LCG-2 Plan in Taiwan
Simon C. Lin and Eric YenAcademia SinicaTaipei, Taiwan
13 January 2004
• Network Infrastructure in Taiwan• Grid Applications in Taiwan• LCG-1 Status• Schedule for LCG2
Outline
Taiwan International Network
Japan
US-West
US-East
Europe
155Mbps(Jan., 2004)622Mbps(Feb., 2004)
155Mbps(Feb., 2004)1.24Gbps(Apr., 2004)
2.4Gbps
622Mbps(Feb., 2004)1.24Gbps(Mar., 2004)
US-West
2.4Gbps
Polo Alto, USASeattle, USA
1.24Gbps
622Mbps
SingaporeSingaren
155MbpsFeb. 2004, possibly
155Mbps
Hong KongHARNet
Topology of Taiwan Domestic Network
• Backbone: 80 G• GigaPoPs: 145 G• Dark Fiber: 6
Taichung
Hsinchu20G
20G
20G
10G
10G
Tainan
Taipei
Sinica NCU
NCTHU
NCNU
CCU
NCKU NSYSU
NTU
NDHU
NCTU
NTHU
10GE5GEfiber10GE or fiber
• High Energy Physics: ATLAS, CMS, CDF• Bioinformatics: BioPortal, HealthGrid• Digital Archive Grid• Biodiversity: GBIF member• Tele-Science• eLearning• Access Grid• Parallel Computing Environment
Grid Applications in Taiwan
• LCG-1 Status– LCG-0 Deployed at March 19, 2003, just after RAL
and CNAF– ASGCCA Approved: June 12th, 2003– Keep 2~6 Staffs Stationed at CERN from July 2003
• Join GTA, DB, Application, and C&T teams for LCG Development
– LCG-1 Testbed Ready: July 30, 2003• Sep. 2: LCG1-1_0_0 Ready• Oct.28: LCG1-1_1_0 Ready• Nov. 7: LCG1-1_1_1.I Ready• Dec.: LCG1-1_1_3 Ready
LCG System Deployment
Current Status
• Acting as the East2 RegionGIIS• 1 Top MDS, 1 RB, 1 BDII, 1 UI, 1 Proxy,
1 LCFGng, 1 SE, 1 CE and 8 WNs• Tier2 Sites will be ready in 1Q2004 (NTU,
NCU & ASIP)• Keep system availability to 99.8%+• Manpower in ASCC for Grid (FTE)
LCG Grid Total
2003 4 3 7
2004 6 4 10
• IBM BladeCenter– Processor (around 1KSI2K/cpu)
• 2x SMP processors; BIOS type: IBM BIOS
• Processor (CPU): Intel Xeon 2.80 GHz
• Front side bus (FSB): 533 MHz
• Internal L2 cache memory size: 512 KB
– System Memory• Memory (RAM): 2GB DDR SDRAM (Chipkill)
• RAM slots total: 4 DIMM; Memory speed: 266 MHz
– Storage• 2x 40GB IDE Hard Drive in each Blade
• Connect to External Storage thru SAN Switch (2Gb)
– Networking: Gigabit Ethernet- Integrated
– System Architecture
• 14 Blades/Chases; 5 Chases(7U)/Rack(19’)
New Platform for LCG-2
• Will try to meet the 12, 19, 26 Jan Schedule– BUT, the Chinese New Year is on the way!
• 52 Blades will be ready by 31 Jan., 2004– is working on the installation and testing under LCG-1
– To fulfill the commitment of 60 nodes (16Nodes originally)
• Mass Storage System– Now using SAN and IBM TSM for management of 30TB+
disk arrays and 130TB+ Tape Library
– Will try Caster/Enstore from Feb. 2004
– Dedicated 5 TB+ disk array will be online in Mar.
• Willing to be a GOC in Asia• Plan to collaborate with Karlsruhe for GGUS
Schedule for LCG-2