  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    1/41

    Lawrenc e Avenue Stree tsc ape Conc ep tsAug ust 30, 2011

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    2/41

    La wrenc e Ave. Streetsc a p e

    Neighbo rhood Context

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    3/41

    La wrenc e Ave. Streetsc a p e

    Key Map Lawrenc e Ave.

    Phase I: Western Ave. toClark St.

    Phase II: Riverto Western Ave.

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    4/41

    Existing Streetsc ape Cond itions

    East of Western Ave.

    La wrenc e Ave. Streetsc a p e

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    5/41

    Existing Cross Section Western Ave. to Ashland Ave.

    La wrenc e Ave. Streetsc a p e

    Lawrence Avenue

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    6/41

    Road Diet / Complete Streets Basic s

    La wrenc e Ave. Streetsc a p e

    La ne red uc tion: 4-la ne to 3-la ne Co nversion Wider sid ew alksDesigna ted b ike laneBenefits a ll mod es of tra nsporta tionAASHTO Design g uide lines no longer rec omm end urba n

    four-lane roa dwa ys without med ians and turning p oc kets.

    Why La wrenc e Ave? Narrow sid ew a lks on b oth sid es of the street High b ic yc le use that exc ee d s sta terec om me nda tions for insta lla tion o f a d ed ic a tedb ike la ne Strong pub lic transit use via the CTA Brown Line ,Me tra North Line, and 6 b us route s on or inte rsec tingLawrence. Ec onom ic streng th o f Linc oln Sq ua re / Linc oln AveCorridor

    Mid -sc a le c om me rc ia l and institutiona l la nd uses

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    7/41

    Prop osed Cross Sec tion East of Western Ave .

    La wrenc e Ave. Streetsc a p e

    Lawrence Avenue

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    8/41

    La wrenc e Ave. Streetsc a p e

    Stree tsc ape Improvem ents East of Western Ave.

    Improved Lighting Wider Sidewalks for Cafes

    Site Furniture Community Identifiers Permeable Pavers

    Over 150 New Street Trees

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    9/41

    La wrenc e Ave. Streetsc a p e

    Streetsc ape Elem ents: River to Damen

    Kiosk Gateway with Identifier

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    10/41

    La wrenc e Ave. Streetsc a p e

    Stree tsc ape Imp rovements Pedestrian Imp rovements East of Western Ave .

    Pedestrian Refuge Islandso Shorter crosswalk distance with 11 New pedestrian refuge areas created at center turn lane crosswalks .

    Stamped Asphalt Crosswalks

    Bump outs

    Storm Water Bumpouts

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    11/41

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    12/41

    La wrenc e Ave. Streetsc a p e

    Stree tsc ape Improvem ents Mid-Bloc k Planters

    Mid-Block Sidewalk Planterso 41 planters located near catch basins to allow for infiltration planter design.o Proposed between Western Ave. and Clark St. where sidewalk widths allow.o Maintenance Agreement will be required prior to construction

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    13/41

    La wrenc e Ave. Streetsc a p e

    Streetsc ape Imp rovements Designa ted Bike Lanes East of Western Ave.

    o Adding 1 mile of designated bike lane (in each direction).o Completing the 5 mile link from the

    Kennedy/Blue Line to east of Sheridan Rd (Elston to Central Park shared) and to Lakefront.

    New Designated Bike Lane

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    14/41

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    15/41

    Proposed Streetsc ape Conditions East of Western Ave.

    La wrenc e Ave. Streetsc a p e

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    16/41

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    17/41

    La wrenc e Ave. Streetsc a p e

    Corridor Impac ts

    Stree tsc ape Changes to Mitiga te Negative Impac ts of the Roa d Diet

    Traffic signal timings will bead justed to p rovid e greate reffic ienc y for throug h-tra ffic onLawrence Ave.

    All signals 85 seconds Ped crossings between

    3.5-4 ft/second

    A c enter turn lane is beingp rovide d so tha t turning c a rs d onot interrup t the flow throug h

    tra ffic and to fa c ilita te c a rsturning onto La wrenc e.

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    18/41

    La wrenc e Ave. Streetsc a p e

    Corridor Impac ts

    Stree tsc ape Changes to Mitiga te Negative Impac ts of the Roa d Diet

    Bump-Outs on sid e stree tswill red uc e c ut-throug htra ffic onto sid e stree ts

    Pedestrian refuge islandswill increase safety forped estrians c rossing a tnon-signalized intersections

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    19/41

    La wrenc e Ave. Streetsc a p e

    Streetsc ape Elem ents: Western to Ashland Traffic Ca lm Key Plan

    Key Plan

    Existing Traffic calming element (Speed Bump)

    N

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    20/41

    La wrenc e Ave. Streetsc a p e

    Corridor Impac ts

    Stree tsc ape Changes to Mitiga te Negative Impac ts of the Roa d Diet

    The major inte rsec tions ofWestern Ave ., DamenAve ., and Ashland Ave willma inta in 4-lane c rosssections

    Buses a re still ab le to pullover a t stops in order toa llow throug h-tra ffic topass

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    21/41

    La wrenc e Ave. Streetsc a p e

    Major Intersec tion- Ashland Ave.

    Traffic flow expected to remain

    about the same by:

    Making right turn bays into right-thru lanes (8 parking stalls lost).Increased length of left turn storage

    bays.

    Addition of left turn signals.Pavement marking changes only;no curb line adjustments.

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    22/41

    La wrenc e Ave. Streetsc a p e

    Enlargem ent of Intersec tion a t Damen Ave.

    Traffic flow expected to remain about the

    same by:

    Making right turn bays into shared right-through lanes (11 parking stalls lost).

    Increased length of left turn storage bays on

    Lawrence by 90 ft.Addition of left turn signals for eastbound andwestbound traffic on Lawrence.

    Adjustment to traffic signal timing to allow forlonger greens on Lawrence.

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    23/41

    La wrenc e Ave. Streetsc a p e

    Ma jor Intersec tion- Western Ave .

    Traffic flow expected to remain the same

    by:

    Making right turn bays into shared right-through lanes (11 parking stalls lost).

    Increased length of left turn storage bays on

    Western by 200 ft on the south leg and 20 fton the north leg.

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    24/41

    La wrenc e Ave. Streetsc a p e

    Claremont Plaza - Area Context

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    25/41

    La wrenc e Ave. Streetsc a p e

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    26/41

    La wrenc e Ave. Streetsc a p e

    Concept A

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    27/41

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    28/41

    La wrenc e Ave. Streetsc a p e

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    29/41

    La wrenc e Ave. Streetsc a p e

    Key Map Lawrenc e Ave.

    Phase I: Western Ave. toClark St.

    Phase II: Riverto Western Ave.

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    30/41

    Existing Streetsc ape Cond itions West of Western Ave.

    La wrenc e Ave. Streetsc a p e

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    31/41

    Existing Cross Sec tion West of Western Ave.

    La wrenc e Ave. Streetsc a p e

    Lawrence Avenue

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    32/41

    Prop osed Cross Sec tion West of Western Ave.

    La wrenc e Ave. Streetsc a p e

    Lawrence Avenue

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    33/41

    La wrenc e Ave. Streetsc a p e

    Stree tsc ape Improvem ents East of Western Ave.

    Improved Lighting Wider Sidewalks for Cafes

    Site Furniture Community Identifiers Permeable Pavers

    Over 100 New Street Trees

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    34/41

    La wrenc e Ave. Streetsc a p e

    Stree tsc ape Imp rovem ents Ped estrian Improvem ents

    ADA Compliant Crosswalks Stamped Asphalt Crosswalk

    o Shorter pedestrian crossing distances o Larger buffer zone for pedestrians

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    35/41

    La wrenc e Ave. Streetsc a p e

    Streetscape Elements: Bump-outs

    Bump-outso Shorter pedestrian crossing distances o Larger buffer zone for pedestrians o Area for plantings

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    36/41

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    37/41

    La wrenc e Ave. Streetsc a p e

    Streetsc ape Elem ents: Bump-out Key Plan

    Key Plan

    Bump-outs Into Lawrence

    Side Street Bump-outs Still to be determined which bump outs are planters or are hardscape

    N

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    38/41

    L A S

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    39/41

    Existing Streetsc ape Cond itions West of Western Ave.

    La wrenc e Ave. Streetsc a p e

    L A St t

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    40/41

    Proposed Streetsc ape Conditions West of Western Ave.

    La wrenc e Ave. Streetsc a p e

  • 8/4/2019 Lawrence Ave Streetscape Presentation - August 29, 2011

    41/41

    Lawrenc e Avenue Stree tsc ape Conc ep ts

    THANK YOU