Purposed for Facilities Design subject
LSCM Layout Design Project
Your LogoYour own footer
• (2001) Developed by Prof. Ir. I Nyoman Pujawan, M.Eng, PhD. named Center for Supply Chain
• (2006) LSCM Lab officially built by Prof. Ir. I NyomanPujawan, M.Eng, PhD. dan Dr (Eng). Ir. Ahmad Rusdiansyah M. Eng
• (Now) The first Logistics dan Supply Chain Management laboratory in Indonesia
Background
Primary Function :
• Provide facilites to students who will to learn about LSCM field
• Such as disscussion, assignments, and task submitting
Secondary Function :
• Research
• Meeting
Activities
• Student
• Researcher
• Lecturer
• Laboratory Assistant
Stakeholders
• Aesthetic problem
• Lack of properties
• Properties is not used properly
• Broken facilities (telephone and printers)
Problems
LSCM Design Project
Your LogoYour own footer
Existing Condition
Storage
• Minimizing distance traveled by user
• Providing a safe and pleasant atmosphere to people work in
• To prepare the laboratory for other activity (ex. subject tasks submitting)
Objectives
Methodology
• Systemic Layout Planning Based (Office) on Facilities Design book by Sunderesh S. Heragu
Input Data & ActivitiesInput Data & Activities
Overall initial flow of work divided into four types of activities:
• Discussion
• Research
• Task submitting
• Meeting
Initial Flow of Work
LSCM Design Project
Your LogoYour own footer
Work Flow (Discussion)
LSCM Design Project
Your LogoYour own footer
Work Flow (Research/Meeting)
LSCM Design Project
Your LogoYour own footer
Work Flow (Task Submitting)
LSCM Design Project
Your LogoYour own footer
Work Flow (Other)
• Can’t expand the space available
• Can’t change the room position in space available
Constraints
Exsisting Layout
Layout Alternatives (1)
Layout Alternatives (2)
Layout Alternatives (3)
THANK YOU!