Asset Lifecycle Solutions LEAN Project Delivery of Minor Capital Projects Brierley D Stubbs Asset Lifecycle Solutions Falah Alhusan United Utilities
Transcript
Page 1: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

LEAN Project Delivery of

Minor Capital Projects

Brierley D Stubbs – Asset Lifecycle Solutions

Falah Alhusan – United Utilities

Page 2: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Asset Lifecycle Solutions Chartered Quantity Surveyors

Whole Life Value Management

of Built Asset

Consultancy – Coaching -

Interim Management

Brierley D Stubbs FRICS

Page 3: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Client Sectors [Project Works, Overhauls & Renewals, Minor Works,

Maintenance & Facilities Management]

Utilities infrastructure

NHS (Hospitals)

Oil Gas & Chemicals Process

Pharmaceutical

PFI / PPP

Social Housing

Hospitals & Education

Sports & Leisure

Uniformed Services

Aviation

Railways infrastructure

Nuclear

Commercial & Retail

BRIERLEY STUBBS Asset Lifecycle Solutions 3

Page 4: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Falah Alhusan BSc MSc CEng FICE FAPM

Wastewater Programme Delivery Manager

Page 5: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

LEAN Project Delivery in Infrastructure Minor Works

INTRODUCTION [Falah Alhusan]

• United Utilities Minor Works profile

Part 1 – The Case For Lean Project Process [Brierley Stubbs] • 5 LEAN Principles

• Stakeholder Value Drivers

• LEAN Construction & Process Efficiency

Part 2 – The Solution [Brierley Stubbs] • SWOT Review – Stakeholders, Process, Contracts

• Project Delivery – Process definition – Inputs, Outputs, Responsibilities

• Service Levels & KPMs

• Key challenges

Part 3 – Value Achievements & Awards [Falah Alhusan]

Page 6: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

United Utilities Minor Works Scope – Outline Summary

• UU Definition - Infrastructure & Non Infrastructure

• Non Infrastructure Operational sites

– Q+X Programmes, Lifecycle renewals, Operational problems

• NW England – 4 x Areas

• End2End Project Delivery

• Framework Construction Partners + Kit Vendors

Page 7: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Delivery Parameters

• Work initiation - Problem Notes, VSPs, MCPs

• Governance & Compliance

• Operational Sites

• Multidiscipline scopes

• Annual throughput; – 600 – 800 minor capital projects per year

– 80% < £100k

• Non-uniform work flow

• Wide geographical dispersion

Page 8: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

United Utilities Geographical Coverage

Contractor 3 Manchester

Carlisle

Manchester

Carlisle

D/hulme

Cumbria

Manchester

Merseyside/

Cheshire

Lancashire

Contractor 1

Contractor 2

Contractor 4

Page 9: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

The Minor Works Team

End2End Project Delivery; • Solution planning & Scope development • Budget & Detailed Estimating • Optioneering (Optimised lifecycle cost) • Outline & Detailed Design • Risk Assessment & Management • H&S Management - CDM • Contract Procurement • Construction Management • Commissioning and handover

Page 10: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

The Challenge

• Improved workflow

• Demonstrate the BEST FIT solution

• Reducing appointment time

• Maximising value in terms of “Whole Life Cost” and lowest prices

• Maximising resource efficiency – Company & Supply Chain

• Providing maximum flexibility in approach to project delivery

Page 11: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Minor Works Delivery Process Evolution

• Pre Partnering (>>> 2001) – MWD Services defined – Competitive tender procurement – Capture Delivery volumetrics

• MWAF Generation 1 (2002 – 2008) – Establish the project delivery process – Long Term Partnering with the Supply Chain

• (European Construction Best Practice capture – Case Study)

• MWAF Generation 2 (2008 >>) – DEMONSTRATE Client Value – Process enhancement (LEAN)

Page 12: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Embedding Best Practice

8 P PRINCIPLES + VEPs

EFFECTIVE application of; 1. Project concept & definition 2. Project Team Management 3. Supply Chain Relationships 4. Information Management & Communication 5. Project Risk Management 6. Innovation & Continuous Improvement 7. Project Execution 8. Performance Measurement

Page 13: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Minor Works Delivery Efficiency Gains

Value & Efficiency initiative

Page 14: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

LEAN Project Delivery in Infrastructure Minor Works

Part 1 – The Case for LEAN Project Process

• 5 LEAN Principles

• Stakeholder Value Drivers

• LEAN Construction & Process Efficiency

Page 15: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

2. Map the Process

3. Create Flow

4. Draw Value

5. Improve Performance

1. Identify Value

5 x LEAN Principles

Page 16: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Stakeholder Values

• Who are the Stakeholders? – Treatment Managers,

– Area Works Planning,

– Technical Officers,

– Asset Registration,

– H&S,

– Minor Works Team Project Manager,

– Construction & Supply Chain partners

– CUSTOMER [OFWAT]

Page 17: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Demonstrating Value

• Value Drivers – Lowest “Cost to Serve”

– BEST FIT Solution • “Common Framework” alignment

– Minimum Client Involvement / Ops interruptions

– Time to PIU (Project in Use)

– Prompt Asset Registration

– Budget Compliance

– Construction Cost = market rate benchmark

– Supply Chain profit & efficiency

Page 18: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

£1 W A S T E NVA ACTIVITY VALUE 25p Typical

Value in the Construction Process

£1 LEAN VALUE NVA ACTIVITY WASTE

MINOR WORKS THROUGHPUT 600 – 800 Jobs per year

80% < £100k Multidiscipline Framework Partners

Page 19: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

VALUE IS IN REDEFINING THE PROJECT PROCESS

• Governance & Compliance – Corporate Governance

• Project Approvals, Finance (Capex / Revex, Economic asset lifecycles), Procurement, etc

– Regulatory compliance • Q&X, Customer Service, Asset Registration, etc.

• Operational Client – >70% of Risk, Cost & Value is determined prior to construction phase

• Minor Works Project Delivery Team – >40% of effort is spent prior to construction phase (Needs definition, Option

appraisal, Solution ID, Sanction estimate, Contract Procurement)

• Framework Partner – Abortive & duplicated effort (poor needs definition) – Workload planning problems (Project Approval delays, Job prioritisation

changes) – Leading to changes on site – scope and cost creep.

• Kit Vendors / Specialist Suppliers – Delivery periods / storage / Site reception

Page 20: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

End2End Project Delivery Planned & Reactive Maintenance, Replacements & Renewals

KIT VENDORS

CONSTRUCTION PHASE PLAN

CONSTRUCT COMMISSION

HANDOVER

O&M MANUAL TRAINING

ASSET REGISTER

SOLUTION DESIGN

REV

IEW

& F

EED

BA

CK

NEED! AREA

WORKS PLAN

SOLUTION OPTIONS

PROCURE PROJECT APPROVAL

TIMESCALE RISK

ASSURED TIMESCALE

DELAY

DESIGN DEFINE

Page 21: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

LEAN CONSTRUCTION - LCI UK Definition

“LEAN Construction . . .requires collaboration and mutual commitment to”: • Create reliable production in both design and build phases

• <<< Needs definition / Options study / Solution ID • <<< Business Case approval / Procurement

• Planning (Construction) • >>> Area Works Planning & Prioritisation • >>> Access plan / Construction Phase Plan

• Improving Long Term Relationships • >>> MWAF Frameworks

• Committing to High Performance & Continual Improvement • Service levels, KPMs, Experience Feedback (Client led)

Page 22: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

LEAN Project Delivery in Infrastructure Minor Works

Part 2 – The Solution

A Project Process to DELIVER & DEMONSTRATE Value • SWOT Review – Stakeholders, Process, Contracts

• Project Delivery – Process definition – Inputs, Outputs, Responsibilities

• Service Levels & KPMs

• Key challenges

Page 23: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

LEAN/Process Enhancement Facilitator

• SWOT Review – Organisation, Stakeholders, Culture

– Contracts, Process, Service Levels, “Blockers”

– Industry Best Practices / Initiatives • Embedded – Partnering / SCM / ?BIM?!

• Improve - “LEAN” / WLC / KPMs

• Improvement team “Champions” – Client sponsors / Ops Liaison - “Client Guardian”

– Minor Works Team / Supply Chain Partners

• Engagement Plan – Goal Deployment

Page 24: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Stakeholder Values

• Awaydays & Workshops

– All Party “Grumble session”

– Company Stakeholder Groups

– Contractor Partners

• Agree Value Drivers

– Set Service Levels

– Develop KPMs

Page 25: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Demonstrating Value

• Value Drivers – Lowest “Cost to Serve” – BEST FIT Solution

• “Common Framework” alignment

– Minimum Client Involvement / Ops interruptions – Shortest / Optimum Time to PIU (Project in Use) – Prompt Asset Registration – Budget Compliance – Construction Cost = market rate benchmark – Supply Chain profit & efficiency

• Planned & Reactive responses

Page 26: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

2. Map the Process

3. Create Flow

4. Draw Value

5. Improve Performance

1. Identify Value

5 x LEAN Principles

Page 27: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

End2End Delivery Process

Problem

Define & Plan

Optioneer

Project Approval

Procure Construct Finalise

Commission & Handover

[Deliverables & Responsibilities] > > > > > > > Create Flow > > > > > > >

Page 28: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Definition > Options > Solution > Approval Process Flow

Page 29: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Definition > Options > Solution > Approval Create Process Flow

Page 30: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Job Priority / Estimate Accuracy

Page 31: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Execute & Close

Page 32: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Minor Works Alliance Frameworks

• NEC – ECC Engineering and Construction Contract (3rd Edition) – Option A – Priced contract with activity schedule

• {95% of jobs}

– Option C – Target Cost with activity schedule • {over £200k}

– Option E – Cost reimbursable • {Emergency works}

• Tendered / Agreed Rates for defined cost elements

Page 33: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

2. Map the Process

3. Create Flow

4. Draw Value

5. Improve Performance

1. Identify Value

5 x LEAN Principles

Page 34: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Project Delivery Process Incidence of KPMs

Page 35: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Project Delivery Process KPM Categories

Page 36: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Project Delivery Process KPM Summary (Excerpt)

Page 37: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Project Delivery Process KPM Metric – Work Planning

Page 38: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Project Delivery Process Visual Management

Page 39: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

LEAN Project Delivery in Infrastructure Minor Works

Part 3 – VALUE ACHIEVEMENTS & AWARDS

Page 40: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Delivering Client Value Outcomes & Benefits 1

• LEAN End2End Project Delivery process – Clear stages, service levels, responsibilities – Agreed KPMs & metrics

• Client operations

– Increased volume of resolved business risks – Assured compliance – regulatory & internal – Economies of scale & reduced lead in time – Certainty of outcome (solution, time & cost) – Asset data capture (PIMS / UCD / MAMS)

• Supply chain

– Collaborative win-win environment – Greater coordination with Kit Vendors – Efficient workload planning & use of resources – Reduced risk – Limited disputes or claims

Page 41: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

Delivering Client Value Outcomes & Benefits 2

• Minor Works Team – Smaller supply base / reduced interfaces – Clearer understanding of Client requirements – Delivery achievements enhanced (see below) – Improved H&S performance – External service opportunities

• Measured efficiencies (Minor Works Team)

– Cost to serve - reduced by -37% – Annual average throughput - increased by +25% – Sanction estimates approved - within timescale 96% – PIU milestone - Target exceeded 95% – Project Outturn cost - Within approved estimate 96% – Risks & Issues - without escalation 98% – H&S Management - without incident 99% – Client satisfaction - Overall 87%

Page 42: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

A Success Story

• ECI Long Term Partnering – Case Study

• ECI “ACTIVE”

• Construction Industry Awards

Page 43: LEAN Project Delivery of Minor Capital Projectsassets.highways.gov.uk/.../LCI_NW_Minor_projects_webinar.pdfLEAN Project Delivery of Minor Capital Projects ... • Minor Works Project

Asset L

ifecycle

So

lutio

ns

LEAN Project Delivery in

Infrastructure Minor Works

Discussion


Recommended