+ All Categories
Home > Design > Kitchens #2 case study

Kitchens #2 case study

Date post: 23-Jan-2017
Category:
Upload: aldrin-stellus
View: 71 times
Download: 1 times
Share this document with a friend
27
View 1
Transcript
Page 1: Kitchens #2 case study

View 1

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 2: Kitchens #2 case study

View 2

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 3: Kitchens #2 case study

View 3

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 4: Kitchens #2 case study

View 4

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 5: Kitchens #2 case study

View 5

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 6: Kitchens #2 case study

View 6

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 7: Kitchens #2 case study

A: C

lean

ing

Pro

cess

are

a

Plan

B:Storage/Working area

C:S

tora

ge/D

isp

lay

and

Bak

ing

are

a

E:Is

lan

d C

oo

kin

g ar

ea

D:I

slan

d w

ork

ing

/sto

rage

are

a

Page 8: Kitchens #2 case study

Elevation A: Cleaning Process

3

D-FrameWall unit Electrical opening

Accessorized Back SplashStop sol glass finish

Sink Base unit Dishwasher Base unit

1

5

4-Accessorizes for sink base unitElectrical push-pull opening drawer Hygiene function since you can open it with your feet .

1-Dish DrainerReachable drainer above the sink

Touch Active MixerHygiene MixerTurns on and off with just a touch anywhere on the spout or handlePull-down spray wand firmly in place with a powerful integrated magnet, so it stays docked when not in use.

Integrity SinkSilestone- Lagoon

Silestone is also the only stone with bacteriostatic protection .

2-D-Frame Offers a 580kg loading capacity, having a progressive motorized flap openingElectrical opening wall units For pure hygienic work field

3-Pull-out waste bin

5-Dishwasher Knock to open feature For pure hygiene

2

4

Page 9: Kitchens #2 case study

Elevation B: Storage/Working area:

Drawer base unit 2 drawers 1 pan drawer

2

1

21

Storage/Working area:Set of Accessorized drawers easy reach for an easy work flowHuge storage area with easy corner accessPop out sockets for electrical equipment's use

1

4-LeMans Full Swing Corner Pull-out (Corner base unit)LeMans is the only corner unit solution that combines very high space utilization with outstanding access.

4

Drawer base unit 2 drawers 1 pan drawerBase unit

Pop-up sockets –Power Box SB-PS01 – 3 socket box

Page 10: Kitchens #2 case study

Elevation C: Storage/Display and Baking area

4- Cake DisplayFull Fridge Full Freezer

OvenFreddy

warming drawerColumn

2-Technical Column 1-Corner unit

1- C- Shelves

Storage/Display areaThe combination between open shelves column and appliances Makes the work flow easy since every thing you need is in one place.

Baking work flow is an entertainment since the technical column have all the backing equipment's needed easy reach and can be set and used in the column where every thing will be easy to reach and the advantage of lighting found to make the space easy tostand and work in.

OVEN

WARMING DRAWER

2-Technical ColumnFor this Project the Technical Column is the place for all backing equipment's needed easy reach and can be set and used in the column where every thing will be easy to reach and the advantage of lighting found to make the space easy to stand and work in

FULL FREEZER FULL FRIDGE

Set of Appliances

4- Cake DisplayCake fridge entertaining kids and guest where you will have the touch of a sweets shop

3-Freddy is the first blast chiller designed for domestic use, and is ideal for anyone who cares about sound nutrition and enjoys cooking for themselves and for others.

1-LeMans Full Swing Corner Pull-out (Corner base unit)LeMans is the only corner unit solution that combines very high space utilization with outstanding access.

Page 11: Kitchens #2 case study

Elevation :D Island Storage/Working area

1-Bottle rack

2-set of drawer accessories

21Bottle rack Base unit Teppenyaki-BBQ

base unit 2 drawers 1 pan drawer

Under counter Freezer

Island Storage/Working areaExtra space for storage and working

Under counter Freezer For extra freezing space.

With the TopBrewer you take up only 1% counter space in return for 100% customer satisfactionEntertaining gusts and kids

TEPPAN YAKIELECTRIC GRILL

Page 12: Kitchens #2 case study

Drawer Base unit Hob-Oven Base unit

2

1

22

11

Elevation E: Island Cooking area

Island Cooking areaAppliances are perfectly fit in the base island unitsAccessorized drawers easy reach make cooking process easer

Baking OVEN INDUCTION HOB (FULL SURFACE)

Set of Cooking Appliances

Ceiling Mounted Hoodperimeter extraction technology to remove moisture and cooking odors. Air is drawn at high speed through theextractor on all four sides

Ceiling Mounted hood

Drawer Base unit

Page 13: Kitchens #2 case study

FINISHES

Base , wall and tall unit Finish :GLOSSY LACQUERED -WHITE

Worktop Finish:Silestone :40mm thickLagoon

Silestone Delivers unique beauty and extreme durability scratch-stain resistanceSilestone is also the only countertop with bacteriostatic protection included in every slabSilestone’s non-porous surface protects your countertops from staining and prevents liquids from penetrating the surface.

Plinth Finish:Matt Lacquered –White

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 14: Kitchens #2 case study

MixerSink

Integrity sinkSilestoneLagoon Finish

9159T AR DST

Touch Active MixerHygiene MixerTurns on and off with just a touch anywhere on the spout or handlePull-down spray wand firmly in place with a powerful integrated magnet, so it stays docked when not in use

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 15: Kitchens #2 case study

Trim is a revolution. Space is the key feature of asystem designed for the frantic pace of contemporaryliving, the organization of our homes, the needto mix technology and functionality. Drawers,cupboards and wall units are no longer enough.Now there are fully equipped back panels: thenew space between wall units and worktop canbe concealed by sliding the glass doors, with amechanism patented by Dada. The led lights andpower socket units transform the back panel intothe technological soul of Trim.

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 16: Kitchens #2 case study

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 17: Kitchens #2 case study

Doors and drawers are opened with a profile handle polished aluminum finish installed on the upper part of the door or drawers.Columns with full height door have the lower and upper door joined by the profile handle.If the columns have two doors, one above the other, the upperdoor opens with a push-pull mechanism.

Technical Column handle finish Polished aluminum

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 18: Kitchens #2 case study

D-FRAME Wall unit a new ergonomic standard that offers a 580kg loading capacity, having a progressive motorized flap opening. It’s structural components of 30mm thick carcass and a 16mm back panel with a door 25mm thick door.

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 19: Kitchens #2 case study

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

The accessories rationally organize the interior space of drawers. The pan drawers hold pans, lids, plates, boxes and bottles.They have non-slip bottoms, wooden racks, adjustable plate holders and black steel trays. The drawers are made for smaller objects. The accessories are modular, to create the ideal configuration. Dividers for cutlery and tools, glass spice jars, black steel boxes and kitchen roll holders, wooden trays and knife block, bread board.

Page 20: Kitchens #2 case study

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

LeMans Full Swing Corner Pull-out (Corner base unit)LeMans is the only corner unit solution that combines very high space utilization with outstanding access.LeMans trays swing right out in front of the cabinet.You can store a lot of pots and pans – and each one is always ineasy reach.LeMans trays move independently of each other.

Page 21: Kitchens #2 case study

Technical columnsTechnical columns can be combined with all of the other columnsin the Dada collections.

For this Project the Technical Column is the place for all backing equipment's needed easy reach and can be set and used in the column where every thing will be easy to reach and the advantage of lighting found to make the space easy to stand and work in

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 22: Kitchens #2 case study

Appliances- Cooling

RF411301 –FULL FREEZER RC462301 –FULL FRIDGE RC200202-BOTTOM FREEZER

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 23: Kitchens #2 case study

Appliances

CEILING MOUNTED HOOD

The ceiling-built-in is a special ceiling extractor from GUTMANN which represents yet another innovation in design and technology. The extractor is completely integrated into the ceiling and is operated by remote control.Extraction is extremely effective, using the unique GUTMANN “perimeter extraction” technology to remove moisture and cooking odors. Air is drawn at high speed through theextractor on all four sides.

G6995 SCVI XXL K20-DISHWASHERKnock to open feature

Sockets

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Pop-up sockets –Power Box SB-PS01 – 3 socket box

Page 24: Kitchens #2 case study

Appliances- Cooking

BOP251100 –OVEN

WSP221100 –WARMING DRAWER

VP4141100–OVEN

CX480111–INDUCTION HOB (FULL SURFACE) VR414110-TEPPAN YAKIVP414110-ELECTRIC GRILL

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 25: Kitchens #2 case study

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Page 26: Kitchens #2 case study

Water Pump Motor

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT

Scanomat Top brewer is an innovative world novelty that has created an entirely new category within coffee brewers. It turns the common conception of coffee brewing and dispensing completely upside down and its simple sculptural design is breathtaking. a product which adapts to your needs. The TopBrewer is designed to seamlessly become a part of your regular work environment, and enhances it. If you're looking for cold water, juice or a piping hot espresso, this is the solution for you. Your café, reception or meeting area will never be the same. With the TopBreweryou take up only 1% counterspace in return for 100% customer satisfaction. Combine multiple TopBrewer units, to cater for all your needs, easily adapting to your environment and allowing for several servings simultaneously.

Page 27: Kitchens #2 case study

IBDA-NAD AL SHEBA SHOW KITCHEN PROJECT


Recommended