An Initiative to Improve Building Efficiency Kafa’ati
Transcript

An Initiative to Improve Building Efficiency

Kafa’ati

HOW TO REGISTER AS AN ESCO

1

The Process begins at www.adwea.ae …

2

The Process continues with ADWEA e-services …

3

The ESCO submits the following information …

4

No. Description

1 Description of Management and Project Management approach.2 Organization chart with resumes of key personnel.3 List of Certified Energy Managers, Certified Energy Auditors, Certified Measurement

& Verification Professionals and Graduate Engineers employed by the ESCO.

4 Methods Statement for the execution of Energy Efficiency Retrofit projects.5 List and size (in AED and m2) of all current project engagements and available

resources.6 ESCO resources (offices, workshops, equipment, software, etc.).7 Description (scope, size, and complexity) of at least 3 recently (within past 5 years)

executed energy efficiency projects, either inside or outside the UAE, including reference list with reference contact details.

8 Quality control including sub-contractor selection procedure and HSE policy and procedures, including a list of recordable injuries and lost time injury records for the most recent 3 years.

9 Description of Cost and Pricing strategy and how best value is achieved.10 Company annual reports (including financial audit findings) for the most recent 3

years.11 History of Litigation and/or Arbitration, including any ongoing cases for the most

recent 5 years.

The ADWEA ESCO review process …

1. ESCO submits Qualification Information.

2. Review Committee reviews information

3. Review Committee checks reference projects.

4. Review Committee completes ESCO Scoresheet.

5. ADWEA Registration, Prequalification and Specification Committee Reviews Scoring.

6. Results are communicated to ESCO.

5

The ESCO is scored on Five Parameters …

Description

Wei

ght

Po

ints

Sco

re

1 Technical Capabilities and Project Experience 6

2 Overall Management & Project Management Approach 5

3 Financial Capabilities 3

4 Resources and Capacity to Execute Work 3

5 Quality Control & HSE policy and history 3

Total Score

Points1 = very weak2 = weak3 = acceptable4 = strong5 = very strong

ScoringBelow 60 = RejectedBelow 80 = Provisionally Accepted80 or Above = Unconditionally Accepted

6

The ESCO also needs a License from DED …

Activity #Name

7110208Buildings Energy Efficiency Services

Description:Includes providing consultancies and designs aiming at reducing energy use in buildings through optimal utilization of the resources and developing solutions to minimize electricity and water consumption, the services target the cooling and ventilation systems, lighting, lifts and pumps, water systems.

7

The ESCO needs to visit www.adbc.abudhabi.ae …

8

PLANNED ROLLOUT SCHEDULE

9

On average a project will take from 5 to 7 years…

Payback & Validation

Verify Savings 50 to 74 months

Retrofit

Monitor Construction 6 months

Contract with ESCO

Select ESCO 1 month

Tender to ESCOs

Seek Proposals 2 months

Select Buildings

Evaluate Data 1 month Government Building tenders

to begin in Q2 2017. Private Building tenders to

begin in Q1 2019. All retrofits and commissioning

to be completed by mid-2022. M&V to be completed for all

buildings by the end of 2028.

10

Kafa’ati building retrofits will conclude in mid-2022

0

50

100

150

200

250

300

350

400

450

500

Jan

-17

Mar

-17

May

-17

Jul-

17

Sep

-17

No

v-1

7

Jan

-18

Mar

-18

May

-18

Jul-

18

Sep

-18

No

v-1

8

Jan

-19

Mar

-19

May

-19

Jul-

19

Sep

-19

No

v-1

9

Jan

-20

Mar

-20

May

-20

Jul-

20

Sep

-20

No

v-2

0

Jan

-21

Mar

-21

May

-21

Jul-

21

Sep

-21

No

v-2

1

Jan

-22

Mar

-22

May

-22

Jul-

22

Cu

mu

lati

ve A

nn

ual

Sav

ings

(G

Wh

)

Cumulative Annual Energy Savings

Beg

in G

ovt

Bu

ildin

gs

End

Go

vt B

uild

ings

Beg

in P

riva

te B

uild

ings

End

Pri

vate

Bu

ildin

gs

11

QUESTIONS?

12