1 1Modern Project Management in ICT 1
Lecture: Modern Project Management in ICT
Prof. Dr. Harald Wehnes
HUST, Mar 12 - 2019
Research Task: Project Management in Vietnam
2 2Modern Project Management in ICT 2
Agenda
1. Big historical projects in VN (result, duration, costs)
2. Big actual projects in VN (result, duration, costs)
3. Big historical and actual projects in Hanoi (result, duration,
costs)
4. The main branches where project management is applied in VN
5. VN portals with job offers for project managers
6. VN universities that offer project management (degree)
courses for students and books about project management in
Vietnamese
7. Skills of project managers (analyze some pm job offers)
8. Project management organizations and groups in VN
General Information
• Location: Ngọc Thụy, Long
Biên District, Hà Nội. (connect
Hoan Kiem and Long Bien
District)
• Age: 117 years (1902-2019)
• The biggest project in
Indochina in 20th century.
Construction Process
• Construction motivation: Increasing Colonial exploitation.
• Contractors: Daydé & Pillé Company.
• Construction duration: 3 years (1989-1902).
Construction Process
• Cost: 6.200.000 FRS.
• Material: 30.000m3 of Stone, 5600 tons of Steel.
• Human resource: 40 France Architects, 3000 Vietnamese
workers
Result
• Approximate 3200 meters length.
• 19 steel spans placed on 20 pillars of over 40 meters.
• 2.6 meters width for vehicles roads and 0.8 meter width
for 2 waking lanes.
Historical value• The greatest construction project in Indochina, the 2nd
longest steel bridge in the world at that time.
• The arterial road of the Northern Vietnam in 20th century
for trading goods and transporting weapons for wars.
• Historical witness of the freedom protecting wars of
Vietnamese people
TREYr e s e a r c h
Objectives• Result
Group 2 14
Traffic: Possible alternative for personal vehicles Reduce traffic jams Maximize usage of public transport
Environment: Save energy, reduce gas usage Reduce accidents Reduce pollution (1682 tons of CO2/year)
TREYr e s e a r c h
Objectives
• Timing: Specific design finished by 9/2017 Finish constructing in 12/2018 Operate from 2019
• Financial: 144 millions USD
• Social:
11 millions users
Feedback from user > 4/5 stars
15Group 2
TREYr e s e a r c h
1. Objectives
1.1 Results:
• This is the first MRT (Mass Rapid Transport) in Ho Chi Minh city.
• Meet the increasing demand of commuting and contribute to the local economy.
• Improve the urban environment by reducing traffic jam and pollution of HCM city.
• Total length of MRT line 1 is 19.7 km from Ben Thanh to Suoi Tien (2.6 km underground and 17.1 km high), 14 stations including 3 underground stations and 11 elevated stations.
1.2 Time:
• Route 1 was started in March 2007.
• Finish constructing in 2019.
• Come into operation in 2020.
17
Group 2
TREYr e s e a r c h
1. Objectives
1.3 Financial:
• Total investment cost: 2.490.000.000 (USD)
• 83% of the total investment cost is financed by JBIC loans and 17% is from the city budget.
• The project does not apply any international market mechanism.
1.4 Social:
• Supply the best punctual transportation system, high power, good reliability in Ho Chi Minh city.
• The MRT system is more efficient than personal vehicles based on CO2 emissions on passengers ‐ km CO2 emissions are reduced.
1.5 Non-objectives:
• Supervise the “Number of passengers using MRT during the year”, “CO2 emissions coefficient on passenger-Km” to optimize operation of the system.
18
Group 2
TREYr e s e a r c h
2. Work Breakdown Constructure
19
Ben
Thanh
central
station
MRT system
Rout
e 3B
Rout
e 3ARoute 2
Northwester
n town of
Cu Chi –
Thu Thiem
Route Tramway
1
Route
Tramway and
Monorail
Route Monorail
2
Specialized
route to Hiep
Phuoc
harbour
Route
Thu Thiem
– Long
Thanh
Internationa
l airport
Route Monorail
3
Second floor
Third floor
Fourth floor
First floor
1 depot
14
stations42
stations
1 depot
20
stations
Route 1
Ben Thanh
– Suoi
Tien
Rout
e 5
Rout
e 4
Rout
e 6
Other
route
s
Group 2
TREYr e s e a r c h
3. Work package list
20
Code Name Deliverables Duration Pre-decessores
1 Ben Thanh Central station
General station for 4 routes(routes 1, 2, 3A, 4) Create a new look for the central area of HCM city.
4 years
1.1 First floor Underground street leading to the City Theater station (4 areas). NA
1.2 Second floor Destination of train Metro 1 (2 areas). NA 1.1
1.3 Third floor The transshipment area. NA 1.2
1.4 Fourth floor Desination of train Metro 2. NA 1.3
2 Route 1 Between Ben Thanh and Suot Tien 10 years
2.1 14 stations 3 underground stations, 11 elevated stations. NA 1.4
2.2 1 Depot Central control and maintenance of trains of route 1 until 2040. NA 2.1
3 Route 2 Located in northwestern town of Cu Chi – Thu Thiem 16 years (3 periods)
3.1 42 Stations 16 underground stations, more than 10 elevated stations (the others were not designed)
NA 2.2
Group 2
TREYr e s e a r c h
3. Work package list
21
Code Name Deliverables Duration Pre-decessores
4 Route 3A Between Ben Thanh and Tan Kien, length of 19.8 Km, 17 stations. 16 years 3.1
5 Route 3B Between Cong Hoa crossroad and Hiep Binh Phuoc, length of 12.2 Km, 11 stations.
NA 4
6 Route 4A Between Thanh Xuan and Hiep Phuoc, length of 35.7 Km, 32 stations. NA 5
7 Route 4B Between Gia Dinh park and Lang Cha Ca, length of 3.2 Km, 3 stations. Being connected to Tan Son Nhat international airport.
14 years 6
8 Route 5 2 periods of construction. Period 1: 8.9 Km, period 2: 14.5 Km. 15 years 7
9 Route 6 Between Ba Queo and Phu Lam, length of 6.7 Km, 7 stations. NA 8
10 Others
10.1 Tramway 1 Length of 12.8 Km, located on the floor. 6 main stations and 17 passenger terminals and 1 Depot.
12 years 0
10.2 Monorail 2 Length of 27.2 Km (national project list calling for investment). 10 years 10.1
10.3 Monorail 3 Length of 16.5 Km. Preparing to a pre-feasibility study report. NA 10.2
Group 2
Lotte Center Tower
• Cost
– $400M
• Duration
– 2010 - 2014
– Opened on 2nd Sep 2014
• Result
– LOTTE CENTER HANOI rises to 65 storieswith 5 stories below, to a height of 267 meterswith a total floor area of 253,402 squaremeters, being the largest and tallest high endmixed-use complex in Hanoi. Its design wasinspired by the traditional Vietnamese “aodai”.
Long Bien Bridge
• Cost
– 6.2 million francs (~$1.2 million in 1900)
– more than 3,000 Vietnamese took part in theconstruction
• Duration
– 1899-1902 and opened in 1903
• Result
– 2.4 kilometers (1.5 mi) in length, it was, at thattime, one of the longest bridges in Asia. Forthe French colonial government, theconstruction was of strategic importance insecuring control of northern Vietnam.
Ha Noi Opera House
• Cost
– 2 million franc ( $8,4 million in 2011)
• Duration
– Construction started: 7 June 1901
– Opened: 9 December 1911
• Result
– Ha Noi Opera House located at Trang Tienstreet with 2600 m2. It was inspired by OpéraGamier, Paris. It is a complex architecturewhich has become a typical symbol andimportant cultural central of Ha Noi.
Great Cathedral of Hanoi( St. Joseph’s Cathedral )
• Cost
– 300.000 franc
• Duration
– 1884 - 1888
• Result
– A Great Church whose architecture wasinspired by Notre-Dame de Paris.
– This is where most Christians in Hanoi gatherevery Sunday.
SKILLS IN PROJECT MANAGEMENT
Project
management
Leadership
Communication
Scheduling
Risk
Management
Quality
Management
Negotiating
START UP
MANAGER POSITION
2
ENGINEERING
ENGINEERING
Research and
Development
Chief Technical
Officer (CTO) Start-up
4
Technical
Staff
Market research
Building business strategies
Estimated investment costs, financial planning
Organization company
BUSINESS
6
VN PortalsInstructor : Harald Wehnes
Group 5 :
Nguyen Hai Dang
Ha An Huy
Le Minh Kien
Nguyen DuyTri
Nguyen Tan Cuong
35
CONTENTS
1. Vieclam.laodong.com.vn
2. Vietnamworks.com
3. Jobstreet.vn
4. Careerlink.vn
5. Ybox.vn
36
Vieclam.laodong.com.vn
• One of the prestigious job search websites in Hanoi.
• With a team of experts and fast information processing techniques can help candidates with the most useful information about job search across the country.
• Searching by many different information by industry, location, salary, experience, form of employment, all levels, full/parttime jobs...
• The number of jobs is always updated most frequently on this website.
37
Vietnamworks.com
• One of the job search websites trusted by many candidates
• The information filtering system of this website also allows you to search for the most suitable candidate positions, depending on the individual's requirements
• If you hace English CV, Vietnamworks will help you stand out and quickly "catch" the eye of employers
38
Jobstreet.vn• The best website to support job seekers in finding jobs nationwide.
• High quality and guaranteed information about recruitments
• Creating a personal profile, multiply your job email so you can directly learn and apply quickly.
• Providing both domestic jobs, Jobstreet also has a section, looking for jobs in Asian countries.
39
Careerlink.vn
• One of the reputable job search information channels for candidates across the country.
• Candidates can create your document in the website, send email comfortably, sending CV directly in the website.
40
Ybox.vn• A job recruitment channel, especially for young people.
• Help candidates connecting with employers through the aggregation of recruiting news from various sources.
• Have a facebook page, which often update interesting scholarships as well as useful training programs for students
41
Research task
Name: Nguyen Khac PhongDo Gia DangTran Thanh TrungNguyen Hai NgocDo Huy Khang
HUST, 12/2018
Vietnam universities that offer project management (degree) courses forstudents and books about project management in Vietnamese
Outline
I. Project management course and degree in Vietnam
II. Books about project management in Vietnam
RESEARCH TASK 43
I. Course and degree
Overview
• Lack of information
• Only a few universities provide project management course and degree
• Most of them are short course, master degree with a collaboration program with foreign universities
RESEARCH TASK 44
I. Course and degree
Short course
• Program: based on standard program of developed countries and adapt to Vietnam Law to provide a qualified training program of project management
• Target learner: Employees in companies
• Benefit: Learners will be provided high quality conditions with modern equipment of university, and after the course, they will receive a certificate of completion
• Time: This course will be hosted annually, lasts for 1 month and night class available for employees who have to work 9 to 5.
RESEARCH TASK 47
I. Course and degree
Master degree
• Master of Project for Innovation and Enterprise Project Management (English/French Program, with Nantes University, France)
• Program: Program of Nantes University, France
• Duration: 1 year (Compulsory internship: 4-6 months)
• Key features: Provides students with a solid theoretical foundation in management science and innovation management. The course is taught in French and English by French and Vietnamese lecturers. During the program, students have opportunities to obtain experience from experts
• Career opportunities- Join in project management in state-owned or private companies;- Work as expert in setting up and deploying projects;- Work for quality ensuring centers at universities, entrepreneur network, or local centers for enhancing innovation ideas.
RESEARCH TASK 48
I. Course and degree
Short course only
• Content: Introduce and guide student to start a project and manage it. Including many steps about resources, sponsor, strategy, financial, timing,……
• Learner: Student of HUBT
• Time: 1 month
• Benefits: Understand about know how to start and manage a new project like an expert
RESEARCH TASK 50
I. Course and degree
3. Collaborate program of HCM City Open University with University of South Queenland
• Provide Master Degree of Business administration (Strategic human resource management) which contains a project management course
RESEARCH TASK 51
II. Books
This book is a fundamental tool for busy managers who understand the value of simplicity. Special and practical instructions will help you learn how to manage any project - no matter how large or complex it is.
RESEARCH TASK 52
1. The one-page project manager –Clark A. Campbell & Mick Campbell
II. Books
This book helps many generations of manager understand the overall and the detail of many aspects in a project with a easy way to approach
RESEARCH TASK 53
2. Fundamentals of Project Management –Joseph Heagney
II. Books
This book provides concepts, practices, modern skills, practical situations,… to manage complex projects.
RESEARCH TASK 54
3. Modern project manager – Nguyen Van Dung
Planning skill
• All about finding way to do all that you need
to do as efficiently as possible
• Organize tasks in the right order, to hit the right
outcome at the right time
• No matter how good you are at executing, without
being able to properly plan a project, the project won’t
succeed.
TIME MANAGEMENT
TO DO LISTList all work to doPrioritizing
important ones
FOCUSEnergy and wisdom
on the jobTime for other
things
RENOUNCE BAD HABITSRemove each one from your
lifeReplace it with good habits
PROACTIVEComplete
earlierPrevent doing
too much work
DELEGATETeach others
how to doCommunicate
effective
TIME MANAGEMENT
Employee develop
ment
Professional
Training
Coaching &
Mentoring
Cross-
Departmental
Training
Personal
development
Develop “Soft-
skills”
Employee development
1.Over view
63
What is Project management?
- It’s the discipline of initiating, planning, executing,
controlling, and closing the work of a team to achieve
specific goals and meet specific success criteria.
Why is Project Management important?
- Without it, teams and clients are exposed to chaotic
management, unclear objectives, a lack of resources,
unrealistic planning, high risk, poor quality deliverables,
projects going over budget and delivered late.
65
1. Introduction:• ICP International Construction Project Management
and Consultant Joint Stock Company
• Viet nam market
• Motivation: looking for ideals and best solution to
design, advise customer
2. Expertise:• Supervision of construction of civil and industrial
projects
• Supervision and installation of electrical equipment
works with voltage levels up to 35Kv
• Design and construction of civil and industrial
projects, design and construction of technical
infrastructure
• Construction of civil and industrial projects
• Quality inspection of construction work
• Verification of construction design
• Construction investment consultancy
• Construction project management consultancy
• Establish investment projects
• Advice contractor.
3. Foundation:
› Human standard: a team of engineers with experience, enthusiasm and high expertise in many
fields
› Standard work: providing customers with Design, Consulting,
Management and Monitoring services with the best quality and
the most professional working skills
› Certificate: business registration certificate, certificate of
› construction activity capacity, Certificate ISO 9001-2008
4. Outstanding:
› Construction Project Management Consultant Head Office of
Saigon Transport Construction Joint Stock Company
› La Veranda Resort project management consultant and
extension consultant
67
› Consultant supervision
of construction and equipment
installation and Project
management consultancy High-rise
apartment Commercial Services
Office Lot H1-04
› Consulting on project management
and maintenance,
› Ho Chi Minh City People's Court
Office
69
1. Introduction
• HBP Project management Ltd. is a fully licenced
Australian owned construction with wealth experience
in the management and design of international projects.
• In January 1994 HBP received its licensed to carry
out construction consulting activities in Vietnam. Now
they have three offices in Hanoi,Da Nang and Ho Chi
Minh City
• HBP offers the fullest range of construction consulting
services, including architectural, engineering design,
construction, cost and project management.
70
2. Expertise› Project management is one of the specific strengths from HBP services.
› HBP takes responsibility for all aspects of the project ensuring that it is
safely completed to the highest standards on time and within budget.
› Not only in Vietnam, HBP also offers Project Management service in
Cambodia, Laos, and Myanmar.
› Some significant field: Design Management, Design Coordination,
Program Preparation & Management, Value Engineering, Authority
Approvals
• HBP Vietnam has a professional team with many years of experience working
in international environment: General Director, Chairman, Finance Director, Chief
Director, The specialized engineers in Mechanical, Electrical, Architecture, Civil Engineering,…
• HBP is a QMS ISO9001 quality approved company, commits a first class service
provided by company, staff, sub-consultants and contractors. Quality management
is central to all of HBP’s activities.
3. Foundation
71
4. Project There are some outstanding project which provided by HBP Project Management
› Office Project :
Riverside Tower Danang
HBP Services:
Project Management, Engineering Design
Completed Date:
June 2008
Residential Project The Manor
HBP Services:Project Management, Construction Management
•Completed Date:
October 2006
72
Institutional ProjectRMIT University
HBP Services:
Project Management, Cost Management,
Engineering Design, Construction Management
Completed Day:
May 2005
HBP has provided services to all of RMIT’s major
capital expenditure projects in HCMC and in
Hanoi.
Heavy Industrial Project Nghi Son Cement
• Cement Distribution Terminal – Hiep Phuoc,
Vietnam
• HBP Services:
Project Management, Cost Management,
Architectural Design, Engineering Design,
Construction Management
• Completed Date:
July 2001
74
I. Introduction
› Cushman & Wakefield Inc. is an American
commercial real estate services company.
› Cushman & Wakefield was founded in New York
on October 31, 1917 by brothers-in-law J. Clydesdale
Cushman and Bernard Wakefield.
› The company's headquarters is located
in Chicago.
› They have a branch in Vietnam that is located
in Hang Trong str.
› Market size: real estate is the hottest part in
Vietnam economic
75
2. Expertise
PROJECT & DEVELOPMENT SERVICES is one of the biggest part
of services of this company. It is not only helps clients make the right
real estate decisions, but executes and delivers the results they need
to be productive and successful.
Otherwise, they also have many others significant sectors:
› Agency/Landlord Leasing
› Business Continuity and Risk Management
› Business Incentives Practice
› Account management
› Corporate Finance & Investment Banking
76
3. Foundation
› Global leadership:
- Brett White, Chairman and CEO
- John Forrester, President
- Duncan Palmer, CFO
› Local leadership( Vietnam):
- Alex Crane, Managing Director
- Bram Rutgers, Director, Project & Development Services
77
4. Outstanding :
Highly Commended Best Property Consultancy & Best
Real Estate Agency – 2010:
Cushman & Wakefield
Vietnam was named Best
Property Consultancy and
Best Real Estate Agency
Marketing at the International
Property Awards Asia Pacific.
• Q4 2018 saw the completion of one new shopping center in District 2,
adding around 26,000 square meters (sq.m) of retail space to the
market.
=> The overall occupancy improved slightly by 1.3 percentage points (ppt)