Joint Use Attachment Report for Xcel Energy Pole # 18.03 Company: City: Permit # Date of Field Inspection: Temperature: XcelPoleNo 073-790 (231435845) Longitude -108.554381279 Latitude 39.06675629 Height 55 Class 2 ExistingRiser No Equipment NewRiserAllowed Yes DistanceToNextPole 237 Above Ground Clearance 15.5 Comment Facilities at Pole Position Owner Height Bottom Unite 20.83 Middle Top Charter 22.5 Power 25.2 Xcel Facilities at Midspan Position Owner Height Bottom Middle Top Power Xcel Unite 18.75 Charter 18.08 29.5 Zippy Tech Grand Junction, CO 5523 9/9/2015 80° F Comment Modifications Required Yes Attachment Height 19'10" GuyingRequired No 18.03 Recommended Modifications Pole 18.03: Charter is currently in violation and shall lower their attachment 8". Span Pole 18.03 to Pole 18.02: Unite is currently in violation and shall lower their line 1'8". Power Type Secondary Power Type Primary Tuesday, September 15, 20 Page 21 of 49
Transcript

Joint Use Attachment Report for Xcel Energy

Pole # 18.03

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 073-790 (231435845)

Longitude -108.554381279

Latitude 39.06675629

Height 55

Class 2

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 237

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 20.83Middle

Top Charter 22.5

Power 25.2Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 18.75

Charter 18.08

29.5

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 19'10"

GuyingRequired No

18.03

Recommended Modifications

Pole 18.03: Charter is currently in violation and shall lower their attachment 8".

Span Pole 18.03 to Pole 18.02: Unite is currently in violation and shall lower their line 1'8".

Power Type Secondary

Power Type Primary

Tuesday, September 15, 20 Page 21 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 18.04

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo

Longitude -108.554400301

Latitude 39.066387688

Height 55

Class 2

ExistingRiser No

Equipment Streetlight

NewRiserAllowed Yes

DistanceToNextPole 134

Above Ground Clearance 9.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 20.33Middle

Top Charter 21.42

Power 26.58Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 19.25

Charter 20.25

22

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 19'4"

GuyingRequired No

18.04

Recommended Modifications

Span Pole 18.04 to Pole 18.03: Charter is currently in violation and shall lower their line 9". Unite shall lower their line 9" to maintain clearance.

Power Type Secondary

25.50

Power Type Secondary

Tuesday, September 15, 20 Page 22 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 18.05

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 114-447 (231461983)

Longitude -108.554384409

Latitude 39.065845775

Height 55

Class 4

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 197

Above Ground Clearance 15.5

Comment

Facilities at Pole

Unite 18.92

Position Owner Height

Bottom

Unite 19.17Middle

Top Charter 20.17

Power 23.83Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 18.92

Charter 19.58

30.08

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 17'11"

GuyingRequired No

18.05

Recommended Modifications

Span Pole 18.05 to Pole 18.04: Unite is currently in violation and shall lower their line 4".

Power Type Secondary

Power Type Primary

Tuesday, September 15, 20 Page 23 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 18.06

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 110-314 (231355572)

Longitude -108.554391678

Latitude 39.065419762

Height 55

Class 2

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 155

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Middle

Top

Power 25.17Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel 22

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 21'2"

GuyingRequired No

18.06

Recommended Modifications

Power Type Secondary

Power Type Secondary

Tuesday, September 15, 20 Page 24 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 18.07

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 104-097 (231483482)

Longitude -108.554384139

Latitude 39.064887431

Height 55

Class 2

ExistingRiser Yes

Equipment

NewRiserAllowed No

DistanceToNextPole 194

Above Ground Clearance 15.5

Comment

Facilities at Pole

CenturyLink 18.92

Position Owner Height

Bottom

CenturyLink 19.58Middle

Top Charter 20.58

Power 23.92Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel 30.67

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 17'11"

GuyingRequired No

18.07

Recommended Modifications

Power Type Riser

Power Type Primary

Tuesday, September 15, 20 Page 25 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 18.08

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 096-938 (231482242)

Longitude -108.554366346

Latitude 39.064455228

Height 55

Class 2

ExistingRiser Yes

Equipment

NewRiserAllowed Yes

DistanceToNextPole 157

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

CenturyLink 23.92Middle

Top CenturyLink 23.92

Power 23.67Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

CenturyLink 18.08

CenturyLink 19.42

19.58

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 18'4"

GuyingRequired No

18.08

Recommended Modifications

Pole 18.08: CenturyLink is currently in violation and shall lower their top attachment 3'7" and their bottom attachment 4'7".

Span Pole 18.08 to Pole 18.07: CenturyLink is currently in violation. Make Ready is required.

Power Type Riser

Power Type Secondary

Make Ready Required

Tuesday, September 15, 20 Page 26 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 18.09

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 091-746 (231483487)

Longitude -108.55438436

Latitude 39.063933099

Height 55

Class 2

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 190

Above Ground Clearance 15.5

Comment

Facilities at Pole

CenturyLink 20.58

Position Owner Height

Bottom

CenturyLink 21.17Middle

Top Charter 22.17

Power 24.92Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

CenturyLink 19.92

CenturyLink 21.42

31.17

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 18'7"

GuyingRequired No

18.09

Recommended Modifications

Pole 18.09: Charter is currently in violation and shall lower their attachment 7". CenturyLink shall lower their top attachment 7" and their bottom attachment 12".

Power Type Secondary

Power Type Primary

Tuesday, September 15, 20 Page 27 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 18.10

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 057-739 (231435939)

Longitude -108.55437955

Latitude 39.063851193

Height 40

Class 2

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 29

Above Ground Clearance

Comment

Facilities at PolePosition Owner Height

Bottom

Middle

Top

Power 30.17Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 19'

GuyingRequired Yes

18.10

Recommended Modifications

Power Type Neutral

Power Type

Tuesday, September 15, 20 Page 28 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 19

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 148-364 (231461992)

Longitude -108.554371893

Latitude 39.068370637

Height 55

Class 2

ExistingRiser No

Equipment Streetlight

NewRiserAllowed Yes

DistanceToNextPole 137

Above Ground Clearance 9.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 20.5Middle

Top Charter 21.5

Power 26.67Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 18.58

Charter 18.58

20.75

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 19'6"

GuyingRequired No

19

Recommended Modifications

Span Pole 19 to Pole 20: Charter and Unite are currently in violation. Charter shall lower their line 4" and Unite shall lower their line 1'4".

Power Type Secondary

26.00

Power Type Secondary

Tuesday, September 15, 20 Page 29 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 20

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 152-504 (231461999)

Longitude -108.554378555

Latitude 39.068746734

Height 55

Class 2

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 212

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 19.83Middle

Top Charter 21.08

Power 24.92Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 18.08

Charter 19.25

29.75

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 18'10"

GuyingRequired No

20

Recommended Modifications

Power Type Secondary

Power Type Primary

Tuesday, September 15, 20 Page 30 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 21

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 160-713 (231462087)

Longitude -108.554368727

Latitude 39.069330178

Height 55

Class 2

ExistingRiser No

Equipment Streetlight

NewRiserAllowed Yes

DistanceToNextPole 159

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 19.33Middle

Top Charter 20.5

Power 25.83Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 17.75

Charter 19.67

23.17

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 18'4"

GuyingRequired No

21

Recommended Modifications

Power Type Secondary

25.00

Power Type Secondary

Tuesday, September 15, 20 Page 31 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 22

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 166-871 (231463226)

Longitude -108.554367581

Latitude 39.069767675

Height 55

Class 2

ExistingRiser No

Equipment Streetlight

NewRiserAllowed Yes

DistanceToNextPole 230

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 18.42Middle

Top Charter 19.5

Power 24.67Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 17.17

Charter 17.17

30.25

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 17'5"

GuyingRequired No

22

Recommended Modifications

Span Pole 22 to Pole 23: Unite is currently in violation and shall lower their line 12".

Power Type Secondary

26.75

Power Type Primary

Tuesday, September 15, 20 Page 32 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 23

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 174-103 (231466690)

Longitude -108.554369965

Latitude 39.070400295

Height 55

Class 2

ExistingRiser No

Equipment Streetlight

NewRiserAllowed Yes

DistanceToNextPole 168

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 19.17Middle

Top Charter 20.42

Power 26.33Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 16.75

Charter 18.17

21.75

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 18'2"

GuyingRequired No

23

Recommended Modifications

Power Type Secondary

25.75

Power Type Secondary

Tuesday, September 15, 20 Page 33 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 24

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 183-272 (231468021)

Longitude -108.554366506

Latitude 39.070862736

Height 55

Class 2

ExistingRiser No

Equipment Streetlight

NewRiserAllowed Yes

DistanceToNextPole 91

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 18.58Middle

Top Charter 20.25

Power 25.42Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Charter 17.75

24

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 17'7"

GuyingRequired No

24

Recommended Modifications

Power Type Secondary

23.42

Power Type Secondary

Tuesday, September 15, 20 Page 34 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 24.01

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 246-270 (231463219)

Longitude -108.554136611

Latitude 39.070872824

Height

Class

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 65

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Middle

Top Charter 19

Power 24.33Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Charter 19.25

25.25

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 18'

GuyingRequired No

24.01

Recommended Modifications

Power Type Secondary

Power Type Secondary

Tuesday, September 15, 20 Page 35 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 24.02

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 342-267 (231468385)

Longitude -108.55379098

Latitude 39.070870688

Height

Class

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 97

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Middle

Top Charter 20.33

Power 25.17Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Charter 19

23.92

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 19'4"

GuyingRequired No

24.02

Recommended Modifications

Power Type Secondary

Power Type Secondary

Tuesday, September 15, 20 Page 36 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 24.03

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 480-263 (231468151)

Longitude -108.553313141

Latitude 39.070875007

Height 40

Class 4

ExistingRiser No

Equipment Xfmr

NewRiserAllowed Yes

DistanceToNextPole 135

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Middle

Top Charter 17.67

Power 24.58Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Charter 17.67

21.42

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 16'8"

GuyingRequired Yes

24.03

Recommended Modifications

Power Type Secondary

Power Type Secondary

Tuesday, September 15, 20 Page 37 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 24.04

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 188-481 (231466603)

Longitude -108.554367176

Latitude 39.071447596

Height 55

Class 2

ExistingRiser No

Equipment Streetlight

NewRiserAllowed Yes

DistanceToNextPole 213

Above Ground Clearance 15.5

Comment

Capacitor Bank also on pole

Facilities at PolePosition Owner Height

Bottom

Unite 21.42Middle

Top Charter 22.58

Power 26.75Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 19.33

Charter 20

30.33

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 20'5"

GuyingRequired No

24.04

Recommended Modifications

Span Pole 24.04 to Pole 24.03: Unite is currently in violation and shall lower their line 4".

Power Type Secondary

27.50

Power Type Primary

Tuesday, September 15, 20 Page 38 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 24.05

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 158-625 (85819215)

Longitude -108.554376394

Latitude 39.071831887

Height 60

Class 2

ExistingRiser No

Equipment

NewRiserAllowed Yes

DistanceToNextPole 140

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 19.67Middle

Top Charter 21.67

Power 25.5Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 19.33

Charter 21.08

24.58

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required No

Attachment Height 18'8"

GuyingRequired No

24.05

Recommended Modifications

Power Type Secondary

Power Type Secondary

Tuesday, September 15, 20 Page 39 of 49

Joint Use Attachment Report for Xcel Energy

Pole # 24.06

Company:

City:

Permit #

Date of Field Inspection:

Temperature:

XcelPoleNo 200-833 (231463202)

Longitude -108.554363797

Latitude 39.072421595

Height 55

Class 2

ExistingRiser No

Equipment Streetlight

NewRiserAllowed Yes

DistanceToNextPole 215

Above Ground Clearance 15.5

Comment

Facilities at PolePosition Owner Height

Bottom

Unite 20.75Middle

Top Charter 21.75

Power 26.25Xcel

Facilities at MidspanPosition Owner Height

Bottom

Middle

Top

Power Xcel

Unite 18.67

Charter 18.67

29.8

Zippy Tech

Grand Junction, CO

5523

9/9/2015

80° F

Comment

Modifications Required Yes

Attachment Height 19'9"

GuyingRequired No

24.06

Recommended Modifications

Span Pole 24.06 to Pole 24.05: Unite is currently in violation and shall lower their line 12".

Power Type Secondary

26.50

Power Type Primary

Tuesday, September 15, 20 Page 40 of 49


Recommended