• Laura Dietrich: Maintenance Manger
• Antoinette Lockett: Plant Manger• Waseem Manzoor: Quality Manger• Xiaoyan Liu: Production Manger
Meeting AgendaI. Understanding Downtime -GroupII. Major Losses of TPM -Antoinette Lockett
I. Planned Downtime Losses -Xiaoyan LiuII. Unplanned Downtime Losses -Laura DietrichIII. Reduce Speed Losses-IV. Poor Quality Losses -Waseem Manzoor
III. Total Productive MaintenanceI. What is TPM -Antoinette LockettII. Breakdown of TPM -Laura DietrichIII. TPM History -Laura DietrichIV. TPM EvolutionV. Goal of TPM -Antoinette LockettVI. Three Principles of Prevention
Meeting Agenda Cont.
I. TPM-8 Pillars-Laura DietrichII. Kick off TPM
I. Launching TPM- Preparatory Stage-Antoinette LockettII. Autonomous Maintenance- Xiaoyan LiuIII. Equipment Management Life Cycle- Xiaoyan LiuIV. TPM Implementation-Waseem ManzoorV. Launching TPM- Stabilization-Waseen ManzoorVI. Eliminating Equipment Losses-Laura DietrichVII. Improvement Goals for Chronic Losses-Laura Dietrich
III. Overall Equipment EfficiencyI. What is OEE-Xiaoyan Liu
II. OEE Factors-Xiayon LiuIII. Calculating OEE-Waseem Manzoor
IV. TPM Benefits-Xiaoyan Liu
Understanding
Downtime
MAJOR LOSSES
Planned Downtime losses
• Start-ups• shift changes• coffee and lunch breaks• planned maintenance shutdowns
Unplanned Downtime Losses
• Equipment breakdown
• Changeovers• Lack of material
Reduced Speed Losses
• Idling and minor stoppages• Slow-downs
Poor Quality Losses
• Process non-conformities
• Scrap
TPM
What is Total Productive Maintenance?
• TPM is a plant improvement methodology which enables continuous and rapid improvement of the manufacturing process through use of employee involvement, employee empowerment, and closed-loop measurement of results
• TOTAL = All encompassing by maintenance and production individuals working together
• PRODUCTIVE = Production goods and services that meet or exceed customers’ expectations
• MAINTENANCE = Keeping equipment and plant in as good as or better than the original conditions at all times
Breakdown of TPM
TPM - History
• Productive maintenance (PM) originated in the U.S. in late 1940’s & early 1950’s
• Japanese companies modified and enhanced it to fit the Japanese industrial environment
• The first use the term TPM was in 1961 by Nippondenso, a Japanese auto components manufacturer
• Seiichi Nakajima – head of JIPM, one of the earliest proponents, known as the Father of TPM
TPM - Evolution
• Breakdown maintenance• Preventive maintenance (PM)• Productive maintenance• Total productive maintenance
Goals of TPM
1. Aims at getting the most effective use of equipment
2. Builds a comprehensive PM system3. Brings together people from all
departments concerned with equipment4. Requires the support and cooperation of
everyone from top managers down5. Promotes and implements PM activities
based on autonomous small group activities.
6. Maintaining Equipment for life7. Encouraging input from all employees8. Using teams for continuous improvement
Three Principles of Prevention
• Maintenance of normal conditions• Early discovery of abnormalities• Prompt response
TPM 8 PILLARS
PILLARS OF TPM
Kob
ets
u K
aiz
en
Pla
nn
ed
Main
ten
an
ce
Qu
ality
Main
ten
an
ce
Tra
inin
g
Offi
ce T
PM
Safe
ty,
healt
h a
nd
En
vir
on
men
t
5s
Au
ton
om
ou
s
Main
ten
an
ce
Kick off TPM
Launching TPM- Preparatory Stage
• Announce top management’s decision to introduce TPM
• Launch an educational campaign to introduce TPM
• Create an organizational structure to promote TPM
• Establish basic policies• Form a master plan for
implementing TPM
Launching TPM- Preliminary Implementation
• Improve the effectiveness of each critical piece of equipment
• Set up and implement autonomous maintenance
• Establish a planned maintenance system in the maintenance department
• Provide training to improve operator and maintenance skills
• Develop an early equipment management program
Launching TPM- TPM Implementation
• Perfect TPM implementation and raise TPM levels
Launching TPM- Stabilization
Eliminating Equipment Losses
Improvement Goals for Chronic Losses
OEE
What is OEE
• OEE (overall equipment efficiency) is a “best practices” way to monitor and improve the efficiency of your manufacturing processes – machines– manufacturing cells– assembly lines
OEE Factors
• Plant Operating Time• Planned production time
– planned downtime ie. breaks
• Availability– downtime losses
• Performance– Speed losses
• Quality– Quality losses
World Class OEE
OEE Factor World Class
Availability 90.0%
Performance 95.0%
Quality 99.9 %
OEE 85.0%
Calculating OEE
• Availability = Operating time/planned production
• Performance = Ideal Cycle Time / Total Pieces or(total pieces / Operating time)/Ideal Run time
• Quality = Good Pieces / Total Pieces• OEE = Availability X Performance X
Quality
Example OEE Calculation
I tem DataShif t length 8 hrs = 480 min.
Short Breaks 2@ 15 min. = 30 min
Meal Break 1 @ 30 min = 30 min
Down Time 47 min
I deal Run Time 60 pieces per min
Total Pieces 19,271 pieces
Reject Pieces 423 pieces
Availability = Operating time Planned production time
• = 373 minutes / 420 minutes• = 0.8881 (88.81%)
Performance =
(Total pieces /Operating time) Ideal Run Time
• = (19,271 pieces/373 minutes)/60 pieces per minute
• = 0.8611 (86.11%)
Quality =
Good PiecesTotal Pieces
• = 18,848 / 19,271 pieces• = 0.9780 (97.80 %)
OEE =
Availability X Performance X Quality • = 0.8881 X 0.8611 X 0.9780• = 0.7479 (74.79%)
TPM BENIFITS
TPM - Benefits
• Improved equipment eliminates the root cause of defects
• Defects are prevented through planned maintenance
• Preventive maintenance costs are reduced as equipment operators conduct autonomous maintenance
• Improved equipment designs ensure that new equipment naturally produces fewer defects
• Simplified products designs and a redesigned process produce with few defects
• Engineers, technicians and managers are trained in maintenance and quality
TPM - Benefits
(Japanese TPM Prize winners during 1982-1984)
• Equipment failures reduced from 1,000/month to 20/month
• Quality defects reduced from 1.0% to 0.1%• Warranty claims reduced by 25%• Maintenance costs reduced by 30%• WIP decreased by 50%• Productivity improved by 50%. (Patterson
& Fredendall, 1995)
TPM – Success stories
• USPS Albany, New York: annual save of $86,000; could save $4.5 million if applied nationwide
• Yamato Kogyo Corp., Japan: - productivity up by 130%, - accidents cut by 90%, - defects reduced by 95%, - employee suggestion rate increased
by over 300%