This project is to create a laboratory for making in an open site in Providence, RI. The purpose of this project is to explore the benefits of innovate building systems that can be most energy efficient. Using solar, and thermal building system to create a building that can be both sustainable, and be able to temper a space according to the demands of human programs.
Popular Tags:
27
Wilfred Leung Adrian Au Melissa Hauser Integrated Building Systems Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges Laboratory for Making New Mill Building Providence RI Drawing No. G-001 General Informaon Scale: ------------- Descripon: G 001 Sheet Index Preliminary Site Studies L 101 Climate Studies (Wind, Solar Path, Shadow Cast) L 102 Urban Studies L 103 Landscape Studies L 104 Landscape Plan L 105 Light Studies Architectural A 100 Site Plan A 101 Ground Floor Plan A 102 Typical Floor Plan A 103 Circulation Diagram A 104 Roof Plan A 201 North & South Elevations A 202 East & West Elevations A 301 Cross Section A 302 Longitudinal Section A 303 Small Block Section A 304 Ground Floor West Elevation Detail A 305 West Wall Facade Detail A 306 South Wall Corner Detail A 307 Roof Detail A 400 Principal Wall Sections A 501 Vertical Circulation Detail A 502 Feature Stair Detail A 503 Elevator Core Detail A 700 Interior Detail A 800 Exterior Detail Structural S 101 Structural Framing Plan Mechanical M 101 Heating Diagram M102 Cooling Diagram Electrical E 101 Electrical Lighting Plan General Notes 1. All work shall conform to the International Building Code and all related documents published by the ICC. Please find these documents in the Bunny Lounge. 2. A letter grade, issued by Laura Briggs upon her inspection of the work contained, shall be submitted to the registrar prior to our long-awaited graduation. 3. All work in the drawing shall be verified for dimension, grade , extent and compatibility to the existing site. Discrepancies are guaranteed. 4. All works contained are done during very late nights, and so these documents are not to be built and are by no means to be considered complete. Build it at your own risk. Zoning/ Site Statistics Address: Jewelry District Providence, RI Proposed Use: Lab for Making Occupancy Group: Construction Type: Codes: International Building Code Rhode Island Building Code American Disability Act Federal Accessibility Standards Total Building Area: Total Core Area: Building Perimeter: Building Height: Building Volume: Symbols
Transcript
Page 1: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. G-001 General Information

Scale: -------------

Description:

G 001

Sheet Index

Preliminary Site StudiesL 101 Climate Studies (Wind, Solar Path, Shadow Cast)L 102 Urban StudiesL 103 Landscape StudiesL 104 Landscape PlanL 105 Light Studies

Architectural A 100 Site PlanA 101 Ground Floor PlanA 102 Typical Floor PlanA 103 Circulation DiagramA 104 Roof PlanA 201 North & South ElevationsA 202 East & West ElevationsA 301 Cross SectionA 302 Longitudinal SectionA 303 Small Block SectionA 304 Ground Floor West Elevation DetailA 305 West Wall Facade DetailA 306 South Wall Corner DetailA 307 Roof DetailA 400 Principal Wall SectionsA 501 Vertical Circulation DetailA 502 Feature Stair DetailA 503 Elevator Core DetailA 700 Interior DetailA 800 Exterior Detail

Structural

S 101 Structural Framing Plan

MechanicalM 101 Heating DiagramM102 Cooling Diagram

ElectricalE 101 Electrical Lighting Plan

General Notes

1. All work shall conform to the International Building Code and all related documents published by the ICC. Please find these documents in the Bunny Lounge.

2. A letter grade, issued by Laura Briggs upon her inspection of the work contained, shall be submitted to the registrar prior to our long-awaited graduation.

3. All work in the drawing shall be verified for dimension, grade , extent and compatibility to the existing site. Discrepancies are guaranteed.

4. All works contained are done during very late nights, and so these documents are not to be built and are by no means to be considered complete. Build it at your own risk.

Zoning/ Site StatisticsAddress: Jewelry District Providence, RIProposed Use: Lab for MakingOccupancy Group: Construction Type:

Codes: International Building Code Rhode Island Building Code American Disability Act Federal Accessibility Standards

Total Building Area: Total Core Area: Building Perimeter: Building Height: Building Volume:

Symbols

Page 2: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. L- 101 Climate Studies

Scale:

Description:

L 101

average highmeanaverage low

20

40

60

80

100

January February March April May June July August September October November December

Temperature Range

0

20

40

60

80

100

January February March April May June July August September October November December

Chart 5

Relative Humidity (%)

0

500

1,000

1,500

2,000

January February March April May June July August September October November December

Chart 4

Direct Normal Radiation Average Daily Total (Btu/sq.ft)

Page 3: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. L-102 Urban Studies

Scale:

Description:

L 102

Description:

Page 4: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. L- 103 Landscape Studies

Scale:

Description:

L 103

Page 5: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. L-104 Landscape Plan

Scale:

Description:

L 104

Description:

Page 6: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. L- 106 Light Studies

Scale:

Description:

L 105

Daylight FactorType: Reflective Double Pane WindowLight Transmittance: 18% Brick Glass %Daylight 9000 3000 2000 7000.1 0.9 0.162 1458 486 324 1130.2 0.8 0.144 1296 432 288 1010.3 0.7 0.126 1134 378 252 880.4 0.6 0.108 972 324 216 760.5 0.5 0.090 810 270 180 630.6 0.4 0.072 648 216 144 500.7 0.3 0.054 486 162 108 380.8 0.2 0.036 324 108 72 250.9 0.1 0.018 162 54 36 13

Window SizeArea of Bay: 20ft *14ft = 280 sq ft

Glass Area (sq ft)0.35 980.3 840.25 700.2 560.15 42

Page 7: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-100 Site Plan

Scale:

Description:

A 100

Description:

Page 8: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-300 Section

Scale:

Description:

A 300 Ground Floor 2nd Floor

Page 9: Lab for Making

Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-300 Section

Scale:

Description:

A 300 Typical Floor Roof

Page 10: Lab for Making

Description:

Wilfred Leung Adrian Au Melissa Hauser

Description:

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-103 Circulation Diagram

Scale:

Description:

A 103

Page 11: Lab for Making

Description: Description: Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-201 North South Elevation

Scale:

Description:

A 201

North

South

Page 12: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-202 East West Elevation

Scale:

Description:

A 202

East

West

Page 13: Lab for Making

Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-301 Cross Section

Scale:

Description:

A 301

Page 14: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-302 Longitudinal Section

Scale:

Description:

A 302

Page 15: Lab for Making

Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-304 West Wall Detail

Scale:

Description:

A 304

Page 16: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-305 West Roof Detail

Scale:

Description:

A 305

Page 17: Lab for Making

Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-306 South Roof Detail

Scale:

Description:

A 306

Page 18: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-307 Foundation Detail

Scale:

Description:

A 307

Page 19: Lab for Making

Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-501 Vertical Circulation

Scale:

Description:

A 501

Page 20: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-300 Section

Scale:

Description:

A 300

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-502 Feature Stair Detail

Scale:

Description:

A 502

Page 21: Lab for Making

Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. A-503 Elevator Core Detail

Scale:

Description:

A 503

Page 22: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. S-101 Framing Plan

Scale:

Description:

S 101

Page 23: Lab for Making

Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. M-101 Heating Diagram

Scale:

Description:

M 101

Page 24: Lab for Making

Description: Description: Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. M-102 Cooling Diagram

Scale:

Description:

M 102

Page 25: Lab for Making

Description: Description: Description:

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. M-103 West Wall Heating

Scale:

Description:

M 103

Description:

Surfaces Area Window Heat Gain

T Ti

Rvalue 34.39 2.08

East 6029 1176 11110

Rvalue ® 25

West 7840 1176 11900

Summer 90 75

North 1820 1820 13919South 3326 370 4119Roof 10240 6144

Air flow 2788

gain from air 10037solar gain 999Qfrom ppl 56580

Total Gain126290

5.7BTU/hr

BTU/yr

Surfaces Area Window Heat Loss

T Ti

Rvalue 34.39 2.08

East 6029 1176 33331

Winter 25 70

Rvalue ® 25

West 7840 1176 35701North 1820 1820 41757South 3326 370 12357Roof 10240 18432

Total Loss141578

6.4BTU/hr

BTU/yr

Page 26: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. M-104 West Wall Cooling

Scale:

M 104

Surfaces Area Window Heat Gain

T Ti

Rvalue 34.39 2.08

East 6029 1176 11110

Rvalue ® 25

West 7840 1176 11900

Summer 90 75

North 1820 1820 13919South 3326 370 4119Roof 10240 6144

Air flow 2788

gain from air 10037solar gain 999Qfrom ppl 56580

Total Gain126290

5.7BTU/hr

BTU/yr

Surfaces Area Window Heat Loss

T Ti

Rvalue 34.39 2.08

East 6029 1176 33331

Winter 25 70

Rvalue ® 25

West 7840 1176 35701North 1820 1820 41757South 3326 370 12357Roof 10240 18432

Total Loss141578

6.4BTU/hr

BTU/yr

Page 27: Lab for Making

Wilfred Leung Adrian Au Melissa Hauser

Integrated Building Systems

Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges

Laboratory for Making New Mill Building Providence RI

Drawing No. M-105 South Roof Cooling

Scale:

Description:

M 105