+ All Categories
Home > Documents > KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off...

KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off...

Date post: 11-Apr-2018
Category:
Upload: lehanh
View: 243 times
Download: 5 times
Share this document with a friend
40
Transcript
Page 1: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package
Page 2: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

KTMB

SPKK G7

CLAB

MOF

CIDB G7

REGISTERED WITH

Page 3: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

CORPORATE

INFORMATION

Page 4: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

COMPANY NAME : RC ASIA ENGINEERING SDN BHD

(FORMERLY KNOWN AS REL CARE SDN. BHD.)

COMPANY REGISTRATION NO : 598588-M

BUSINESS ADDRESS : NO.48, JLN SS22/21,

DAMANSARA JAYA,

47400 PETALING JAYA,

SELANGOR DARUL EHSAN.

[email protected]

TELEPHONE : 03-77252231

FAX : 03-77252270

INCORPORATION DATE : 12th NOVEMBER 2002

AUTHORISED CAPITAL : RM 1 Million

PAID UP CAPITAL : RM 1 Million

BANKER : STANDARD CHARTERED

MALAYAN BANKING BERHAD

CIMB BANK BERHAD

RHB BANK BERHAD

OCBC AL-AMIN BANK BERHAD

ALLIANCE BANK BERHAD

COMPANY SECRETARY : ACCASIA CORPORATE CONSULTANTS S/B

Page 5: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

STATEMENT

MISSION

Page 6: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

Mission Statement

To establish RC Asia Engineering as a competent

Engineering Services Provider to the local Railway

Industry.

RC Asia Engineering will adopt and implement

Industry Best Practices and is committed to

Engineering Excellence.

Integrity and Professionalism shall be upheld in all

RC Asia Engineering’s dealings with Customers,

Suppliers and Business Associates.

RC Asia Engineering will endeavour to provide

our Customers consistently High Quality Services

at Competitive Prices.

RC Asia Engineering is committed to attracting

and retaining in its employ the best people in the

industry.

RC Asia Engineering will adopt a Progressive and

Dynamic approach tempered by Financial

Discipline to grow the business and enhance

Shareholder wealth.

Page 7: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

COMPANY

BACKGROUND

Page 8: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

RC Asia Engineering Sdn Bhd started out as JLJY Rel Care Enterprise

which was established in 1996 and was positioned to provide

engineering services and support to KTMB and existing Main

Contractors in various railway yard and track-upgrading and

rehabilitation projects.

JLJY Rel Care Enterprise continued to grow and establish itself as a

Competent and Reliable Engineering Services Provider and by the

year 2002 had a total of 150 competent and skilled personnel

conversant with all types of track engineering work.

To reflect the Organization’s Capability and Standing in the industry, it

was decided in 2002 to incorporate a private limited company, REL

CARE SDN. BHD. to take over the business of JLJY Enterprise. The

company name was subsequently changed to RC ASIA ENGINEERING

SDN BHD.

RC Asia Engineering Is now an established and reputable contractor

specializing in all manner of railway track engineering works. With a

professional management team ably supported by dedicated and

skilled engineering personnel, RC Asia Engineering is well placed to

serve the Railway Industry.

RC Asia Engineering’s commitment to Engineering Excellencesteeped in Professionalism and Quality is key to the successfulprocurement and execution of a variety of railway projects. Andnotable is the Ballast Undercutting and Replacement project on150

kilometres of the East Coast Line, which is the first time work of thisnature has been attempted on a scale of this magnitude in Malaysia.

Page 9: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

We have been involved in the implementation of the Electrified

Double Tracking Project from Ipoh – Rawang (200 km), Electrified

Double Tracking Project from Seremban – Gemas (100 km) and

Electrified Double Tracking Project from Ipoh – Padang Besar (300

km).

Our repertoire of work also includes rehabilitation and upgrading

of existing wooden sleeper tracks to concrete sleeper tracks with

UIC 54 kg rails (200 km)

Our professionalism and competency has been recognized by the

Ministry of Transport and the major railway operator, KTMB

(Malayan Railway). Hence, we have been called upon by the

latter to assist in reviving and or completing ‘sick projects’.

Challenges bring out the best in our people. They are self

motivated and hold themselves to the highest standards of

accountability for quality and deliverables. Our peoples’

commitment by way of ripple effect inspire those who work with

and around us to reach for the same exacting standards.

Page 11: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

KEY PERSONNEL

R. KUMARESAN

[ DIRECTOR ]

JAMES ANTHONY DASS

[ DIRECTOR ]

KESAVAN KRISHNAN

[ DIRECTOR ]

BATHMANATHAN

[ FINANCE]

ALEXANDAR RONALD KUMAR

[ DIRECTOR ]

Page 12: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

WORKFORCE

1. M.Nethiananthen Project Manager

2. Surendran Parameswaran Engineer

3. Sri Sarawanan Kunabalan Engineer

4. Mohd Azzil Fahmi Rezli Engineer

5. Rajaratnam PWI

6. Abdul Mujib Surveyor

7. Megat Hafizuddin Surveyor

8. Dhevendran Safety manager

9. Ashok Kumar Safety Supervisor

Page 13: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

10. Sri Latha Marimuthu Senior Accounts Executive

11. Jevitha Marimuthu Accounts Executive

12. TamilMalar Admin Executive

13. S.Christhuvaraju Senior Track Supervisor

14. Francis Arulnathan Senior Track Supervisor

15. Nor Azli Abd.Rahman Senior Track Supervisor

16. Balakrishnan Senior Track Supervisor

17. Sanusi Senior Track Supervisor

18. Jeyakumar Track Supervisor

19. Santharan Track Supervisor

20. Track Ass Supervisor 20 Nos.

21. Skilled Workers 220 Nos.

Page 14: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

ORGANIZATION CHART

20 TRACK ASS. SUPERVISOR

SURENENGINEER

SANTHARANTRACK SUPERVISOR

JAMES ANTHONY DASSDIRECTOR

KESAVAN KRISHNAN DIRECTORS

M.NETHIANANTHEN PROJECT MANAGER

R. KUMARESANDIRECTOR

DHEVENDRANSAFETY MANAGER

BALAKRISHNANTRACK SUPERVISOR

FAHMIENGINEER

BATHMANATHANFINANCE CONTROLLER

MEGATSURVEYOR

LATHASNR ACCOUNTS EXC

ABDUL MUJIBSURVEY ENGINEER

JEVITHAACCOUNTS EXEC

TAMILMALARADMIN EXEC

FRANCISTRACK

SUPERVISOR

AZLITRACK

SUPERVISOR

K.ARASANTRACK

SUPERVISOR

LABOUR FORCE (210)

CHRISTHUVA RAJSENIOR TRACK SUPERVISOR

JEYAKUMARTRACK SUPERVISOR

SUBERAMANIUMSENIOR TRACK SUPERVISOR

SANUSITRACK

SUPERVISOR

RAJARATNAMP.W.I

ASHOK KUMARSAFETY SUPERVISOR

BOARD

MANAGEMENT

SITE STAFF NANDATRACK

SUPERVISOR

SRI SARAWANAENGINEER

SIRONP.W.I

M. RAMAMURTHYP.W.I

ALEXANDAR RONALD KUMAR

DIRECTORS

Page 15: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

Client References

KERETAPI TANAH MELAYU BERHAD(Malayan Railway)

En.Mohd Ramli B. Mohd Noh (General Manager - Permanent Way)

Tn. Haji Hilmi Mohamad (General Manager –Project Management)

Suzaini Mohd Oilus Senior Engineer , Permanent Way Department

IRCON International Limited

Mr. Hitesh Khanna - Regional Director Mr. Parmod Kumar – Project Director

Mr.Laxmi Narayanan - Project Director

Lion Pacific Engineering Sdn Bhd

Datin Gumasundari - Director

LEIGHTON

Mr. Dhamodharan Krishnan - Project Superintendent

KL CONSULTANTS (KLC)

Mr. Ramesh Krishnan - Director

Mr. Arshad Puasa - Consultants

KLIA CONSULTANTS

Mr. Ir Huzairi Ismail Consultants

ALSTOM

• Mr. Saminathan Project Manager.

MINCONSULT

• Mr. Sivananda Raj Consultants

Page 16: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

SPECIALIZATION

AND

CORE COMPETANCIES

TRACK WORKS

CABLING WORKS

CIVIL STRUCTURAL WORKS

Page 17: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

RAILWAY ENGINEERING

Over the past 20 years RC Asia Engineering has been able to

mould itself to Industry best practices and successfully

delivered major project of every kind. Our expertise has

been an inspiration to our many clients. We are well

prepared to handle work such as: -

New Railway Track Linking

Undercutting of Ballast and Ballast Cleaning

Turnouts Installation

Level Crossing Installation.

Destressing of Rail Track

Track Maintenance

Track Dismantling Thermite Welding and Flush Butt Welding

Track Diversion

Survey of existing track

Ultrasonic Test

Power Rail Installation

Lim Rail Installation

In-Situ Casting turnout

Construction of Slab Track

Installation of Scissor Crossover

Page 18: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

CABLING WORKS

While RC Asia Engineering’s core competency is track work, in

its quest to become a multi faceted contractor, it has taken on

and successfully delivered Cabling works. In this respect we

have a team which is capable of executing the following

Cabling work scope:-

CABLE ( SIGNALING CABLE – VARIOUS SIZES )

FIBER OPTIC CABLE (MULTIPLE CORE)

POWER CABLE ( VARIOUS SIZES )

AUTOMATIC TRAIN PROTECTION (ATP) SYSTEM

OTHER WAYSIDE EQUIPMENT

Page 19: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

CIVIL STRUCTURAL WORKS

RC Asia Engineering has also been involved in

Civil Structural work as part of its objective to

become an Engineering Procurement and

Construction Management Outfit. For a start, RC

Asia Engineering has been involved in earth work

and structure construction. Scope of works

involved are:-

Walkway Construction

Derailment Wall Construction

Cable Trough Construction

Culverts and Drainage Construction

Steel structure Construction

Earth work

Road Works

Page 20: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

CURRENTPROJECT

COMPLETEDPROJECT

Page 21: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

ITEM PROJECT TITLE CLIENT DURATION VALUE (RM)

1

Rehabilition of Track Formation replacement of Ballast and Associated Works between Jerantut,Pahang to Gua Musang Railway Station,Kelantan (Package B)

FAJARBARU BUILDER SDN BHD

Aug 2016 -Jan 2019

47,000,000.00

2 Projek Landasan Keretapi Dari Subang Jaya-Terminal SKYPARK (FASA 1)

LION PACIFIC SED BHD Mac 2016 -January 2017

3,080,000.00

3

Labour Supply For East Residence,KLGCC - Rectification and Upgrading Works for Block G,H,I (39 units) for completion of balance of works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, Mukim Batu Dalam Kuala Lumpur

GSIB SDN BHD June 2013-March 2017

1,400,000.00

CURRENT PROJECT SUMMARIES

Page 22: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

MAJOR COMPLETED PROJECT SUMMARIES

ITEM PROJECT TITLE CLIENT DURATION VALUE (RM)

1 Supply Manpower For Kelana Jaya

Line Extension Project.

Colas Rail Asia

Sdn Bhd

April - May

2016 1,500,000.00

2 Destressing and Welding Works

From Paloh to Kulai.KTMB

April - June

2015 300,300.00

3 M370-Northern Double Tracking

Project Between Ipoh and Padang

Besar - Supply of Labour for

Temporary Track Diversion.

Emrail Sdn.Bhd.June 2010 -

Apr 2015 10,000,000.00

4 Proposed Fourth lane Widening

Between Sungai Buloh (KM457) and

Rawang Interchange (KM443.90)-

Package C

AlloyMtdJuly 2014-May

2015 240,000.00

5 Proposed Rail Renewal And

Associated Works From Batang

Benar to Seremban in Central

Region

KTMBJuly 2014 -

Dec 2014 240,000.00

6 Design, Manufacture, Supply,

Deliver, Assemble, Replace, test

and Commission Of New 1:6

Shallow Depth Scissor Crossover at

Sentul Timur Siding for Ampang Line

Unik Kukuh

Sdn.Bhd.

June - Nov

2014 400,000.00

7 Klang Valley Mass Rapid Transit

Project Between Sg.Buloh To

Kajang. (SBK-S-06-Trackworks).

Package: Depot Trackworks.( To

provide Light Weight Tie Tamper

and Operator to carry out Tamping

Work)

GJA-NBCT Rail

JV

Apr - October

2014 470,000.00

8 Construction And Completion Of

Viaduct Guideway And Other

Associated Works From Taman

Mesra To Kajang Station - Extension

and Rehabilitation of Track and

Associated Work at Kajang (KTMB)

Station ( Track Work ).

Touch Tronics

Rail And Services

Sdn.Bhd.

Sept 2013-

May 2014 1,600,000.00

9 Electrified Double Track Priject

Between Ipoh And Padang Besar

Systems- Provision of Manpower

Supply for Termination Works

Balfour BeattyOct 2013-April

2014 500,000.00

Page 23: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

ITEM PROJECT TITLE CLIENT DURATION VALUE (RM)

10 Work for Temporary/ Permanent

Diversion between Seremban to

Tampin CH461.234 to

CH500.400:Electrified Double Track

Project from Seremban to

Gemas(Package A)

Ircon

International

Feb 2010 - Jul

2013 8,000,000.00

11 TrackWork for Main Line Track for

Electrified Double Track in Tampin to

Batang Melaka sectiob from

CH510800 to CH535500, Package B.

Ircon

International

May 2011-Jul

2013 7,700,000.00

12 Design, Construction, Completion,

Testing, Commissioning and

Maintenance of the Electrified

Double Track Project between

Seremban-Gemas: Signalling,

Trenching, cable Lying and

Asscociated work Between Sg.Gadut

and Rembau Station.

Fabricontrol

Const.(M) Sdn

Bhd

May-Nov

2011 1,260,000.00

13 Design, Construction,Completion,

Testing, Commissioning and

Maintenance of the Electrified

Double Track Project between

Seremban-Gemas: Supply of general

workers on daily basis for

maintenance of existing railway

track.

Ircon

International

Limited

Feb2009-

Feb2010 288,000.00

14 M370-Northern Double Tracking

Project between Ipoh and Padang

Besar - Supply of labours for

Temporary Track Diversion.

Emrail Sdn.

Bhd.

June2009-

May2010 350,000.00

15 Rehabilitation and strengthen of

track and associated works between

Seremban and Rembau Railway

Station.

AKS Sepakat

Sdn. Bhd.

May2009-

Dec2009 1,700,000.00

16 Design, Construction,Completion,

Testing, Commissioning and

Maintenance of the Electrified

Double Track Project between

Seremban-Gemas: Tender for

Construction and Establishment of

Rail Stacking Yard in existing

Seremban Railway Yard.

Ircon

International

Limited

Sept2008-

Nov2008 608,000.00

MAJOR COMPLETED PROJECT SUMMARIES

Page 24: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

ITEM PROJECT TITLE CLIENT DURATION VALUE (RM)

17 Dismantling of recovered wooden

sleeper panels stacked at various

station yards, sorting according to

various grade and component and

stacking at the station yards.(Gemas

to Tampin)

Hisniaga

Sdn.Bhd.

June2008-

Dec2008 370,000.00

18 Rehabilitation and strengthening of

track and associated works between

Seremban and Rembau Railway

Station

AKS Sepakat

Sdn. Bhd.

Mac2008-

Aug2008 1,590,000.00

19 Track Rehabilitation & Strengthening -

Complete Track Renewal (CTR) Work

with UIC 54kg rail, PSC sleeper &

distressing between Parit Buntar -

Bukit merah and Bukit Merah - Taiping

Stations.

Ircon

International

Limited

Jan2007-

April2008 2,500,000.00

20 Track Rehabilitation & Strengthening -

Earthwork & Track work for raising and

renewal of track by laying temporary

diversion between Parit Buntar-Bukit

Merah and Bukit Merah-Taiping

Stations.

Ircon

International

Limited

Feb -

Dec2007 3,199,000.00

21 Replacement of Ballast & Associated

Works between Kerdau to

Sg.Yu,Pahang.

Emrail Sdn.

Bhd.

Oct2002-

Aug2005 18,000,000.00

22 Double Tracking Work between

Rawang to Ipoh (maintenance

team).

Emrail Sdn.

Bhd.

Dec2005-

Dec2006 1,200,000.00

23 Double Tracking Work between

Rawang to Ipoh (maintenance

team)

Emrail Sdn.

Bhd.

Oct2003-

Dec2004 1,300,000.00

24 Double Tracking Work between

Rawang to Ipoh (maintenance

team)

Emrail Sdn.

Bhd.

Dec2002-

Dec2003 1,100,000.00

MAJOR COMPLETED PROJECT SUMMARIES

Page 25: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

PICTORIAL RECORD

OF

TRACK ENGINEERING

Page 26: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

CONSTRUCTION OF SLAB TRACK

LRT EXTENSION LINE BETWEEN KELANA JAYA TO PUTRA HEIGHTS

COMPLETED PROJECT

RC Asia Engineering has been deployed by Colas Rail Asia in their LRT line construction. With good team works from both collaboration, the management and ground staffs and worker had successfully completed the project within the timeline. This made RCA as hands-on contractor in this scope of work

Page 27: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

IN-SITU CASTING OF DERAILMENT WALL

LRT EXTENSION LINE BETWEEN KELANA JAYA TO PUTRA HEIGHTS

COMPLETED PROJECT

With good dedication RCA wasgiven privilege to adopt thisscope of work in the observationof Colas Rail Asia. RCA manage todeliver the job within thetimeline and made its trackrecord in this field.

Page 28: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

IN-SITU CASTING OF TURNOUTS

LRT EXTENSION LINE BETWEEN

KELANA JAYA TO PUTRA HEIGHTS

COMPLETED PROJECT

In-situ casting of Turnout activates was constructed first time in

Malaysia and we were proudly to declare that we venture this

expertise from the above project. We have installed more than 50

sets.

Page 29: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

CONSTRUCTION OF WALKWAY

COMPELETED PROJECT

PROJEK MASS RAPID TRANSIT LEMBAH KLANG JAJARAN SUNGAI BULOH – KAJANG.

RC Asia Engineering was engaged to install the supplied walkway in the MRT line. In venturing this job, RCA has delivered the given quantity with complete handing over within the contract timeline.

Page 30: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

CABLE TROUGH INSTALLATION

COMPLETED PROJECT

LRT EXTENSION LINE BETWEEN KELANA JAYA TO PUTRA HEIGHTS

Cable Trough installation was carried out in two method. The footing was done in-situ casting and the cable trough was installed as precast unit.

Page 31: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

INSTALLATION OF LIM RAILS & POWER RAIL

LRT EXTENSION LINE BETWEEN KELANA JAYA TO PUTRA HEIGHTS

COMPELETED PROJECT

Our expertise in handling these particular materials without scratching,

damaging and installing from small scale had given good impression to

handle the major portion of the project and completing them within the

projection timeline.

Page 32: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

SHALLOW DEPTH SCISSOR CROSSOVER

Dismantling and clearing Works

Mapping of points works

Complete Installation of Scissor Crossover Work

Installation of Hording Works

DESIGN, MANUFACTURE, SUPPLY, ASSEMBLE, REPLACE, TEST AND COMMISSION OF NEW 1:6 SHALLOW DEPTH SCISSOR CROSSOVER AT SENTUL TIMUR SIDING FOR AMPANG LINE.

Page 33: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

COMPLETE TRACK LINKING WORKS

COMPLETED PROJECT FOR IRCON INTERNATIONAL LTD

- DOUBLE TRACK PROJECT SEREMBAN TO SG. GADUT

- DOUBLE TRACK PROJECT TAMPIN TO BTG. MELAKA

COMPLETED PROJECT FOR EMRAIL SDN BHD

- RAWANG TO IPOH

RC Asia has largest ever experience in track construction and working with multi national companies in the country. Collaboration with client in suppling materials and RCA delivering the work made to grow this large.

COMPLETED PROJECT FOR EMRAIL – LEIGHTON SDN BHD

- IPOH TO PADANG BESAR

Page 34: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

PORTAL QUICK RELAYING SYSTEM

With good background in railway engineering RC Asia have been

delivering lifeline projects without problems. These have been

proven from the below completed project.

COMPLETED PROJECT UNDER IRCON INTERNATIONAL

- TAIPING TO BUKIT MERAH – LION PACIFIC - BUKIT MERAH TO PARIT BUNTAR – LOH & LOH- PARIT BUNTAR TO BUKIT MERTAJAM – AMAN

SELAMA

COMPLETED PROJECT FOR AKS SEPAKAT SDN BHD

- SEREMBAN TO REMBAU – AKS SEPAKAT SDN BHD

Page 35: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

EXTENSION OF SIDING LINE AND ADDITIONAL 3RD LINE WORKS

SITE CLEARING WORK

FORMATION WORK

TRACK CONSTRUCTION

COMPLETED WORK

- BUKIT MERAH STATION - IRCON- TAIPING YARD - IRCON- PARIT BUNTAR YARD – IRCON- SEREMBAN YARD - IRCON- PLENTONG YARD - KTMB- KEMPAS YARD – KTMB- SEREMBAN YARD - KTMB

Page 36: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

FORMATION WORK

COMPLETED PROJECT

- TAIPING YARD KTMB – IRCON- KEMPAS YARD KTMB – KTMB- SEREMBAN YARD KTMB – KTMB- SEREMBAN NEW YARD – IRCON

ROAD WORK

COMPLETED PROJECT

- TAIPING YARD – IRCON- SEREMBAN YARD – IRCON- BTG.MELAKA - IRCON

Page 37: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

TURNOUTS INSTALLATION

PSC SLEEPER TURNOUTS

TIMBER SLEEPER TURNOUTS

- KUALA LIPIS KTMB – EMRAIL- KERAMBIT KTMB – EMRAIL- JERANTUT KTMB - EMRAIL- TAIPING KTMB - IRCON- BUKIT MERAH KTMB – IRCON- PLENTONG KTMB – KTMB- TAMPIN KTMB - IRCON

- SEREMBAN KTMB – IRCON- SG. GADUT KTMB – IRCON

COMPLETED PROJECT

Page 38: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

PORTABLE MECHNICAL TAMPING WORKS

■ Manual Mechanical Tamping works been carried out at various section in the Railway construction.

■ Track Rehabilitation Works for KTMB.

■ Rectification of Derailment Spot in KTMB.

■ Initial Tamping of newly constructed Track in Double Tracking Project.

■ Initial Tamping of Newly Constructed Track in MTR depot Track

COMPLETED PROJECT

Page 39: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

CIVIL & DRAINAGE CONSTRUCTION

Rehabilitation Track KTMB Taiping Double Track Seremban - Gemas Rehabilitation Track Kerdau – Sg Yu Civil Construction for GSIB

Page 40: KTMB - RC Asia Engineering Sdn Bhd · works for 118 units Townhouse on Lot PT3565, Jalan 1/70D, Off Jalan Bukit Kiara, ... Batang Melaka sectiob from CH510800 to CH535500, Package

RC Asia Engineering Sdn BhdSince:1996


Recommended