LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004
Transcript
Page 1: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

LCG-2 Plan in Taiwan

Simon C. Lin and Eric YenAcademia SinicaTaipei, Taiwan

13 January 2004

Page 2: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

• Network Infrastructure in Taiwan• Grid Applications in Taiwan• LCG-1 Status• Schedule for LCG2

Outline

Page 3: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.
Page 4: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

Taiwan International Network

Japan

US-West

US-East

Europe

155Mbps(Jan., 2004)622Mbps(Feb., 2004)

155Mbps(Feb., 2004)1.24Gbps(Apr., 2004)

2.4Gbps

622Mbps(Feb., 2004)1.24Gbps(Mar., 2004)

US-West

2.4Gbps

Polo Alto, USASeattle, USA

1.24Gbps

622Mbps

SingaporeSingaren

155MbpsFeb. 2004, possibly

155Mbps

Hong KongHARNet

Page 5: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

Topology of Taiwan Domestic Network

• Backbone: 80 G• GigaPoPs: 145 G• Dark Fiber: 6

Taichung

Hsinchu20G

20G

20G

10G

10G

Tainan

Taipei

Sinica NCU

NCTHU

NCNU

CCU

NCKU NSYSU

NTU

NDHU

NCTU

NTHU

10GE5GEfiber10GE or fiber

Page 6: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

• High Energy Physics: ATLAS, CMS, CDF• Bioinformatics: BioPortal, HealthGrid• Digital Archive Grid• Biodiversity: GBIF member• Tele-Science• eLearning• Access Grid• Parallel Computing Environment

Grid Applications in Taiwan

Page 7: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

• LCG-1 Status– LCG-0 Deployed at March 19, 2003, just after RAL

and CNAF– ASGCCA Approved: June 12th, 2003– Keep 2~6 Staffs Stationed at CERN from July 2003

• Join GTA, DB, Application, and C&T teams for LCG Development

– LCG-1 Testbed Ready: July 30, 2003• Sep. 2: LCG1-1_0_0 Ready• Oct.28: LCG1-1_1_0 Ready• Nov. 7: LCG1-1_1_1.I Ready• Dec.: LCG1-1_1_3 Ready

LCG System Deployment

Page 8: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

Current Status

• Acting as the East2 RegionGIIS• 1 Top MDS, 1 RB, 1 BDII, 1 UI, 1 Proxy,

1 LCFGng, 1 SE, 1 CE and 8 WNs• Tier2 Sites will be ready in 1Q2004 (NTU,

NCU & ASIP)• Keep system availability to 99.8%+• Manpower in ASCC for Grid (FTE)

LCG Grid Total

2003 4 3 7

2004 6 4 10

Page 9: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

• IBM BladeCenter– Processor (around 1KSI2K/cpu)

• 2x SMP processors; BIOS type: IBM BIOS

• Processor (CPU): Intel Xeon 2.80 GHz

• Front side bus (FSB): 533 MHz

• Internal L2 cache memory size: 512 KB

– System Memory• Memory (RAM): 2GB DDR SDRAM (Chipkill)

• RAM slots total: 4 DIMM; Memory speed: 266 MHz

– Storage• 2x 40GB IDE Hard Drive in each Blade

• Connect to External Storage thru SAN Switch (2Gb)

– Networking: Gigabit Ethernet- Integrated

– System Architecture

• 14 Blades/Chases; 5 Chases(7U)/Rack(19’)

New Platform for LCG-2

Page 10: LCG-2 Plan in Taiwan Simon C. Lin and Eric Yen Academia Sinica Taipei, Taiwan 13 January 2004.

• Will try to meet the 12, 19, 26 Jan Schedule– BUT, the Chinese New Year is on the way!

• 52 Blades will be ready by 31 Jan., 2004– is working on the installation and testing under LCG-1

– To fulfill the commitment of 60 nodes (16Nodes originally)

• Mass Storage System– Now using SAN and IBM TSM for management of 30TB+

disk arrays and 130TB+ Tape Library

– Will try Caster/Enstore from Feb. 2004

– Dedicated 5 TB+ disk array will be online in Mar.

• Willing to be a GOC in Asia• Plan to collaborate with Karlsruhe for GGUS

Schedule for LCG-2


Recommended