I V I nfrastru G Volum nfras ucture De Governm me II strucevelopm ment of K ‐ Dat ture ment Dep Karnataka ta She Proje partmen a eet oects nt f Key Pr Pu In De y repared by ublic Private frastructure epartment Partnership e Developme p Cell ent
Transcript
Page 1: Ka PPP Projects02

I

 

VI

nfrastruG

Volumnfras

ucture DeGovernm

me II struct

evelopmment of K

 

 

‐ Datture 

 

ment DepKarnataka

ta SheProje

partmena 

eet ofects

nt 

f Key

 

 

 

Pr

Pu

In

De

y         

     

repared by 

ublic Private

frastructure

epartment  

         

 

 Partnership

e Developme

         

 

p Cell 

ent 

     

Page 2: Ka PPP Projects02

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 3: Ka PPP Projects02

KARNATAKA INFRASTRUCTURE PROJECTS THROUGH PPP (IDD‐ GOK) 

Sl No  Name of the Project  Cost 

(Rs Cr.) 

Relevance  Status  Page No. 

1  Bellary Airport  140 Connectivity  to  Steel City‐ Fast growing region 

Project  Development Agreement to be signed 

2  High Speed Rail Link  6689 (completion cost)

Connects  City  to  Airport‐ BIAL 

RFP  Stage;  Bid  by 12/08/2010 

3  Sea Port at Tadri (35 MT expandable to 114 MT) 

3000 Phase ‐ I

To  serve  the  Cement, Steel & Auto Region  

RFQ    issued on        ‐15th Apr; Response by ‐ 30 Jun ‘2010   ( Pre‐bid on 05/06/2010) 

4  Sea Port at Haldipur (19MT‐ Swiss Challenge Project) 

1900 To  serve  the  Cement, Steel & Auto Region 

DPR  Stage,  RFQ  by  end  of Jun 2010 

11 

5  Monorail Project in Bangalore‐ Corridor‐ 31 Km 

5600 To  serve  as  feeder  to Metro 

DPR Under Progress 

Bid by Dec 2010 

12 

6  Monorail Project in Bangalore (Swiss Challenge‐15KM) 

2100 To  serve  as  feeder  to Metro 

 

DPR Stage 

Bid  likely  by  end June or July 2010 

13 

7  Mega Power Projects 

(Three projects of 700MW each) 

10500 To  meet  the  Karnataka’s Power needs 

Gas based: PCKL‐ 2100 MW (Feasibility  study  done) Belgaum,  Gadag, Davangere;  Bid  by  June 2010       KPCL‐1400 MW;  

14 

8  Gas Pipeline Project  7000 by GAIL

From Dhabhol‐ Bangalore  Under  implementation; COD by Mar 2012. 

17 

9  City Gas distribution  Green Field Development  Feasibility Underway; Likely to be taken up in 12 towns/ cities  along  the  Gas pipeline. 

18 

10  Railway projects  (2421  KM)  (1362 km  ‐ under progress +1059 km ‐ newly  sanctioned ) 

14000 To improve connectivity to ports, Industrial Zones.  

1362  kms  of  Rail  works under  implementation.  In 2010‐11,     9 projects have been approved . Out of this for  5  projects  GoK  has approached  Railways  for sanction  on  PPP:                  1. Hubli‐ Ankola 

2. Talaguppa‐ Honnavar,  3.Kudchini‐ Bagalkot,  4.Bijapur‐ Shahbad,  5.Dharwad‐ Belgaum.  DPR ready  for  first  three. 

19 

Page 4: Ka PPP Projects02

Sl No  Name of the Project  Cost 

(Rs Cr.) 

Relevance  Status  Page No. 

11  Roads (general)  3500 1600 km  NIT by Jun/July  2010 (partly issued) 

 

21 

12  SH‐69 & NH 63 –Roads to Ports 

1600 Connectivity to ports  SH‐69:  Feasibility  under examination;  NH‐63:  NHAI‐  preparing feasibility report 

22 

13  SH‐ 132 Road   160  26 Km   Under Procurement 

 

23 

14  Logistics Architecture in Karnataka for fruits and Vegetables 

680 To  serve  Karnataka’s horticulture  and  provide both  backward  and forward linkages 

Feasibility  Study  done  in respect  of  Belgaum, Bijapur,  Gadag,  Dharwad and Bagalkot  

24 

15  Food Parks  100 Forward  integration  to large  fruit  and  vegetable producing centres. 

 Mid  Tender  stage  in respect of Bangalore Rural, Tumkur,  Shimoga, Davanagere, Bijapur, Haveri and Belgaum Districts 

26 

16  VADA‐ Industrial Infrastructure 

30345  State  ‐  of  ‐  the  Art Industrial Park over 500 Sq Km in Bellary 

Feasibility  done;  RFQ  by June / July 2010 

28 

17  Convention Centre at Devanahally (Tourism) 

1050 Will  be  the  largest  in South India 

Bid Process completed  30 

18  Other Tourism Projects  

 

1621 Tourism  circuits,  Golf Course, Aquamarine, etc., 

Partly under bid  31 

19  Logistic Park at Bangalore  154 (Phase ‐ I)

Transportation,  storage and Logistics in Bangalore 

Feasibility & DPR Stage  32 

20  Devanahally  Business Park  9500 Business  Hub  by  the  side of    the  fastest  growing Airport‐ Bangalore 

RFQ by end June 2010  34 

21  Intermodal Terminal HUBs in Bangalore 

2865  

(Except Bayappanahalli & Mangalor

e) 

(6  in  Bangalore+  1  in Mangalore);  To  povide seamless interchange   

Feasibility  Study  done  for Peenya,  Yeshvantpur, Yelahanka,  Mysore  Road, Majestic, Bayappanahalli & Mangalore 

35 

22  Airstrips at Raichur, Gadag, Bagalkot and Chikkmangalur 

145 Air connectivity to Districs  PPP  Annuity  –  Bid  in  June 2010 

37 

 

Note Bangalore  Metro    –   

Phase –  II,    DPR under way for about 55 Km  Phase‐    I,   42 Km,  Under implementation through GoI‐GoK funding 

38 

Page 5: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

5  Public Private Partnership Cell | Infrastructure Development Department 

 

1.Development of Bellary Airport 

Sl.No. Item Details

1. Name of the Project Development of Bellary Airport

1.1 Sector & Sub Sector name (Infra policy’07)

Transportation & Logistics : Airport

1.2 Description of the Project

Infrastructure Development Department (IDD), Government of Karnataka (GoK) (the “Authority”) has decided to undertake development of regional airports (the “Project”) through Public Private Partnership (PPP).

1.3 Components of the project

Development of Airport and ancillary facilities.

1.4 Justification for the project (Public Need)

Bellary, rich in culture and heritage and endowed with abundant mineral resources, has, from time immemorial, been considered an important region due to its strategic location and positioning amidst the Deccan plains. This region has witnessed rapid industrial growth and is known as the mining, steel and industrial hub of Karnataka. The Bellary-Toranagallu-Hospet belt, currently the largest exporter of galvanized steel, is expected to enhance steel production to 12 MMT

Page 6: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

6  Public Private Partnership Cell | Infrastructure Development Department 

 

by 2010 with an overall investment of over Rs 30,000 Crores. Further there are plans to produce atleast another 25 MMT of Steel in the area. This expansion, with significant employment and business potential, would propel overall economic growth of the region. The Govt is planning to establish an industrial park over an area of 500 sq Km near about the Bellary City. Government of Karnataka proposes to develop an airport in this vibrant growth centre which would further act as a facilitator for future economic growth.

1.5 Places of Study Bellary 2. Project Viability Project is proposed to be developed on a PPP framework

2.1 Cost Break up (Rs Cr) Indicative Project Cost is approximately Rs. 144 Crore 3.

Way Forward • Bid Process for selection of a private developer in progress. • LoA to be issued

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 7: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

7  Public Private Partnership Cell | Infrastructure Development Department 

 

2.Development of High Speed Rail  

Sl.No.  Item  Details 

1.  Name of the Project   Development of High Speed Rail link from the Bangalore City to the Bangalore International Airport. 

1.1  Sector & Sub Sector name (Infra policy’07) 

Transportation & Logistics: Urban Transport Systems 

1.2  Description of the Project 

The  Govt  of  Karnataka  (GoK),  is  engaged  in  the  development  of High Speed Rail Link  (HSRL)  to  the Bangalore  International Airport and  as  part  of  this  endeavor,  GoK  has  decided  to  undertake development of HSRL Project through Public Private partnership on Design, Build, Finance, Operate and Transfer  ("DBFOT") basis, and has decided to engage the Bangalore Airport Rail Link Ltd to carry out  the  bidding  process  for  selection  of  a  private  entity  as  the Bidder to whom the Project may be awarded.  

1.3  Components of the project 

The  project  involves  design,  construction,  operation  and maintenance of the High Speed Rail Link. Some section of the HSRL will be underground while the rest would be elevated.  

1.4  Justification for the project (Public Need) 

Bangalore International Airport is about 34 kms from the center of the city and therefore the HSRL would: 

• reduce the  journey time to about 25 mins as against more than an hour by road;  

• be  in  air‐conditioned  comfort,  safe  and  reliable  and  there 

Page 8: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

8  Public Private Partnership Cell | Infrastructure Development Department 

 

will not be traffic hold‐ups.

• Have check in facility at the city itself 

• Not pollute 

• Be much cheaper and safer 

1.5  Places of Study  Bangalore

2.  Project Viability  The project viability has been assessed to be taken up under a PPP framework. The project is currently under bid.  

2.1  Cost Break up (Rs Cr)  Estimated cost: Rs. 6689.00 (completion cost) 

 3.  

Way Forward  The  RFQ  process  for  short  listing  qualified  bidders  is  completed. RFP response by 12th Aug 2010  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 9: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

9  Public Private Partnership Cell | Infrastructure Development Department 

 

3.Development of Sea port at Tadadi 

Sl.No.  Item  Details 

1.  Name of the Project   Development of Port at Tadadi

1.1  Sector & Sub Sector name (Infra policy’07) 

Transportation, Ports

1.2  Description of the Project 

 Government  of  Karnataka  (GoK)  (the  “Authority”)  has  decided  to undertake development and operation / maintenance of a sea port at Tadadi in Uttar Kannada district of  Karnataka (the “Project”) through Public  Private  Partnership  (PPP)  on  Design,  Build,  Finance,  Operate and  Transfer  (the  “DBFOT”)  basis.  The  Authority  has  nominated Karnataka  State  Industrial  Investment  &  Development  Corporation Limited  (KSIIDC), as  the nodal agency  for  the Project. GoK has  taken action  to  get  Hubli  –  Ankola  Railway  line,  Talaguppa  –  Honnavar Railway  line  sanctioned. The SH‐69 and NH‐63 would be widened  to provide better connectivity. KSIIDC is the Nodal Agency for the project.

1.3  Components of the project 

The  project  is  to  generate  114  MMT  per  annum  cargo  handling capacity in 3 phases.  Phase – I                       34 MMTPA) by 2014 Phase – II additional     45 MMTPA by 2022 Phase – III additional    35 MMTPA by 2027  Total capacity of           114 MMTPA 

1.4  Justification for the project (Public Need) 

Karnataka has only one major port at Mangalore.  The remaining ports are non‐major ports. A port at Tadadi, would help  improve the trade infrastructure, especially in the northern part of the state. It will be a  Logistics  link  to  Industrial  Corridors  (Cement,  Steel,  Auto mobile  in Bagalkot, Gulbarga, Koppal, Bellary, Dharwad)   

1.5  Places of Study  Pre‐feasibility study was carried out for Tadri, Uttara Kannada District, 

Page 10: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

10  Public Private Partnership Cell | Infrastructure Development Department 

 

Karnataka. 

2.  Project Viability  Overall Project feasibility established

2.1  Cost Break up (Rs Cr)  3000 

 3.  

Way Forward  • Selection of a technical consultant for preparing a Feasibility Report for the Project. 

• Bid Process for selection of a private developer. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 11: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

11  Public Private Partnership Cell | Infrastructure Development Department 

 

4.Development of Sea port at Haldipur (Swiss Challenge route by M/s MEL)  

Sl.No.  Item  Details 

1.  Name of the Project   Development of Port at Haldipur

 

1.1  Sector & Sub Sector name (Infra policy’07) 

Transportation, Ports

1.2  Description of the Project 

The project is to generate 18 MMT per annum cargo handling capacity to be enhanced to 34 in 2 phases.    

1.3  Components of the project 

18  MMTPA  Capacity with  negative  pressure  sheds  to  handle  bulk cargo like coal and Iron Ore. 

1.4  Justification for the project (Public Need) 

Logistics  link  to  Industrial  Corridors  (Cement,  Steel,  Auto mobile  in Bagalkot, Gulbarga, Koppal, Bellary, Dharwad)  

1.5  Places of Study  Pre‐feasibility study  was  carried  out  for  Haldipur(8  Km  north  of Honnavar), Uttara Kannada District, Karnataka.  

2.  Project Viability  Overall Project feasibility established

2.1  Cost Break up (Rs Cr)  1900 

 3.  

Way Forward  M/s MEL has been  given permission  to proceed by Single Window Agency  for  the  studies.  The  RFQ  to  be  floated  shortly. GoK  taken action  to  get  Hubli  –  Ankola  Railway  line,  Talaguppa  –  Honnavar Railway line sanctioned. The SH‐69 and NH‐63 would be widened to provide better connectivity to this port. 

 

 

 

 

Page 12: Ka PPP Projects02

 

 

So

1

1

1

1

1

1

2

2

 3

Governme

12  Pu

5.Develop

l.No. 

Item 

.  Name

.1  Sectoname

.2  DescrProje

.3  Compproje

.4  Justifproje

.5  Place

.  Proje

.1  Cost 

. Way 

 

 

nt of Karnata

blic Private P

ment of  M

e of the Pro

or & Sub Sece (Infra poli

ription of thect 

ponents of tect 

fication for ect (Public N

es of Study 

ect Viability

Break up (R

Forward 

aka  Vo

Partnership 

Monorail Pro

oject 

ctor cy’07) 

he 

the 

the Need) 

Rs Cr)

olume II – D

Cell | Infrast

oject in Ban

Details 

Developme

Transporta

Developmencorridors  

Corridor 1ring road (3Corridor 2km) 

Track, Sign

The increasrequired fo

BangaloreCorridor 1ring road (3Corridor 2km) 

 

At Rs. 140 c

Selection othe Project

Data Sheet o

tructure Dev

ngalore 

ent of Mono

ation & Logi

nt of Monor

: Hebbal  to31 km) : Periphera

alling syste

sed traffic tor this techn

: Hebbal  to31 km) : Periphera

crore per km

of  Technicat. 

of Key Infra

elopment De

orail Project

stics : Urba

rail / Light R

o  J.P. Naga

al Ring Roa

m, Rolling s

that requirenology. 

o  J.P. Naga

al Ring Roa

m

al  Consultan

astructure P

epartment 

t in Bangalo

n Transport

ail Transit Sy

r along  the

d  to Toll G

stock, Railw

es commuta

r along  the

d  to Toll G

nt, who wo

Projects 

ore 

t System 

ystem (LRT) 

e western p

Gate along M

ways station,

ation and th

e western p

Gate along M

ould  assess 

for the follo

portion of o

Magadi Roa

, Depot

he minimal 

portion of o

Magadi Roa

the  viabili

owing 

outer 

ad  (9 

ROW 

outer 

ad  (9 

ty  of 

Page 13: Ka PPP Projects02

 

 

S

1

1

1

1

1

1

2

2

Governme

13  Pu

6.Develop

l.No.  Ite

.  Na

.1  Sena

.2  DePro

.3  Copro

.4  Juspro

.5  Pla

.  Pro

.1  Co

.  Wa

 

 

 

 

nt of Karnata

blic Private P

ment of  M

em 

ame of the 

ctor & Sub me (Infra p

escription ofoject 

omponents ooject 

stification fooject (Publi

aces of Stud

oject Viabil

ost Break up

ay Forward

aka  Vo

Partnership 

Monorail Pro

Project  

Sector olicy’07) 

f the 

of the 

or the c Need) 

dy 

lity 

p (Rs Cr) 

olume II – D

Cell | Infrast

oject in Ban

Details 

Developme

Transporta

Developmenfollowing co

Corridor: M

Track, Sign

The  increaROW requi

BangaloreCorridor: M

 

Estimated a

M/s Schomthe detailefor final ap

Data Sheet o

tructure Dev

ngalore (Sw

ent of Mono

ation & Logi

nt  of  Monoorridors  

Majestic to A

alling syste

sed  traffic ired for this

Majestic to A

at Rs 140 C

mi Geodesic ed  studies,pproval befo

of Key Infra

elopment De

iss Challeng

orail Project

stics : Urba

orail  /  Light

Agara Junct

m, Rolling s

that  requirs technology

Agara Junct

rore/ Km

(project prto be put ore tenderin

astructure P

epartment 

ge by M/s S

t in Bangalo

n Transport

t  Rail  Trans

tion (15 km)

stock, Railw

res  commuy. 

tion (15 km)

roponents) before  the ng process c

Projects 

Schomi Geo

ore 

t System 

sit  System 

ways station,

tation  and 

is currentlySingle Wincommences

odesic) 

 

(LRT)  for  th

, Depot

the minim

y undertakinndow Agencs.  

he 

mal 

ng cy 

Page 14: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

14  Public Private Partnership Cell | Infrastructure Development Department 

 

7.1.Gas based Power Project at Davangere 

Sl.No.  Item  Details 

1.  Name of the Project  700MW Gas Based Thermal Power Project at Davangere, Karnataka

1.1  Sector & Sub Sector name (Infra policy’07) 

Energy ; Power Generation

1.2  Description of the Project 

M/s GAIL has proposed to implement Dabhol‐ Bangalore gas pipeline passing through Belgaum, Gadag, Davangere & Tumkur Districts. To  tide  over  the  power  crises  in  the  power  starved  state, GoK  is  keen  to develop 700 MW capacity power plant at Davangere that is located along the gas pipeline corridor on PPP basis. 

1.3  Components of the project 

Land: 400 acres; Water: 40 cusec; Fuel : Natural Gas 9 mmscmd 

1.4  Justification for the project (Public Need) 

State has witnessed peak power deficit and the energy deficit in the range of 11% in the last few years  

1.5  Places of Study  Raagimaslavada, Harpanahalli Taluk, Davanagere District 

2.  Project Viability  Overall Project feasibility established 

2.1  Cost Break up (Rs Cr) 

3500.00  

3.  

Way Forward  M/s GAIL for confirmation of availability & price of Natural GasProject studies & statutory clearances 

 

Page 15: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

15  Public Private Partnership Cell | Infrastructure Development Department 

 

7.2.Gas based Power Project at Belgaum 

Sl.No.  Item  Details 

1.  Name of the Project  700MW Gas Based Thermal Power Project at Belgaum, Karnataka 

1.1  Sector & Sub Sector name (Infra policy’07) 

Energy ; Power Generation

1.2  Description of the Project 

M/s GAIL has proposed to implement Dabhol‐ Bangalore gas pipeline passing through Belgaum, Gadag, Davangere & Tumkur Districts. To  tide  over  the  power  crises  in  the  power  starved  state, GoK  is  keen  to develop 700 MW capacity power plant at Belgaum that  is  located along the gas pipeline corridor on PPP basis. 

1.3  Components of the project 

Land: 400 acres; Water: 40 cusec; Fuel : Natural Gas 9 mmscmd 

1.4  Justification for the project (Public Need) 

State has witnessed peak power deficit and the energy deficit in the range of 11% in the last few years  

1.5  Places of Study  Chillabhabi village, Hukkeri Taluk, Belgaum District 

 2. 

 Project     Viability  

Overall Project feasibility established    

2.1  Cost Break up (Rs Cr) 

3500.00  

3.  

Way Forward  M/s GAIL for confirmation of availability & price of Natural GasProject studies & statutory clearances 

 

 

 

 

 

Page 16: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

16  Public Private Partnership Cell | Infrastructure Development Department 

 

7.3.Gas based Power Project at Gadag 

Sl.No.  Item  Details 

1.  Name of the Project  700MW Gas Based Thermal Power Project at Mundargi, Gadag, Karnataka 

1.1  Sector & Sub Sector name (Infra policy’07) 

Energy : Power Generation

1.2  Description of the Project 

M/s GAIL has proposed to implement Dabhol‐ Bangalore gas pipeline passing through Belgaum, Gadag, & Davangere Districts To  tide  over  the  power  crises  in  the  power  starved  state, GoK  is  keen  to develop 700 MW capacity power plant at Davangere that is located along the gas pipeline corridor on PPP basis  

1.3  Components of the project 

Land: 400 acres; Water: 40 cusec; Fuel : Natural Gas 9 mmscmd 

1.4  Justification for the project (Public Need) 

State has witnessed peak power deficit and the energy deficit in the range of 11% in the last few years  

1.5  Places of Study  Meundi Village, Mundargi Taluk, Gadag District 

2.  Project Viability  Overall Project feasibility established 

2.1  Cost Break up (Rs Cr) 

3500.00  

3.  

Way Forward  M/s GAIL for confirmation of availability & price of Natural GasProject studies & statutory clearances 

 

 

 

 

 

 

 

 

Page 17: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

17  Public Private Partnership Cell | Infrastructure Development Department 

 

8.Gas Pipeline from Dhabol to Bangalore 

Sl.No.  Item  Details 

1.  Name of the Project  Gas pipeline from Dhabol to Bangalore 

1.1  Sector & Sub Sector name (Infra policy’07) 

Energy ; Oil and Gas

1.2  Description of the Project 

M/s GAIL has proposed to implement Dabhol‐ Bangalore gas pipeline passing through Belgaum, Gadag, Davangere & Tumkur Districts.  

1.3  Components of the project 

730 Km of Trunk from Dhabol to Bangalore and 417 Km of Spur lines.

1.4  Justification for the project (Public Need) 

16 MMSCMD of gas  to  feed 4400 MW of power generation,  serve city gas distribution in 12 cities and fuel industrial activity 

1.5  Places of Study/ Project 

Belgaum, Gadag, Dharvad, Gadag, Bellari, Davangere, Chitra Durga, Tumkur, Ramnagar and Bangalore Districts 

2.  Project Viability  Overall Project feasibility established 

2.1  Cost Break up (Rs Cr) 

4544.00  

3.  

Way Forward  M/s  GAIL  has  completed  the field  survey,  Land  acquisition  underway, Construction to start in Oct’10. 

 

 

 

 

 

 

Yelahanka (4.62)

GOA (3.70)

BANGALORE (9.4)

DABHOL

MANGALORE

DEVANGERE (0.003)

TUMKUR 0.02

BIDADI(6.2)

HARIHAR (0.35)

BELGAUM (1.46)

DHARWAD (0.003)

RATNAGIRI (0.343)

SANGLI (0.1)

KOLHAPUR (0.218)

GOKAK TOP

CH 60

CH 170

CH 250

CH 325

CH 495

CH 665

CH 730

Mundarki (6.5)

Jagalur (6.5)

Challakere

CHIKODI (0.05)

Devaranayanadurga (6.5)

Ghataprabha (9.5)

Gubbi

BIJAPUR(1.0)

GULBARGA

SV station on

EWPL

CH 170

Page 18: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

18  Public Private Partnership Cell | Infrastructure Development Department 

 

9.City Gas Distribution 

Sl.No.  Item  Details 

1.  Name of the Project  City Gas Distribution in 12 cities of Karnataka

1.1  Sector & Sub Sector name (Infra policy’07) 

Energy ; Gas (Distribution)

1.2  Description of the Project 

M/s  GAIL  has  proposed  to  implement  City  Gas  Distribution  in  12  cities through Joint Venture with GoK 

1.3  Components of the project 

City wide Gas distribution in 12 cities

1.4  Justification for the project (Public Need) 

City gas distribution in 12 cities to reduce the cost of logistics of domestic gas transportation and to increase access. 

1.5  Places of Study/ Project 

Belgaum, Gadag, Dharvad, Gadag, Bellari, Davangere, Chitra Durga, Tumkur, Ramnagar and Bangalore Districts 

2.  Project Viability  Overall Project feasibility established 

2.1  Cost Break up (Rs Cr) 

 

3.  

Way Forward  GIAL &  KSIIDC  Joint Venture would  invite private  sector  (under  PPP)  for creating SPVs to deliver the projects 

 

 

 

 

 

 

Yelahanka (4.62)

GOA (3.70)

BANGALORE (9.4)

DABHOL

MANGALORE

DEVANGERE (0.003)

TUMKUR 0.02

BIDADI(6.2)

HARIHAR (0.35)

BELGAUM (1.46)

DHARWAD (0.003)

RATNAGIRI (0.343)

SANGLI (0.1)

KOLHAPUR (0.218)

GOKAK TOP

CH 60

CH 170

CH 250

CH 325

CH 495

CH 665

CH 730

Mundarki (6.5)

Jagalur (6.5)

Challakere

CHIKODI (0.05)

Devaranayanadurga (6.5)

Ghataprabha (9.5)

Gubbi

BIJAPUR(1.0)

GULBARGA

SV station on

EWPL

CH 170

Page 19: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

19  Public Private Partnership Cell | Infrastructure Development Department 

 

10.Railway Infra Plan for Karnataka 

Sl.No.  Item  Details 

1.  Name of the Project   Preparation of Rail Infra Plan for Kanrnataka

1.1  Sector & Sub Sector name (Infra policy’07) 

Transportation, Rail

1.2  Description of the Project 

Rail network development needs of the state, key projects to be developed on priority basis and to prepare rail infra plan.  

1.3  Components of the project 

The existing rail network of Karnataka needs enhancement to reach rail density of 30 km. It is proposed that some of the projects are taken up under PPP. The Key Projects are 

I. New Projects Proposed by GoK for Cost Sharing 1. Shimoga – Harihara 2. Whitefield – Kolar 3. Davangere – Tumkur 4. Gadag – Haveri 

II. New Projects to be taken up under PPP mode 1. Hubli – Ankola 2. Talaguppa – Honnavar 3. Kudachi‐Bagalkot 4. Bijapur – Shahabad 5. Dharwad ‐ Belgaum  

1.4  Justification for the  Faster Logistics by in forming Rail density to 30 km  

Page 20: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

20  Public Private Partnership Cell | Infrastructure Development Department 

 

project (Public Need) 

1.5  Places of Study  The study was carried out for whole rail network of Karnataka. 

2.  Project Viability  No viability study involved in this project.

2.1  Cost Break up (Rs Cr)  The project is not about a particular project. The list of projects and their estimated costs are given in the study. 

3  Way Forward  The Railway has approved the above listed projects. 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 21: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

21  Public Private Partnership Cell | Infrastructure Development Department 

 

11.Development of Roads in Karnataka 

Sl.No.  Item  Details 

1.  Name of the Project   Development of Roads under Mega road development Programme in Karnataka on PPP Mode 

1.1  Sector & Sub Sector name (Infra policy’07) 

Transportation & Logistics: Roads

1.2  Description of the Project 

Mega Road development programme to develop about 1600 Km of roads under PPP 

1.3  Components of the project 

The First phase involves 15 roads (8 Packages, 15 sub packages)  

1.4  Justification for the project (Public Need) 

As part of  improvement of the road  index  from 1.07 km/Sq.km to 1.5 km/sq.km 

1.5  Places of Study  Entire State ‐ Karnataka

2.  Project Viability   

2.1  Cost Break up (Rs Cr)  3500.00

3.  

Way Forward  Partly Bid out 

 

 

 

 

Page 22: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

22  Public Private Partnership Cell | Infrastructure Development Department 

 

12.Road Project: SH‐69 – Road* to Ports 

Sl.No.  Item  Details 

1.  Name of the Project  SH‐69 ‐ Road (Blue color) to Ports

 1.1  Sector & Sub Sector 

name (Infra policy’07) 

Transportation; Roads

1.2  Description of the Project 

State Highway connecting Kumta on NH‐ 17  to NH‐ 4 passing  through Sirsi, Mundagod and Thadas which is about 127.6 kms connecting Uttara Kannada & Dharwad districts having single lane & intermediate lane widths. 

1.3  Components of the project 

127.6 kms to be four laned

1.4  Justification for the project (Public Need) 

Road to be four laned to cater to the cargo transportation by virtue of which the  port  capacity  can  be  increased  to  34.25 mtpa.  To  serve  as  a  parallel artery  to NH‐63  (from Ankola  to Gutti) providing  connectivity  to Bellary & proposed ports at Tadadi & Haldipur. 

1.5  Places of Study/ Project 

Kumta on NH‐ 17 to NH‐ 4 passing through Sirsi, Mundagod and Thadas

2.  Project Viability  Feasibility study underway

2.1  Cost Break up (Rs Cr) 

 

3.  

Way Forward  Single Window Agency has been given a go ahead for the studies

* NH‐63 Road from Gooty – Ankola to be developed as another road for port connectivity 

 

 

 

Page 23: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

23  Public Private Partnership Cell | Infrastructure Development Department 

 

13.Development of SH‐132 in Bellary 

Sl.No.  Item  Details 

1.  Name of the Project   Development of State Highway 132 in Bellary District <no picture> 

1.1  Sector & Sub Sector name (Infra policy’07) 

Transportation, Roads

1.2  Description of the Project 

The  project  provides  connectivity  to  the  new  Airport  at  Bellary  and connects neighboring Andhra Pradesh  

1.3  Components of the project 

The  project  involved  developing  a  4‐lane  road  from  Bellary  city  to  the proposed Greenfield airport and  from  there on a 2‐lane  road up  to  the Andhra  Pradesh  border.  The  project  also  involved  developing wayside amenities. 

1.4  Justification for the project (Public Need) 

To provide better connectivity to the proposed Greenfield airport and to connect to the state highway network in the state of Andhra Pradesh.  

1.5  Places of Study  Bellary, Karnataka 

2.  Project Viability   

2.1  Cost Break up (Rs Cr)  158.47 (Construction Cost)

3.  

Way Forward  KSHIP  is  the  nodal  agency  for  the  project.  Fresh  tenders  have  been invited to develop the project on an annuity basis. Response to RFP by 26th June 2010 

 

 

 

 

 

 

 

 

 

 

Page 24: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

24  Public Private Partnership Cell | Infrastructure Development Department 

 

14.Logistics Architecture in Karnataka for fruits and Vegetables  

Sl.No.  Item  Details 

1.  Name of the Project   Agri Logistics Hub in various regions of Karnataka 

1.1  Sector & Sub Sector name (Infra policy’07) 

Agri‐infrastructure Sector : Agriculture & Horticulture Markets, Agro‐food Processing & Allied infrastructure 

1.2  Description of the Project 

Development of an integrated facility for modern Terminal Market Centre with  suitable  logistics  support  establishing  the  forward  and  backward linkages, eliminating the number of middlemen and enabling higher profit sharing with the farmers and thereby  increasing the economic outlook of the state. Agro Logistics Hub  (ALH) to serve Belgaum, Bijapur, Bagalokot, Dharwad & Gadag districts. 

1.3  Components of the project 

• Terminal Market Centre essentially comprises warehousing, food processing, logistics services and other relevant value added services. 

• Collection centers at the taluka/village level would enable collection of farm produce from the cluster of villages, farmers, producers. 

• Integrated Logistics support  1.4  Justification for the 

project (Public Need) The proposed project would help boost the economy of the region by passing a higher share of consumer price to the farmers, providing value added benefits to the farmers including easy access to the credit facilities, availability of enhanced quality input for farm produce, providing 

Page 25: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

25  Public Private Partnership Cell | Infrastructure Development Department 

 

employment opportunities for the local people in the region etc.

1.5  Places of Study  Top ten district places ranked on population served, extent of agriculture land availability and yield from such land parcels. A pilot study was undertaken for Belgaum district. 

 2. 

 Project Viability  

The project is viable. Assessment of the project financials suggest that the project would fetch a return of approximately 17.1% at  annual occupancy of 50%. 

2.1  Cost Break up (Rs Cr)  681.00 

3.  Way Forward  Would be taken under PPP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 26: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

26  Public Private Partnership Cell | Infrastructure Development Department 

 

15.Development of Food Parks Tumkur, Shimoga, Davangere in Karnataka 

Sl.No.  Item  Details 

1.  Name of the Project   Development of Food Parks at Tumkur, Shimoga, Davangere in Karnataka  

 

1.1  Sector & Sub Sector name (Infra policy’07) 

Sector: Agri‐infrastructureSub sector: Agro‐food processing and allied infrastructure 

1.2  Description of the Project 

Developer is required to develop, design, finance, construct and operate the Food Park with a minimum 20 (twenty) number of food processing units at the park.   The food parks would have specialized infrastructure like cold storage, ware house, packaging units, quality control laboratory etc. 

1.3  Components of the project 

The components of the study are as per following 

• Study  the  different  state  government  and  central  government schemes 

• Study status of food processing industry in Karnataka 

• Study major crops and processing industry in the Food Park area 

• Food Park configuration 

• Financial Viability Assessment 

• Environmental management plan 

1.4  Justification for the project (Public Need) 

The status of  food processing  is very  low  in Karnataka as well as  India. The  project  is  aimed  at  creation  of  new  food  processing  units  and creating  different  value  chain  facilities  like  cold  storage,  warehouse, quality control laboratory, packaging unit etc. 

1.5  Places of Study  Tumkur, Davangere, Shimoga

Page 27: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

27  Public Private Partnership Cell | Infrastructure Development Department 

 

2.  Project Viability  Project requires support to be financially viable  

2.1  Cost Break up (Rs Cr)  The cost breakup is given as below. 

Project Cost Head Shimoga Davangere Tumkur Land 600 300 90 Building 968 846 573 Plant & Machinery 445 426 373 Other Expenses 168 130 81 Total Project Cost 2181 1702 1117

 

3.  

Way Forward  To  select  the developer  for each  location under a  competitive bidding process.  (The  project  is  currently  under  bidding  and  last  date  for  bid submission is June 25, 2010.) 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 28: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

28  Public Private Partnership Cell | Infrastructure Development Department 

 

16.Development of Industrial park at VADA, Bellary 

Sl.No.  Item  Details

1.  Name of the Project   Development of Industrial park at VADA, Bellary 

1.1  Sector & Sub Sector name (Infra policy’07) 

Urban Development, Transportation, Water 

1.2  Description of the Project 

Feasibility study  for developing an  industrial park at VADA  in Bellaryconducted. 

1.3  Components of the project 

(See Below)

1.4  Justification for the project (Public Need) 

Rapid  industrialization  driven  by  iron  ore  resources  available  in  the region  calls  for  planned  development.  To  aid  the  planned  and controlled  industrial  &  township  development,  establishment  of  a state of the art  industrial parks that would provide facilities of profit of over 34 MMT of Steel Annuity is necessary 

1.5  Places of Study  The study was carried out for Vijayanagar Area, Bellary, Karnataka. 

2.  Project Viability  NA 

2.1  Cost Break up (Rs Cr) 

Category 

Total investment (in Rs. Crores) 

Internal Roads   9,000.00  NH‐SH Widening & Bypasses   200.00  Railway   400.00  Water supply & sewerage   1,500.00  Telecom   4,500.00  Power generation &  12,000.00  

To taken up in 3 phases 

Page 29: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

29  Public Private Partnership Cell | Infrastructure Development Department 

 

distribution  SWM & Industrial Effluent treatment   500.00   Logistic Parks   500.00  Fuel ‐ Gas line   200.00  Sub ‐ Total   28,900.00  Environmental Management system   100.00  Rehabilitation & Resettlement charges          ( 5% of total cost )   1,445.00  Grand Total   30,345.00  

 

 3.  

Way Forward  Detailed Project Report would be prepared  and  the private player would be selected through bidding process  for the development of trunk infrastructure 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 30: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

30  Public Private Partnership Cell | Infrastructure Development Department 

 

17.International Convention Centre, Bangalore Sl.No.  Item  Details 

1.  Name of the Project   International Convention Centre, Devanahalli, Bangalore 

1.1  Sector & Sub Sector name (Infra policy’07) 

Tourism 

1.2  Description of the Project 

Bangalore, the capital of Karnataka and the fifth largest metropolis in India, is one of the fastest growing cities in the Country with a population of over 6.5 million. Apart from being the nerve centre of India’s software industry, Bangalore is also a major manufacturing and commercial centre of the Country.  With its domestic and international connectivity, salubrious climate, and a host of other factors, Bangalore attracts people from all over the world for meetings, seminars, conferences and exhibitions. In order to leverage the potential for meetings, incentives, conventions and exhibitions (MICE) by providing State‐of‐the‐Art convention infrastructure at Bangalore, the Government of India (GoI) sanctioned the establishment of an International Convention Centre with PPP at Bangalore, vide their letter number DO.No.5‐P&C (46)/2003‐Pt‐I of 31/08/2004. For this, GoI also proposed the availability of a Viability Gap Fund (VGF). Following this, The Department of Tourism (DoT), Government of Karnataka (GoK) proposed to develop the convention centre with state‐of‐the‐art facilities at par with international standards (“International Convention Centre” or “ICC”) at Bangalore. 

The  ICC  is  proposed  to  be  developed  with  private  participation under  a  long  term  concession  on  an  area  of  about  35  acres  at Devanahalli,  adjacent  to  the new Bangalore  International Airport. Its  proximity  to  the  new  international  airport  would  allow  the projects to draw synergies from each other. 

1.3  Components of the project 

1. Main Convention Hall: 6000 seating capacity Break‐out/Meeting/ Conference Rooms: 20 nos., with min. 

Page 31: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

31  Public Private Partnership Cell | Infrastructure Development Department 

 

capacity of 50 to 250Banquet Hall  to cater to requirements of Convention Hall Support Facilities such as: Business centre, Registration area, VIP Lounge area, Administration offices, Press rooms, Interpreters’/translation rooms   

2. Exhibition Halls:        20000 sqm 3. Hotels:           

5 star category        300 rooms Additional inventory                      450 rooms 

4. Food Court          Min 400 covers 5. Parking facilities 6. Supporting services and utilities‐ roads, electric substation, 

water, sewage and waste disposal facilities 1.4  Justification for the 

project (Public Need) Karnataka does not have a state–of–the–art convention centre to meet the needs of large‐scale meetings, seminars, conferences, exhibitions and performances, it still is a major attraction for the reasons cited above and its connectivity, climatic conditions and existing companies for a large number of events and conferences. In recent years Bangalore has hosted several major events such as Bangalore IT. Com, Bangalore Bio.com, International Aero Show, Aerodrome India, India Wood, Stona, Excon, MRF Car Rally, SUMInfra, Global Health Summit, Indian Science Congress, Global Investors Meet among others. Many of such events like Banglaore IT.Com, India Wood, Stona etc., have become periodic (yearly, semi‐annually) affairs at Bangalore.  The main objective of the ICC would be to equip the city with a state‐of‐the‐art convention centre, which would meet the needs of both domestic and international business‐cum‐tourist clientele for activities including large‐scale meetings, conferences and performances.  

1.5  Places of Study  NA 2.  Project Viability   2.1  Cost Break up (Rs Cr)  Total Estimated Project Cost – Rs 1050 Crores 

3.  

Way Forward  Letter of Award has been issued and Concession Agreement is to be executed  between  the  successful  bidder  and  Department  of Tourism. 

 

18.Other Tourism Projects 

(to be provided by Tourism Department) 

 

Page 32: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

32  Public Private Partnership Cell | Infrastructure Development Department 

 

19.Logistic Centre at Balepura near BIAL in Bangalore 

Sl.No.  Item  Details 

1.  Name of the Project  Logistics Park near Devanahalli, Bangalore on PPP Basis 

1.1  Sector & Sub Sector name (Infra policy’07) 

Sector: Transportation & Logistics Sub‐Sector: Warehousing infrastructure (including container freight stations, 

container depots, cold storage facilities and tank farms) 

1.2  Description of the Project 

Salient Features

• To be  located  in BIA‐Devanahalli region (BIAAPA Jurisdiction) along or  in close proximity to NH‐7 & the Yelahanka‐Chikabalapur‐Kolar railway line 

• 50  acres  (10,89,000  sq.  ft.  built‐up  area)  in  Phase  1,  followed  by additional 50 acres each in Phases 2 & 3, with an overall development of 150 acres. However, the same may need to be firmed up vide a Detailed Demand Assessment as part of the Detailed Project Report (DPR) 

• Suggested  Product  Mix  includes  Multi‐modal/  Integrated  Transport Logistics  Centre  (including  Truck  Terminal  &  Rail  sidings),  Inland Container Depot (ICD)/ Domestic Rail Head (DRH), Air cargo centre, Bulk Warehousing, Retail & other Warehousing and Other Common Facilities. 

1.3  Components of the project 

a) Multi‐modal/ Integrated Logistics Transport Centre b) Bulk Warehousing c) Inland Container Depot (ICD)/ Domestic Rail Head (DRH)  d) Air cargo centre e) Other Warehousing f) Other Common Facilities 

1.4  Justification for the  a) The  development  of  the  Logistics  Park  is  expected  to  augment  the 

Page 33: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

33  Public Private Partnership Cell | Infrastructure Development Department 

 

project (Public Need) logistics infrastructure in Bangalore.b) The  Logistics  Park  is  expected  to  boost  the  development  of  the surrounding  area  and  each  Phase  is  expected  to  generate  a  direct employment of around 3200. 

1.5  Places of Study  Bangalore 

2.  Project Viability  

Based  on  the  preliminary  financial  viability  assessment,  Project  is expected to be self‐sustainable and viable for development on PPP basis. 

2.1  Cost Break up (Rs Cr) Estimated Project CostPhase 1: Rs. 154.73 Crores Phase 2: Rs. 202.82 Crores Phase 3: Rs. 239.40 Crores Refer Annexure 1 for Cost Break‐up 

3.  

Way Forward  Would be taken under PPP  

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 34: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

34  Public Private Partnership Cell | Infrastructure Development Department 

 

20.Devanahalli Business Park, Bangalore  

Sl.No.  Item  Details 

1.  Name of the Project   Devanahalli Business Park, Bangalore 

1.1  Sector & Sub Sector name (Infra policy’07) 

Tourism/ Industrial Infrastructure 

1.2  Description of the Project 

GoK  and  KSIIDC  propose  to  establish  Devanahalli  Business  Park (DBP) on 408.58 acres (104.57 acres for GoK use) site adjoining the northern boundary of BIA.  

1.3  Components of the project 

International Convention Centre; Central Business district Business Park; Finance district; Healthcare; Aviation Academy; Office Complex; Hospitality; Car parking; IT Parks; Amusement and Theme Parks. 

1.4  Justification for the project (Public Need) 

Market Study & Business plan by Jones Lang LaSalle Meghraj (JLLM), Utility Master Plan by Mahindra Consulting Engineers (MACE) identified the need for this project with various components 

1.5  Places of Study/ project 

Devanhalli, Bangalore 

2.  Project Viability   2.1  Cost Break up (Rs Cr)  Total Estimated Project Cost – Rs 9500 Crores 

3.  Way Forward  RFQ ‐ Jun 2010  

 

 

 

 

Page 35: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

35  Public Private Partnership Cell | Infrastructure Development Department 

 

21.Development of Intermodal Transit Hubs at Yeshwanthpur, Yelahanka, Mysore Road, Peenya, Hebbal, Bayappanahalli , Majestic 

Sl.No.  Item  Details 

1.  Name of the Project  Development of Intermodal Transit Hubs in Bangalore 

1.1  Sector & Sub Sector name (Infra policy’07) 

Sector: Transportation and LogisticsSub sector: Bus /truck /urban transport terminals and associated public facilities such as public amenities centre 

1.2  Description of the Project 

 Pre‐Feasibility study included the following activities: i. Identification of zones for ITH on the basis of decongestion of  the 

city by establishing the ITH at the Strategic Location with linkages to major Roads, Railway line and Metro. 

ii. Preliminary Financial Analysis for the viability of the project on PPP 

1.3  Components of the project 

The component of the project includes: i. Integrated Bus Terminus  ii. State of the Art Railway Station iii. Commercial Development 

1.4  Justification for the project (Public Need) 

The Intermodal Transit Hubs are envisaged in order to integrate the different modes of transport and minimize the cost and inconvenience of changing the different modes of transport. An integrated system thus avoids duplication of the facilities.   

1.5  Places of Study  Bangalore:  Yeshwanthpur, Yelahanka, Mysore Road, Peenya, Hebbal, Byatarayanapura, Majestic 

 2. 

 Project Viability 

The project is viable on PPP basis.

Page 36: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

36  Public Private Partnership Cell | Infrastructure Development Department 

 

 

2.1  Cost Break up (Rs Cr) Location Cost (Rs. Cr) 

Yeshwanthpur 75.00 

Yelahanka 275.00 

Mysore Road 75.00 

Peenya  275.00 

Hebbal  350.00 

Byappanahalli Under Study 

Majestic  1815.00 

Total 2865.00  

3.  

Way Forward  Being put under PPP

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 37: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

37  Public Private Partnership Cell | Infrastructure Development Department 

 

22.Development of  4 Air strips at Raichur, Chickmagalur, Gadag & Bagalkot under PPP  frame work on Annuity Mode 

Sl.No.  Item  Details 

1.  Name of the Project   Development of  4 Air strips at Raichur, Chickmagalur, Gadag & Bagalkot under PPP  frame work in one package on Annuity Mode 

 

1.1  Sector & Sub Sector name (Infra policy’07) 

Transportation & LogisticsAirports 

1.2  Description of the Project 

Existing kaccha    airstrips  at  Raichur &  Chickmagalur  districts  are proposed  for  upgradation    to  ATR  72  aircraft  operation &  15‐20 seater aircraft operation respectively. DPR’s are prepared. The  land  (of  about  296  acres  for  each  airstrip)  is  identified  to accommodate  an  ATR  72  aircraft  size  (initially  it would  be  15‐20 seater aircraft operation size for Gadag)]   at Gadag & Bagalkot for Greenfield Development.  DPR’s under preparation. 

1.3  Components of the project 

Construction of Airstrip  including rigid pavement runway, terminal bldg,  compound  wall  for  operational  area,  navigational  aids  & services   

1.4  Justification for the project (Public Need) 

To promote balanced regional linkages between the State Capital & districts  and  to  meet  the  social  requirements  &  commercial developments to cover  emergency & medical evacuation, etc., 

1.5  Places of Study  Raichur, Chickmagalur, Gadag & Bagalkot

2.  Project Viability   

2.1  Cost Break up (Rs Cr)  145.00  (including 4 Airstrips)

3.  

Way Forward  Industrial & tourism Sector developmentsConnectivity improvements through Roads & Railways. To be taken up on PPP Annuity Route 

Page 38: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

38  Public Private Partnership Cell | Infrastructure Development Department 

 

Note: 

Development of Bangalore Metro (Phase – II) in Bangalore* 

  Sl.No.  Item  Details 

1.  Name of the Project   Development of Bangalore Metro Phase II.

1.1  Sector & Sub Sector name (Infra policy’07) 

Transportation & Logistics: Urban Transport Systems 

1.2  Description of the Project 

BMRCL is currently identifying further routes. 

1.3  Components of the project 

The  project  would  involve design,  construction,  operation  and maintenance of these identified routes.  

1.4  Justification for the project (Public Need) 

Metro  Rail  (Urban Mass  Transport)  contributes  in  lower  cost  of transportation, lower carbon foot print, lower health problems etc. 

1.5  Places of Study  Bangalore

2.  Project Viability  The project viability has been assessed to be taken up under a PPP framework. The project is currently under bid.  

2.1  Cost Break up (Rs Cr)  Feasibility Studies are on

 3.  

Way Forward  Modality for procurement to be decided upon study completion

 

* Decision as to whether these would be taken under PPP is yet to be made. 

Page 39: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

39  Public Private Partnership Cell | Infrastructure Development Department 

 

Managing Director, Karnataka State Industrial Investment Development Corporation, No.49, 4th Floor, East wing, Khanija Bhavan, Race Course Road, Bangalore-560001. Ph.No.: 080-22258131 Fax: 080- 22255740 E-mail: [email protected] Website: www.ksiidc.com

Managing Director, Food Karnataka Limited, No.49, Khanija Bhavan, 4th Floor, Race Course Road, Bangalore-560001. Ph.No.: 080-22269188 E-mail: [email protected] Website: www.ksiidc.com

Director (I/c) KSIIDC ILFS Project Development Company, Al Latheef, No.2, 1st Floor, Union Street of Infantry Road, Bangalore-560001. Ph.No.: 080-40343303 Fax: 080- 40343310 E-mail: [email protected]

Additional Secretary to Govt., Food Processing & Harvesting Technology, No.128, 3rd Gate, M.S.building, Bangalore-560001 Ph.No.:080-22372611 Fax: 080-22389874 E-mail: [email protected] Website: www.mofpi.com

Managing Director, Infrastructure Development Corporation (Karnataka) Limited (iDeCK), Infra House.39, 5th Cross, 8th Main, RMV Extension, Sadashivanagar, Bangalore-560080 Ph: 080-43448000 Fax: 080-23613016 E-mail: [email protected] Website: www.ideck.net

Chief Executive Officer, Rail Infrastructure Development Company (Karnataka) Limited (K-RIDE) No.36, 7th Floor, MSIL Building, Cunningham Road, Bangalore-560052 E-mail: [email protected] Website: www.hmrdc.com

Managing Director, Karnataka State Road Transport Corporation, Central Offices, K.H.Road, Shantinagar, Bangalore-560027 Ph: 080-22221321 Fax: 22240330 Website: www.ksrtc.org

Managing Director, Karnataka Urban Infrastructure Development & Finance Corporation Silver Jubilee Block, 2nd Floor, Unity Building Annexe, 3rd Cross, Mission Road, Bangalore-560027. Ph.No.: 080-22332021 Fax: 080-22232157 E-mail: [email protected] Website: www.kuidfc.com

Principal Secretary to Govt., Infrastructure Development Department, Room No.28, Ground Floor, Vikasa Soudha, Bangalore-560001 Ph.No.: 080-22282366 Fax: 080-22280605 E-mail: [email protected] Website: www.idd.kar.nic.in

Managing Director, Bangalore Airport Rail Link, 3rd Floor, East Wing, Khanija Bhavan, No.49, Race Course Road, Bangalore-560001. Telefax: 080-41273608 E-mail: [email protected]

Commissioner, Karnataka Housing Board, 4th Floor, Kaveri Bhavan, Gandhinagar, Bangalore-560009. Ph.No.: 22213592 Fax: 22240976 E-mail: [email protected] Website: www.khb.kar.nic.in

Managing Director, Karnataka Road Development Corporation Ltd., #16/J, Millers Tank Bund Area, Thimmaiah Road, Bangalore-560009. Ph: 080-22380141 Fax: 22380143 Website: www.krdcl.com

Key Contacts 

Page 40: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

40  Public Private Partnership Cell | Infrastructure Development Department 

 

Managing Director, Bangalore Metropolitan Transport Corporation, Central Offices, K.H.Road, Shantinagar, Bangalore-560027. Ph: 080-22952592 Fax: 22952401 Website: www.bmtcinfo.com

Chief Project Officer, Karnataka State Highway Improvement Project (KSHIP) 1st Floor, PWD Annexe, Left Wing, K.R.Circle, Bangalore-560001 Ph: 22230510 Fax: 22229666 E-mail: [email protected] Webset: www.kpwd.gov.in

Managing Director, Karnataka State Agriculture Produce Processing & Export Corporation Ltd., (KAPPEC) No.17, Richmond Road, Bangalore-560025. Ph: 080-22271194 Fax: 22278974 E-mail: [email protected] Website: www.kappec.kar.gov.in

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Page 41: Ka PPP Projects02

Government of Karnataka  Volume II – Data Sheet of Key Infrastructure Projects 

 

41  Public Private Partnership Cell | Infrastructure Development Department 

 

 

Infrastructure Development Department 

Principal Secretary to Govt. Infrastructure Development Department Room No. 28, Ground Floor, Vikasa Soudha, Dr. Ambedkar Veedhi, Bangalore – 560 001,Karnataka Phone : 080‐22035085 E‐mail: prs‐[email protected]  

Public Private Partnership Cell 

Director PPP Cell, Infrastructure Development Department, Room No. 08, Ground Floor, Vikasa Soudha, Dr. Ambedkar Veedhi, Bangalore – 560 001, Karnataka Phone : 080‐22034070 E‐mail: [email protected]  

 


Recommended