Tentative 2014 Construction Timeline

Page 3: Jon Chiglo, PE Project Director 2014 Construction Plans.

Access to businesses and residences

Local access will remain during business hours and at all times to residences.

- Business signage- Detour signage- Temporary gravel roads

Page 4: Jon Chiglo, PE Project Director 2014 Construction Plans.

2014 Minn. Approach Work Contracted Maximum Impacts

• North Frontage Road—50 calendar days

• Osgood Avenue—40 calendar days

• Greeley Street—40 calendar days

• Oakgreen Avenue—25 calendar days

• South Frontage Road—70 calendar days

Page 5: Jon Chiglo, PE Project Director 2014 Construction Plans.

Highway 36

• Single-lane in each direction – Open AT ALL TIMES• Work: Resurface road

• Westbound: Spring to mid-summer 2014(red)• Eastbound: Mid-summer to fall 2014(green)

Page 6: Jon Chiglo, PE Project Director 2014 Construction Plans.

South Frontage Road – East of Osgood

• Closed to through traffic • Local access to businesses and residences • Work: Resurface road, replace public utilities • Spring to mid-summer 2014 (red)

Page 7: Jon Chiglo, PE Project Director 2014 Construction Plans.

Hwy 95 / Lookout Trail / Sunnyside

• Hwy 95• Single-lane in each direction • Work: Construct 4-lane road • Spring to mid-summer 2014 (red)

• Lookout Trail• Work: Reconstruct access to Hwy 95

to right in/out intersection• Spring to mid-summer 2014

• Sunnyside Marina• Work: Reconstruct driveway• Spring to mid-summer 2014

Page 8: Jon Chiglo, PE Project Director 2014 Construction Plans.

North Frontage Road

• North Frontage Road – Northwestern to Greeley• Possible detours to access

North Frontage Road.

• Work: Resurface road, add turn lane, add curb & gutter

• Spring to mid-summer 2014 (red)

Page 9: Jon Chiglo, PE Project Director 2014 Construction Plans.

North Frontage Road

• North Frontage Road – Greeley to Osgood• Possible detours to access North Frontage Road, either from

Greeley St. or Osgood Ave.• Permanent closure of right in/out connection to Hwy 36• Work: Resurface road, add turn lane, add curb & gutter • Spring to mid-summer 2014 (red)

Page 10: Jon Chiglo, PE Project Director 2014 Construction Plans.

Greeley St./Oakgreen Ave. Intersection

• North/south traffic closed for 2 periods of 6 calendar days each

• Oakgreen—Closed between S. Frontage Road and 58th St./Oak Park Blvd. for 25 days. Local residential access only. (green)

• Work: Build new frontage road system further away from Hwy 36; shift intersection to the east; install three traffic signal systems; add double left turn lanes

Page 11: Jon Chiglo, PE Project Director 2014 Construction Plans.

Osgood Ave. Intersection

• North/south traffic closed for 2 periods of 6 calendar days each

• Work: Add double left turn lanes, resurface intersection

• Osgood intersection and Greeley-Oakgreen intersection WILL NOT close at the same time

Page 12: Jon Chiglo, PE Project Director 2014 Construction Plans.

Final Hwy 36 Intersections Looking East

Page 13: Jon Chiglo, PE Project Director 2014 Construction Plans.

S. Frontage Road – Oakgreen to Osgood

• Possible detours/temporary roads to access businesses/residences

• Work: Resurface road, add turn lane, add curb & gutter, replace public utilities

• Late summer to fall 2014 (blue)

Page 14: Jon Chiglo, PE Project Director 2014 Construction Plans.

Trail Construction

• Work: Construct pedestrian/bicycle trails • Occurs as time allows, complete in fall 2014

Page 15: Jon Chiglo, PE Project Director 2014 Construction Plans.

Other area county/city projects

Page 16: Jon Chiglo, PE Project Director 2014 Construction Plans.

Wisconsin Approach Work

Work occurs: March 2014-late summer 2016

Goal: Open WIS 64 at the same time as the new bridge

Page 17: Jon Chiglo, PE Project Director 2014 Construction Plans.

2014 Wisc. Approach Work

• Grade from the bluff to County Road E

• Build the WIS 35 overpass over the new WIS 64

Page 18: Jon Chiglo, PE Project Director 2014 Construction Plans.

2014-2017 Wisc. Approach Schedule

Page 19: Jon Chiglo, PE Project Director 2014 Construction Plans.

The New St. Croix Crossing

Page 20: Jon Chiglo, PE Project Director 2014 Construction Plans.

Bridge Superstructure

• Timeline: Dec. 2013 to late-summer/early fall 2016

• Winter/Spring 2014 Impacts: Pile driving on the Minnesota shoreline and work on Pier 8 • Through May• 6 days per week -- 7 a.m.-7 p.m. • Goal: As much work done as possible while

windows are closed

Page 21: Jon Chiglo, PE Project Director 2014 Construction Plans.

Minnesota Land Piers Work Progress

Page 22: Jon Chiglo, PE Project Director 2014 Construction Plans.

2014 Bridge Construction

• Build all river piers and land piers vertically (Piers 1-13)

Page 23: Jon Chiglo, PE Project Director 2014 Construction Plans.

2014 Bridge Construction

• Begin casting segments – Approx. 1,000 • 656 extradosed segments• 330 approach segments

• Two casting yard locations -- Gray Cloud Island and at the Hwy 36/95 interchange

• Place first segment in fall 2014

Page 24: Jon Chiglo, PE Project Director 2014 Construction Plans.

River Bridge Construction Staging

Page 25: Jon Chiglo, PE Project Director 2014 Construction Plans.

Segment Lifter Example

Page 26: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 27: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 28: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 29: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 30: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 31: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 32: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 33: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 34: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 35: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 36: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 37: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 38: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 39: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 40: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 41: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 42: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 43: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 44: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 45: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 46: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 47: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 48: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 49: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 50: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 51: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 52: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 53: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 54: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 55: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 56: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 57: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 58: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 59: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 60: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 61: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 62: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 63: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 64: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 65: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 66: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 67: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 68: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 69: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 70: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 71: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 72: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 73: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 74: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 75: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 76: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 77: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 78: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 79: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 80: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 81: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 82: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 83: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 84: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 85: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 86: Jon Chiglo, PE Project Director 2014 Construction Plans.

Construction Sequence

Page 87: Jon Chiglo, PE Project Director 2014 Construction Plans.

Contact Information

Hotline1-855-GO-CROIX (462-7649)

[email protected]

Website/Regular project updateswww.mndot.gov/stcroixcrossing