E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 1 of 55 JHARKHAND URJA SANCHARAN NIGAM LIMITED TRANSMISSION DEPARTMENT TECHNICAL SPECIFICATION AND GENERAL CONDITION FOR SUPPLY OF 33/ .04 KV 315 KVA SUB – STATION TRANSFORMER WITH ALL ITS ACCESSORIES N.I.T. NO. 301/ PR/ JUSNL/ 2014 – 15 LAST DATE & TIME OF : Upto 13.30 Hrs. on 06.02.2015 RECEIPT OF TENDER DATE OF OPENING OF TENDER : At 15.30 Hrs. on 06.02.2015 SOLD TO M/S ………………………………………… COST = Rs. 10,000/-
Transcript
Page 1: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 1 of 55

JHARKHAND URJA SANCHARAN NIGAM LIMITED

TRANSMISSION DEPARTMENT

TECHNICAL SPECIFICATION AND GENERAL CONDITION FOR SUPPLY OF

33/ .04 KV 315 KVA SUB – STATION TRANSFORMER WITH ALL ITS ACCESSORIES

N.I.T. NO. 301/ PR/ JUSNL/ 2014 – 15

LAST DATE & TIME OF : Upto 13.30 Hrs. on 06.02.2015 RECEIPT OF TENDER DATE OF OPENING OF TENDER : At 15.30 Hrs. on 06.02.2015

SOLD TO M/S …………………………………………

COST = Rs. 10,000/-

Page 2: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 2 of 55

INDEX

SL DESCRIPTION PAGE

1. GENERAL TERMS & CONDITIONS 4 – 11

2. TENDER CONDITIONS 12

3. GENERAL TECHNICAL REQUIREMENTS 13 – 25

4. GUARANTEED TECHNICAL PARTICULARS 26 – 31

5. BIDDING SCHEDULES (To be filled up) 32 – 45

6. CONTRACTS FORMATS 46 – 55

xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx

Page 3: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 3 of 55

JHARKHAND URJA SANCHARAN NIGAM LIMITED

ENGINEERING BUILDING, HEC, DHURWA, RANCHI-4

FAX NO. 0651 – 2400799

(Department of Transmission)

General Terms and Conditions for Submission of Tender for Supply of Materials.

Sealed tenders are invited in duplicate from reputed financially sounds and experienced

manufacturers only having adequate Design, Manufacturing, Testing and Commissioning of 33/ 0.4 kV 315 KVA Sub-Station Transformer with all its accessories as per specifications attached offers of

only those tenderers will be considered who will furnish valid ISO 9001 certificate, relevant type test

certificate, whichever required, for the above materials on the date of opening of tender (Part – I). .

Offer should be properly paginated with initial and seal on each page.

1. Quantity

10 Sets (Actual Quantity may Increase or Decrease)

2. The tender should be submitted in the prescribed enclosed proforma only in two parts i.e.

Part – I (Technical & Commercial Part) and Part – II (Price Part) in two separate envelops

duly sealed and super scribed on the top of the envelops as Technical and Commercial Part –

I/ Price Part – II and addressed to Chief Engineer (Transmission), JUSNL Ranchi – 4. The

name of the firm, NIT No., Due date, Name of materials offered, amount of earnest money

deposited with money receipt no. and date should be clearly indicated on the cover of the

envelop.

3. Both parts of the sealed tenders will be received upto 13.30 hrs. of 06.02.2015 in the office of

Chief Engineer (Transmission), JUSNL Ranchi and the Part – I will be opened at 15.30 hrs.

on 06.02.2015 the due date in presence of such of those tenderers or their authorized

representatives as may desire to be present. The undersigned may extend the due date of

opening of Part – I with intimation to all tenderers.

The Price Part (Part–II) of those tenderers whose offers are found technically and

commercially acceptable will be opened later on. The exact date will be intimated to the

successful tenderers. No offers/ tenders will be accepted after due date and time.

4. The desirous tenderers can purchase tender documents including terms and conditions,

B.O.Q. and technical specification from the office of Chief Engineer (Transmission), JUSNL

Ranchi on payment of Rs. 10,000/- (Rupees Ten Thousand only) (non-refundable) in cash

or in shape of demand draft issued by any Nationalized Bank in favour of Accounts Officer,

Page 4: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 4 of 55

JUSNL Ranchi payable at Ranchi. No tenders will be accepted/ considered unless the

tenderer buy at least one copy of the tender documents by the prescribed date.

5. Terms & Conditions

1. Tender document (BOQ) including terms & conditions, tender specification can be

purchased from office of Chief Engineer (Transmission), JUSNL, Ranchi on

payment of cost of tender document (non – refundable) either in shape of cash or in

demand draft of any nationalized Bank in favour of Accounts Officer, JUSNL,

Ranchi payable at Ranchi.

2. Tender must be accompanied with earnest money mentioned against NIT in shape of

Demand Draft / Banker’s Cheque, payable at Ranchi in favour of Accounts

Officer, JUSNL, Ranchi failing which tender will be rejected.

3. Tenderer must submit type tested certificate issued by any Govt. test bed of tendered material alongwith tender.

4. Request for issue/ submission of tender document by post will not be entertained.

5. Conditional and incomplete tenders shall not be accepted. Tender must be in conformity with our schedules.

6. Tenders received after due date and time of submission will not be considered.

7. Quantity mentioned against above NIT’s may increase or decrease.

8. Tender document submitted by the firms must be paginated.

9. Nigam reserves the right to extend the date of sale/ submission/ opening of tenders or reject the tender without assigning any reason thereof, and also reserves the right to distribute the supply of materials among more than one supplier.

10. Firm should submit undertaking / affidavit:

a. That the firm is not black listed by any firm/ PSU/ Govt.

b. That the directors of the firm have no direct / indirect blood relation / proxies or any relation with JUSNL Employee.

6. Earnest money:

a) Tender (Part –I) must be accompanied with an earnest money of Rs. 1,04,000.00 (Rupees One Lac Four Thousand) only unless exempted from such deposit, failing which the tender will be rejected and price part will not be opened.

b) Tender must be accompanied with earnest money mentioned against NIT in shape of Demand Draft / Banker’s Cheque, payable at Ranchi in favour of Accounts Officer, JUSNL, Ranchi failing which tender will be rejected.

c) Fixed Deposit receipt/ Money Order or and saving certificate etc. are not acceptable towards deposit of earnest money and tenders with above will be considered without earnest money.

d) Earnest money deposited by firms against any other tender of the Nigam/ or of this office will not be considered as earnest money for the present tender under any circumstances.

Page 5: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 5 of 55

e) No earnest money will be accepted after opening of the tender.

f) The earnest money will be liable to be forfeited on revocation of tender before the validity of the quotations expire or on refusal to enter into a contract after the award is made to the tenderer.

7. Exemption

The tenderers of following categories are exempted from deposit of earnest money subject to

the conditions laid down below: -

a) SSI unit of Jharkhand permanently registered with the department of Industries, Govt.

of Jharkhand for the tendered item supported by certified copy of their registration

certificate.

b) The firm registered with DGS&D for manufacture of the item for which tenders have

been submitted and the registration certificate remain valid at the time of submission

of the tender and/ or during contract period. The tender in such case should be

accompanied with a certified Photostat copy of the valid registration certificate failing

which the tender shall be rejected.

c) The State Govt./ Govt. of India undertakings.

d) Firms registered with NSIC under single point registration scheme for manufacture of

the item, provided that certificate is valid on the date of tender and during the period

of delivery having adequate turnover and production capacity.

NB: Aforementioned certificate must accompany with documentary evidence for its

validity on the date of submission of tender/ period of delivery failing which tenders

will be rejected.

8. Security Deposit and Contract Agreement:

The successful tenderers shall have to deposit security money @ 5% (five percent) of the

ordered value at the time of executing the contract agreement. However, the SSI units of

Jharkhand having permanent valid registration with Department of Industries, Govt. of

Jharkhand for the manufacture of the item will be required to deposit security money @ 1%

(one percent) of the ordered value. In no case exemption from security money will be

granted. Security money to be deposited may be adjusted from the earnest money deposited,

if any.

The amount of security money shall be deposited with the Accounts Officer, JUSNL,

Ranchi in cash or in shape of Demand Draft/ Bank Guarantee as a performance guarantee.

The security money thus deposited will be released after completion of satisfactory supply of

Page 6: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 6 of 55

materials and expiry of guarantee period. Payment will be made only after depositing the

security money and execution of contract agreement.

9. Delivery:

Deliveries of full offered quantity of materials are to be completed within Six (06) months

from issue of Letter of Intent.

10. Penalty

The delivery will be guaranteed under penalty. Our usual terms of penalty is 0.25% of the

value of the materials delayed/ undelivered for a week or part thereof with maximum ceiling

of 5%.

Equipment will be deemed to have been delivered only when all its component parts are also

delivered in stores of JUSNL If certain components are not delivered in time the equipment

will be considered as delayed with such time as the missing parts are delivered.

11. The Nigam reserves the right to reject the lowest or any of the tender either in whole or in

part without assigning any reason.

12. Price: The price quoted should be FIRM and price must be quoted only in the Nigam’s

prescribed proforma indicating therein ex-factory price, freight element up to destination,

element of Excise Duty, Sales Tax and other charges. The Ex-works price shall be quoted

after considering benefit under MODVAT or any other scheme to be retained by the supplier.

The materials are to be dispatched to various destinations in Jharkhand as may be required.

The responsibility of safe delivery will rest with the supplier. If the price elements are not

quoted separately as indicated above, the tender will be liable for rejection. Freight element

will include loading, packing and forwarding etc. at manufacturer’s works and unloading at

stores of purchasers.

Arithmetical errors will be rectified on the following basis. If there is discrepancy

between unit price and the total price i.e. obtained by multiplying the unit price and quantity,

the unit price shall prevail and total price shall be corrected. If the bidder does not accept the

correction of errors, his bid will be rejected. If there is a discrepancy between words and

figures, the amount in words shall prevail.

13. Insurance:

The materials are to be insured with Nigam’s underwriter under its open marine policy in all

cases for which the supplier should complete the Nigam’s proforma and sent the original to

the Chief Claim Officer, JHARKHAND URJA SANCHARAN NIGAM LIMITED, Ranchi

for taking over a policy with copy to the consignees and paying officers concerned at the

time of dispatch of each consignment.

Page 7: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 7 of 55

In case the materials are insured under the Nigam’s open policy the consignee

concerned will take prompt action to lodge a claim with the Railway Authority and the

Insurance Company with an intimation to the Chief Claim Officer of the Nigam for the

materials received short/ in damaged conditions and no recovery of the cost of such materials

shall be effected from the supplier’s bill except for sort supply for reason of defective

packing or any other lapses on the part of consignor. If packing cases are found in intact

conditions at the time of taking delivery and the materials therein are found short, the cost of

such materials shall be recovered from the supplier’s bill. Similarly the supplier will be liable

for compensation for defective packing.

14. Import License.

Import license can not be arranged by the Nigam for such of these materials which are under

banned category of import. When import is desired to be the tenderers under their own quota

license, the value of quote specifically available against the tender should be stated. In case

of availability suitable indigenous make materials the same may be preferred.

15. Tests

Tests will have to be conducted on the materials in case order is placed according to relevant

standard and test certificate in triplicate will have to be furnished prior to supply of materials.

Each lots of the materials shall be subjected to the test prescribed in the relevant standard

(latest edition) before supply is affected. Untested material will not be accepted.

16. (i) Inspection

The materials are to be inspected by the Nigam’s representative during the process of

manufacturing and prior to dispatch. The suppliers are requested to intimate the

progress of manufacturing and testing at least 15 days in advance to Chief Engineer

(Transmission), JUSNL, Ranchi to enable them to depute an officer or an authorized

representative for inspection. Failure to adhere to the specification will entail

rejection of materials. All tests and inspection shall be made at the place of

manufacture unless otherwise specially agreed upon by the manufacture and

purchaser at the time of purchase. The manufacturer shall offer the inspector

representing the purchaser all reasonable facilities without charges to satisfy him that

the materials cleared for dispatch after approval of inspection report should be

dispatched/ delivered immediately to different consignees.

(ii) The purchaser has the right to have the tests carried out at his own cost by an

independent agency whenever there is a dispute regarding the quality of supply.

(iii) During pre-dispatch inspection the firm shall have to produce original copy of type

test report/ Calibration Certification of testing equipments from govt. laboratory/ BIS

license/ NSIC, DGS&D or SSI registration certificate inspecting officer for

Page 8: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 8 of 55

verification. If there is any discrepancies found during verification the materials may

not be accepted.

17. Forfeiture of Earnest Money & Security Money Deposit:

It should be clearly understood that in the event of the tenderers failing to accept and execute

the telegraphic and detailed orders, if it is placed within the validity period of the offer, then

the full amount of earnest money and security deposit will be forfeited and the Nigam’s

decision in this respect will be final and binding on the tenderer.

18. Guaranteed Particulars

The performance particulars as required in the specifications should be sent along

with the tender, other details not specified may also be given.

19. Past Performance:

The tenderer must submit performance certificate for 3 years successful operation of similar

rating of 33/ 0.04 kV 315 KVA Sub-Station Transformer supplied to any reputed

organizations.

20. Turn over criteria

The tenderer must have average annual turn over of minimum 26.00 Lacs (Twenty Six Lacs)

for last three consecutive years. The tenderer must submit balance sheet, Profit & Loss

Account and Auditor’s report of last three financial years in support of the above criteria.

21. Departure from Specification

Departure from specification of the tender, if any, should be specified in the offer.

22. Sales Tax:

Attested copies of up-to-date Sales Tax clearance certificate should accompany the tender

failing which the tender will be rejected. State/ Central Sales Tax registration number of the

tenderer should also be stated.

23. Progress Report

The suppliers will have to submit monthly progress report regularly until completion of

delivery to the Chief Engineer (Transmission), JUSNL, Ranchi by the first week of every

month following the month in which order is placed.

24. Terms of Payment :

(a) 100% payment will be made by Accounts Officer, JUSNL, Ranchi on submission of

5% Bank Guarantee of nationalized bank of ordered value on non-judicial stamp Rs.

50/- (Rupees fifty) only valid for 24 months from the date of last supply and on

receipt of SRV duly signed by the concerned consignee after receipt of the materials

in good condition along with approved routine test certificate. However, Excise Duty

part will be paid only after production of documentary evidence issued by Excise

Department of their jurisdiction S T will be paid on submission of upto date income

Page 9: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 9 of 55

tax and sales tax clearance certificate by competent authority of respective

department. The paying officer will accept the Bank Guarantee after confirmation

from the concerned bank.

(b) If the Bank Guarantee is not furnished only 95% (ninety five percent) value of the

materials will be paid and rest 5% (five percent) amount will be paid after 24 months

from the date of receipt of the materials subject to satisfactory supply performance

reported by each consignee.

25. Validity Period.

Tenderer should specify the validity period of their offer which should be for period of at

least 180 (one hundred eighty) days from the date of opening of tender, which may be

extended on discretion of the Nigam. The offers with lesser validity period may be out right

rejected.

26. Raw Materials

No raw materials will be arranged by the Nigam. Tenderers will have to arrange their

requirements of raw materials themselves.

The purchaser reserves the right to inspect the raw material procured by the supplier for the

purpose of manufacture of materials to check the genuineness of the raw materials. The

purchaser or his representative can demand the original invoices in respect of all the raw

materials.

27. Quantity:

The requirement mentioned in the tender notice and general conditions is tentative and is

subject to increase or decrease at the time of finalization of the tender.

28. In case the order is placed, the firm will have to dispatch the materials in the name of the

consignee only and “self booking” will not be accepted.

29. Jurisdiction of Court:

The civil court Ranchi shall alone have an exclusive jurisdiction to decide any difference/

dispute/ cases for and against JUSNL/ Contractors/ Suppliers arising out of or in respect of

the NIT, or contract agreement, or Purchase order.

30. Contract Form:

The successful tenderers will have to execute contract agreement in the Nigam’s proforma

prior to the placement of the purchase order. The contract agreement is to be executed on Rs.

100.00 non -judicial stamp paper.

31. Extension Order:

In the event of an order being placed on the tenderer, the tenderer requested to give his

concurrence that he is willing to accept additional order are on the same terms and conditions

Page 10: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 10 of 55

if the extension order is placed by Nigam within 6 (Six) month from the date of acceptance/

placement of order.

32. Guarantee Period :

The materials shall be guaranteed for satisfactory performance, against defective or low

quality materials and bad workmanship for Twenty Four Months from the date of

commissioning or Thirty Months from the date of delivery of in stores. Whichever is earlier.

If during the guarantee period the goods are found defective or defects in service the same

will be replaced/ repaired by the supplier free of all the charge within one month on receipt

of intimation. In case defective stores/ materials are not replaced/ rectified as per the

guarantee clause, the Nigam shall recover an equipment amount plus 15% (fifteen percent)

supervision charges from any of the bills.

33. Termination of Contract:

In case the contractor/ supplier fails to deliver the materials or any consignment there of

within contracted period of delivery or in case the materials are found not in accordance with

the prescribed specification and samples the Nigam shall exercise its discretionary power

either:

A) To recover from the supplier the damages as provided in the penalty of general

conditions of tender for supply.

Or

B) To Purchase elsewhere after giving due notice to the contractor on account and at the

risk of contractor such material not so delivered or other of similar description

without canceling the contract in respect of consignment not yet due for delivery.

Or C) To cancel the contract reserving Nigam’s right to recover damages.

Notwithstanding the powers, under (a), (b), (c) referred above are in addition to the

rights and remedy available to this Nigam under the General Law of India relating to

contracts.

Note: a) In the event of risk purchase of stores of similar description, the option of the Nigam

shall be final. In the event of action taken under (a) or (b) above, the supplier shall be

liable for any loss which the Nigam sustain on the account but the supplier shall not

be entitled to any saving on such purchases made against default.

b) The decision of the Nigam shall be final as regards the acceptability of the stores

supplied by the supplier on the Nigam shall not be required to give any reason in

writing or otherwise at any time for the rejection of the materials.

Page 11: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 11 of 55

34. Nigam’s officer/ authorized representative may inspect the factory regarding availability of

adequate manufacturing and testing for producing quality materials in case tenderers being

considered for placement of order by the Nigam.

35. The Nigam reserves the right to cancel full or part of the awarded contract without assigning

any reason of those firms which will be found defaulter for delay in supply of materials or his

supply sub-standard quality of the materials.

36. General:

Please again note that in incomplete offer not having specific comments on all the points of

our specification and not supported by various information desired in our specifications shall

be rejected out-right and no further correspondence shall be made with the supplier in respect

of their offer which causes delay in finalizing the tender.

Chief Engineer (Transmission)

Page 12: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 12 of 55

JHARKHAND URJA SANCHARAN NIGAM LIMITED DEPARTMENT OF TRANSMISSION

TENDER CONDITIONS The following conditions are to be strictly fulfilled by the firm while submitting their tenders: -

1. Tenders not accompanied by the prescribed earnest money will be rejected outright. The firm

registered with DGS&D Permanently registered with Department of Industries, Govt. of

Jharkhand/ Registered with NSIC under single point registration for manufacture of the item/

undertaking of Govt. of Jharkhand/ Govt. of India are however exempted but the proof of

registration viz. certified or attested copy should be submitted along with the tender,

otherwise tender will be liable to be rejected.

2. Tenderer has to accept the penalty clause as per tender otherwise tender will be considered as

invalid.

3. The offers which are not kept valid for acceptance, for at least 180 days from the date of the

opening of the tenders will be rejected.

4. Incomplete tenders which do not contain full details, technical particulars, literature test

certificates, performance report, prices of materials, delivery period etc. will be rejected.

GTP must be filled up item wise. Incomplete or mentioning as “per IS” will not be

acceptable.

5. The prices are specifically asked to be submitted as F.O.R. destination and if not so

furnished; the tender shall not be considered as valid and will be rejected.

6. Tender which is not submitted in the Nigam’s prescribed forms shall be rejected. Any

additional particulars can be furnished in the accompanying letter of statement.

7. Tender received in this office after the due date & time shall be rejected.

8. Prices must be indicated both in figure & words failing which the tender may be rejected.

9. Tenderer must submit attested copy of BIS license for the ISI marked materials. License

should be valid on the date of tender/ period of supply; otherwise offer shall not be

considered as valid and will be rejected.

10. Type test reports for the type tested materials must be enclosed otherwise offer shall not be

considered as valid and will be rejected.

11. Firm should submit undertaking / affidavit:

a. That the firm is not black listed by any firm/ PSU/ Govt.

b. That the directors of the firm have no direct / indirect blood relation / proxies or any

relation with JUSNL Employee.

Chief Engineer (Transmission)

Page 13: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 13 of 55

SECTION- II

GENERAL & TECHNICAL SPECIFICATION FOR 315 KVA

STATION SERVICE TRANSFORMER

Page 14: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 14 of 55

GENERAL & TECHNICAL SPECIFICATION FOR 315 KVA STATION

SERVICE TRANSFORMER

1.00.00 SCOPE OF WORK

This specification covers the design, manufacture, assembly, testing of

transformer at manufacturer's works, supply, delivery at site, Transformers complete with

all specified fittings, accessories and transformer oil.

A) 33KV/ 433 V; 315 KVA, 3 phase ,50 C/S, Dynl 1 outdoor type Service transformer,

complete with all necessary fitting and accessories.

2.000 QUANTITY REQUIRED :

The type and quantity required has been identified and quantified in the schedule of quantity.

3.000 FITTINGS & ACCESSORIES

Each transformer shall have all necessary fittings and accessories but not limited to the following :

3.01 Conservator with filling hole, cap and 1" diameter drain valve having flanged terminal.

3.02 Conservator supporting bracket for tank mounting.

3.03 Isolation valve for the conservator.

3.04 Magnetic Oil gauge with low level alarm contacts.

3.05 Silicagel breather with oil seal and connecting pipe for non inert gas sealed Transformer.

3.06 Pressure relief pipe, double diaphragm type, complete with port hole type oil gauge for

indication of the fracture of the lower diaphragm and necessary air equalizer connection

between the conservator and the pressure relief pipe.

3.07 Access holes with bolted covers for access to inner ends of bushings offload tap-change switch.

3.08 Lifting eyes for cover.

3.09 Lifting eyes for core and winding.

3.10 Lifting lugs for the complete transformer.

3.11 Air release plugs at the top of cover.

3.12 Upper filter valve, 1" diameter, baffled to reduce aeration of oil, flanged, to

seat 1 '/2" B.S.P. male threaded adapter (for filter pipe connection).

3.13 Bottom filter valve, 1" diameter, flanged, to seat I1/-." B.S.P. male threaded

adapter (for filter pipe connection), so fitted as to drain off the oil completely.

3.14 Drain Valve, 2" diameter, flanged, with oil sampling device.

3.15 Jacking pads with hauling holes.

Page 15: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 15 of 55

3.16 Mat Roller Wheels.

3.17 Tank Earthing Terminals - 2 (two) numbers.

3.18 Buchholz (gas) relay, double float type with one set of alarm and one set of

trip contacts and a testing petcock. The contacts shall be wired upto the

terminal cabinet with mineral insulated cable.

3.19 Dial thermometer for oil temperature indication complete with two sets

of alarm/ trip contacts.

3.20 Pocket for inserting alcohol thermometer for oil temperature indication with necessary

thermometers.

3.21 Rating plate and diagram plate.

3.22 Terminal connectors suitable for ACSR Zebra on HV Bushing

3.23 OFF - Load tap - Change gear.

3.24 Insulating oil required for first filling, plus 10 percent extra.

3.25 TOOLS AND TACKLES :

One complete set of erection and maintenance tools for each Transformer shall be

included in the scope of supply for the unit prices quoted in the schedule of prices. List

of all tools and accessories to be supplied must be furnished. Tools kits shall wrenches,

screw drivers etc, of all sizes required.

4.000 QUANTITIES :

The quantities mentioned in tender schedule of quantity are provisional. The purchaser

reserves the right to vary the quantities while placing an order, at the unit quoted rate by

the successful tenderer.

5.000 OPERATING CONDITIONS :

5.01 System Voltage : i) 33KV Plus/Minus 10 Percent.

ii) 433/250 Volts Plus/ Minus 10 Percent.

5.02 System Frequency : 50 Cycles per second Plus/ Minus 3 Percent.

5.03 System grounding : Solidly earthed

6.00 DESIGN RATING

6.01 Type : Outdoor, oil immersed self-cooled, step down, core type,

double- wound three phase, Service Transformer suitable for outdoor use in tropical

weather.

6.02 Cooling : Oil immersed natural air cooled (ONAN).

Page 16: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 16 of 55

6.03 Continuous Rating : 315 KVA.

6.04 No load voltage at Normal tap

a) H.V. side : 33,000 Volts.

b) L.V. side : 433 Volts.

6.05 Frequency : 50

6.06 Percentage impedance Zps : 5%

(%) on rated KVA base at 75 °C

6.07 Tap change (Control) : OFF CIRCUIT

6.08 Taps provided on : H.V.

6.09 Tapping : Three plus and three minus steps of 2. 5% each.

6.10 Winding Insulation level class : Oil - immersed, class - 'A'.

6.11 Basic Impulse insulation Level (KVP) :

a) Winding : H.V. 170

L.V. 2.5

b) Bushing : H.V. 170

L.V. 2.5

6.12 Continuous rating Temperature rise over ambient (500 C Peak)

i) Winging : 450 C by resistance

ii) Oil : 350 C by Thermometer

iii) Core : As permitted by for adjacent windig

7.01 SPARES

7.01 The price of the following spares shall be quoted , for procurement at the purchaser's discretion :-

a) Two nos. H.V. Bushing for each type.

b) Two nos. L.V. Bushing for each type.

c) Two Nos. Neutral Bushing.

d) Two sets of Gaskets.

e) Two sets of Relief pipe diaphragm.

f) Two sets of silica gel with glass container.

g) Two nos. Bucholz Relay

h) Two nos. Oil sampling valve I) Dial type thermometer

Page 17: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 17 of 55

7.02 TOOLS & TACKLES

List of any special tools and tackles required for erection and maintenance must be furnished along with price.

8.00 TESTS

All the routine test and type test will be in accordance with IS : 2026 shall be performed and six (6) copies of test certificates shall be supplied to the purchaser for his approval, before despatch of the Transformers. At least one Transformer of will be subjected to type test as desired by the Purchaser. Charges for conducting type tests shall be indicated by the tenderer.

9.00 PAINTING

The Transformers shall be given a priming coat of zinc chromate and two coats of weather resistant light Grey paint.

10.00 Technical particular & Drawings

The tenderer shall furnish complete technical particulars literature and drawings in six sets showing the detailed parts, principle of operation and also the wiring diagram.

11.00 Drawings & Instruction Books

At least 10 sets of final drawings shall be supplied by the successful tenderer. A set of velograph tracings or any other form of permanent negatives for the transformer shall be furnished as soon as the equipment is shipped. A comprehensive manual for use by the Purchaser's field Engineer to erect and to operate and carry out maintenance on the transformer shall be prepared and 5 copies of the same shall be furnished as soon as the transformer are dispatched from works.

12.01 STANDARDS

12.01 The Transformer with all its auxiliaries, accessories and all component aterial shall fully satisfy the requirements of the latest issue of IS -2.5^.2 or SS (No. 71) I.E.C. American Standards (ASAC 57.11) NEMA and A.l.E.E rules or an approved equivalent standard. .-

12.02 In the event of a conflict between the above standards and the stipulations laid down in this specification, the latter shall govern.

13.0 DETAIL DESIGN REQUIREMENT

13.1 Tank :

The tank shall be made of boiler plate, so shaped as to reduce welding to a minimum. All seams shall be double welded for absolute oil tightness. The tank shall withstand full vacuum in standard atmospheric condition.

Guides shall be welded from the inner sides of the tank to facilitate tanking and untanking.

The conservator shall be liberally dimensioned such that at the lowest ambient temperature and no load on the Transformer the oil level shall not recede too low and at the highest ambient temperature and full load on the Transformer the oil shall not spill into the breather pipe or to the exterior to waste.

After fabrication, tank and its conservator, fitted with the respective valves, shall be pressure tested with Transformer oil for a minimum duration of 24 hours to withstand a

Page 18: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 18 of 55

pressure equal to the static head of the oil upto the service level plus an air pressure of one atmosphere. No valve shall drip and no weld shall sweat.

13.002 Core :

The magnetic circuit shall be built of grain oriented silicon steel laminations conforming to the adopted standard. The thickness of the sheet steel shall be 0.014" . The sheet steel shall have passed to test for brittleness vide ASTM Designation A. 34" Bend Test for Ductility.

The bidder should offer the CORE for inspection & approval by the purchaser during the manufacturing stage. Bidder's call notice for this purpose should be accompanied with the following documents as applicable, as proof towards use of primary CORE material:

a) Invoice of supplier

b) Mill's test certificate

c) Packing list

d) Bill of lading

e) Bill of entry certificate by customs

CORE material should be directly procured either from the manufacturer or through their accredited marketing organisation of repute and not through any agent

The percentage change in the iron loss at the maximum working induction density employed in the Transformer, when measured at normal room temperature after the sheets have been heated to a temperature of 100°C continuously for 600 hours shall not be measurable.

The legs and Yokes of the core shall have similar sections to minimize heating and noise arising from any transverse flux. But joints between the Yokes and the limbs will not be accepted. Necessary cooling ducts shall be provided in the core and Yoke for heat dissipation from the core.

The core clamping frame shall be provided with lifting eyes for the purpose of tanking and untaking the active part of the Transformer. The whole core shall be electrically connected by an iron strip to the tank for being earthed to drain off any electric static potential that may build up.

Each of the core bolts and parts of the core clamping frame work shall be insulated from the core laminations and tested after completion of the core assembly to withstand a D.C. pressure of 3500 Volts for a duration of 1 -Minute.

13.03 Coils

Each coil shall be wound of paper insulated continuous and smooth electrolytic copper conductor. Similar coils shall be interchangeable. Successive coils of a winding may be connected by accessible joints which shall be brazed or welded and finished smooth to prevent abrasive damage to insulation. No Corona discharge shall result on the Windings upon exciting the Transformer for the specified induced voltage test.

Class 'A' insulation shall be used. The insulation of the windings shall withstand test as specified. A negative wave (1.5 / 40 micro-second) or (1/50 micro- second) shall be used for impulse testing. The method of application of impulses shall be according to A.I.E.E. practice.

Page 19: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 19 of 55

The windings shall be so assembled on the core as to minimize strains in the windings that may develop in normal service or due to internal short circuit. Liberal ducts shall be provided for oil circulation and prevention of any hot spot temperature in the winding that may affect the life of the Transformer. All leads and connections shall be mechanically strong, heavily insulated protected and rigidly clamped, so that they withstand stress due to terminal short circuit. The winding assembly shall be dried in vacuum, thoroughly shrink to final dimensions and impregnated under vacuum with tested insulating oil conforming to adopted standard. The insulation resistance of the winding measured immediately after impregnation shall be intimated to the Purchaser.

To compensate for any further shrinkage in service, pressure adjusting screws shall be provided at an easy access. The whole assembly shall be finally weld by suitable means under axial compression of at least twice the axial thrust likely to be set up under a terminal short circuit.

13.04 INSULATING OIL

The oil required for first filling of the Transformer plus 10% shall be supplied with the Transformer. The oil shall conform to IS : 335- 1972 or equivalent and shall be shipped in drums which will become the property of the purchaser. The cost of the oil shall be included in the price of the Transformer.

13.05 BUSHINGS

Bushing (oil- filed type) shall have the following fittings :

a) A non- breathing oil expansion chamber (toughened glass type for lower voltage class and metallic type with sight or magnetic gauge for higher voltage

class ).

b) Metallic ground shield

c) Removable oil filing and oil draining plugs wherever required.

Condenser bushings shall be similar to those specified above, except that a condenser shall be used for grading the voltage stress instead of the oil and it shall be fully weather proof.

The winding lead shall be connected to the central bushing tube extended .and threaded, by means of a detachable clamp.

14.00 TAP AND TAP CHANGE GEAR

The Transformer shall be able to operate at the rated KVA without exceeding the rated temperature rise, when connected on any particular tapping at voltage above or below the rated voltage of that tapping. Each tap shall also be capable of withstanding a voltage variation of ±10% above the rated voltage of the tap when the Transformer is not loaded.

Three Plus and three minus off load taps, suitable for rated KVA output shall be provided on each phase winding of the Transformer. Shift in connections from any tap to an adjacent tap shall change the L.V. winding side voltage by 2.5 percent.

The tap changing switch shall be three phase gang operated for simultaneous changing of taps on the three phase by operating an external hand wheel provided with an arrangement for operation at man height from ground level. A Voltage and tap position indicator to indicate the tap in use shall be provided at the external operating wheel, and arrangement shall be made for securing and pad-locking the tap switch in any of the working position. The arrangement shall be such that no padlock can be inserted unless the contacts are correctly engaged and the switch set in position where no open circuit or short circuit is possible,

Page 20: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 20 of 55

15.00 DRYING OUT AT THE MANUFACTURER'S WORKS

Each transformer shall be dried in vacuum and sealed under a positive pressure of dry inert gas for delivery. As it may be necessary to dry out the unit at site, detailed instructions regarding the drying out at site shall be furnished by the Contractor.

16.00 PAINTINGS

The surface to be painted be shot or sandblasted to remove all rust and scale or foreign adhering matter or greases. All steel surfaces in contact with insulating oil, as far as accessible, shall be painted with heat resistant, oil-insoluble varnish. All steel surfaces exposed to weather, shall be given a priming coat of zinc chromate and two coats of suitable paint.

All paints shall be carefully selected to withstand tropical heat and extremes of weather. The shall not scale of or crinkle or be removed by abrasion due to normal handling. The colour of the final coat of paint to be applied after erection will be intimated to the successful Tenderer. The Tenderer shall also give his recommendation regarding surface coating of Transformer to minimize heat absorption from air.

17.00 TESTS AT WORKS

The Purchaser and/ or his authorised agent reserve the right to witness any/ or all tests at the factory.

17.001 Tests during manufacture

The following tests specified in this specification shall be perform on each Transformer during manufacture, in addition to any other customary tests of the manufacturer and test report in five (5) copies shall be furnished.

a) Vacuum withstand strength of tank.

b) Oil tightness test.

c) Material test for core steel.

d) Core insulation test.

e) Measurement of insulation resistance after drying and impregnation of Windings.

17.002 Routine Tests

After completion of the manufacture the following tests shall be performed and five (5) copies of the test report shall be submitted to the purchaser for his approval before shipment:

i) Ratio test for all taps.

ii) Check test for polarity, vector relationship and terminal markings. The polarity shall be subtractive.

Hi) No- Load 50 cycle excitation current referred to the H.V. winding at 90 percent, 100 percent and 110 percent of the rated Voltage.

iv) Measurement of load losses at rated load current and calculation of the losses at 75° C.

v) Impedance voltage between winding at rated current at 75°C temperature.

vi) Resistance of windings, cold at test bed temperature and Calculation for corresponding values at 75°C .

vii) Insulation resistance between windings and windings to earth at 75°C. viii) High Voltage tests. High Potential (Applied Voltage) Test.

Page 21: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 21 of 55

For H.V. Windings, 50 cps. rms voltage of a magnitude (as specified and appropriate for the insulation class of the

winding under test shall be applied for a duration of 60 seconds between the winding under test and the remaining Windings, core and tank, all connected to earth.

xi) Measurement of insulation resistance following test (viii) above.

x) Over excitation test-following test (ix) the Transformer which has already passed test (viii) shall be excited at 110 percent rated voltage and left without load for 12 hours continuously after which period the losses shall be recorded.

xi) Calculation of the regulation at unity power factor and 0.85 power factor lagging load current.

xii) Determination of efficiency at full, three quarters, half and quarter loads at unity and 0.85 (lag) power factor.

xiii) Zero sequence impedance test.

17.03 Type Test

a) Temperature rise test :

One Transformer of each type shall be tested for temperature se test which shall not exceed the following values when referred to average ambient temperatures of air of 45°C.

i) Windings

ii) Insulating oil > As specified in design rating,

iii) Core

c) The tenderer shall submit with his tender a type test report for impulse test

on a similarly designed Transformer and shall quote separately extra charges, if any, for carrying out the impulse tests.

A standard method of impulse testing shall be used in accordance with the Manufacturer's practice, oscillographic records of the neutral current wave forms shall be taken at reduced crests of wave and comparison of wave forms shall be made to detect failure, if any. Enlarged copies of the oscillograms shall be furnished with the test report.

17.04 Tests on Associated Equipment

Porcelain bushing, bushing current Transformers, winding temperature indicating devices, Dial thermometers, Buchholz relays, off- load tap changing gear, Insulation oil, Cable sealing ends, Protective current Transformer and other associated equipment covered by contract shall be tested by the Contractor in accordance with the relevant standard of manufacture. If such equipment are purchased by the Contractor from a subcontractor he shall have them tested to comply with his requirements. The contractor shall furnish a certificate of compliance with the relevant tests for all auxiliary apparatus. Five (5) certified copies of test reports shall be furnished for the porcelain bushings.

The tenderer shall clearly state in the tender the testing facilities available at the Manufacturer's works. If testing equipment of full capacity suitable for testing Transformer be not available, he shall clearly state the method proposed to be adopted by him together in ascertaining the Transformer characteristics etc. corresponding to full capacity testing.

Page 22: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 22 of 55

17.05 TESTS ON COMPLETION

Where ever possible all tests shall be carried out before despatch. Should, however, it becomes necessary for the final tests as to performance and guarantee to be held over until the plant is erected at site they shall be carried out in the presence of the Contractor's representative within three months of the commissioning of the plant, unless operating or to her site conditions reasonable by the Purchaser after the

completion of erection. The tests however shall not be postponed beyond two more months. Should it be necessary to postpone the tests any further due to ‘force majeure’ then such tolerance shall be applied to the guaranteed performance as may be specified in technical specifications in consideration of the period that the equipment has been in operation.

Should the result of these tests not come within the margin specified, the tests shall, if required, be repeated within one month from the date of the plant is ready for re-test, and the contractor shall repay to the Purchaser all reasonable expenses which he may be put to by such re-tests.

The tests and re-tests shall be carried out in accordance with the stipulations of technical specifications. The Engineer shall, on giving seven days" notice in writing to the Contractor setting out any ground of objection which he may have in respect of the work, be at liberty to reject any drawing and all or any plant or workmanship, the subject of any of the said grounds of objection, which in his opinion is not in accordance with the contract.

17.06 GUARANTEED LOSSES

The guaranteed losses of 315 KVA, 33/0. 433 KV Service Station Transformers will be as given below :

i) Guaranteed No- LOAD LOSS at normal ratio, rated frequency and 75deg average. Winding temperature. — 0.48 K\V (Max)

ii) Guaranteed LOAD LOSSES at normal ratio, rated output, rated voltage, rated frequency at 75 deg average winding temperature. -4.40 KW (Max)

The losses figures of transformer indicated above are guaranteed without any positive tolerance under penalties for each transformer. In case the measured losses exceed the guaranteed values as above, penalties' shall be levied as per provision under clause No. 17.07 of the tender document.

17.07 PENALTIES FOR EXCESS LOSSES :

The loss figures of Transformers specified under clause No. 17.006 are guaranteed under penalty for each Transformer.

In case the measured losses exceed the guaranteed loss figures, penalties shall

be levied at the following rates :-

i) Rs. 80, 000 =00 (Rupees eighty thousand) only per KW for excess of measured No LOAD LOSS in KW over the corresponding guaranteed value, ii) Rs. 35, 000.00 ( Rupees thirty five thousand) only per KW for the excess of FULL LOAD LOSS under specified conditions in KW over the corresponding guaranteed values.

For fraction of kilo watts, the penalty shall be applied pro- rata.

No tolerance shall be permitted over the test/ measure figures of losses. If the test figures of losses are less than the guaranteed figures, no tonus will be allowed.

Page 23: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 23 of 55

18.01 DETAILS OF AUXILIARIES. CONTRACTORS DRAWINGS & INSTRUCTION MANUALS

18.01 Language

All drawings, technical data or correspondence, submitted to the Purchaser for approval or for information shall be in English. All dimensions shall be in Metric Units.

18.02 Tender Drawings

The tender drawings shall be in triplicate comprising the following :

General outline and shipping dimensions, nett and shipping weights, height of the crane hook for lifting core, sectional views of bushing etc.

18.03 Number of Drawing and Procedure for Approval

Three prints with dark lines on a white background shall be furnished of each drawing submitted for approval. One copy shall be returned to the Contractor marked " Approved" and if they are not in conformity with provision of the contract then this copy shall be marked "Approved with corrections indicated" or "Examined and returned for correction".

When prints of drawings have been marked "Approved with corrections indicated" or "Examined and Returned for Correction", the Engineer will give reasons for such correction and the Contractor shall make the necessary corrections and re-submit three (3) copies for final approval.

Immediately on receipt of a finally approved drawing the contractor shall furnish the Purchaser with five (5) copies of such drawings.

All drawings which the Contractor shall submit to the Purchaser for approval shall be approved (or otherwise) within thirty (30) days of their receipt.

18.04 Revision

If any minor revisions are made after a drawing has been approved, the Contractor shall furnish eight (8) prints in the same manner as described above subsequent to each revision. The velographs roll also to be revised.

Every revision shall be shown by number, date and subject in a revision block provided in the drawing.

ii) Outline drawings indicating weight, dimensions, forces and loads to enable the design of the foundation structure and associated equipment to be completed by the Purchaser.

iii) Structural drawings and schedules of all sleeves, foundation bolts and parts to be set in the foundation.

18.05 Binding Data and Arrangement Plans

Contractor shall submit for approval the following binding, data and plans :

i) Dimensioned general layout and arrangement drawings of the equipment

ii) Outline drawings indicating weight, dimensions, forces and loads to enable the design of the foundation structure and associated equipment to be completed by the Purchaser.

iii) Structural drawings and schedules of all sleeves, foundation bolts and parts to be set in the foundation

Page 24: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 24 of 55

18.06 Detailed Drawings

Soon after arrangement plans and data have been approved detailed drawing clearly

indicating overall dimensions, limiting dimensions! for useful service and method of

disassembly and assembly shall be furnished by the Contractor. Such drawings shall

include the following :

i) Final plans and layouts giving complete details against the above mentioned

arrangement plans.

ii) Detailed wiring and connection diagram and arrangement of conduits for wiring

various controls and instruments upto the required points.

iii) Detailed foundation plan drawing.

iv) An erection manpower estimate and detailed program of shipment and erection.

v) Name and Rating Plates : Full particulars as per standard.

vi) Diagram plate : Electrical connections of the winding, numbering of taps,

tapping switch terminals, disposition of terminals, vector relationship polarity

and terminal markings of C.T. parts earthed through the tank and special

details . if any.

vii) Assembly of core and coils : Details of winding connections, insulation

spacers, barriers, clearances, core bolt insulation compensating devices for

shrinkage etc.. which will help the Purchaser to replace a set of windings in

any future eventuality.

viii) Bushing Assembly : Plan, elevation, cutaway view and details of joints

and seals etc.

ix) General outline showing front and side elevations, weights, loads forces

and moments on supports and shipping weights.

x) Outline dimensioned drawing of current transformer.

xi) Outline dimensioned drawings of cable sealing end.

xii) Arrangement of C.T. and Cable sealing end inside the compartment.

xiii) Other drawings as required.

18.07 Assembly and Erection Instruction

Page 25: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 25 of 55

The contractor shall furnish five (5) sets of the following for the use of Purchaser's

field Engineers :

i) Descriptive literature and drawings to illustrate the working principles, method of

assembly and dismantling.

ii) Instruction Book for proper erection and assembly of all equipment with program of

work and necessary instructions for checking and recording proper assembly of the

plant.

iii) Complete spare parts hand books with details and diagrams. Separate

recommendations shall be made for the parts required for the first three (3) years of

operation. Parts requiring frequency replacement shall be listed separately from

parts required for ensuring reliability in unforeseen emergencies.

18.08 Final Drawing and Operation Manuals

The Contractor shall furnish five (5) complete set of prints and one permanent negative

of all detailed drawings of the equipment actually supplied, five (5) sets of

comprehensive manuals for use in the operation and maintenance of the plant shall also be

supplied. These documents shall reach the Purchaser along with the main equipment or

earlier.

Page 26: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 26 of 55

GUARANTEED TECHNICAL PARTICULARS

SUB-STATION SERVICE TRANSFORMERS

1 Name of the manufacturer. ………………………………………………..

2 Country of Origin ………………………………………………..

3. Standard specification on which ……………………………………………….. the performance data is based

4. Continuous Maximum Rating ……………………………………………KVA

5. Rated temperature rise over specified average ambient at rated output (45°C air)

a) Of oil by thermometer ……………………………………...……0 C rise

b) Of winding by resistance ……………………………………………0 C rise

6 No load voltage ratio.

7. Exciting current referred to H.V.

and 50 CTS at

a) 90 percent rated voltage ……………………………………………Amps.

b)100 percent rated voltage ……………………………………………Amps.

c) 110 percent rated voltage ……………………………………………Amps.

8 Power factor of excitation current at 100 percent rated voltage, 50 CPS ……………………………………………%

9 Iron Losses at 50 CPS and

a) 90 percent rated voltage ……………………………………………KW

b)100 percent rated voltage ……………………………………………KW

c) 110 percent rated voltage ……………………………………………KW

10. Copper losses (at 75°C) ……………………………………………KW

1 I. Total losses ……………………………………………KW

12. Resistance voltage (at 75°C) at full load :

a)H.V. ……………………………………………%

b) L.V. ……………………………………………%

(All values shall be referred to rated KVA)

1 3 . Reactance voltage at (75°C) at full load

a)H.V. ……………………………………………%

b) L.V. ……………………………………………%

Page 27: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 27 of 55

(All values shall be referred to rated KVA)

14. Impedance voltage (at 75 C) at full load.

a) H.V. ………………………………………%

b) L.V. ………………………………………%

(All values shall be referred to rated KVA)

1 5 Resistance per phase (at 20°C)

a) H.V. winding ……………………………………Ohm.

b) L.V. winding ……………………………………Ohm.

16. Regulation at full load (at 75°C) and following power factors.

a) 1.00 …………………………………%

b) 0.90 lagging …………………………………%

c) 0.85 lagging …………………………………%

d) 0.80 lagging …………………………………%

17. Efficiency (75°C) at unity and 0.85 pf

a) 100 percent load …………………………………%

b) 75 percent load …………………………………%

c) 50 percent load …………………………………%

d) 25 percent load …………………………………

18. Zero sequence Impedance (75 Cu. Temp)at

a) Highest tap …………………………………%

b) Lowest tap …………………………………%

c) Normal tap …………………………………%

(Referred to short time each Fault current)

19. Withstand time without injury with three

phase dead short circuit at the terminals. …………………………………

20. "Ideal heating time" or the thermal time constant of:

a) Winding …………………………………Secs.

b) Transformer …………………………………Secs.

21. Core

a) Material …………………………………

b) Thickness of stampings …………………………………

c) Flux density in the core at

rated voltage and 50 CPS. …………………………………Gauses

d) Flux density 110 percent

voltage and 50 CPS. …………………………………Gauses

Page 28: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 28 of 55

e) Insulation between the core laminations. ……………………………………..

f) Type of Joints between the core limbs and Yoke. ……………………………………..

g) Bolt insulation flash over

voltage (1-Min) …………………………………Volts.

22 Winding

a) Current density in

H.V. Winding ……………………………Amps, per mm Sq.

L.V. Winding ……………………………Amps, per mm Sq

b) Insulation on the copper ……………………………………..

c) Type of joints in the Windings, if any. ……………………………………..

d)Insulation strength of winding with (Designation of wave applied) ……………………………………..

e) Impulse full wave :

H.V. ……………………………………..KV

f) Impulse Chopped wave

H.V. ……………………………………..KV

g) Low Frequency withstand and Voltage (KV) Dry (60 sees.)

i) H.V. …………………………………….. KV

ii) L.V. …………………………………….. KV

h) Low Frequency withstand Voltage

(KV) Wet (30 sees.)

i) H.V. Winding ……………………………………..

ii) L.V. Winding ……………………………………..

23. Minimum Clearances in Cms

Through Oil

a) H.V. to Yoke ……………………………………..Cms.

b) L.V. to core ……………………………………..Cms.

c) Phase to phase (H.V.) ……………………………………..Cms.

d) Phase to phase (L.V.) in Air ……………………………………..Cms.

e) H.V. phase to phase ……………………………………..Cms.

f) L.V. phase to phase ……………………………………..Cms.

g) H.V. bushing terminal to earth ……………………………………..Cms.

Page 29: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 29 of 55

24. Type of Windings ……………………………………..

25. Phase Angle position of L.V. (phase

to earth) Vector with respect to the

H.V. (phase to earth) Vector

assigning position sense to the anti

clockwise Rotation… Elec. Degrees ……………………………………..

26 a) Type of tap Changer ……………………………………..

b) Winding taps provided on

H.V. or L.V ……………………………………..

c) Number of taps provided

on the winding ……………………………………..

d) Number of taps above normal ……………………………………..

e) Number of taps below normal ……………………………………..

f) Extreme taps to provide voltage

variation above and below

normal voltage . . . + ... (-) ……………………………………..

g) Each tap to provide voltage

variation of ……………………………………..

h) Percent impedance at Lowest tap ……………………………………..

i) Position of taps (on the neutral end

or in the middle of the winding) ……………………………………..

27. Bushings

a) Name of Manufacturer ……………………………………..

b) Country of origin ……………………………………..

c) Standard specification on which

the performance data is based. ……………………………………..

d) Type of H.V. bushing ……………………………………..

e) Impulse withstand (full wave)

Page 30: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 30 of 55

H.V. Bushing ……………………………………..KV

f) I-Min dry withstand Voltage

H.V. Bushing ……………………………………..KV

g) Wet withstand Voltage (30 sees.)

H.V. Bushing ……………………………………..KV

h) Puncture voltage (a flash over

Voltage in oil whichever is mini

mum) at Power Frequency ……………………………………..KV

28 Cable Termination Box

a) Rated Voltage ……………………………………..KV

b) Dry withstand Voltage ……………………………………..KV

29. Net weight of core ……………………………………..

30. Net weight of copper

a) H.V. ……………………………………..

b) L.V. ……………………………………..

3 I. Net UN-taking weight of core frame

and coils. ……………………………………..

32. Net weight of insulation oil ……………………………………..

33. Volume of insulating oil-gals ……………………………………..

34. Total weight of Transformer including all equipment's load ……………………………………..

35. Total shipping weight of transformer and ancillary equipment ……………………………………..

36 Overall Dimensions of the Transformer

a) Height ……………………………………..

b) Breadth ……………………………………..

c) Width ……………………………………..

d) Height of H.V. Bushing Terminal

Page 31: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 31 of 55

over ground ……………………………………..

37. Minimum thickness of plate

a) Tank – Sides ……………………………………..

b) Tank – Bottom ……………………………………..

c) Tank – Cover ……………………………………..

d) Conservator and radiator ……………………………………..

Place:-

Date:-

Name:

Status:

Name of the tendering company

And seal.

Page 32: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 32 of 55

BIDDING SCHEDULES

Section - IV

Page 33: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 33 of 55

JHARKHAND URJA SANCHARAN NIGAM LIMITED

RANCHI

SCHEDULE – A

Tender Proforma Part – I (Technical & Commercial)

NIT No. 301/PR/JUSNL/2014-15 DUE DATE OF THE TENDER : 06.02.2015

1. Name & Full address of the tenderer :

With Tel & Fax No.

2. Name of Materials :

3. Name of Manufacturer :

4. Quantity offered :

5. Whether the F.O.R. destination price has :

been quoted giving freight element

6. Price variation clause if any :

7. Delivery period :

8. Validity of the offer :

9. Acceptance of the payment terms :

10. Details of deviation from the tender :

Specification if any

11. Acceptance of the technical specification :

of the materials for which offer is made

12. Guarantee performance particulars & :

copies of performance & test certificates

of materials have been attached

13. Guarantee :

Page 34: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 34 of 55

14. Acceptance of penalty clause :

15. Particulars of payment made for Purchase of :

BOQ and specification

16. Amount of earnest money paid with money :

receipt No. & Date

17. Whether the firm is registered SSI Unit of

Jharkhand or registered with NSIC/

DGS&D (give details) of registration etc.

& attach photo state copy of certificates

18. Name of place where the materials will

be manufactured & will be available for

inspection by officer of the Nigam.

19. Whether upto-date Sales Tax and

Income Tax clearance certificates submitted

20. Sales Tax Registration No. :

21. Whether proof of financial capability :

submitted

22. Whether details of orders executed & :

performance certificate submitted

in attested/ certified copy.

23. List of enclosures :

24. Remarks :

Signature of tenderer with full name

Designation:……………………….

Seal:………………………………..

Page 35: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 35 of 55

JHARKHAND URJA SANCHARAN NIGAM LIMITED ENGINEERING BUILDING, HEC, DHURWA, RANCHI-4

SCHEDULE – B – I

TENDER PERFORMA PART – II (PRICE)

NIT No. 301/PR/JUSNL/2014-15 DUE DATE OF THE TENDER : 06.02.2015

1. Name & full address of Tenderer

:

2. Name of Manufacturer

:

3. Name of Materials

:

4. Tender notice no. & Date

:

5. Quantity offered

:

6. Price (Both in words & figures)

:

a) Ex – factory price

:

b) Excise Duty

:

c) Sales Tax

:

d) Entry Tax etc.

:

e) Specify other taxes if any

:

Page 36: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 36 of 55

f) Freight including loading, packing& forwarding etc.

:

g) Other charges, if any :

h) Insurance (will be arranged by the Nigam)

:

7. Discount, if any

8. The price should be quoted considering benefit of “MODVAT”/ any other assistance available to the supplier and the benefit by them. A certificate/ undertaking to this effect should also accompany the tender.

Signature of tenderer with full name

Designation:……………………….

Seal:………………………………..

Note: Breakup in the schedule of price attached must be filled up.

Page 37: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 37 of 55

SCHEDULE OF PRICE B II

Sl No.

Item Description

Qty

. (N

os.)

Uni

t Ex-

wor

ks

pric

e in

Rs.

Uni

t Fre

ight

ch

arge

s R

s.

Uni

t Exc

ise

Dut

y le

viab

le a

t pre

sent

(R

s.)

Uni

t Sal

es T

ax

levi

able

at P

rese

nt

(Rs.

)

Ent

ry T

ax (

Rs.

)

Specify other taxes

leviable if any (Rs.)

Unit Landed price including sales tax, Entry Tax, excise duty and freight (Rs.)

Total Landed price including

sales tax, Entry Tax, excise duty and freight

(Rs.)

1 33/0.4 kV 315 KVA Sub-Station Service Transformer with complete fittings & accessories and with 10% extra oil for first filling.

10

i) H.V. Bushing with metal parts

ii) L.V. Bushing with metal parts

iii) Neutral Bushing with metal parts

iv) Buchholz relay

v) Magnetic oil guage

vi) Oil temp indicator

vii) Silicagel breather

2

2

2

2

2

2

2

A Indicate whether sales tax will be extra or is included in the price quoted. State: - Extra/ included

B If extra over the price quoted, indicate percentage of quoted price. State: Percent

C Indicate whether excise duty will be extra or is included in the price quoted. State: - Extra/ included

D If extra to the price quoted indicate percentage of quoted price State: Percent

E INDICATE PRICE State: - FIRM

Note: - Any vagueness in the answers to the questionnaire will disqualify the tender.

Signature:

Name:

Designation:

Date: - Name of the Company:

Place: -

Page 38: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 38 of 55

TO BE FILLED IN AND SIGNED BY THE TENDERER

Schedule – C

Schedule of General Particulars

1. Name of Bidder/ Manufacturer :

2. Address of Bidder/ Manufacturer :

3. Telegraphic address of Bidder/ Manufacturer :

4. Name & designation of the officer of the Bidder/ Manufacturer to whom all reference shall be made for expeditious technical co-operation

:

5. Place of Manufacturer :

6. Service of facilities available :

7. Availability of spare parts :

8. Bidder proposal no. & date :

9. Offer is valid upto : Give date upto which valid

10. i) Earnest money deposited or not : State Yes/ No

ii) If deposited indicate amount & details

iii) If not, state DGS&D registration no. and tech detail of validity of registration

: Date upto which it is valid.

iv) For SSI units of Jharkhand state, details of registration number of SSI registration enclosed or not.

: State Yes/ No

v) Whether Govt. of India or State Govt. undertaking. If yes give details to authenticate the claim

: State Yes/ No

vi) Enclose Photostat copy of the letter of registration with DGS&D, SSI for SSI unit of Jharkhand with the bid.

: State Yes/ No

11. i) Security deposit of five percent of the value of the order has to be deposited within 15 days from issue of L.O.I. on the successful bidder.

: State willing to deposit/ not willing

ii) This deposit has to be kept with the Nigam for the entire guarantee period.

: State willing to deposit/ not willing

12. Whether delivery schedule indicated in the specification is acceptable.

: State Yes/ No

13. Whether penalty for delay of delivery as indicated in the specification is acceptable.

: State Yes/ No

14. Whether latest copy of income tax clearance certificate and sales tax certificate enclosed with the bid or not.

: State Yes/ No

15. Whether terms of payment indicated in the : State Yes/ No

Page 39: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 39 of 55

specification is acceptable.

16. Whether guarantee clause indicated in the specification is acceptable.

: State Yes/ No

17. Whether 5% bank guarantee as stipulated under performance guarantee clause will be submitted.

: State Yes/ No

18. Whether agreeable to enter into a contract in event of order.

: State Yes/ No

19. DELETED :

20. Whether unit F.O.R. destination prices have been quoted in the price bid.

: State whether freight is included or extra to the price quoted.

21. Whether prices quoted are also applicable on reduced quantity or not? Rebate on account of quantity increase, if any, applicable may be mentioned.

: Indicate amount

22. Whether a statement showing deviations from general conditions enclosed.

: State Yes/ No

23. Whether a statement showing deviations from technical specification enclosed.

: State Yes/ No

24. Whether the bidder is agreeable to manufacture & supply the equipment in case deviations stipulated by him is not acceptable to Nigam.

: State Yes/ No

25. Whether excise duty is leviable. : If so, say extra or included in the price quoted.

26. Whether sales tax is chargeable. : If so, say extra or included in the price quoted.

27. Whether certificate/certificates of past performance enclosed or not.

: State Yes/ No

28. Annual production units for past 5 years. :

29. Whether unit F.O.R. destination price of all individual items quoted in the price bid or not?

: State Yes/ No

Signature:

Name:

Designation:

Date: - Name of the Company:

Place: -

Page 40: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 40 of 55

(TO BE FILLED IN AND SIGNED BY THE TENDERER)

SCHEDULE – ‘D’

Schedule of Deviations for Supply and Delivery

We/ I have carefully gone through the Technical specification and We/ I have satisfied our selves/

myself and hereby confirm that our/ my offer strictly conforms to the requirements of the technical

specification except for the deviation which are given below: -

Sl No. Description (Clause/ page) Stipulations in

specification

Deviation

offered

Remark

Signature:

Name:

Designation:

Date: - Name of the Company:

Place: -

Page 41: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 41 of 55

(TO BE FILLED IN AND SIGNED BY THE TENDERER)

SCHEDULE – ‘E’

Schedule of Erection & Maintenance tools

The tenderer shall furnish below a list of special tools, accessories and equipments required for

installation, testing and maintenance and their prices.

Item

No.

Description Number

recommended

Units Prices Purpose of

use For works For Site Total

Signature:

Name:

Designation:

Date: - Name of the Company:

Place: -

Page 42: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 42 of 55

(TO BE FILLED IN AND SIGNED BY THE TENDERER)

SCHEDULE – ‘F’

SCHEDULE OF SPARES QUOTED

The tenderer shall furnish below a list of spare parts quoted in the price bid. This should be strictly

as per the quantity mentioned in the specification.

Item

No.

Description Recommended Quoted Purpose of

Use

Signature:

Name:

Designation:

Date: - Name of the Company:

Place: -

Page 43: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 43 of 55

(TO BE FILLED IN AND SIGNED BY THE TENDERER)

SCHEDULE – ‘G’

SCHEDULE OF PAST EXPERIENCE

Sl No. Purchaser Date of initial Operation Major technical details

Signature:

Name:

Designation:

Date: - Name of the Company:

Place: -

Page 44: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 44 of 55

(TO BE FILLED IN AND SIGNED BY THE TENDERER)

SCHEDULE – ‘H’

SCHEDULE OF DRAWINGS

The tenderer shall furnish below the list of drawings, which shall be furnished by them.

Sl No. Name of Drawing When to be submitted (to be given in days) after

issue of letter of intent.

Signature:

Name:

Designation:

Date: - Name of the Company:

Place: -

Page 45: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 45 of 55

(TO BE FILLED IN AND SIGNED BY THE TENDERER)

SCHEDULE – ‘I’

SCHEDULE OF DELIVERY

Guaranteed delivery completion period counted from the date of issue of letter of intent for: -

Sl No. Name of the

equipment

Commencement

period in month

Rate of the supply

per month

Total completion

period in month

Signature:

Name:

Designation:

Date: - Name of the Company:

Place: -

Page 46: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 46 of 55

FORMATS

Page 47: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 47 of 55

CONTRACT FORM

This contract made this ……………………… only of …………………… of the Thousand

Nine Hundred …………………. Between the JUSNL, constituted under section 5 of the Electricity

(supply) Act, 1948 (thereinafter referred to as “The JUSNL” on the one part and Sri

………………………………………… in the own behalf and on behalf of other members of the

Joint Family/ Proprietor of the firm …………………………… S/ o Sri

……………………………………………………… by religion ………………….. P.O. …………...

P.S. ………………………… District ……………………. (in the state of ………………………..)

at present residing at Vill/ Town ………………………………………………………………………

District ……………………………………

OR

………………………….. as partnership firm/ joint stock company duly registered under the Indian

Partnership Act. 1932/ Indian Company Act. 1913/ 1956 bearing registration No. …………….. 19

with the Registrar of Firms/ Registrar of Joint Stock Company at ………………….. in the State of

…………………………….. and having its registered office at ………………….. acting through its

……………………….. namely Sri ………………………………… S/o …………………………….

Permanent resident of Village/ Town ……………….. P.O. ………………… P.S. …………………

District ………………….. in the state of …………………….. as present residing at Village/ Town

………………………………………….. P.O. ………………… P.S. ……………………. District

……………………… (Hereinafter referred to as the “Contractor/ Supplier”. Which expression,

shall unless excluded y or repugnant to the context, including his heirs, legal representatives,

successors, executors, administrators and permitted assigns) on the other part.

Whereas the JUSNL agrees to purchase …………………… quantity of ………………… materials

and the supplier/ contractor has agreed to sell the said materials in accordance with JHARKHAND

URJA SANCHARAN NIGAM LIMITED’s notice inviting Tender No. …………… General

conditions of tenders and the bill of quantity and contractors/ supplier proposal No. ……………….

Dated ………….. and ………….. on the following terms and conditions.

(i) The contractor/ supplier agrees to deliver the above said materials in conformity with

the provisions of the general conditions of NIT and other documents referred to above

which forms as part of this contract within …………… months from execution of

this contract.

(ii) The JUSNL hereby agrees to pay the contractor/ supplier on due performance of the

contract price of …………………………….. from the JUSNL’s fund in the manner

and in accordance with terms specified in the NIT as also in the P.O. No. ………........

dated …………………….. to be issued.

Page 48: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 48 of 55

(iii) Other conditions if any, to be mentioned.

In witness whereof the said parties hereto have hereunto set and subscribed their respective hand and

seal the day and year first above written.

I signed by/ or on behalf of the Contractor/ supplier …………………………………… Authorized

by the contractor/ supplier under deed of ……………………………. Dated ………........... strike off

the words not needed. Where the signature is made under authorization made by a deed resolution,

the customer should furnish and attested copy of deed/ resolution.

Signature on behalf of the JUSNL Signature on behalf of the Contractor/ Supplier

Seal of the Contractor/ Supplier

1. Witness 1. Witness

2. Witness 2. Witness

Page 49: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 49 of 55

FOR “SECURITY DEPOSIT” / “PERFORMANCE GUARANTEE”

FORM OF GUARANTEE BOND

(TO BE USED BY NATIONALISED BANKS)

This deed of guarantee is made this ………………………………. Day of ………………… between

……………………………………………………………………………………………….

(Name of the Bank and its)

Constitution with detailed address including its head office (hereinafter called “the Bank”, which

expression shall, where the context so admits include its successor and permitted assign) of the one

part and the JHARKHAND URJA SANCHARAN NIGAM LIMITED being the JUSNL constituted

under section – 5 read with section – 12 of the Electricity (Supply) Act, 1948 (Act. No. I, IV of

1948) having its head office at H.E.C., Engineering Building, Dhurwa, Ranchi (hereinafter called

“The JUSNL” which expression shall, where the context so admits include its successor and

permitted assign) of the other part.

1. WHERE AS …………………………………… (Name of the contractor or supplier if a

Co.) being a company registered under the Indian Companies Act having its registered office at

…………………………… (Name of the contractor (S) or supplier (S). If a partnership firm)

…………………………… bearing registration no. …………………………….. of the year

…………………… with the registration of firms at ……………………………….. and having its

registered office at ……………………… (Name of contractor or supplier if individual …………….

Fathers name ………………………….. resident of ………………… P.S. ……………… District

………………… and having his principal place of business at ………………... (hereinafter called

“The said contractor (S)/ the said supplier (S) entered into an agreement no. ………………………..

dated …………….. with the JUSNL for Rs. ………………………….. (Hereinafter called “the said

agreement”) has been placed an Order No. …………….. dated ……………….. for the supply of

………………….. to the JUSNL (here in after called “The said purchase order”).

2. WHEREAS, in accordance with clause ………………….. of the said agreement/ the said

purchase order, the said contractor (S) said supplier (S) in required to deposit with the JUSNL Rs.

……………………………… only as cash security for the due performance of the terms and

conditions of the said agreement/ the said purchase order.

AND WHEREAS, in accordance with ………………… of the said agreement/ the said

purchase order, the Bank have at the request of the said contractor (S)/ the said supplier (S) agreed to

give their guarantee and the JUSNL has agreed to accept the said Bank Guarantee for the aforesaid

sum.

Page 50: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 50 of 55

NOW THESE PRESENT WITNESSETH AS FOLLOWS: -

In consideration of the JUSNL having agreed to exempt the said contractor (S)/ the said supplier (S)

from the demand under terms and conditions of the said agreement/ the said purchase order of

security deposit/ performance for the due fulfillment by the said contractor (S)/ the said supplier (S)

of the terms and conditions in the said agreement/ the said purchase order on production of a Bank

Guarantee for Rs. ……………………………………………. (Rs. …………………………………..

………………… only) we, …………………. Bank do hereby undertake to pay to the JUSNL an

amount not exceeding Rs. …………………. Against any loss of damage or non-payment caused to

or suffered or would be caused to or suffered or would be caused to or suffered by the JUSNL by

reason of any breach by the said contractor (S)/ the said supplier (S) of any of the terms and

conditions contained in the said agreement/ the said purchase order.

3. We ………………………….. Bank do hereby undertake to pay the amount due and payable

under this guarantee without any demurrage, merely on a demand from the JUSNL stating that

amount claimed is due to way of loss of damage caused to or would be caused to or suffered by the

JUSNL by reason of any breach of the said contractor (S)/ the said supplier (S) of any of the terms

and conditions contained in the said agreement/ the said purchase order or by reason of the said

contractor’s (S) the said supplier’s failure to perform the said agreement/ the said purchase order.

Any such demand on the bank shall be conclusive as regards the amount due and payable by the

Bank under the guarantee. However, our liability under this guarantee shall be restricted to amount

no exceeding Rs. ………………………………………………………………………….

4. We, ……………………………………….. Bank further agree that the guarantee here in

contained remain in full force and effect during the period that would be taken for the performance

of the said agreement/ the said purchase order and that it shall continue to be enforceable till all the

dues of the JUSNL under or by virtue of the said agreement/ the said purchase order has been fully

paid and its claims satisfied or discharged or till the JUSNL certificate that the terms and conditions

of the said agreement/ the said purchase order/ fully and properly carried out by the said contractor

(S)/ the said supplier (S) and accordingly discharges the before …………………………………. We

shall be discharged from all liability under this guarantee there after.

5. We, ……………………………………….. Bank further agree with the JUSNL that the

JUSNL shall have the fullest liberty without our consent and without affecting in any manner our

obligations hereunder to vary any of the terms and conditions of the said agreement/ the said

purchase order or to extend time of performance by the said contractor (S)/ the said supplier (S) from

time to time or to postpone for anytime or from time to time, any of the powers exercisable by the

JUSNL against the said contractor (S)/ the said supplier (S) and to forbear or enforce any of the

Page 51: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 51 of 55

terms and conditions relating to the said agreement/ the said purchase order and we shall not be

relieved from our liability by reason of any such variation, or extension being granted to the said

contractor (S)/ the said supplier (S) or for any forbearance act of omission on the part of the JUSNL

or any indulgence by the JUSNL to the said contractor (S) the said purchase order or by any such

matter or thing what so ever which under the law relating to sureties would but for this provision

have effect of so relieving us.

6. We, ………………………………… Bank lastly undertake not to revoke this guarantee

during its currency except with the previous consent of the JUSNL in writing.

Date the ………………………… day of …………………….

For ………………………… Bank.

Page 52: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 52 of 55

FOR ‘PAYMENT’

FORM OF GUARANTEE BOND

(TO BE USED BY NATIONALISED BANKS)

THIS DEED OF GUARANTEE IS MADE THIS …………………………………….. day to

…………………………….. between ……………………………. (Name of the Bank) and its

……………………………… Constitution with detailed address including its head office

(hereinafter called “the Bank”, which expression shall, where the context so admits include its

successor and permitted assign) of the one part and the JHARKHAND URJA SANCHARAN

NIGAM LIMITED being the JUSNL constituted under section – 5 read with section – 12 of the

Electricity (Supply) Act, 1948 (Act. No. LIV of 1948) having its head office at H.E.C., Engineering

Building, Dhurwa, Ranchi (hereinafter called “The JUSNL” which expression shall, where the

context so admits include its successor and permitted assign) of the other part.

1. WHERE AS …………………………………… (Name of the contractor or supplier if

Govt.) being a company registered under the Indian Companies Act having its registered office at

…………………………… (Name of the contractor or supplier, if a partnership firm) bearing

registration no. …………………………….. of the year …………………… with the registration of

firms at ……………………………….. and having its registered office at (Name of contractor or

supplier if individual ……………. Fathers name ………………………….. resident of

………………… P.S. ……………… District ………………… and having his principal place of

business at ………………... (hereinafter called “The said contractor (S)/ the said supplier (S)

entered into an agreement no. ……………………….. dated …………….. with the JUSNL for Rs.

………………………….. (Hereinafter called “the said agreement”) has been placed an Order No.

…………….. dated ……………….. for the supply of ………………….. to the JUSNL (here in after

called “The said purchase order”).

2. WHEREAS, in accordance with clause ………………….. of the said agreement/ the said

purchase order, the said contractor (S) said supplier (S) in required to deposit with the JUSNL Rs.

……………………………… only as cash security for the due performance of the terms and

conditions of the said agreement/ the said purchase order.

AND WHEREAS, in accordance with clause ………………… of the said agreement/ the

said purchase order, the Bank have at the request of the said contractor (S)/ the said supplier (S)

agreed to give their guarantee and the JUSNL has agreed to accept the said Bank Guarantee for the

aforesaid sum.

NOW THESE PRESENT WITNESSETH AS FOLLOWS: -

Page 53: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 53 of 55

In consideration of the JUSNL having agreed to exempt the said contractor (S)/ the said supplier (S)

of Rs. …………………………… as per terms and conditions mentioned in the said agreement/ te

said purchase order, on production of bank guarantee for Rs. …………………………………………

(Rs. ………………………………….. ………………… only) we, …………………. Bank limited

do hereby undertake to pay to the JUSNL an amount not exceeding Rs. …………………. Against

any loss or damage or non-payment caused to or suffered on would be caused to or suffered or

would be caused to or suffered by the JUSNL by reason of any breach by the said contractor (S)/ the

said supplier (S) of any of the terms and conditions contained in the said agreement/ the said

purchase order.

2. We ………………………….. Bank do hereby undertake to pay the amount due and payable

under this guarantee without any demurrage, merely on a demand from the JUSNL stating that

amount claimed is due to way of loss of damage caused to or would be caused to or suffered by the

JUSNL by reason of any breach of the said contractor (S)/ the said supplier (S) of any of the terms

and conditions contained in the said agreement/ the said purchase order or by reason of the said

contractor’s (S) the said supplier’s failure to perform the said agreement/ the said purchase order.

Any such demand on the bank shall be inclusive as regards the amount due and payable by the Bank

under the guarantee. However, our liability under this guarantee shall be restricted to amount not

exceeding Rs. ………………………………………………………………………….

3. We, ……………………………………….. Bank further agree that the guarantee here in

contained remain in full force and effect during the period that would be taken for the performance

of the said agreement/ the said purchase order and that it shall continue to be enforceable till all the

dues or the JUSNL under or by virtue of the said agreement/ the said purchase order have been fully

paid and its claims satisfied or discharged or till the JUSNL certified that the terms and conditions of

the said agreement/ the said purchase order are fully and properly carried out by the said contractor

(S)/ the said supplier (S) and accordingly discharges the guarantee. Unless demand or claim under

this guarantee is made on us in writing on/ before …………………………………. We shall be

discharged from all liability under this guarantee there after.

4. We, ……………………………………….. Bank further agree with the JUSNL that the

JUSNL shall have the fullest liberty without our consent and without affecting in any manner our

obligations hereunder to vary any of the terms and conditions of the said agreement/ the said

purchase order or to extend time of performance by the said contractor (S)/ the said supplier (S) from

time to time or to postpone for anytime or from time to time, any of the powers exercisable by the

JUSNL against the said contractor (S)/ the said supplier (S) and to forbear or enforce any of the

terms and conditions relating to the said agreement/ the said purchase order and we shall not be

relieved from our liability by reason of any such variation, or extension being granted to the said

contractor (S)/ the said supplier (S) or for any forbearance act or omission on the part of the JUSNL

Page 54: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 54 of 55

or any indulgence by the JUSNL to the said contractor (S)/ the said supplier (S) or by any such

matter or thing what so ever which under the law relating to supplies would but for this provision

have effect of so relieving us.

5. We, ………………………………… Bank lastly undertake not to revoke this guarantee

during its currency without the previous consent of the JUSNL in writing.

Date the ………………………… day of …………………….

For ………………………… Bank.

Page 55: JHARKHAND URJA SANCHARAN NIGAM LIMITED - … urja sancharan nigam limited ... 33/ .04 kv 315 kva sub – station transformer with all its accessories ... (boq) including terms ...

E:\Saroj\Trans\Materials 2014-15\S.ST (BOQ).doc Page 55 of 55

INSURANCE PROFORMA

The Chief Claims Officer, JHARKHAND URJA SANCHARAN NIGAM LIMITED, H.E.C., Engineering Building, Dhurwa, Ranchi Dear Sir, As per terms of the following Purchase Order we have to advise you to please arrange

insurance of the following consignment under the JUSNL’s Open Marine Policy.

Purchase Order No. ……………………………. Dated ……………………… and address of

the Officer placing the order …………………………………………………………………………...

………………………………………………………………………………………………………..

Full description of goods …………………………………………………………………………...

………………………………………………………………………………………………………..

Invoice value (rounded to nearest rupees/ kg. …………………………………………………………

……………………………………………………………………………………………… (in words)

Rupees ……………………………………………….. a printed copy of the invoice to be enclosed)

Name and Address of consignee ……………………………………………………………………….

…………………………………………………………………………………………………………..

Name and Address for Consignor ………………………………………………………………….

…………………………………………………………………………………………………………..

Mode of transit ……………………………………………………………/ Rail/ Truck.

6. L.R./ R.R. No. …………………………………… dated …………………………….

7. From Station ……………………………….. to Station ……………………………...

8. Description of packing …………………………………………………………………

9. Endorsement on R/R by Railway or other carrier regarding condition of packing at the

time of dispatch …………………………………………………………………….

Yours faithfully Signature Full Address of Supplier

Place: - ……………………. Date: - ……………………..