Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. G-001 General Information
Scale: -------------
Description:
G 001
Sheet Index
Preliminary Site StudiesL 101 Climate Studies (Wind, Solar Path, Shadow Cast)L 102 Urban StudiesL 103 Landscape StudiesL 104 Landscape PlanL 105 Light Studies
Architectural A 100 Site PlanA 101 Ground Floor PlanA 102 Typical Floor PlanA 103 Circulation DiagramA 104 Roof PlanA 201 North & South ElevationsA 202 East & West ElevationsA 301 Cross SectionA 302 Longitudinal SectionA 303 Small Block SectionA 304 Ground Floor West Elevation DetailA 305 West Wall Facade DetailA 306 South Wall Corner DetailA 307 Roof DetailA 400 Principal Wall SectionsA 501 Vertical Circulation DetailA 502 Feature Stair DetailA 503 Elevator Core DetailA 700 Interior DetailA 800 Exterior Detail
Structural
S 101 Structural Framing Plan
MechanicalM 101 Heating DiagramM102 Cooling Diagram
ElectricalE 101 Electrical Lighting Plan
General Notes
1. All work shall conform to the International Building Code and all related documents published by the ICC. Please find these documents in the Bunny Lounge.
2. A letter grade, issued by Laura Briggs upon her inspection of the work contained, shall be submitted to the registrar prior to our long-awaited graduation.
3. All work in the drawing shall be verified for dimension, grade , extent and compatibility to the existing site. Discrepancies are guaranteed.
4. All works contained are done during very late nights, and so these documents are not to be built and are by no means to be considered complete. Build it at your own risk.
Zoning/ Site StatisticsAddress: Jewelry District Providence, RIProposed Use: Lab for MakingOccupancy Group: Construction Type:
Codes: International Building Code Rhode Island Building Code American Disability Act Federal Accessibility Standards
Total Building Area: Total Core Area: Building Perimeter: Building Height: Building Volume:
Symbols
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. L- 101 Climate Studies
Scale:
Description:
L 101
average highmeanaverage low
20
40
60
80
100
January February March April May June July August September October November December
Temperature Range
0
20
40
60
80
100
January February March April May June July August September October November December
Chart 5
Relative Humidity (%)
0
500
1,000
1,500
2,000
January February March April May June July August September October November December
Chart 4
Direct Normal Radiation Average Daily Total (Btu/sq.ft)
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. L-102 Urban Studies
Scale:
Description:
L 102
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. L- 103 Landscape Studies
Scale:
Description:
L 103
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. L-104 Landscape Plan
Scale:
Description:
L 104
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. L- 106 Light Studies
Scale:
Description:
L 105
Daylight FactorType: Reflective Double Pane WindowLight Transmittance: 18% Brick Glass %Daylight 9000 3000 2000 7000.1 0.9 0.162 1458 486 324 1130.2 0.8 0.144 1296 432 288 1010.3 0.7 0.126 1134 378 252 880.4 0.6 0.108 972 324 216 760.5 0.5 0.090 810 270 180 630.6 0.4 0.072 648 216 144 500.7 0.3 0.054 486 162 108 380.8 0.2 0.036 324 108 72 250.9 0.1 0.018 162 54 36 13
Window SizeArea of Bay: 20ft *14ft = 280 sq ft
Glass Area (sq ft)0.35 980.3 840.25 700.2 560.15 42
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-100 Site Plan
Scale:
Description:
A 100
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-300 Section
Scale:
Description:
A 300 Ground Floor 2nd Floor
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-300 Section
Scale:
Description:
A 300 Typical Floor Roof
Description:
Wilfred Leung Adrian Au Melissa Hauser
Description:
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-103 Circulation Diagram
Scale:
Description:
A 103
Description: Description: Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-201 North South Elevation
Scale:
Description:
A 201
North
South
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-202 East West Elevation
Scale:
Description:
A 202
East
West
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-301 Cross Section
Scale:
Description:
A 301
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-302 Longitudinal Section
Scale:
Description:
A 302
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-304 West Wall Detail
Scale:
Description:
A 304
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-305 West Roof Detail
Scale:
Description:
A 305
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-306 South Roof Detail
Scale:
Description:
A 306
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-307 Foundation Detail
Scale:
Description:
A 307
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-501 Vertical Circulation
Scale:
Description:
A 501
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-300 Section
Scale:
Description:
A 300
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-502 Feature Stair Detail
Scale:
Description:
A 502
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. A-503 Elevator Core Detail
Scale:
Description:
A 503
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. S-101 Framing Plan
Scale:
Description:
S 101
Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. M-101 Heating Diagram
Scale:
Description:
M 101
Description: Description: Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. M-102 Cooling Diagram
Scale:
Description:
M 102
Description: Description: Description:
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. M-103 West Wall Heating
Scale:
Description:
M 103
Description:
Surfaces Area Window Heat Gain
T Ti
Rvalue 34.39 2.08
East 6029 1176 11110
Rvalue ® 25
West 7840 1176 11900
Summer 90 75
North 1820 1820 13919South 3326 370 4119Roof 10240 6144
Air flow 2788
gain from air 10037solar gain 999Qfrom ppl 56580
Total Gain126290
5.7BTU/hr
BTU/yr
Surfaces Area Window Heat Loss
T Ti
Rvalue 34.39 2.08
East 6029 1176 33331
Winter 25 70
Rvalue ® 25
West 7840 1176 35701North 1820 1820 41757South 3326 370 12357Roof 10240 18432
Total Loss141578
6.4BTU/hr
BTU/yr
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. M-104 West Wall Cooling
Scale:
M 104
Surfaces Area Window Heat Gain
T Ti
Rvalue 34.39 2.08
East 6029 1176 11110
Rvalue ® 25
West 7840 1176 11900
Summer 90 75
North 1820 1820 13919South 3326 370 4119Roof 10240 6144
Air flow 2788
gain from air 10037solar gain 999Qfrom ppl 56580
Total Gain126290
5.7BTU/hr
BTU/yr
Surfaces Area Window Heat Loss
T Ti
Rvalue 34.39 2.08
East 6029 1176 33331
Winter 25 70
Rvalue ® 25
West 7840 1176 35701North 1820 1820 41757South 3326 370 12357Roof 10240 18432
Total Loss141578
6.4BTU/hr
BTU/yr
Wilfred Leung Adrian Au Melissa Hauser
Integrated Building Systems
Course No 2178 Fall, 2012 Friday 1:10 - 4:10 Laura Brigges
Laboratory for Making New Mill Building Providence RI
Drawing No. M-105 South Roof Cooling
Scale:
Description:
M 105