'-3 1/2"

12'-2 1/2"12'-10 13/16"

8'-10"

(E) TRUSS ABOVE

(E) TRUSS ABOVE

(E) BEAM ABOVE

DOWN

(E) BEAM ABOVE

(N) PHOTOVOLTAIC CANOPY,

UNDER SEPARATE PERMIT

LEVEL LANDING

LEVEL LANDING

FIRE DEPARTMENTKNOX BOX

DOWN

OPENABOVE

CL

CL

OPENABOVE

TYP.

EXIT

EXIT

CONFERENCE104

A: 329 sq ft

KITCHEN / UTILITY108

A: 127 sq ft

ADMIN103

A: 134 sq ft

STUDIO115

A: 1,424 sq ft

FILE STORAGE109

A: 147 sq ft

WOMEN'S LAV107

A: 87 sq ft

PRINCIPAL106

A: 148 sq ft

MEN'S LAV114

A: 50 sq ft

ENTRY101

A: 97 sq ft

SAMPLES111

A: 115 sq ft

RECEPTIONIST102

A: 55 sq ft

RECEPTION105

A: 100 sq ft

BREAK AREA112

A: 152 sq ftSTORAGE110

A: 145 sq ft

3

2

1

G

BC

DE

F

A

W/D

(N) OVERHANGABOVE

(N) LIGHT TOWER ABOVE

PORTABLE FIREEXTINGUISHER (2A-10BC)

PORTABLE FIRE

EXTINGUISHER (2A-10BC)

MAX 1/2" THRESHOLDAT LANDING

MAX 1/2" THRESHOLD

AT LANDING

2X6 PLUMBINGWALL

CL

CL

ADASHOWER

D.W.

N

Mon

day,

Sep

tem

ber 1

8, 2

006

Shirl

ey

On:

10:3

9 AM

Last

Plo

tted

By:

1

23

SYNDESISSTUDIO

Santa MonicaCA 90404

0602D

PROPOSEDROOF PLAN

CITY SUBMITTAL SET04/26/06

05/01/06 DEMO PERMIT SET

1920 Olympic

CITY SUBMITTAL SET

1 PLAN CHECK CORRECTIONS

06/15/06

6/12/06

4

PLAN CHECK CORRECTIONS2 7/11/06

PERMIT REVISION SET

CITY RE-SUBMITTAL SET07/11/06

5 CITY RE-SUBMITTAL SET07/13/06

6 07/17/06

A1.69/18/2006

7 PERMIT REVISION RESUBMITTAL

PLAN CHECK CORRECTIONS3 8/02/06

08/08/06PERMIT REVISION RESUBMITTAL

8

PLAN CHECK CORRECTIONS4 8/14/06

08/18/06

9 08/25/06 M.E.P. SUBMITTAL

1PROPOSED ROOF PLAN

1/4" = 1'-0"

202-L

200-B200-A

202-

K20

0-J

200-

I

200-

E20

0-C

200-

D

200-H

200-F200-G

1A2.1

4A2.1

3A2.1

1A3.1

1A3.1

2A2.1

4A3.1

4A3.1

5A3.1

5A3.1

3A3.1

3A3.1

2A3.1

2A3.1

5'

5'

2'-6

"3'

-1"

2'-6

"

4'-1"10'-4"

4'-1"

3'-5" 3'-3" 3'-5"

3'-5" 3'-3" 3'-5"

8'-1

"

4'-2

"

4'-6"

8'

3'-2

"1'

OPEN SLOT IN (N) ROOF OVERHANG

(N) OVERHANG

(N) DOWNSPOUT

(N) DOWNSPOUT

(N) HIGH ROOFOVERHANG ABOVE

(N) NON REFLECTIVE

COOL-ROOF ENERGY STAR

ROOFING SYSTEM

(N) MECHANICAL UNIT SCREEN

(N) ROOF MONITOR

(N) NON REFLECTIVE

COOL-ROOF ENERGY

STAR ROOFING SYSTEM

(N) NON REFLECTIVE

COOL-ROOF ENERGY

STAR ROOFING SYSTEM

(N) NON REFLECTIVE

COOL-ROOF ENERGY

STAR ROOFING SYSTEM

(N) NON REFLECTIVE

COOL-ROOF ENERGY

STAR ROOFING SYSTEM

(N) PHOTOVOLTAIC PANELS,

UNDER SEPARATE PERMIT

(N) PHOTOVOLTAIC CANOPY,

UNDER SEPARATE PERMIT

(N) PHOTOVOLTAIC PANELS,

UNDER SEPARATE PERMIT

(N) ENERGY STAR HIGH

EFFICIENCY HVAC UNITS

300-A

CL

CL

CL

CLCL

CL

SLOPE

V.I.F.V.I.F.

V.I.F.

SLO

PE

SLO

PE4:

12

4:12

4:12

4:12

SLOPE

(MIN. CLASS B RATING)(MIN. CLASS B RATING)

(MIN. CLASS B RATING)

(MIN. CLASS B RATING)

(MIN. CLASS B RATING)

CL

CL

CL

CL

V.I.F

.V.

I.F.

V.I.F

.

V.I.F

.

CLCL

3

2

1

G

BC

DE

F

A

3A3.2

1A3.2

2A3.2

4A3.2

(N) ALUMINUM FRAME

SKYLIGHT ICBO# ER-4063

(N) LIGHTTOWER

OPEN TO BELOW

2HIGH ROOF PLAN

1/4" = 1'-0"

26'-6"

4'18'-6"

4'

16'-1

"

4'8'

-1"

4'

4'2'

-6"

3'-1

"2'

-6"

4' 8'-1"10'-4"

8'-1"

(E) ROOF LINE BELOW

(E) ROOF LINE BELOW

(N) PHOTOVOLTAIC PANELS,

UNDER SEPARATE PERMIT

(N) TS FRAME AS

PER STRUCTURALS

CLCL

V.I.F

.

V.I.F

.

CL

CL

CL

CL

V.I.F

.V.

I.F.

V.I.F.V.I.F.

V.I.F.

V.I.F.F

E

3A3.2

1A3.2

2A3.2

4A3.2

N

Page 7: Jared E Wright Portfolio

7

Mon

day,

Sep

tem

ber 1

8, 2

006

Shirl

ey

On:

10:3

9 AM

Last

Plo

tted

By:

1

23

SYNDESISSTUDIO

Santa MonicaCA 90404

0602D

PROPOSEDROOF PLAN

CITY SUBMITTAL SET04/26/06

05/01/06 DEMO PERMIT SET

1920 Olympic

CITY SUBMITTAL SET

1 PLAN CHECK CORRECTIONS

06/15/06

6/12/06

4

PLAN CHECK CORRECTIONS2 7/11/06

PERMIT REVISION SET

CITY RE-SUBMITTAL SET07/11/06

5 CITY RE-SUBMITTAL SET07/13/06

6 07/17/06

A1.69/18/2006

7 PERMIT REVISION RESUBMITTAL

PLAN CHECK CORRECTIONS3 8/02/06

08/08/06PERMIT REVISION RESUBMITTAL

8

PLAN CHECK CORRECTIONS4 8/14/06

08/18/06

9 08/25/06 M.E.P. SUBMITTAL

1PROPOSED ROOF PLAN

1/4" = 1'-0"

202-L

200-B200-A

202-

K20

0-J

200-

I

200-

E20

0-C

200-

D

200-H

200-F200-G

1A2.1

4A2.1

3A2.1

1A3.1

1A3.1

2A2.1

4A3.1

4A3.1

5A3.1

5A3.1

3A3.1

3A3.1

2A3.1

2A3.1

5'

5'2'

-6"

3'-1

"2'

-6"

4'-1"10'-4"

4'-1"

3'-5" 3'-3" 3'-5"

3'-5" 3'-3" 3'-5"

8'-1

"

4'-2

"

4'-6"

8'

3'-2

"1'

OPEN SLOT IN (N) ROOF OVERHANG

(N) OVERHANG

(N) DOWNSPOUT

(N) DOWNSPOUT

(N) HIGH ROOFOVERHANG ABOVE

(N) NON REFLECTIVE

COOL-ROOF ENERGY STAR

ROOFING SYSTEM

(N) MECHANICAL UNIT SCREEN

(N) ROOF MONITOR

(N) NON REFLECTIVE

COOL-ROOF ENERGY

STAR ROOFING SYSTEM

(N) NON REFLECTIVE

COOL-ROOF ENERGY

STAR ROOFING SYSTEM

(N) NON REFLECTIVE

COOL-ROOF ENERGY

STAR ROOFING SYSTEM

(N) NON REFLECTIVE

COOL-ROOF ENERGY

STAR ROOFING SYSTEM

(N) PHOTOVOLTAIC PANELS,

UNDER SEPARATE PERMIT

(N) PHOTOVOLTAIC CANOPY,

UNDER SEPARATE PERMIT

(N) PHOTOVOLTAIC PANELS,

UNDER SEPARATE PERMIT

(N) ENERGY STAR HIGH

EFFICIENCY HVAC UNITS

300-A

CL

CL

CL

CLCL

CL

SLOPE

V.I.F.V.I.F.

V.I.F.

SLO

PE

SLO

PE4:

12

4:12

4:12

4:12

SLOPE

(MIN. CLASS B RATING)(MIN. CLASS B RATING)

(MIN. CLASS B RATING)

(MIN. CLASS B RATING)

(MIN. CLASS B RATING)

CL

CL

CL

CL

V.I.F

.V.

I.F.

V.I.F

.

V.I.F

.

CLCL

3

2

1

G

BC

DE

F

A

3A3.2

1A3.2

2A3.2

4A3.2

(N) ALUMINUM FRAME

SKYLIGHT ICBO# ER-4063

(N) LIGHTTOWER

OPEN TO BELOW

2HIGH ROOF PLAN

1/4" = 1'-0"

26'-6"

4'18'-6"

4'

16'-1

"

4'8'

-1"

4'

4'2'

-6"

3'-1

"2'

-6"

4' 8'-1"10'-4"

8'-1"

(E) ROOF LINE BELOW

(E) ROOF LINE BELOW

(N) PHOTOVOLTAIC PANELS,

UNDER SEPARATE PERMIT

(N) TS FRAME AS

PER STRUCTURALS

CLCL

V.I.F

.

V.I.F

.

CL

CL

CL

CL

V.I.F

.V.

I.F.

V.I.F.V.I.F.

V.I.F.

V.I.F.F

E

3A3.2

1A3.2

2A3.2

4A3.2

N

Page 8: Jared E Wright Portfolio

88

GREEN ROOF PLANTING SYSTEMSOLAR PANEL OVERHANG

DIAGRAMMATIC FEATURES IN 3D SECTION

Page 9: Jared E Wright Portfolio

99

MICRO-CLIMATE RESEARCH STATION P.V. MEMBRANE AND SOLAR PANEL ARRAY

SU

ST

AIN

Page 10: Jared E Wright Portfolio

1010

DETAIL

EXISTING TRUSS

CUSTOM FABRICATION DRAWINGS

DETAIL

DET

AILS

DET

AILS

DET

AILS

DET

AILS

DET

AILS

DETAIL DET

AILS

DETAIL DET

AILSEXISTING TRUSS

DET

AILSEXISTING TRUSS

DET

AILS

CUSTOM FABRICATION DRAWINGS

DET

AILS

CUSTOM FABRICATION DRAWINGS

DETAIL

DET

AILS

DETAIL

DET

AILS

DET

AILS

DET

AILS

9 1/

2"3'

-9"

9 1/

2"3'

-9"

7 1/

2"

4"

5 1/2" x 1 3/4" WEBMEMBER (TYP.) TOP CHORD

5 1/2" x 1 3/4" WEBMEMBER (TYP.)

TOP CHORD

9 1/2" x 1 3/4"BOTTOM CHORD1/2" BOLTS (TYP.)

1/2" BOLTS (TYP.)

ELEVATIONA

A

SECTION A

9 1/2" x 1 3/4"BOTTOM CHORD

Page 11: Jared E Wright Portfolio

11

Page 12: Jared E Wright Portfolio

12

This project’s re-imagining of western design retains the warmth and materiality of traditi onal building styles in Jack-son Hole, while creati ng a simplifi ed form consistent with to-day’s lifestyle and uti lizing available technologies.

The building uti lizes a walk-up concept for the residences similar to fl ats and town homes found in the most vibrant, walkable neighborhoods throughout the world. Raising the living area above street level creates a separati on between public and private areas. Two commercial spaces are located at the corners of the building and are situated at ground level to provide a connecti on to the public areas they serve.

The materiality will rely upon local sources including wood and stone to create harmonious compositi ons of texture and form. Juxtaposing interesti ng and innovati ve materials, in-cluding concrete, stone, glass and wood, maximize the honest expression of structure and materials.

Emphasis on integrati ng the structure into the natural en-vironment has defi ned the project from its incepti on. The outdoors will be being brought into the urban development through the creati on of unique green spaces and ample decks and rooft op areas as well as through the extensive use of win-dows and an open fl oor plan. The design emphasis celebrates the natural environment, makes the natural environment a design focal point and provides ample transiti on for residents to the outdoors despite it’s downtown setti ng.

This project has deconstructed the condominium formula of a central elevator bank and long public hallways, and replaced it with semi-private elevators and vesti bules. Residents have the convenience of elevator access within steps of their un-derground parking and terminati on points at any of the three fl oors above. Eliminati on of a central corridor permits win-dows on opposing sides of each residence, resulti ng in natural light fl ooding the space throughout the day.

Page 13: Jared E Wright Portfolio

13

PROJECT INVOLVEMENTproject manager for david hertz faia architects

pre-design through design development

PROJECT DESCRIPTIONarea: 40,000 sf

type: multi-story mixed-usestatus: on the boards

BUILDING INFOsub-grade: parking, storage and mechanical

first floor: commercial spaces, lodging/residential, first floor: common areas, gardens

second floor: lodging and residential unitsthird floor: lodging and residential unitsroof: exterior decks, gardens, pv panels

CREDENTIALSproposed LEED Certified Gold

ENVIRONMENTAL FEATURESnatural day-lighting and ventilation

rainwater collection systemsolar pv and solar thermal array

green roof plantingautomated lighting controls

whole building battery back-updrought tolerant landscaping

zero VOC paints and adhesives

REFUGE ON NORTH CACHEMIXED USE WITH MULTI-FAMILY RESIDENCES

JACKSON HOLE, WY

Page 14: Jared E Wright Portfolio

1414

SITE CONCEPTS

SITE

Page 15: Jared E Wright Portfolio

1515

DIGITAL MASSING STUDY

DIGITAL MASSING STUDY

SITE FACTORS ANALYSIS

SUN ANGLES

Page 16: Jared E Wright Portfolio

16

A2.124/11/2008

0808D

BLDG 2- FIRSTFLOOR PLAN

JACKSONHOLE

NORTHCACHE

PROJECT

UP

UP

UP

8.33 %

8.33

%

UP

UP

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

11'-3

"7'

-3"

30'-0

"6'

-0"

13'-6

"24

'-6"

4'-0

"13

'-0"

30'-0

"30

'-0"

10'-0

"30

'-0"

30'-0

"5'

-9"

27'-9

"5'

-9"

5'-9" 5'-9"

11'-2" 41'-7" 4'-0" 49'-6" 4'-0" 102'-0" 4'-0" 30'-0" 5'-9"+6210'

+6210'

+6215'

+6215'

+6215'

+6210'

+6215'

+6210'

+6215'

+6215'

+6210'

+6215'

+6215'

+6210'

+6215'

+6210'

+6215'

+6210'

+6215'

W/D

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

W/D

MUDRM MUD

RMMUDRM

KCH

KCH

KCH

BEDROOMW/D

BTH

BTH

BTH

BTH

MUDRM

W/D

KCH

BTH

BEDROOM

BEDROOM

BEDROOM

W/D

KCH

BEDROOM

BTH

BTH

MUDRM

MUDRM

BTH

BEDROOM

BEDROOM

BEDROOM

KCH

BTH

BEDROOM

KCH

BEDROOM

BEDROOMMUDRM

KCH

W/D

BTH

W/D

BTH

MUDRM

W/D

KCH

BEDROOM

BEDROOM

KCH

BEDROOM

BTH

MUDRM

BTH

DN

ELEVATORELEVATOR

DN UP

UP

CORRIDOR

CORRIDOR

KCH

MUDRM

W/D

BTH

BEDROOM

BEDROOM

W/D

BEDROOM

BTH

BTH

KCH

KCH

BEDROOM

BEDROOM

W/D

BEDROOM

KCH

BTH

W/D

KCH

BTH

BEDROOM

BEDROOM

BEDROOM

BTHMUDRM

KCH

BTH

BEDROOM

BEDROOM

W/D

W/D

BEDROOM

BEDROOM

BEDROOM

BALCONYBALCONY

BALCONY

BALCONY

SIDE WALK

LANDSCAPE LANDSCAPE

SIDE WALK

LANDSCAPELANDSCAPE

ENTRY

BALCONY

ENTRY

AD

A R

AM

P

AD

A R

AM

P

NORTH CACHE

LANDSCAPE

BRICK PAVERS, TREES AND STREETLAMPS TO MATCH CITY DESIGN

UP

UP

LAN

DS

CA

PE

LAN

DS

CA

PE

LANDSCAPESIDE WALK

PHASE FOURPHASE THREE

BALCONY

WA

LKW

AY

WA

LKW

AY

WA

LKW

AY

BALCONY

BALCONY

RAMP TO PARKINGBELOW

MECH./STOR.A: 184 sq ft

3 BEDROOMA: 1,731 sq ft

MECH./STOR.A: 43 sq ft

1 BEDROOMA: 895 sq ft

2 BEDROOMA: 1,190 sq ft

2 BEDROOMA: 1,171 sq ft

1 BEDROOMA: 911 sq ft

2 BEDROOMA: 1,376 sq ft

3 BEDROOMA: 1,918 sq ft

2 BEDROOMA: 1,376 sq ft

3 BEDROOMA: 1,832 sq ft

MECH./STOR.A: 74 sq ft

EMPLOYEEA: 610 sq ft

RETAILA: 1,878 sq ft

3 BEDROOMA: 2,054 sq ft

EMPLOYEEA: 672 sq ft

COMMONSKI / EQUIP.A: 111 sq ft

COMMONGYM.A: 952 sq ft

MECH./STOR.A: 234 sq ft

2 BEDROOMA: 1,173 sq ft

AFFORDABLEA: 1,057 sq ft

AFFORDABLEA: 976 sq ft

2 BEDROOMA: 1,540 sq ft

UP

RSTUVWX

5

6

OPQ MN

1

2

3

4

L

240'-0"20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 6'-3" 1

4'-6"1'-9" 2'-9"

7'-3" 10'-0"

2A3.4

1A3.3

1A4.3

1A4.3

1A3.4

2A3.3

2A4.4

2A4.4

1A4.4

1A4.4

GRATE AT

PROPERTY LINE

PROPERTY LINE

NORTH

SCALE: 1/8" = 1'-0" 1BLDG 2 FIRST FLOOR

!"#$%&'ÿ(&)*'&+,(ÿ#"#(*ÿ+*-./*

0123456ÿ78789

:;<=;>778%?,*ÿ%*#,?&'%#&'#*0,

9*%?/'ÿ%*, %(**,@ÿ"AB>

%.'ÿ&'

ÿ!.'

*ÿ><%,Cÿ<>@77ÿ'&&

'ÿDÿE7ÿ9*/B

%.'ÿ&

'ÿ9*#Bÿ><

%,Cÿ<>@77ÿ'&

&'ÿDÿ:Eÿ9*/B

!"#$%&ÿ'(ÿÿÿ)'***+ ',-.-ÿ%/0ÿ!%",1-2ÿ'

!"#$%&ÿ'(ÿÿÿ)'***+ 3,-.-ÿ2/!ÿ!%",1-2ÿ3

!"#$%&'ÿ(&)*

'&+,(ÿ#"#(*ÿ+*-./*

0123456ÿ78789

:;<=;>778

%?,*ÿ%*#,?&'%

#&'#*0,

9*%?/'ÿ%*,

%(**,@ÿ"AB>

%.'ÿ&'ÿ!.'*ÿ><%,Cÿ<>@77ÿ'&&'ÿDÿE7ÿ9*/B

%.'ÿ&

'ÿ9*#Bÿ><%,Cÿ<>@77ÿ'&&'ÿDÿ:Eÿ9*/

B

!"#$%&ÿ'(ÿÿÿ)'***+

'

,-.-ÿ%/0ÿ!%",1-2ÿ'

!"#$%&ÿ'(ÿÿÿ)'***+

3

,-.-ÿ2/!ÿ!%",1-2ÿ3

!"#$%&'ÿ(&)*

'&+,(

ÿ#"#(*ÿ+*-.

/*

0123456ÿ78789

:;<=;>778

%?,*ÿ%*#,?&'%

#&'#*0,

9*%?/'ÿ%*,

%(**,@ÿ"AB>

%.'ÿ&'ÿ

!.'*ÿ><

%,Cÿ<>@77

ÿ'&&'ÿDÿE

7ÿ9*/B

%.'ÿ&'ÿ9*#Bÿ><%,Cÿ<>@77ÿ'&&'ÿDÿ:Eÿ9*/B

!"#$%&ÿ'(ÿÿÿ)'***+

',-.-ÿ%/0ÿ!%",1-2ÿ'

!"#$%&ÿ'(ÿÿÿ)'***+

3,-.-ÿ2/!ÿ!%",1-2ÿ3

SOLAR ANGLESMO

UNTA

IN VI

EWS T

O THE

SOUT

H

Page 17: Jared E Wright Portfolio

17

A2.124/11/2008

0808D

BLDG 2- FIRSTFLOOR PLAN

JACKSONHOLE

NORTHCACHE

PROJECT

UP

UP

UP

8.33 %

8.33

%

UP

UP

F

F

F

F

F

FF

F

F

F

F

F

F

F

F

F

11'-3

"7'

-3"

30'-0

"6'

-0"

13'-6

"24

'-6"

4'-0

"13

'-0"

30'-0

"30

'-0"

10'-0

"30

'-0"

30'-0

"5'

-9"

27'-9

"5'

-9"

5'-9" 5'-9"

11'-2" 41'-7" 4'-0" 49'-6" 4'-0" 102'-0" 4'-0" 30'-0" 5'-9"+6210'

+6210'

+6215'

+6215'

+6215'

+6210'

+6215'

+6210'

+6215'

+6215'

+6210'

+6215'

+6215'

+6210'

+6215'

+6210'

+6215'

+6210'

+6215'

W/D

BEDROOM

BEDROOM

BEDROOM

BEDROOM

BEDROOM

W/D

MUDRM MUD

RMMUDRM

KCH

KCH

KCH

BEDROOMW/D

BTH

BTH

BTH

BTH

MUDRM

W/D

KCH

BTH

BEDROOM

BEDROOM

BEDROOM

W/D

KCH

BEDROOM

BTH

BTH

MUDRM

MUDRM

BTH

BEDROOM

BEDROOM

BEDROOM

KCH

BTH

BEDROOM

KCH

BEDROOM

BEDROOMMUDRM

KCH

W/D

BTH

W/D

BTH

MUDRM

W/D

KCH

BEDROOM

BEDROOM

KCH

BEDROOM

BTH

MUDRM

BTH

DN

ELEVATORELEVATOR

DN UP

UP

CORRIDOR

CORRIDOR

KCH

MUDRM

W/D

BTH

BEDROOM

BEDROOM

W/D

BEDROOM

BTH

BTH

KCH

KCH

BEDROOM

BEDROOM

W/D

BEDROOM

KCH

BTH

W/D

KCH

BTH

BEDROOM

BEDROOM

BEDROOM

BTHMUDRM

KCH

BTH

BEDROOM

BEDROOM

W/D

W/D

BEDROOM

BEDROOM

BEDROOM

BALCONYBALCONY

BALCONY

BALCONY

SIDE WALK

LANDSCAPE LANDSCAPE

SIDE WALK

LANDSCAPELANDSCAPE

ENTRY

BALCONY

ENTRY

AD

A R

AM

P

AD

A R

AM

P

NORTH CACHE

LANDSCAPE

BRICK PAVERS, TREES AND STREETLAMPS TO MATCH CITY DESIGN

UP

UP

LAN

DS

CA

PE

LAN

DS

CA

PE

LANDSCAPESIDE WALK

PHASE FOURPHASE THREE

BALCONY

WA

LKW

AY

WA

LKW

AY

WA

LKW

AY

BALCONY

BALCONY

RAMP TO PARKINGBELOW

MECH./STOR.A: 184 sq ft

3 BEDROOMA: 1,731 sq ft

MECH./STOR.A: 43 sq ft

1 BEDROOMA: 895 sq ft

2 BEDROOMA: 1,190 sq ft

2 BEDROOMA: 1,171 sq ft

1 BEDROOMA: 911 sq ft

2 BEDROOMA: 1,376 sq ft

3 BEDROOMA: 1,918 sq ft

2 BEDROOMA: 1,376 sq ft

3 BEDROOMA: 1,832 sq ft

MECH./STOR.A: 74 sq ft

EMPLOYEEA: 610 sq ft

RETAILA: 1,878 sq ft

3 BEDROOMA: 2,054 sq ft

EMPLOYEEA: 672 sq ft

COMMONSKI / EQUIP.A: 111 sq ft

COMMONGYM.A: 952 sq ft

MECH./STOR.A: 234 sq ft

2 BEDROOMA: 1,173 sq ft

AFFORDABLEA: 1,057 sq ft

AFFORDABLEA: 976 sq ft

2 BEDROOMA: 1,540 sq ft

UP

RSTUVWX

5

6

OPQ MN

1

2

3

4

L

240'-0"20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 20'-0" 6'-3" 1

4'-6"1'-9" 2'-9"

7'-3" 10'-0"

2A3.4

1A3.3

1A4.3

1A4.3

1A3.4

2A3.3

2A4.4

2A4.4

1A4.4

1A4.4

GRATE AT

PROPERTY LINE

PROPERTY LINE

NORTH

SCALE: 1/8" = 1'-0" 1BLDG 2 FIRST FLOOR

!"#$%&'ÿ(&)*'&+,(ÿ#"#(*ÿ+*-./*

0123456ÿ78789

:;<=;>778%?,*ÿ%*#,?&'%#&'#*0,

9*%?/'ÿ%*, %(**,@ÿ"AB>

%.'ÿ&'

ÿ!.'

*ÿ><%,Cÿ<>@77ÿ'&&

'ÿDÿE7ÿ9*/B

%.'ÿ&

'ÿ9*#Bÿ><

%,Cÿ<>@77ÿ'&

&'ÿDÿ:Eÿ9*/B

!"#$%&ÿ'(ÿÿÿ)'***+ ',-.-ÿ%/0ÿ!%",1-2ÿ'

!"#$%&ÿ'(ÿÿÿ)'***+ 3,-.-ÿ2/!ÿ!%",1-2ÿ3

!"#$%&'ÿ(&)*'&+,(ÿ#"#(*ÿ+*-./*

0123456ÿ78789

:;<=;>778%?,*ÿ%*#,?&'% #&'#*0,

9*%?/'ÿ%*,%(**,@ÿ"AB>

%.'ÿ&'ÿ!.

'*ÿ><%,Cÿ<>@77ÿ'

&&'ÿDÿE7ÿ9

*/B

%.'ÿ&

'ÿ9*#

Bÿ><%,C

ÿ<>@77

ÿ'&&'

ÿDÿ:Eÿ9

*/B

!"#$%&ÿ'(ÿÿÿ)'***+' ,-.-ÿ%/0ÿ!%",1-2ÿ'

!"#$%&ÿ'(ÿÿÿ)'***+3 ,-.-ÿ2/!ÿ!%",1-2ÿ3

MOUNTAIN VIEWS TO THE EAST

DESGIN DEVELOPMENT FLOOR PLAN17DESGIN DEVELOPMENT FLOOR PLAN17DESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANUPDESGIN DEVELOPMENT FLOOR PLANUPDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANU

PDESGIN DEVELOPMENT FLOOR PLANUPDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLAN

+6215'

DESGIN DEVELOPMENT FLOOR PLAN+6215'

DESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLAN6DESGIN DEVELOPMENT FLOOR PLAN66DESGIN DEVELOPMENT FLOOR PLAN6DESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLANDESGIN DEVELOPMENT FLOOR PLAN

Page 18: Jared E Wright Portfolio

18

T1.1

6/5/2009

Robert HeneagePlan One / Architects189 N. Main, Suite 112Driggs, ID 83422tel: 208 354 8036fax: 208 354 8037

VICINITY MAPS

EXECUTIVE ARCHITECT

PROJECT INFO

DESIGN ARCHITECT

David Hertz, FAIA LEED APDavid Hertz Architects Inc.Studio of Environmental Architecture (S.E.A.)1920 Olympic Blvd. Santa Monica, CA. 90304tel: 310 829 9932fax: 310 829 5641e-mail: [email protected] lic. 25190

PROJECT LOCATION:345-375 NORTH CACHE STREETJACKSON, WYOMING 83001LOTS 1 - 5, BLOCK 3JOSEPH R. JONES ADDITION

LOT SIZE:APPROXIMATELY 32,670 S.F.

MAX F.A.R.:1.25

ZONING:AC, WITHIN THE LODGING OVERLAYDISTRICT

TYPE OF DEVELOPMENT:PLANNED MIXED-USE

NUMBER OF STORIES:THREE W/ SUB-GRADE PARKING

APPLICABLE BUILDING CODES:2006 INTERNATIONAL BUILDING CODE2006 INTERNATIONAL MECHANICAL CODE2006 INTERNATIONAL PLUMBING CODE2006 INTERNATIONAL ELECTRICAL CODE2006 INTERNATIONAL FIRE CODE

BUILDING INFO

CIVIL

JORGENSEN ASSOCIATES, P.C.PO Box 9550270 East Simpson Ave.Jackson, WY 83002Phone: 307.733.5150Fax: 307.733.5187

SUB-GRADE FLOOR:PARKING GARAGE FOR TENANTSAND RESIDENTS. THIS FLOOR ALSOINCLUDES STORAGE ANDMECHANICAL AREAS

FIRST FLOOR:A MIX OF COMMERCIAL SPACE,LODGING UNITS, RESIDENTIALUNITS AND COMMONS AREA OPENTO THE EXTERIOR

SECOND FLOOR:A MIX OF LODGING UNITS ANDRESIDENTIAL UNITS

THIRD FLOOR:A MIX OF LODGING UNITS ANDRESIDENTIAL UNITS

ROOF DECK:OPEN ROOF DECK AREAS WITHGREEN SPACE AND SOLAR PANELS

CALCULATIONS

OWNER

NORTH CACHE INVESTMENTS, LLC.Dan Cook3622 Central AvenueNashville, TN 37205

CONTENTS

ARCHITECTURAL SHEETS:

T1.1 TITLE SHEET

A1.1 EXISTING SITE PLANA1.2 SITE PLAN SURROUNDINGA1.3 PROPOSED SITE PLAN

A2.1 PARKING PLANA2.2 FIRST FLOOR PLANA2.3 SECOND FLOOR PLANA2.4 THIRD FLOOR PLANA2.5 ROOF DECK PLAN

A3.1 EXTERIOR ELEVATIONS

A4.1 BUILDING SECTIONSA4.2 BUILDING SECTIONSA4.3 BUILDING SECTIONS

CIVIL SHEETS:

C1.1 NOTES AND LEGENDC1.2 EXISTING CONDITIONSC2.1 SITE GRADINGC3.1 UTILITY OVERVIEWC3.2 WATER/SEWER PLN & PROFILEC3.3 PARKING GARAGESTORMWATER MANAGEMENT PLANC3.4 STORMWATER PLAN & PROFILEC4.1 ROAD DETAILSC4.2 UTILITY DETAILSC4.3 STORMWATER DETAILS

LOGISTICS PLAN:

Z7.01 SITE LOGISTICS PLAN

MIXED-USE DEVELOPMENTNORTH CACHE PMD

SUBJECT PROPERTY

SUBJECT PROPERTY

T1.1

6/5/2009

Robert HeneagePlan One / Architects189 N. Main, Suite 112Driggs, ID 83422tel: 208 354 8036fax: 208 354 8037

VICINITY MAPS

EXECUTIVE ARCHITECT

PROJECT INFO

DESIGN ARCHITECT

David Hertz, FAIA LEED APDavid Hertz Architects Inc.Studio of Environmental Architecture (S.E.A.)1920 Olympic Blvd. Santa Monica, CA. 90304tel: 310 829 9932fax: 310 829 5641e-mail: [email protected] lic. 25190

PROJECT LOCATION:345-375 NORTH CACHE STREETJACKSON, WYOMING 83001LOTS 1 - 5, BLOCK 3JOSEPH R. JONES ADDITION

LOT SIZE:APPROXIMATELY 32,670 S.F.

MAX F.A.R.:1.25

ZONING:AC, WITHIN THE LODGING OVERLAYDISTRICT

TYPE OF DEVELOPMENT:PLANNED MIXED-USE

NUMBER OF STORIES:THREE W/ SUB-GRADE PARKING

APPLICABLE BUILDING CODES:2006 INTERNATIONAL BUILDING CODE2006 INTERNATIONAL MECHANICAL CODE2006 INTERNATIONAL PLUMBING CODE2006 INTERNATIONAL ELECTRICAL CODE2006 INTERNATIONAL FIRE CODE

BUILDING INFO

CIVIL

JORGENSEN ASSOCIATES, P.C.PO Box 9550270 East Simpson Ave.Jackson, WY 83002Phone: 307.733.5150Fax: 307.733.5187

SUB-GRADE FLOOR:PARKING GARAGE FOR TENANTSAND RESIDENTS. THIS FLOOR ALSOINCLUDES STORAGE ANDMECHANICAL AREAS

FIRST FLOOR:A MIX OF COMMERCIAL SPACE,LODGING UNITS, RESIDENTIALUNITS AND COMMONS AREA OPENTO THE EXTERIOR

SECOND FLOOR:A MIX OF LODGING UNITS ANDRESIDENTIAL UNITS

THIRD FLOOR:A MIX OF LODGING UNITS ANDRESIDENTIAL UNITS

ROOF DECK:OPEN ROOF DECK AREAS WITHGREEN SPACE AND SOLAR PANELS

CALCULATIONS

OWNER

NORTH CACHE INVESTMENTS, LLC.Dan Cook3622 Central AvenueNashville, TN 37205

CONTENTS

ARCHITECTURAL SHEETS:

T1.1 TITLE SHEET

A1.1 EXISTING SITE PLANA1.2 SITE PLAN SURROUNDINGA1.3 PROPOSED SITE PLAN

A2.1 PARKING PLANA2.2 FIRST FLOOR PLANA2.3 SECOND FLOOR PLANA2.4 THIRD FLOOR PLANA2.5 ROOF DECK PLAN

A3.1 EXTERIOR ELEVATIONS

A4.1 BUILDING SECTIONSA4.2 BUILDING SECTIONSA4.3 BUILDING SECTIONS

CIVIL SHEETS:

C1.1 NOTES AND LEGENDC1.2 EXISTING CONDITIONSC2.1 SITE GRADINGC3.1 UTILITY OVERVIEWC3.2 WATER/SEWER PLN & PROFILEC3.3 PARKING GARAGESTORMWATER MANAGEMENT PLANC3.4 STORMWATER PLAN & PROFILEC4.1 ROAD DETAILSC4.2 UTILITY DETAILSC4.3 STORMWATER DETAILS

LOGISTICS PLAN:

Z7.01 SITE LOGISTICS PLAN

MIXED-USE DEVELOPMENTNORTH CACHE PMD

SUBJECT PROPERTY

SUBJECT PROPERTY

Page 19: Jared E Wright Portfolio

19

REND

ER

Page 20: Jared E Wright Portfolio

2020

CO

NC

EP

TC

ON

CE

PT

Page 21: Jared E Wright Portfolio

21

MULLIN AUTOMOTIVE MUSEUMWORLD’S LARGEST COLLECTION OF 1930s BUGATTI AND FRENCH RACE CARSOXNARD, CA

PROJECT INVOLVEMENTproject manager for david hertz faia architectsconstructi on docs through constructi on admin

PROJECT DESCRIPTIONarea: 45,000 sf type: adapti ve reuselayout: fi rst fl oor with mezzanine levelstructure: ti lt-up concrete panel warehousestatus: completed, 2010

BUILDING PROGRAMsmall movie theatergift storeprivate access club / loungeseparated archives roomoffi cesdetail shopdisplay areas for the carsdisplays for automoti ve arti factsdisplays for ti me-period furniture

CREDENTIALSproposed LEED Certi fi ed

ENVIRONMENTAL FEATURESgreen roof planti ng with solar pv arrayautomated lighti ng and venti lated controlsdrought tolerant landscapingFCS certi fi ed wood productszero VOC paints and adhesivesreuse of existi ng structure

MEDIA RECOGNITIONArchitects Newspaper, 2010AutoBlog, 2010LA Times Online, 2010

Page 22: Jared E Wright Portfolio

22

Page 23: Jared E Wright Portfolio

23

WW/D

A

W

A

The Mullin Collecti on Automoti ve Museum is a complete interior re-design of an existi ng 45,000 square foot, typical ti lt-up concrete warehouse, transformed into both a public and private automo-ti ve museum holding the world’s largest collecti on of Bugatti and French race cars of the 1930s. While the interior houses the arti facts; the design of the exterior preludes with a large entry canopy made of replicated windshields, large graphic art screens and a corner signage component made of stainless steel and LED lighti ng. The building’s many sustainable green-building features include roof monitors for daylighti ng and natural venti lati on, a solar photovoltaic roof, a green roof with a new elevator pent-house and wind turbines. Interior programmati c elements include a theater, gift store, private club, archives, offi ces, as well as several display areas for cars and automoti ve arti facts such as furnti ure.

A

Page 24: Jared E Wright Portfolio

24242424

Page 25: Jared E Wright Portfolio

2525

C O N S T R U C T I O N D O C U M E N T SC O N S T R U C T I O N D O C U M E N T SC O N S T R U C T I O N

Page 26: Jared E Wright Portfolio

26

S.O.W.D.LAW OFFICES

BEVERLY HILLS, CA

PROJECT INVOLVEMENTproject manager for

david hertz faia architectspredesign through con. docs.

PROJECT DESCRIPTIONarea: 4,000 sf

type: tenant improvementstatus: completed, 2010

Page 27: Jared E Wright Portfolio

2727

PLANET BLUEBOUTIQUE RETAIL

SANTA MONICA, CA

PROJECT INVOLVEMENTproject designer for

david hertz faia architectsconstruction documents

construction admin.

PROJECT DESCRIPTIONarea: 3,000 sf

type: interior remodelstatus: completed, 2006

Page 28: Jared E Wright Portfolio

2828

A2.0Tues

day,

May

31,

200

5W

inte

l_5

On:

10:2

3 P

MLa

st P

lotte

d B

y:

1 SCHEMATIC DESIGN SET

5/31/2005

FLOOR PLANS

X/X/XX

0505D

5025 THACHER RD.OJAI, CA. 93023

THE THACHERSCHOOL

NEW LOWER SCHOOLDORMITORY

Preliminary Cost Analysis SetNot for Construction

1399'

1399'

1399'

1396'

1396'

1393'

1393'

1393'

1393'

1393'

1393'

3

DN

DECK(GARAGE BELOW)

A: 261.25 sq ft

NN

Page 29: Jared E Wright Portfolio

PROJECT INVOLVEMENTproject manager for david hertz faia architectsconstructi on docs through constructi on admin

PROJECT DESCRIPTIONarea: 13,500 sf

type: new constructi on in existi ng campusstatus: completed, 2008

BUILDING INFOstudent dorm rooms

staff housinggrand meeti ng hall

communal restrooms and showerslaundry faciliti es

large interior courtyard

ENVIRONMENTAL FEATURESnatural day-lighti ng and venti lati on

automated venti lati on controlsdrought tolerant landscaping

zero VOC paints and adhesivesreclaiimed oak fl ooring

reclaimed site stonesolar thermal panels

grat-water irrigati on and fi re suppressionradiant fl oor heati ng

SIPS panel constructi on

THATCHER SCHOOL DORMITORYHIGH SCHOOL STUDENT RESIDENCES

OJAI, CA

Taking its cues from nearby barns and Thacher’s Western ethos, this dormitory design makes the most of a magnifi cent setti ng, drawing on natural venti lati on and natural light to maintain a strong connecti on with the outdoors. The new

structure promises faculty members and students alike a comfortable living space that embodies and illuminates the envi-ronmental ethic taught through Thacher’s Camping Program. In additi on to incorporati ng many sustainable elements, the

new structure will make use of building materials salvaged from its aging predecessor, an energy-ineffi cient and expen-sive-to-maintain dormitory completed in 1950.

Page 30: Jared E Wright Portfolio

30

F

STEPPING STONES

FIRST FLOOR

SECOND FLOOR

THIRD FLOOR

Page 31: Jared E Wright Portfolio

31

SPLIT HOUSESINGLE FAMILY RESIDENCEVENICE, CA

PROJECT INVOLVEMENTproject manager for da-vid hertz faia architectsconstr. docs. through const. admin

PROJECT DESCRIPTIONarea: 2,550 sf status: completed, 2008

F

STEPPING STONES

FIRST FLOOR

Page 32: Jared E Wright Portfolio

32

The house makes use of its small lot by separati ng the typi-cal single object building into two parts, “fl oati ng” the main house, in refl ecti ng pools on the front, and the subsequent courtyard created between the two buildings. The front water court, starts at an eleva-ti on equal to the fi rst fl oor and spills over a waterfall at the en-try, which is ti led in variegated shades of Blue Mosaic ti les.

The exterior is clad with a rain screen fabricated from Par-klex wood panels which form oversized 24” wide x 96” long brick like panels that dissolve at the courtyard and provide edited views beyond and within, and screen the voids creat-ed where the bridge that connects the two buildings spans the courtyard. The Parklex panels wrap from the exterior in the same module and joint spacing as the exterior, into the kitchen and powder room to create a monolithic and solid wall. The Parklex panels part and give way to a tall hidden door panel that works within the grid patt ern and spacing at the courtyard to fl oati ng concrete slabs as a walkway over the water court for an alternate side entry.

Page 33: Jared E Wright Portfolio

33

This project sits on a ti ny lot in Venice, California abutti ng an alleyway, heavily tres-passed as a walking route to the Pacifi c Ocean just off of famed Abbot Kinney Blvd. The home was commis-sioned buy a Hollywood di-rector who was interested in maximizing the natural light, venti lati on while creati ng a dramati c interior space.

The structure is “split” (hence the name), down the length of the two buildings running down the middle and pulled apart to create a con-ti nuous frameless glass skylight, which, creates a visual line of sight while providing abundant nat-ural light from the center to all interior spaces.

The central stair is fabricated to al-low for open risers and a stepped stringer to make a fl oati ng open riser with treads of 2 in. thick hard-wood. The stacked stair leads to a conti nuous skylight with operable skylights that are thermostati cally controlled to work as a solar chim-ney to exhaust out hot air and fun-nel cool prevailing ocean breezes into the home. The house is enti rely passively naturally venti lated and solar hydronic radiant heated.

Page 34: Jared E Wright Portfolio

34

Page 35: Jared E Wright Portfolio

3535

YALE RESIDENCESINGLE FAMILY RESIDENCE

SANTA MONICA, CA

PROJECT INVOLVEMENTproject manager for david hertz faia architects

all phases, predesign through constructi on

PROJECT DESCRIPTIONarea: 3,500 sf

status: completed, 2011

1

2

3

4

5

0816D

3/16/12

A3.1

Santa Monica,CA 90403856 Yale St.YALE

1 Schematic Plan Approval12/29/2008

50% DD Set2/12/2009

3

2

4/27/2009 Plan Check Submittal Set

Bid Set4 5/20/2009

6/10/2009

5 7/22/2009 2nd Plan Check Submittal

Plan Check Corrections #2

Plan Check Corrections #1

9/15/2009

10/16/2009 Plan Check Corrections #3

6 3rd Plan Check Submittal9/16/2009

7 Plan Check Permit Revision3/10/2010

8 4/5/2010 Plan Check Correction

Permit Revision #3

Permit Revision #1&2

4/13/2010

4/15/2010

EXTERIORELEVATIONS

9 3/29/2011 Landscape Permit Set

+10'

+17'

+10'-6"

+13'-8"

+266'-9"

+280'-9"

+285'-9"

14'-0

"5'

-0"

±0" SITE WALL

DRIVE GATE

INTEGRALLY PIGMENTEDSTUCCO, TYP.

ENTRY GATE

INTEGRALLY PIGMENTEDSTUCCO, TYP.

GUARDRAIL

OUTDOORGRILL

LIGHTFIXTURE

LIGHTFIXTURE

FLOOD LIGHT FLOOD LIGHT

FASCIA

WOOD COMPOSITEPANEL

PARAPET FASCIA FASCIA

ENTRYOVERHANG

MECH UNIT BEYONDFLAT GLASSSKYLIGHT

INTERIOR WALL BEYOND

MECH UNIT BEYOND

PARAPET

INTEGRALLY PIGMENTEDSTUCCO, TYP.

PARAPET

SOLAR THERMAL PANELSBEYOND

ALUMINUM TRELLISWITH IPE

ALUMINUM TRELLISWITH IPE

T.O. ROOF

T.O. CHIMNEY

T.O. PARAPET T.O. PARAPET

MAX EXCEPTION TOHEIGHT

14' MAX ALLOWABLEBUILDING HEIGHT

AVERAGE NATURALGRADE

=18'-9"

=13'-9"

= -3"

8 7 6 5 4 32.4

2 1

-1'-6"T.O.F.F.

5'-0

"

2'-0

"

14'-0

"5'

-0"

+266'-9"

+280'-9"

+285'-9"

GATE

OVERHANGBEYOND

OVERHANGBEYOND

DRIVE GATEBEYOND

FASCIA

WOOD COMPOSITE PANEL

SITE WALL

MECH UNITBEYOND

INTEGRALLY PIGMENTEDSTUCCO, TYP.

PARTIALHEIGHT WALL

SITE WALL

WOOD COMPOSITEPANEL

SOLAR THERMAL PANELS BEYOND

T.O. SITE WALL

T.O. CHIMNEY

T.O. WALL

T.O.F.F.

MA

XE

XC

EP

TIO

NTO

HE

IGH

T

MA

X A

LLO

WA

BLE

BU

ILD

ING

HE

IGH

T

AVERAGENATURAL

GRADE

=18'-9"

=13'-9"

= -3"

T.O. ROOF

E D C B A

+13'-9"

+3'-6"

5'-0

"

SIDEWALK LEVEL AT PROPERTY LINE

TOP OF SITE WALL LEVEL AT PROPERTY LINE

SCALE: 1/4" = 1'-0" 1SOUTH ELEVATION02'4'8'

SCALE: 1/4" = 1'-0" 2EAST ELEVATION (YALE ST.)02'4'8'

NOTE: SLIDING DOOR ARROWSINDICATE CLOSED POSITION.

1

2

3

4

5

0816D

3/16/12

A2.3

Santa Monica,CA 90403856 Yale St.YALE

1 Schematic Plan Approval12/29/2008

50% DD Set2/12/2009

3

2

4/27/2009 Plan Check Submittal Set

Bid Set4 5/20/2009

6/10/2009

5 7/22/2009 2nd Plan Check Submittal

Plan Check Corrections #2

Plan Check Corrections #1

9/15/2009

10/16/2009 Plan Check Corrections #3

6 3rd Plan Check Submittal9/16/2009

7 Plan Check Permit Revision3/10/2010

8 4/5/2010 Plan Check Correction

Permit Revision #3

Permit Revision #1&2

4/13/2010

4/15/2010

FIRST FLOORREFERENCE

9 3/29/2011 Landscape Permit Set

F

F

107-1

106-

1

107A 107A107B 107A

107-4 107-5

109A109A

103-1c103-1b103-1a

107-3107-2

109-3

108-1

109B

109-1

111-1

109C

106A 102A102A

102B

101-1

104-

1

105A

105-

1

107-6

110-2

110-3

110-1

101-2

104AEMPTY

100-1

W/DW/D

4A9.1

EQ

.E

Q.

SETBACK LINE

OVERHANG

FLOORDRAIN

OVERHANG

PULL DOWN SHADE

SETBACK LINE

FLOORDRAIN

ROOF OVERHANGABOVE

PULL DOWN SHADE

OVERHANG

1' OFFSETPIVOT DOOR

D.S. TYP.

HUB FOR DATA, PHONE,ALARM ETC.

D.S. D.S.

SETBACK LINE

D.S. TYP.PULL DOWN

SHADE

SHOWERS AND WALLS ABOVE BATHTUBS WITHSHOWER HEADS SHALL BE FINISHED WITH ASMOOTH, NONABSORBENT SURFACE TO A HEIGHTNOT LESS THAN 70" ABOVE THE DRAIN INLET

D.S. TYP.

CLEAR TO 70" H.ABOVE DRAIN

D.S. TYP.D.S. TYP. D.S. TYP.

PULL DOWN SHADE

EXISTING TREES

SETBACK LINE

ROOF OVERHANGABOVE

10' MIN. CLEAR THROUGHGATE OPENING

PULL DOWN SHADE

GATE OVERHANGABOVE

ENTRY CALL BOX W/THROUGH WALL MAIL DROP

4" DIA. SMOOTH METALEXHAUST DUCT TO ROOF.

OVERHANG

UPPER AND LOWER CABINETRY

PARTIAL HEIGHTWING WALL

200 AMP ELECTRICALPANEL AND SOLAR

INVERTER

FLOOR DRAIN TOEXTERIOR OF BLDG.

WATER HEATER

MASTER BED109

GARAGE110

GUEST BED106

DEN103

HALLWAY107

GUEST BATH105

DEN BATH104

KITCHEN / DINING102

MECH.111

MASTER BATH108

EXT. ENTRY100

LIVING101

WALL MOUNTEDINDOOR AIR UNIT

CENTERED ABOVE

WALL MOUNTEDINDOOR AIR UNIT

CENTERED ABOVE

WALL MOUNTEDINDOOR AIR UNIT

CENTERED ABOVE

STONE TILEFLOOR

7.50 %

SD

SD

SD

SD

SD

SD

14"

GUARDRAIL

PULL DOWNSHADE

RADIANT MANIFOLD

RADIANT MANIFOLD

PULL DOWN SHADE

(N) S

LOP

E D

NM

IN 1

/4" /

FT

MAJESTIC VENT-FREE #BC-36ICBO #ER5677

GARDEN

RADIANT HEATINGTHROGH OUT

DR

SR

STEP DOWN INTORECESSED TUB

WOODFLOORING

LINENCLOSET

RADIANT HEATINGTHROGH OUT

PERMEABLE SURFACE DRIVE

DESK

DESK

OUTDOORPATIO

CLE

RE

STO

RY

AB

OV

E

DR

SR

CLE

RE

STO

RY

AB

OV

E

CLE

RE

STO

RY

AB

OV

E

DR

SR

CLE

RE

STO

RY

AB

OV

E

RAMPUP

CLT

UTILITYCLOSET

COATCLOSET

CLE

RE

STO

RY

AB

OV

E

CONCRETECONCRETE

CLERESTORY ABOVE

CLE

RE

STO

RY

AB

OV

E

STONE TILEFLOOR

EGRESS WINDOW

CLT

CLT

CLT

BE

NC

H W

/ DR

AWE

RS

EX

TER

IOR

BE

NC

H

CLT

CLT

WOODFLOORING

V.I.F.

CONCRETE

CONCRETE

CONCRETE

CONCRETE

WOODFLOORING

CLERESTORY ABOVE

CLERESTORY ABOVECLERESTORY ABOVE

CLERESTORY ABOVE

WOODFLOORING

CORK FLOORING

GARDEN

CLERESTORY ABOVE

RADIANT HEATINGTHROGH OUT

STONE TILEFLOOR

CLE

RE

STO

RY

AB

OV

E

CLERESTORY ABOVE

WOODFLOORING

CONCRETE

PERMEABLE SURFACE DRIVE

WALL TYPE LEGEND

EXTERIOR WALL, 2X6 FRAMING, W/ STUCCO

SHEARWALL - FOR REFERENCE ONLY SEESTRUCTURAL FOR DETAILS

CONCRETE BLOCK SITE WALL

EXTERIOR WALL, DOUBLE 2X4 FRAMINGAROUND MOMENT FRAME, W/ STUCCO

EXTERIOR WALL, 2X FRAMING W/ WOODPANEL RAINSCREEN SYSTEM

INTERIOR WALL, 2X6 FRAMING,GYP. BOARD BOTH SIDES

INTERIOR WALL, 2X4 FRAMING,GYP. BOARD BOTH SIDES

PARAPET WALL, 2X6 FRAMING, W/ STUCCOBOTH SIDES AND TOP

NORTH

SCALE: 3/16" = 1'-0" 1FIRST FLOOR REFERENCE

SD

NOTE: CONTRACTOR SHALL VERIFY ALLDIMENSIONS, HEIGHTS AND ELEVATIONS INTHE FIELD AND SHALL NOTIFY ARCHITECT OFANY DISCREPANCIES AND/OR OMISSIONS.

SMOKE DETECTOS SHALL RECEIVETHEIR PRIMARY POWER SOURCE FROM THEBUILDING WIRING AND SHALL BE EQUIPPEDWITH BATTERY BACK-UP AND LOW BATTERYSIGNAL AS PER 91.310.9.1 3,4. HARDWIREDSMOKE ALARMS SHALL BE UL 217 COMPLIANT[NFPA 72, 907.2.10]

This residence was designed specifi cally for a cli-ent that needed ADA accessible and special ac-cessibility requirements due to a medical condi-ti on. Careful att enti on was given to all surfaces, hardware, heights, etc. so that future and cur-rent accesssible needs would be met. The house is a one story structure with low slope ramps to compensate for changes in grade on the site. Sustainable materials and designs were incor-portated into the house including pervious pav-ing, drought tolerant landscaping, FSC certi fi ed woods and bamboo, as well as solar thermal heati ng and solar photovoltaics.

Page 36: Jared E Wright Portfolio

36

MANHATTAN RESIDENCESINGLE FAMILY RESIDENCE

HERMOSA BEACH, CA

PROJECT INVOLVEMENTproject manager for

david hertz faia architectsdesign development through con. admin.

PROJECT DESCRIPTIONarea: 5,500 sf

status: completed, 2011

1

2

3

4

A1.1

0806D

1929 MANHATTAN

HERMOSA BEACH, CA 90254

1 2/17/09

CONVEX SLOPEANALYSIS

ZONING APPROVALSUBMITTAL SET

3

CLIENT MEETING4/20/092

1ST PLAN CHECKSTRUCTURAL SUBMITTAL5/20/09

10/29/09 2ND PLAN CHECKSTRUCTURAL SUBMITTAL4

PLAN CHECK CORRECTIONS10/29/09

PLAN CHECK CORRECTIONS

5

3RD PLAN CHECKSTRUCTURAL SUBMITTAL

BID SET ISSUED

6

11/17/09

11/23/09

12/10/09

4TH PLAN CHECKSTRUCTURAL SUBMITTAL

PLAN CHECK CORRECTIONS

7

1/25/2010

1/25/2010

8 ISSUED FOR CONSTRUCTION1/28/2010

3/16/123/16/12 10:07 AM 0806D_MANHATTAN.pln

PLAN CHECK CORRECTIONS2/23/2010

1929 MANHATTAN

PROJECTADDENDA

SK-21REVISED ROOF FOR HEIGHT

XXX

XXX

XXX

LEGEND

EXISTING FINISH GRADE

PROPOSED FINISHGRADE / FLOOR

PROPOSED TOP OFRAIL / PARAPET

PC 113.71106.00

PC 114.25

111.46

108.86

PC 97.91

105.50

117.51 TWPC 97.91

117.27

117.51 TW

110.67

115.91

113.17Existing Grade

PC 102.00

117.13106.00

110.67 113.17

108.86 111.46105.50

115.91

117.27

PC 102.00

99.60

104.00

104.00

99.60

99.6

0

103.55

100.05100.

05

104.

0010

3.55

117.13Approved Convex Slope

Existing Grade

Approved Convex Slope

90.64'

90.76'

NORTH PROPERTYLINE PROFILE

3' R

EAR

YAR

D S

ETBA

CK

5' R

EAR

YAR

D S

ETBA

CK

3' REAR SETBACK LINE

SOUTH PROPERTYLINE PROFILE

4'-0

"4'

-0"

9'-0"

9'-0"

17'-0"

3'-0"

5'-0"

113.71 B.O.W. PC

114.25 PC

102.00 B.O.W.PC

97.91 PC

140'

125'-6"

134'-6"

136'-6"

140'

116'-6"

126'-6"

130'

114'-25"

140'

120'-3" T.O.W.

114'-25"

140'

130'

130'

130'106'-6"

126'-6"

116'-6"

137'-6"

(N) PERMEABLECONCRETE DRIVE PER

GRADING PLANS(N) 4'W X 16'L X 3'D

RETENTION BASIN PERGRADING PLANS

BBQ

ROOFT.O.ROOF

T.O.PARAPET

STAIR

ROOF

ROOFGARAGE SETBACK FROM IMPROVEMENT

T.O.RAIL

T.O.RAIL

T.O.ROOF

ROOF

TRASH ENCLOSURE

24" AREA DRAIN PERGRADING PLANS

T.O.TRELLIS

T.O.RAIL

T.O.ROOF

BAMBOOBAMBOO

LOT DISTANCE 90.76'

LOT DISTANCE 90.64'

40.0

2'

POOL(OPEN SPACE)

171 SF

40.0

3'REAR YARD

SID

E Y

AR

D

BAMBOOFRONT YARD

RAMP DOWN

MA

NH

ATTA

N A

VE

T.O.WALL

ROOF DECK

PALM

DR

IVE

OVERHANG

T.O.RAIL

T.O.RAIL

BALCONY

SID

E Y

AR

D

PLANTING

T.O.RAIL

OPEN SPACE142 SF

T.O.RAIL

FINISH GRADE

T.O.ROOF

ROOF GREEN ROOF

FINISH FLOOR

FRO

NT

YAR

D

FRO

NT

YAR

D

T.O.ROOF

126'-6"

97'-6"

97'-6"

126'-6"

SOLAR ON TRELLISOVER ROOF DECK

N

CONVEX SLOPE ANALYSIS

Page 37: Jared E Wright Portfolio

3737

1

2

3

4

A1.1

0806D

1929 MANHATTAN

HERMOSA BEACH, CA 90254

1 2/17/09

CONVEX SLOPEANALYSIS

ZONING APPROVALSUBMITTAL SET

3

CLIENT MEETING4/20/092

1ST PLAN CHECKSTRUCTURAL SUBMITTAL5/20/09

10/29/09 2ND PLAN CHECKSTRUCTURAL SUBMITTAL4

PLAN CHECK CORRECTIONS10/29/09

PLAN CHECK CORRECTIONS

5

3RD PLAN CHECKSTRUCTURAL SUBMITTAL

BID SET ISSUED

6

11/17/09

11/23/09

12/10/09

4TH PLAN CHECKSTRUCTURAL SUBMITTAL

PLAN CHECK CORRECTIONS

7

1/25/2010

1/25/2010

8 ISSUED FOR CONSTRUCTION1/28/2010

3/16/123/16/12 10:07 AM 0806D_MANHATTAN.pln

PLAN CHECK CORRECTIONS2/23/2010

1929 MANHATTAN

PROJECTADDENDA

SK-21REVISED ROOF FOR HEIGHT

XXX

XXX

XXX

LEGEND

EXISTING FINISH GRADE

PROPOSED FINISHGRADE / FLOOR

PROPOSED TOP OFRAIL / PARAPET

PC 113.71106.00

PC 114.25

111.46

108.86

PC 97.91

105.50

117.51 TWPC 97.91

117.27

117.51 TW

110.67

115.91

113.17Existing Grade

PC 102.00

117.13106.00

110.67 113.17

108.86 111.46105.50

115.91

117.27

PC 102.00

99.60

104.00

104.00

99.60

99.6

0

103.55

100.05100.

05

104.

0010

3.55

117.13Approved Convex Slope

Existing Grade

Approved Convex Slope

90.64'

90.76'

NORTH PROPERTYLINE PROFILE

3' R

EAR

YAR

D S

ETBA

CK

5' R

EAR

YAR

D S

ETBA

CK

3' REAR SETBACK LINE

SOUTH PROPERTYLINE PROFILE

4'-0

"4'

-0"

9'-0"

9'-0"

17'-0"

3'-0"

5'-0"

113.71 B.O.W. PC

114.25 PC

102.00 B.O.W.PC

97.91 PC

140'

125'-6"

134'-6"

136'-6"

140'

116'-6"

126'-6"

130'

114'-25"

140'

120'-3" T.O.W.

114'-25"

140'

130'

130'

130'106'-6"

126'-6"

116'-6"

137'-6"

(N) PERMEABLECONCRETE DRIVE PER

GRADING PLANS(N) 4'W X 16'L X 3'D

RETENTION BASIN PERGRADING PLANS

BBQ

ROOFT.O.ROOF

T.O.PARAPET

STAIR

ROOF

ROOFGARAGE SETBACK FROM IMPROVEMENT

T.O.RAIL

T.O.RAIL

T.O.ROOF

ROOF

TRASH ENCLOSURE

24" AREA DRAIN PERGRADING PLANS

T.O.TRELLIS

T.O.RAIL

T.O.ROOF

BAMBOOBAMBOO

LOT DISTANCE 90.76'

LOT DISTANCE 90.64'

40.0

2'

POOL(OPEN SPACE)

171 SF

40.0

3'REAR YARD

SID

E Y

AR

D

BAMBOOFRONT YARD

RAMP DOWN

MA

NH

ATTA

N A

VE

T.O.WALL

ROOF DECK

PALM

DR

IVE

OVERHANG

T.O.RAIL

T.O.RAIL

BALCONY

SID

E Y

AR

D

PLANTING

T.O.RAIL

OPEN SPACE142 SF

T.O.RAIL

FINISH GRADE

T.O.ROOF

ROOF GREEN ROOF

FINISH FLOOR

FRO

NT

YAR

D

FRO

NT

YAR

D

T.O.ROOF

126'-6"

97'-6"

97'-6"

126'-6"

SOLAR ON TRELLISOVER ROOF DECK

N

Page 38: Jared E Wright Portfolio

38

Page 39: Jared E Wright Portfolio

39

Prevailing onshore �ow cross ventilates to courtyard

Central courtyard for natural day light & ventilation

Electric solar shading

Pre-fabricated stainless steel pool & light well to basement

Solar Hydronic Radiant Heating

Reclaimed wood �oors

Zero VOC interior �nishes

Photovoltaic Array

Green Roof

David Randall Hertz FAIA Architect LEED AP.

Central courtyard for natural day light & ventilation

Pre-fabricated stainless steel pool & light well to basement

Solar Hydronic Radiant Heating

Reclaimed wood �oors

Zero VOC interior �nishes

Photovoltaic Array

Green Roof

NATURAL VENTILATION DIAGRAM

Page 40: Jared E Wright Portfolio

4040

1234

A2.2

0806D

1929 MANHATTAN

HERMOSA BEACH, CA 90254

12/17/09

SECO

ND

FLOO

RPLAN

ZON

ING

APPRO

VALSU

BMITTAL SET

3

CLIEN

T MEETIN

G4/20/09

2

1ST PLAN C

HEC

KSTR

UC

TUR

AL SUBM

ITTAL5/20/09

10/29/092N

D PLAN

CH

ECK

STRU

CTU

RAL SU

BMITTAL

4

PLAN C

HEC

K CO

RR

ECTIO

NS

10/29/09

PLAN C

HEC

K CO

RR

ECTIO

NS

5

3RD

PLAN C

HEC

KSTR

UC

TUR

AL SUBM

ITTAL

BID SET ISSU

ED

6

11/17/09

11/23/09

12/10/09

4TH PLAN

CH

ECK

STRU

CTU

RAL SU

BMITTAL

PLAN C

HEC

K CO

RR

ECTIO

NS

7

1/25/2010

1/25/2010

8ISSU

ED FO

R C

ON

STRU

CTIO

N1/28/2010

3/16/123/16/12 10:07 AM

0806D_M

ANH

ATTAN.pln

PLAN C

HEC

K CO

RR

ECTIO

NS

2/23/2010

1929 MANHATTAN

PROJECT

ADDENDASK-21

REVISED ROO

F FOR HEIG

HT

45.2

1.21.15.1

T5T4

T3T6

T8T2

T1

FF

F

A B C D

DN

18 R. @

6 5/8"17 T. @

11"

C.7

UP 18 R. @ 6 5/8"17 T. @ 11"

1A9.1

3A9.1

PLD12

SITE WALL D

ETAIL

1A

4.3

1A

4.1

1A

5.5

1A

5.5

2A

5.4

2A

5.4

1A

5.4

1A

5.4

4A

5.4

4A

5.4

1A

5.11

A5.1

1A

5.21

A5.2

3A

5.4

3A

5.4

1A

5.31

A5.3

2A

5.5

2A

5.5

17'-0"5'-0"

4'-0"

3'-0"

31'-10"

3'-6"

73'-81/8"

9'-0"

13'-0" 3'-6" 15'-33/4"

20'-13/8"

16'-103/8"

10'-75/8"

26'- 5/8"

4'-0"

5"

9"

51/2"

33/4"

2"

11'-115/8"

2'-0"

1'-0"

1'-0"

4'-4"8'-3"

85/8" 3'-0"6'-9"

3'-0"

5'-4"5'-4"

5'-4"5'-4"

5'-4"5'-4"

1'-15/8" 3'-10" 3'-0"

1'-15/8" 3'-10" 3'-0"

5'-13/8" 9'-57/8"

8'-67/8"

8'-27/8"

16'-0"

97.47

97.24

97.91

102113.71

114.25

10'10'

116.50

116.5'

116.50

10'

10'

116.50

114.25

116.50

114.25

114.25

116.50

10'

LINE

OF C

LOS

ES

TIM

PR

OV

EM

EN

T

SE

TBA

CK

LINE

RE

CE

SS

IN C

EILIN

GFO

R S

HA

DIN

G D

EV

ICE

S

RO

OF

DR

AIN

RO

OF

DR

AIN

BE

NC

H/S

TOR

AG

E

RO

OF

DR

AIN

DR

AIN

PIP

E TO

DO

WN

SP

OU

T

DO

WN

SP

OU

T IN W

ALL

BA

LCO

NY A

BO

VE

CATC

H B

AS

IN

DR

AIN

TOIN

FILTRATIO

N P

IT

SU

BG

RA

DE

PIP

ETO

INFILTR

ATION

PIT

CATC

H B

AS

IN

DO

WN

SP

OU

T IN W

ALL

EX

PO

SE

DS

TEE

L FRA

ME

EX

PO

SE

DS

TEE

L FRA

ME

WL5

IF CE

ILING

ALLO

WS

,R

AIS

E O

FFICE

FLOO

R8" (O

NE

STE

P), TB

D.

FL1

FL1

FL1

DO

WN

SP

OU

T IN W

ALL

FL1W

L3

WL3

WL3

WL3

FL1

WL3

WL1

WL3

FL1

WL1

WL1 W

L2W

L1

FULL H

EIG

HT

CA

BIN

ETR

Y

THIS

DO

ES

NO

T US

EC

UR

RE

NT E

AS

EM

EN

TO

F THE

STA

IRS

INN

EIB

OG

HE

R'S

PR

OP.

TV W

ALL

WL3

SIM

ILAR

SITE

WA

LL

SITE

WA

LL

SITE

WA

LL

CO

RN

ER

WIN

DO

W,

NO

CO

LUM

N

FL3

SE

TBA

CK

LINE

EX

PO

SE

D C

OLU

MN

'S O

UTS

IDE

FLAN

GE

TO B

E FLU

SH

WITH

BU

ILDIN

G E

XTE

RIO

R FIN

ISH

FL3

WL4

DR

AIN

PIP

E TO

DO

WN

SP

OU

T

DR

AIN

PIP

E TO

DO

WN

SP

OU

T

3" SQ

. ALU

MIN

UM

PO

ST, TY

PIC

AL

WL3

FRA

ME

LES

SG

LAS

SG

UA

RD

RA

IL

TRE

LLISS

TRU

CTU

RE

VE

NT P

IPE

S TO

EX

TER

IOR

WITH

SE

IHO

WE

ATHE

R R

ES

ISTA

NT C

OV

ER

204D204C

204A204B

201B203-1

201-1

210-1208-1

203-2

210D210D

210E

206A

206C206C

206B

206A206A

205A

205B205C 205C

205A 205A

210B

210A

210B

210A

210C210B210C

210A210A 210A210A

207A

201A202A

202B

201-2

204-1

207-1

SID

E YA

RD

SID

E YA

RD

MANHATTAN AVE

PLANTIN

G

(OPEN

SPAC

E MIN

. DIM

. 10')171 SF

PALM DR.

BU

FFET

OP

EN

SPA

CE

BE

LOW

1-HO

UR

FIRE

RATE

D

BA

MB

OO

BA

MB

OO

ALL W

ALLS

ALL W

ALLS

FRONT YARD

PLANTER AREA

PLANTER AREA

FOU

R W

ALLS

OF E

LEVATO

R

DIN

ING

210

HA

LLWAY B

208

POO

L206

ELEVATOR

/STAIR

202

ENTR

AN

CE

203 POW

DER

RO

OM

-A201

BR

IDG

E207

OFFIC

E204

BB

Q/R

OO

F DEC

K211

LIVING

205

KITC

HEN

209

2A

4.21

A4.2

12" AR

EA D

RA

IN, P

ER

GR

AD

ING

PLA

NS

TYP

ICA

L:1/4" / FT M

IN. S

LOP

ETY

PIC

AL:

1/4" / FT MIN

. SLO

PE

TYP

ICA

L:1/4" / FT M

IN. S

LOP

E

32

2.62.8

10'-73/8"

11'-1"

10'-0"16'-10

3/8"3'-6" 14'-81/8"

3'-2"6'-5"

3'-2"

13'-0"

10'-0"11'-4"

10'-0"

SE

CU

RITY S

CR

EE

NTO

PU

LL AC

RO

SS

PO

OL O

PE

NIN

G

204E

209A

202C

IDITEM

MANUF.

PRO

DU

CT

FINISH

/ CO

LOR

REMARKS

FL1FLO

OR

ING

N/A

CO

NC

RE

TE TO

PP

ING

SLA

BS

MO

OTH

TRO

WE

L / STA

ND

AR

DFL2

FLOO

RIN

GPEBBLE R

OC

KR

OC

K/A

GG

RE

GA

TE E

PO

XY

CU

STOM

GLASS

FL3S

TAIR

TRE

AD

S / LA

ND

ING

STER

RAM

AI OR

EQ.

RE

CLA

IMED

WO

OD

T.B.D

. / T.B.D

.FL4

DEC

KING

N/A

4" IPE

WO

OD

SLA

TS2 C

OATS SIKKEN

S / CLEAR

WL1

WA

LL FINIS

HP

RA

TT & LA

MB

ER

T OR

EQ

.PAIN

TT.B

.D. / W

HITE

TYP

ICA

L WA

LL FINIS

HW

L2W

ALL FIN

ISH

PR

ATT &

LAM

BE

RT O

R E

Q.

PAINT

T.B.D

. /WH

ITEB

ATH

RO

OM

LOC

ATIO

NS

WL3

WA

LL FINIS

HN

/APLASTER

SAME AS EXTER

IOR

STUC

CO

ENTR

Y AREA

WL4

WA

LL FINIS

HN

/APLASTER

SM

OO

TH TR

OW

EL / T.B

.D.

ELE

VA

TOR

CO

RE

WL5

WA

LL FINIS

HE

LDO

RA

DO

STO

NE

STA

CK

ED

STO

NE

ALD

ER

WO

OD

/ DR

Y-S

TAC

K G

RO

UT

LOC

ATIO

NITEM

MANUF.

PRO

DU

CT

FINISH

/ CO

LOR

REMARKS

EX

TER

IOR

WA

LLSS

TUC

CO

N/A

INTEG

RALLY PIG

MEN

TEDS

MO

OTH

TRO

WE

L / GR

EY

T.B.D

.E

XTE

RIO

R D

EC

KS

DEC

K MEM

BRAN

EPAC

IFIC PO

LYMER

S, INC

.E

LAS

TO-D

EC

K 5000 FR

STA

ND

AR

D / T.B

.D.

HIG

H R

OO

FR

OO

FING

ME

MB

RA

NE

VE

RS

I-WE

LD45-M

IL T.P.O

. SIN

GLE

PLY

WH

ITEU

L CLASS A

BA

LCO

NY

/GU

AR

DR

AIL

4" WO

OD

SLA

TSN

/AIP

E W

OO

D2 C

OATS SIKKEN

S / CLEAR

INTER

IOR

:

EXTERIO

R:

1929 MANHATTAN

FINISH

SCH

EDU

LE

11/23/2009

N

SC

ALE

: 1/4" = 1'-0"1

SE

CO

ND

FLOO

R P

LAN

NO

TE: S

LIDIN

G D

OO

R &

WIN

DO

W A

RR

OW

SIN

DIC

ATE TH

E C

LOS

ING

DIR

EC

TION

FLOO

R PLA

N

Page 41: Jared E Wright Portfolio

4141

1

2

3

4

A4.2

0806D

1929 MANHATTAN

HERMOSA BEACH, CA 90254

1 2/17/09

EXTERIORELEVATIONS

ZONING APPROVALSUBMITTAL SET

3

CLIENT MEETING4/20/092

1ST PLAN CHECKSTRUCTURAL SUBMITTAL5/20/09

10/29/09 2ND PLAN CHECKSTRUCTURAL SUBMITTAL4

PLAN CHECK CORRECTIONS10/29/09

PLAN CHECK CORRECTIONS

5

3RD PLAN CHECKSTRUCTURAL SUBMITTAL

BID SET ISSUED

6

11/17/09

11/23/09

12/10/09

4TH PLAN CHECKSTRUCTURAL SUBMITTAL

PLAN CHECK CORRECTIONS

7

1/25/2010

1/25/2010

8 ISSUED FOR CONSTRUCTION1/28/2010

3/16/123/16/12 10:07 AM 0806D_MANHATTAN.pln

PLAN CHECK CORRECTIONS2/23/2010

1929 MANHATTAN

PROJECTADDENDA

SK-21REVISED ROOF FOR HEIGHT

ABCD

3" SQ. ALUMINUMPOST, TYPICAL

3" SQ. ALUMINUMPOST, TYPICAL

3" SQ. ALUMINUMPOST, TYPICAL

BASEMENTF.F.

1ST FL F.F.

2ND FL F.F.

3RD FL F.F.

ROOF DECKF.F.

ROOF DECK,MASTERBEYOND

GREEN ROOF,LIVING BEYOND

2NDMASTER

MASTER BATH A

KID'S ROOM

KITCHEN,DINING

BEYOND

S.S. CABLE RAILINGSITE STAIR

S.S. CABLE RAILINGSITE STAIR

+97'-6"

+106'-6"

+116'-6"

+126'-6"

+136'-6"

+141'

-9'

±0"

+10'

+20'

+30'

+34'-6"

GLASS GUARDRAILFOR ROOF DECK

BAMBOO

RETAINING WALL

EXPOSED STEELSTRUCTURE

BAMBOO

EXPOSED STEELSTRUCTURE

STEEL TROWELGREY STUCCO

WOODSLATS

STEEL TROWELGREY STUCCO

ALUMINUM EYEBROWOVERHANG

STEEL TROWELGREY STUCCO

STEEL TROWELGREY STUCCO

STEEL TROWELGREY STUCCO

SOLAR PANELS

GLASS GUARDRAILFOR DECK

WOOD GUARDRAILFOR BALCONY

SOLAR PANELS

GLASS GUARDRAILFOR DECK

EXPOSED STEELSTRUCTURE

GLASS GUARD RAIL FOR BALCONY

SOLAR PANELOVER TRELLIS

-9'

±0"

+10'

+20'

+30'

+34'-6"

+7'-9"

+13'-6"

CONVEX SLOPE LINE AT9' SETBACK

ENTRANCE TO THE PROPERTY

WOODFENCE

STEEL TROWEL GREY STUCCO

WOOD SLATGUARDRAIL

FRAMELESS GLASS "BOX"

WING WALL TO MATCHSTORY BELOW

STEP IN GUARDRAIL

STUCCO GUARDRAIL WALLW/ WOOD SLAT CLADDING

A B C D

MITERED GLASSCORNER WINDOW

MITERED GLASSCORNER WINDOW

ALUMINUM CORNER

ALUMINUM CORNER

ALUMINUM EYEBROWOVERHANG

ALUMINUM EYEBROWOVERHANG

LANSCAPING

STREET / CURB

SCALE: 1/4" = 1'-0" 1WEST ELEVATIONSCALE: 1/4" = 1'-0" 2EAST ELEVATIONELEVATION

Page 42: Jared E Wright Portfolio

42

PANEL HOUSESINGLE FAMILY RESIDENCE

VENICE BEACH, CA

PROJECT INVOLVEMENTproject designer for

david hertz faia architectsconstruction administration

PROJECT DESCRIPTIONarea: 3,000 sf

status: completed, 2006

Page 43: Jared E Wright Portfolio

43

EASTERN REMODELSINGLE FAMILY RESIDENCE

VENICE CANALS, CA

PROJECT INVOLVEMENTproject manager for

david hertz faia architectspredesign through con. docs.

PROJECT DESCRIPTIONarea: 3,200 sf

status: in construction, 2011