Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting December 6, 2018 2:00PM SECURING OUR WATER FUTURE TODAY
Transcript
Page 1: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Joint Los Angeles Basin Replenishment and

Extraction Master Plan

Mandatory Pre-Proposal Meeting

December 6, 2018 2:00PM

SECURING OUR WATER FUTURE TODAY

Page 2: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Agenda

• Background • WRD Efforts• LADWP Efforts

• WRD-LADWP Partnership • Goals

• Joint Los Angeles Basin Master Plan Overview• Goals• Scope of Work Review• Proposal Requirements• Interview Overview• Schedule

• Questions

Page 3: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Background

Page 4: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

4

Page 5: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Regional Water Independence Program

• Current Program – Water Independence Now (WIN)• Goals

• Implement multiple projects to make WRD 100% independent of imported water

• Challenges• Limited replenishment water (storm water and recycled water)

• Future Opportunities and Goals• Entire WRD service area off of imported water and 100% reliant of

groundwater1. Identify and develop new replenishment sources available to WRD

2. Identify and develop replenishment locations within WRD (spreading/injection)

3. Identify how to get pumpers to utilize full pumping rights for extraction

Page 6: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

LADWP/Mayor Goals

• “Reduction of purchased imported water 50% by 2024. Creation of an integrated water strategy that increases local water supplies.“ -Mayor’s Executive Directive #5

• “Develop sustainable local water resources, 50% by 2035.”- Sustainable City pLAn

• “Develop and present a draft plan to integrate a long-term recycled water strategy and a GDAP.” – Strategic Plan, March 2018

• “Conduct a conceptual analysis for serving customer demands south of Santa Monica Mountains with groundwater to maximize production and recharge in the Central and West Coast Basins.”- Strategic Plan, September 2018

• “A strategic plan outlining potential full development of recycled water at Hyperion.” - FY 2019 GM Goals

Page 7: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

LADWP’s Groundwater Development and Augmentation

Plan (GDAP )

Contract with Geosyntec: 3 years - $1,000,000

Goals

• Utilize LA’s water rights in Central & West Coast Basins and beyond adjudications

• Focuses on developing extraction and treatment requirements in the Central Basin

• Create Partnerships

• Align our priorities with Water Replenishment District

Page 8: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

LADWP Elements of Hyperion Reuse

Page 9: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Pilot Study of NdN MBR at Hyperion

• Project Partners - LADWP, LASAN, WBMWD

• Purpose - Design, construction, and operation of a pilot facility and the utilization of the findings from the pilot study to determine the design, technology selection, operation criteria, and feasibility of a potential 70 MGD NdN MBR facility at HWRP.

• Goal - Provide data to demonstrate the effectiveness of NdNMBR and develop appropriate design criteria for a system at HWRP. Provide pathogen removal results to DDW for regulatory approval of pathogen log removal credits (LRC) for NdN MBR.

• Pilot Completion – 2021/22

Page 10: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

WRD- LADWP Partnership

Page 11: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

WRD-LADWP Partnership

• Official MOU signed in September 19th, 2018

• Initial 3-year partnership

• Identified and initiated two working groups• Monthly Working Group

• Executive Working Group

• Collaboration on various groundwater initiatives and projects

• Develop resources in the greater Los Angeles area

• Cooperate on studies, planning efforts and potential pilot projects

Page 12: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Joint Los Angeles Basin

Master Plan Overview

Page 13: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

4 – Prong Approach

Implementable Projects

Master Plan

Stakeholder Outreach

RegulatoryOutreach

Governance Structure

Consultant WRD and LADWP

Page 14: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Master Plan Goals

1. Maximize use of water leaving the Hyperion Water Reclamation Plant;

2. Identify and maximize all groundwater replenishment locations in the West Coast and Central Basins;

3. Identify additional sources of replenishment water and additional infrastructure and potential associated stakeholders;

4. Develop conceptual projects and associated strategic implementation schedules;

5. REAL projects with REAL implementable steps through a series of Technical Memos

Page 15: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Master Plan Scope of Work Review

• Task 1 – Potential Opportunity List Development• Review existing planning documents and provided “project list”• Identify all replenishment sources, replenishment locations, extraction locations• Workshop #1

• Task 2 – Detail Development• Coordinate replenishment sources with injection and extraction locations to develop

Potential Project List• Detail to projects on the Potential Project List (“concept design”) and ranking• Workshop #2

• Task 3- Additional Analysis

• Task 4 – Extended Project Development

• Task 5 – Project Management

• Task 6 – Optional Tasks

Page 16: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Master Plan Proposal Requirements

• 30 Pages (front and back can be used) bound

• Proposal shall be wet signed

• Five hard copies and one flash drive electronic copy

• Desired qualifications• Understanding of WRD and LADWP goals and missions• Experience with additional agencies in the LA Basin• Team member experience with large scale complex master planning efforts and strategic

implementation plans• Project manager to have direct experience leading large scale, multi agency efforts• Key team members to be available to this project

• Fee proposal should have staff, hours and budgets for Tasks 1,2,5,6• Task 3 is just a line item budget of $750,000 in the fee proposal• Task 4 is just a line item budget for $200,000 in the fee proposal• Consultant should include who is anticipated to be working on these tasks in the approach

section of the proposal, but not in the fee proposal• Task 3 & 4 to be defined, negotiated and formalized with a scope amendment to reflect the

work to be done after Task 2 is complete. All within the maximum budget amounts set in the RFP

Page 17: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Master Plan Interview Overview

• WRD to provide an email to invited interview attendees with specific details after the short list has been identified

• Two hour interviews• First hour – Consultant presentation

• Second hour – Q&A and dialogue

• Key team members must be in attendance• Project manager

• Additional staff as deemed important by Consultant

Page 18: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Master Plan Schedule

• Release RFP – Nov 26th, 2018

• Mandatory Pre-proposal Meeting – Dec 5th, 2018

• Question due by – Dec 13th, 2018

• Proposals due – Jan 8th, 2019

• Interviews – Week of January 21st, 2019

• WRD Board Award – February 2019

• Kick off Meeting – March 4, 2019 (tentative)

Page 19: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Project Component Scheduling

Release RFP/Selection Task 1 – 2 months Task 2 – 3 months Task 3 – 4 months Task 4 – 2 months

1/1/2019 3/4/2019 2/1/20201/1/2020

Task 5 – Entire Duration (11 months)

Page 20: Joint Los Angeles Basin Replenishment and Extraction ......Joint Los Angeles Basin Replenishment and Extraction Master Plan Mandatory Pre-Proposal Meeting ... •Scope of Work Review

Thank YouDiane Gatza, P.E.