Linaro Test and Validation Summit Linaro Engineering Teams LCE13 - Dublin, July 2013 How Do We Better Test our Engineering 2nd Half
Transcript
Page 1: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Linaro Test and Validation Summit

Linaro Engineering Teams

LCE13 - Dublin, July 2013

How Do We Better Test our Engineering

2nd Half

Page 2: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

PART 1: Linaro Platform

Overview

LAVACitius, Altius, Fortius"Faster, Higher, Stronger"

Builds & CIBuild Your Code When You are Not Looking

QA ServicesCover all bases

PART 2: Linaro Engineering

Kernel Developers& Maintainers

Landing Teams Linaro GroupsLEG / LNG

( Do they use CI ? Manual or Automated Testing? )* How do they validate/verify their output? * What/how do they develop?

& easier to use

Page 3: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Linaro Test and Validation Summit

Mike Holmes

LCE13 - Dublin, July 2013

LNG Engineering

Page 4: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Create: Two Linux kernels (with and without RT) and a yocto filesystem.

● Benchmark: RT + KVM + HugePage + Dataplane APIs Required to test kernel and userspace performance, some tests may be run in both spaces.

● Platforms: Arndale, AM335x Starter Kit ? (LSI & TI boards in future ?) QEMU - versatile Express ?

LNG outputs

Page 5: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Our code is validated using CI, and performance trends monitored.

● Our output is verified on one general purpose ARM platform and against two SoC vendor platforms via a configurable switch to allow for dedicated links between nodes under test.

● Using open source software, we use one realistic network application, a general purpose benchmark and five feature specific test suites.

LNG outputs are verified by

Page 6: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Automated testing is done using● custom scripts run via jenkins & lava executing

○ (RT) LTP (Real Time Test Tree)○ (RT) Cyclictest ○ (RT) Hackbench○ (KVM) virt-test○ (Hugepage) sysbench OLTP○ (KVM, Hugepage, RT) openvswitch (Kernel and

userspace)○ (KVM, Hugepage, RT) netperf○ Traffic test cases via pcap files and tcpreplay

LNG uses these tools

Page 7: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● We test against three branches○ linux-lng-tip (development)○ linux-lng-lsk (bug fixes to stable)○ linux-lng-lsk-RT (bug fixes to stable RT variant)

● LNG specific CFG fragments○ KVM (or will this be in a lsk kernel per default?)○ PREEMPT_RT○ NO_HZ_FULL (or will this be in a lsk kernel per

default?)○ HUGEPAGE (is that a CFG option?)

LNG Kernel branches / configuration

Page 8: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Some of the SoC vendors hardware has up to 16 x 10Gb links, generating this much traffic is non trivial.

● Tests equipment such as IXIA traffic generators are expensive.

● Test equipment needs to be remotely switched between the different hardware under test in an automated way

● Scheduling test runs that take days and requires specific equipment to be dedicated to the task.

LNG unique challenges

Page 9: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Multiple nodes may be needed to test traffic interoperability.

● It is not feasible to replicate the test environment at every developer's desk.

● the applied RT patch even when disabled, alters the execution paths

● Some test run for 24 hours or more

LNG unique challenges

Page 10: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Questions○ LAVA is(isn't) working for us

■ Interactive shells in the LAVA environment would speed debugging given that testing can only be performed with the test equipment in the lab

■ Multinode testing, with the reservation and configuration of network switches is required.

■ Long term trends in performance data need to analysed and compared for regression analysis, triggering alerts for deviations.

○ Further thoughts on Friday○ https://lce-13.zerista.

com/event/member/79674

LNG Q&A

Page 11: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Linaro Test and Validation Summit

Scott Bambrough

LCE13 - Dublin, July 2013

Landing Team Engineering

Page 12: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Bootloaders● Linux kernels based on mainline or current

RC's● Linux kernels based on LSK (expected) ● Ubuntu member builds● Android member builds● ALIP member build

Some outputs are public, others confidential.

LT Outputs

Page 13: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Kernel code is validated using CI in the Linaro LAVA Lab, on various member hardware devices and ARM fast models.

● Our kernel code is also validated in member LAVA labs on both current and next gen hardware.

● Our builds at present are a sanity tested by the LT's but most testing is done by piggybacking on QA or automated testing set up by the platform team.

Verification of LT outputs

Page 14: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Currently run only basic compile boot test + default CI tests (LTP, powermgmt)

● This needs to change, we want/need to do more● We need more SoC level tests, having LT's aware of

how to produce tests to run in LAVA will become more important

LT and kernel tests

Page 15: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

1. Much better LAVA documentation2. Document the tests themselves3. Infrastructure for testing4. Infrastructure for better analysis of results

LT & Member Services Needs

Page 16: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Deployment Guide○ what are the hardware requirements for a LAB○ what are the infrastructure requirements for a LAB○ hardware setup, software installation instructions

● Administrator's Guide○ basically how Dave Piggot does his job○ after initial setup, day to day ops and maintenance

Better Documentation

Page 17: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Test Developer's Guide○ how to integrate tests to be run in lava-test-shell

(lava glue)○ recommendations on how best to write tests for lava-

test-shell

● User's Guide for lava-test-shell○ for developers to use lava-test-shell○ section devoted to using lava-test-shell in workflow

of kernel developer?

Better Documentation

Page 18: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Impossible to answer the question: What tests are available in LAVA?

● http://lava-test.readthedocs.org/en/latest/index.html○ not sufficient, not up to date○ problem isn't LAVA team, Linaro needs an

acceptance policy on what a test has available before being used in LAVA

● would like to see meta-data in test documentation that can be used in test reports○ in a format that can be used in report generation

Document the tests

Page 19: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Buddy systems○ TI LT developed tests that require access to

reference material for comparison■ video frame captures■ audio filed

○ TI LT audio/video tests required external box to capture hdmi/audio output

○ Need to do more of this type of automated testing to verify that lower level functions work correctly at BSP level

○ GStreamer insanity test suite requires access to multimedia content

Infrastructure for Testing

Page 20: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Web dashboard won't cut it● need to separate analysis from display

○ rather do an analysis, then decide how to display● why infrastructure?

○ think there should be a level of reuse for components used to do analysis

○ think these should be separate from LAVA○ think of this a more of a data mining operation

Infrastructure for Analysis

Page 21: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

example:● generate test report as PDF

○ perform tests, generate a report○ include metadata regarding tests

■ metadata from test documentation?

example:● test report comparing:

○ current member BSP kernel○ current LT kernel based on mainline

● evidence of quality/stability of LT/mainline kernel● could be used to convince product teams

Infrastructure for Analysis

Page 22: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

example:● regression analysis of kernel changes

○ perform tests one day, make changes, test next○ did any test results change?

■ yes, send report of changes via email

example:● generate test report as PDF

○ perform tests, generate a report○ include metadata regarding tests

■ metadata from test documentation?

Infrastructure for Analysis

Page 23: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

example:● test report comparing:

○ current member BSP kernel○ current LT kernel based on mainline

● evidence of quality/stability of LT/mainline kernel● could be used to convince product teams

Infrastructure for Analysis

Page 24: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Linaro Test and Validation Summit

Kevin Hilman

LCE13 - Dublin, July 2013

Kernel Developer/Maintainer

Page 25: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Most kernel development is done with little or no automation

● build: local, custom build scripts● boot: manual boot testing on local hardware● debug: custom unit-test scripts, manual verification of

results● publish: to public mailing lists● merged: into maintainer trees, linux-next● test: manual test of maintainer trees, linux-next

○ but many (most?) developers don't do this

Current workflow: development

Page 26: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Code review on mailing list● build/boot testing by maintainers● build testing in linux-next (manual)

○ several developers do manual build tests of their pet platforms in linux-next and report failures

● Intel's 0-day tester (automated, but closed)○ regular, automatic build tests○ multi-arch build tests○ boot tests (x86)○ automatic git bisect for failures○ very fast results○ detailed email reports○ extremely useful

Current workflow: validation

Page 27: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

This model is "good enough" for most developers and maintainers, so...

Why should we use Jenkins/LAVA?

Linaro test/validation will have to be● at least as easy to use (locally and remotely)● output/results more useful● faster

○ build time○ diagnostic time

Current workflow: "good enough"

Page 28: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Local testing: aid in build, boot, test cycle○ local LAVA install, using local boards○ reduce duplication of custom scripts/setup○ encourage writing LAVA-ready tests○ easy to switch between local, and remote LAVA lab

● Remote CI: broader coverage○ "I'm about ready to push this, I wonder if broke any

other platforms..."○ automatic, fast (ish) response

Potential Usage models

Page 29: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Has to be easy to install○ packaged (deb, rpm)○ or git repo for development (bzr is ......)

● Has to fit into existing developer work flow○ LAVA does not exclusively own hardware○ developers have non-Linaro platforms○ command-line driven○ must co-exist with existing interactive use of boards

■ existing Apache setup■ existing TFTP setup■ existing, customized bootloaders■ ...

Local testing: LAVA

Page 30: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Broad testing● multi-arch (not just ARM)● ARM: all defconfigs (not just Linaro boards)

○ also: allnoconfig, allmodconfig, randconfig, ...● Continuous builds

○ Linus' tree, linux-next, arm-soc/for-next, ...○ developers can submit their own branches

● On-demand builds○ register a tree/branch○ push triggers a build

● fast, automatic reporting of failures○ without manual monitoring/clicking through jenkins

Remote CI

Page 31: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Tracking build breakage in upstream trees

● when did build start breaking● what are the exact build error messages

(without Jenkins click fest)● which commit (probably) broke the build

○ automated bisect

Useful output: build testing

Page 32: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Where is the line between Jenkins and LAVA?

● Jenkins == build, LAVA == test?

● when a LAVA test fails how do I know...○ was this a new/updated test?○ was this a new/updated kernel? ○ if so, can I get to the Jenkins build?

In less than 10 clicks?

Issues: Big picture

Page 33: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● "Master image" is not useful○ LAVA assumes are powered on and running master

image (or will reboot into master image)○ assumptions about SD card existence, partitioning...○ assumptions about shell prompts

linaro-test [rc=0] #○ etc. etc.

● Goal: LAVA directly controls bootloader○ netboot: get kernel + DTB + initrd via TFTP○ extension via board-specific bootloader scripting

Tyler's new "bootloader" device support in LAVA appears to have mostly solved this !!

Issues: LAVA design

Page 34: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

● Terminology learning curve○ dispatcher, scheduler, dashboard○ device, device-type○ What is a bundle?○ WTF is a bundle stream?○ Documentation... not helpful (enough said)

● Navigation○ click intensive○ how to get from a log to the test results? or...○ from a test back to the boot log?○ what about build log (Jenkins?)○ can I navigate from Jenkins log to the LAVA test?

Issues: LAVA usability

Page 35: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Kernel + modules: omap2plus_defconfig● 1 minute

○ hackbox.linaro.org (-j48: 12 x 3.5GHz Xeon, 24G)● 1.5 minutes

○ khilman local (-j24: 6 x 3.3GHz i7, 16G RAM)● 8 minutes

○ Macbook Air (-j8: 2 x 1.8GHz i7, 4G)● 14 minutes

○ Thinkpad T61 (-j4: 2 x Core2Duo, 4G RAM)● 16 minutes

○ Linaro Jenkins (-j8: EC2 node, built in tmpfs)● 17 minutes

○ ARM chromebook (-j4: 2 x 1.7 GHz A15, 2G RAM)

Issues: Jenkins performance

Page 36: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Linaro Test and Validation Summit

Grant Likely

LCE13 - Dublin, July 2013

LEG Engineering

Page 37: LCE13: Test and Validation Mini-Summit: Review Current Linaro Engineering Processes

Recommended