This was a building science project that was focused on creating an office building that both performed well in its climate and maximized rentable square footage. It's not the most aesthetically pleasing design I've come up with but it was a great exercise to get a better understanding of the technical drawings and quantitative calculations that go into a design.
Popular Tags:
19
J J LAKE VILLA HIGH PERFORMANCE OFFICES CONTENTS: PROJECT A A.1 - Plat A.2 - Topography A.3 - Zonning PROJECT B B.1 - Floor Plans B.2 - Core Detail PROJECT C C.1 - Structural Plan PROJECT D D.1 - Site Plan PROJECT E E.1 - Sun Diagram E.2 - East/West Elevations E.3 - West Section E.4 - North/South Elevations E.5 - South Section PROJECT F F.1 - Reflected Ceiling Plan PROJECT G A.1 - Bay Detail A.2 - Bay Section Detail A.3 - Wall Section Detail In architecture it’s not good enough to simply create something that looks beautiful; you need to create something that functions beautifully as well. The purpose of this project was to create a building as technically sound as it was aesthetically pleas- ing. Remaining within the given restrictions of the zoning code I and a design partner were to create a high performance office building. We employed passive solar design techniques to make the building energy efficient, while maximizing the rentable space to make it financially efficient as well.
Transcript

JJ

LAKE VILLA HIGH PERFORMANCE OFFICES

CONTENTS:PROJECT AA.1 - PlatA.2 - TopographyA.3 - Zonning

PROJECT BB.1 - Floor PlansB.2 - Core Detail

PROJECT CC.1 - Structural Plan

PROJECT DD.1 - Site Plan

PROJECT EE.1 - Sun DiagramE.2 - East/West ElevationsE.3 - West SectionE.4 - North/South ElevationsE.5 - South Section

PROJECT FF.1 - Reflected Ceiling Plan

PROJECT GA.1 - Bay DetailA.2 - Bay Section DetailA.3 - Wall Section Detail

In architecture it’s not good enough to simply create something that looks beautiful; you need to create something that functions beautifully as well. The purpose of this project was to create a building as technically sound as it was aesthetically pleas -ing. Remaining within the given restrictions of the zoning code I and a design partner were to create a high performance office building. We employed passive solar design techniques to make the building energy efficient, while maximizing the rentable space to make it financially efficient as well.

SITE INFO:

Building Height: 55’ (2 stories)Parking:

FAR: .5 x 217,973 sf = 108,986.5 sfMaximum Building Area: 22,500 sf

Setbacks: front 40’sideyards 20’rear 20’development setbacks: 5’

LEGEND manhole elect. box utility hydrant water well

N

ILLINOIS ROUTE 83

S. 32 26’ 44” E

SIDEWALK

15’ EASEMENT

o

N. 5

7 3

3’ 1

6” E

o

N. 5

7 3

3’ 1

6” E 39

4’ -

0”o

N. 17 46’ 28” Wo

700’ - 0”

800

33’ -

0”

33’ -

0”

33’ -

0”

33’ -

0”

CEDAR AVENUE

WO

OD

ED

AR

EA

WE

TLA

ND

S.2

6 A

CR

ES

5,00

4 A

cres

217,

973

SQ

. FT.

EDGE OF WATER

EDGE OF WATER

STANDING WATER

WISCONSIN CENTRAL LIMITED RAILROAD

204’

- 0”

20’ - 0”

20’ -

0”

20’ -

0”

40’ -

0”

310’

- 6”

5’ - 0”

15’ E

ASEM

ENT

676’ - 8”

725’ - 4”

172’

- 0”

40’ -

0”

790

791

792

793

794

794

795

796

797

798

799

801

803

804

799

798

797

796

795

794

793

792

791

790

scale

date

project

JJ

3/15/07

plat

1” = 100’

Adam FisherJohn Hutton

A.1

LA

KE

VIL

LA

N scale

date

project

JJ

3/15/07

topography

n.a.

Adam FisherJohn Hutton

A.2

LA

KE

VIL

LA

790

804803

802

801

800

800

799

799

798797

796795

794793792791790

798

797

796

795

794

794793

792

791

N scale

date

project

JJ

3/29/07

floor plans

3/64” = 1’

Adam FisherJohn Hutton

B.1

LA

KE

VIL

LA

16’ - 0”16’ - 0” 82’ - 2”

6’ -

3”6’

- 3”

18’ -

3”

25’ -

0”

6’ - 6”101’ - 2”6’ - 6”27’ - 11”

37’ -

5”

10’ -

10”

27’ - 11”

37’ -

5”

10’ -

10”

16’ - 4”16’ - 4”

OFFICE 6

OFFICE 8

TRASHROOM

MEN’SWC

WOMEN’SWC

JANITOR’SCLOSET

STAIR 2

STAIR 1

ELEV. 1 ELEV. 2

TELECOM.CLOSET

ELECT.CLOSET

DOWN

DOWN

OFFICE 5 OFFICE 7

OPENTO

BELOW

TRASHROOM

MEN’SWC

WOMEN’SWC

JANITOR’SCLOSET

STAIR 2

STAIR 1

ELEV. 1 ELEV. 2

TELECOM.CLOSET

ELECT.CLOSET

UP

UP

OPENTO

ABOVE101’ - 2”6’ - 6”27’ - 8”

36’ -

4”

11’ -

10”

6’ - 6” 27’ - 8”

36’ -

4”

11’ -

10”

25’ -

0”

6’ -

6”

8’ -

3”24

’ - 6

”6’

- 6”

17’ -

1”

17’ -

1”

16’ - 4” 14’ - 4” 42’ - 9” 44’ - 10” 12’ - 3” 16’ - 4”

CEILING ABOVE

ATRIUM

FIRE DOORS

EMERGENCYEXIT

OFFICE 1

OFFICE 2 OFFICE 3

OFFICE 4

18’ -

3”

FIRST FLOOR

SECOND FLOOR

scale

date

project

JJ

3/29/07

core detail

5/64” = 1’

Adam FisherJohn Hutton

B.2

LA

KE

VIL

LA

101’ - 2”

30’ - 6” 4’ - 6” 5’ - 6” 12’ - 0” 5’ - 6” 7’ - 10”

4’ -

11”

19’ -

7”

4’ -

11”

19’ -

7”

24’ -

6”

24’ -

6”

6’ - 6”10’ - 6”10’ - 6”7’ - 10”

30’ - 6” 13’ - 9” 13’ - 9”4’ - 0”11’ - 9”11’ - 9”

85’ - 6”

STAIR 1

STAIR 2

WOMEN’SWC

MEN’SWC

JANITOR’S CLOSETTRASH ROOMATRIUM

ELEVATOR 2ELEVATOR 1

TELECOM.CLOSET

ELECTRICALCLOSET

UP

UP

N

FIRST FLOOR

SECOND FLOOR

OFFICE 6

171’ - 4”30’ - 6” 41’ - 10” 24’ - 0”

75’ -

6”

24’ -

6”

14’ -

11”

14’ -

11”

8’ -

4”8’

- 4”

41’ - 10”24’ - 0”

OFFICE 8

TRASHROOM

MEN’SWC

WOMEN’SWC

JANITOR’SCLOSET

STAIR 2

STAIR 1

ELEV. 1 ELEV. 2

TELECOM.CLOSET

ELECT.CLOSET

DOWN

DOWN

OFFICE 5 OFFICE 7

OPENTO

BELOW

TRASHROOM

MEN’SWC

WOMEN’SWC

JANITOR’SCLOSET

STAIR 2

STAIR 1

ELEV. 1 ELEV. 2

TELECOM.CLOSET

ELECT.CLOSET

UP

UP

OPENTO

ABOVE

CEILING ABOVE

ATRIUM

FIRE DOORS

EMERGENCYEXIT

OFFICE 1

OFFICE 2 OFFICE 3

OFFICE 4

75’ -

6”

24’ -

6”

14’ -

11”

14’ -

11”

8’ -

4”8’

- 4”

A B C D E F1

2

3

4

5

6

1

2

3

4

5

6 N

scale

date

project

JJ

4/26/07

structure

3/64” = 1’

Adam FisherJohn Hutton

C.1

LA

KE

VIL

LA

TRIBUTARY AREAS

BEAM SIZES

COLUMNNUMBER

A3A4B2B3B5C1C3C4C6D1D3D4D6E2E3E5F3F4

BEAMNUMBER

B1B2B3B4B5B6B7B8B9B10B11

# OF BEAMSPER FLOOR

2242222

G4G4G4G4

14’ - 11”65’ - 10”23’ - 3”24’ - 0”41’ - 10”30’ - 6”39’ - 5”24’ - 6”28’ - 3”42’ - 8”30’ - 6”

9”36”14”14”23”16”22”17”18”29”19”

TRIBUTARY AREA (S.F.)

618.125618.125733.28581860.82721263.0608841.79261380.11141421.2256841.7926841.79261380.11141421.2256841.7926733.28581860.82721263.0608618.125618.125

NOMINALCOLUMN SIZE

W6W6W6W12W8W8W10W10W8W8W10W10W8W6W12W8W6W6

DEPTHSPAN

DECKING

BAR JOISTS 6’ O.C.JOIST

NUMBERJ1J2J3J4J5J6J7J8J9J10J11J12J13J14J15J16J17J18J19J20J21J22J23J24J25J26J27J28J29J30J31

# OF JOISTSPER FLOOR

841244444328444444444841211111121

6’ - 3”3’ - 9”

24’ - 6”7’ - 5”4’ - 8”

11’ - 2”3’ - 2”1’ - 2”

14’ - 11”3’ - 4”2’ - 5”3’ - 7”3’ -2”

4’ - 10”2’ - 10”6’ - 0”2’ - 4”7’ - 2”2’ - 0”8’ - 4”2’ - 2”

20” - 7”25’ - 3”21’ - 7”34’ - 7”35’ - 8”22’ - 8”23’ - 6”33’ - 0”24’ - 2”20’ - 4”

10”10”14”10”10”12”10”10”13”10”10”10”10”10”10”10”10”10”10”10”10”13”15”13”18”19”14”14”18”14”13”

1 1/2” DECKING4” SLAB

DEPTHSPAN

PROPOSED BUILDING

LEGENDMANHOLEUTILITYFUEL EFFICIENT VEHICLESCARPOOL VEHICLESHANDICAPPED PARKING

700’ - 0”

ILLINO

IS RO

UTE 83

ED

GE

OF

WAT

ER

ED

GE

OF

WAT

ER

ED

GE

OF

WAT

ER

STA

ND

ING

WAT

ER

725’ - 4”

WIS

CO

NS

IN LIM

ITE

D R

AILR

OA

D

LOADING DOCK

WETLANDS 24,911 SF.57 ACRES

HANDICAPPED PARKING

20’ -

0”

PERMEABLE PAVER

PERMEABLE ASPHALT

R 22’ - 0”

R 22’ - 0”

R 12’ - 0”

R 1

2’ -

0”

R 50’ - 0”

R 5

0’ -

0”

28’ -

0”

16’ - 0”

6’ - 0”

9’ - 0”

19’ - 0”

24’ - 0”

24’ - 0”32’ - 3

R 22’ - 0”

29’ - 0”

19’ -

0”

R 5

0’ - 0

CURB

CURB

FUEL EFFICIENT VEHICLES

CROSS WALK

394’ - 0”

CARPOOL VEHICLES

799

798

797

796

798797

796795

795

796

797

798

799

800

794

scale

date

project

JJ

4/12/07

parking

1/64” = 1’

Adam FisherJohn Hutton

D.1

LA

KE

VIL

LA

N

scale

date

project

JJ

3/15/07

sun

n.a.

Adam FisherJohn Hutton

E.1

LA

KE

VIL

LA

LIGHTING:

Daylight: 2570.4 sfVisual Light: 3018.8 sfSkylight: 250 sfClerestory: 776 sfTotal Glazed Area: 5,689.2 sfWall Area: 14.531.28 sfWindow to Wall Ratio: .39 Visual Transmittance:Daylight: .7Skylight: .69Visual Light: .5Solar Heat Gain Coefficient: .39 all windowsEffective Apeture: 1.55

scale

date

project

JJ

4/26/07

elevations

3/64” = 1’

Adam FisherJohn Hutton

E.2

LA

KE

VIL

LA

A

1

2

3

2’2’

10’ -

8”

4’ -

0”

10’ -

0”

32’ -

10”

4’-2

3

A

A

C

C

B

B

A

1

2

3

2’2’

10’ -

8”

4’ -

0”

10’ -

0”

32’ -

10”

4’-2

3

A

A

C

C

B

LEGENDA - GLASS HEIGHT X WIDTH 1: 11’-0” X 5’-0” 2: 2’-6” X 5’-0” 3: 5’-0” X 5’-0”B - SPANDREL GLASSC - OPERABLE LOUVER

WEST ELEVATION

EAST ELEVATION

Sunlight Winter solstice 24.2o

Sunlight Summer Solstice 71o

Matte Surface:Visible From Ground

C

Specular Surface:Not Visible From Ground

A

Semi-Specular Surface:Not Visible From Ground

SURFACE MATERIALS:

WEST

B

scale

date

project

JJ

4/26/07

sections

3/64” = 1’

Adam FisherJohn Hutton

E.3

LA

KE

VIL

LA

32’ -

2”

14’ -

2”

10’ -

0”

10’ -

0”

9’ -

0”9’

- 0”

14’ -

0”

10’ -

8”

4’ -

2”3’ -

4”

10’ -

2”

9’ -

4”

7’ -

0”

6’ -

0”

4’ -

0”

4’ -

0”

AA

FIXED SKYLIGHT

FIXED CLERESTORY

OPRABLE WINDOWSFOR ALL OFFICES

B OFFICE 9

OFFICE 3

OFFICE 7

ATRIUM

CC

C

CC

32’ -

2”

14’ -

2”

10’ -

0”

10’ -

0”

9’ -

0”9’

- 0”

14’ -

0”

10’ -

8”

4’ -

2”3’ -

4”

10’ -

2”

9’ -

4”

7’ -

0”

6’ -

0”

4’ -

0”

4’ -

0”

AA

FIXED SKYLIGHT

FIXED CLERESTORY

OPRABLE WINDOWSFOR ALL OFFICES

B OFFICE 9

OFFICE 3

OFFICE 7

ATRIUM

CC

C

CC

LEGENDA - GLASS HEIGHT X WIDTH 1: 9’-0” X 5’-0” 2: 2’-6” X 5’-0” 3: 5’-0” X 5’-0” 4: 9’-6” X 5’-0”B - SPANDREL GLASSC - OPERABLE LOUVER

A

1

2

3

4 3

2’2’

10’ -

8”

10’ -

0”

4’-0

”4’

-2”

A

A

A

B

C

C

A

1

2

3

4 42

2’2’

10’ -

8”

32’ -

10”

32’ -

10”

10’ -

0”

4’-0

”4’

-2”

A

A

B

C

C

NORTH ELEVATION

SOUTH ELEVATION

scale

date

project

JJ

4/26/07

elevations

3/64” = 1’

Adam FisherJohn Hutton

E.4

LA

KE

VIL

LA

OVERHANG:East and West Facades

LIGHT SHELF:South Facade

LIGHT SHELF

DAYLIGHT

VISUAL LIGHT

MATTE SURFACE

scale

date

project

JJ

4/26/07

sections

3/64” = 1’

Adam FisherJohn Hutton

E.5

LA

KE

VIL

LA

SOUTH

DETAILS:

Evening Sun

Morning Sun

ELEC.CLOSETSHAFT SHAFT ATRIUM

32’ -

2”

30’ -

9”15

’ - 3

16’ -

4”

14’ -

2”

28’ -

6”

4’ -

0”

4’ -

0”

4’ -

0”

10’ -

0”

10’ -

0”

10’ -

0”

10’ -

0”

9’ -

0” 14’ -

0”

10’ -

8”

4’ -

2”3’

- 4”

9’ -

0”

14’ -

0”

14’ -

5”

14’ -

2”

10’ -

0”

10’ -

0”

4’ -

0”

9’ -

0”9’

- 0”

MEN’SRESTROOM

MEN’SRESTROOM

WOMEN’SRESTROOM

WOMEN’SRESTROOM

FIXEDSKYLIGHTS

TELECOM.CLOSET

TELECOM.CLOSET

STAIR 1 STAIR 2FIXED

CLERESTORY

OFFICE 6

OFFICE 1

OFFICE 8

OFFICE 5

OPRABLEWINDOWS FORALL OFFICES

ELEC.CLOSETSHAFT SHAFT ATRIUM

32’ -

2”

30’ -

9”15

’ - 3

16’ -

4”

14’ -

2”

28’ -

6”

4’ -

0”

4’ -

0”

10’ -

0”

10’ -

0”

10’ -

0”

10’ -

0”

9’ -

0” 14’ -

0”

10’ -

8”

4’ -

2”3’

- 4”

9’ -

0”

14’ -

0”

14’ -

5”

14’ -

2”

10’ -

0”

9’ -

0”9’

- 0”

MEN’SRESTROOM

MEN’SRESTROOM

WOMEN’SRESTROOM

WOMEN’SRESTROOM

FIXEDSKYLIGHTS

TELECOM.CLOSET

TELECOM.CLOSET

STAIR 1 STAIR 2FIXED

CLERESTORY

OFFICE 6

OFFICE 1

OFFICE 8

OFFICE 5

OPRABLEWINDOWS FORALL OFFICES

10’ -

0”

4’ -

0”

4’ -

0”

10’-0”

10’-0”10’-0”

10’-0”

10’-0” 10’-0”

10’-0”

10’-0”

10’-0”

14’-2”

32’-2”

16’-4”

16’-4” 15’-7”

15’-7”

14’-5” 14’-2”

14’-2”

10’-0”

82’ - 0”

24’ - 3”

5’ -

8”2’

- 0”

88’ - 0”

88’ - 0”

1’ - 9” 14’ - 0” 24’ - 8”

18’ -

3”

5’ -

8”

2’ -

1”

11’ - 0”24’ - 9”

2’ -

8”5’

- 8”

1’ -

6”

14’ - 0” 14’ - 0”

24’ - 9”

2’ -

1”

2’ -

0”

5’ -

8”

10’-0”

10’-0”

10’-0”

10’-0”

10’-0”

16’-0”

15’-3”14’-5”14’-2”

10’-0”

10’-0”

10’-0”

10’-0”

10’-0” 10’-0”

10’-0” 10’-0”

13’-0” 10’-0”

10’-0”

10’-0”

10’-0”

17’-10”

32’-2”

10’-0”

13’-0”

LEGEND

COLUMN CELL LUMINARE CAN LUMINARE FLORECENT LUMINARE WALL SCONE CEILING HEIGHT ALL SOFFITS ARE 9’ A.F.

N

scale

date

project

JJ

5/10/07

lighting

3/64” = 1’

Adam FisherJohn Hutton

F.1

LA

KE

VIL

LA

B B B B

M

K R R S

QL

P

ONS

A

G H D

I J

A

C

D E F

ABCDEFGHIJKLMNOPQRS

1755.591206.571801.28140.31

12590

166.25166.2577.62559.625750.24

2392.391584.47124.44

9077.62559.625166.25140.31

249’-3”144’-5”561’1”52’11”45’-0”38’-0”58’-0”58’-0”44’-6”35’-6”

110’-0”610’-1”223’-8”44’-9”38’-0”44’-6”35’-6”58’-0”

52’-11”

10’-0”10’-0”14’-2”14’-5”15’-3”16’-0”16’-4”15’-7”16’-4”15’-7”32’-2”10’-0”10’-0”10’-0”10’-0”10’-0”10’-0”10’-0”13’-0”

3.553

1113.67

13.72516.9

14.2513.623.423.2

11.856.373.53

910.5514.3314.888.72

12.27

50553131313131313131314250333131313331

452852311771115141111175

2790173629121688080

2912291229122912291229122912291229122912291229122912

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

50501010202050502020N/A1050202020205010

99

16.1715.8619.8320.819.618.7

21.2320.25N/A11121313131312

14.3

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.7

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

.5

SYMBOL

AVERAGE MAINTAINED LIGHT LEVEL: 54.95 LUMES

CELL 2X2 PARABOLIC2 T8 CURVALUME LAMPS

8” DOWNLIGHT SPECULARREFLECTOR BAFFLE

4’ INDUSTRIAL 2 LAMP

SCONE LIGHTING

METALUX

HALO

METALUX

LUMINOSITIES

2P5GAX2U1-5/8

H801

EVIM240

408889

FB031/35K

H801-810C

F32T8-SPX35

40885D1

62

56

80

26

2800

3200

2950

N/A

258

56

8

40

15996

3136

640

1040

20812

ROOMS AREA PERIMETER ROOMHEIGHT RCR CU NUMBER

OF LAMPSTOTALWATTS

LIGHT LOSSFACTOR

REQ. FOOTCANDELS

MAXSPACING RC RW

DESCRIPTION MANUFACTURER MODEL NUMBER LAMP WATTS LUMINES NUMBER

OF LIGHTSTOTAL

WATTAGE

A

JK

L

M

Y

Z

N

S

T

U

X

P

Q R

AA

BB

CC

DD

EE

FF

KK

LL

MM

NN

OO

PP

QQ

TT

UU

VV

SS

RR

JJ

HH

GG

B C

E F

D

G H

A B CD

E F G H

L

M

N

P

Q R

S

T

U

XY

Z

V

W

AA

BB

CC

DD

EE

FF

GG

KK

LL

MM

NNHH

JJ

RR

SS

OO

PP

QQ

TT

UU

VV

JK

A: Sheet Metal CopingB: Neoprene Gasketed ScrewC: Cont. Metal counter FlashingD: Membrane Base FlashingE: Dec. Layer 3/8” Ext. Grade GypsumF: Cant StopG: Multiple Layer Built-up RoofH: Rigid InsulationJ: Wood NailerK: Metal CleatL: Vapor RetarderM: Open Web JoistN: Fire StopP: Steel DeckingQ: Tab PlateR: Steel JoistsS: Steel GirdersT: BracingU: Ceiling HangersV: SheathingW: DrywallX: Dropped CeilingY: SoffitZ: Louvers

AA: MullionBB: Spandral GlassDD: 2x4 Steel StudsEE: Angle AnchorFF: AnchorGG: Steel RunnerHH: Finished FloorJJ: Sub FloorKK: FirreproofingLL: W12 Steel ColumnMM: Welded Wire FabricNN: Steel Base PlateOO: RebarPP: SlabQQ: FootingRR: Polysrtene Foam InstallationSS: Subsoil Drainage SystemTT: SandUU: GravelVV: Earth scale

date

project

JJ

5/24/07

wall section

1/4” = 1’

Adam FisherJohn Hutton

G.1

LA

KE

VIL

LA

scale

date

project

JJ

5/24/07

bay detail

n.a.

Adam FisherJohn Hutton

G.2

LA

KE

VIL

LA

scale

date

project

JJ

5/24/07

bay section

n.a.

Adam FisherJohn Hutton

G.3

LA

KE

VIL

LA


Recommended