UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413 UNIVERSITY OF CALIFORNIA, SAN DIEGO PREQUALIFICATION QUESTIONNAIRE For UREY HALL BARREIRO LABORATORY RELOCATION UNIVERSITY OF CALIFORNIA, SAN DIEGO PROJECT NUMBER: 5166/A4L-450/968413 SUBMITTED BY: < please enter your company name here > UNIVERSITY OF CALIFORNIA, SAN DIEGO CAPITAL PROGRAM MANAGEMENT 10280 NORTH TORREY PINES ROAD LA JOLLA, CA 92037 ISSUE DATE: July 18, 2017 MANDATORY PREQUALIFICATION MEETING: July 24, 2017 MANDATORY MEETING LOCATION: CPM, Large Conference Room, Suite 466 SUBMITTALS DUE: August 2, 2017 UCSD 10/14/03 Page 1 of 44 Level I Prequalification Questionnaire CM @ Risk CM/C Lvl-1 P/Q Quest (UCSD Rev. 01/26/2016)
Transcript
Page 1: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

PREQUALIFICATION QUESTIONNAIREFor

UREY HALL BARREIRO LABORATORY RELOCATION UNIVERSITY OF CALIFORNIA, SAN DIEGO

PROJECT NUMBER: 5166/A4L-450/968413

SUBMITTED BY:

< please enter your company name here >

UNIVERSITY OF CALIFORNIA, SAN DIEGOCAPITAL PROGRAM MANAGEMENT10280 NORTH TORREY PINES ROAD

LA JOLLA, CA 92037

ISSUE DATE: July 18, 2017MANDATORY PREQUALIFICATION MEETING: July 24, 2017

MANDATORY MEETING LOCATION: CPM, Large Conference Room, Suite 466SUBMITTALS DUE: August 2, 2017

UCSD 10/14/03 Page 1 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 2: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

LEVEL 1PREQUALIFICATION QUESTIONNAIRE

ForUREY HALL BARREIRO LABORATORY RELOCATION

(Where a time period is given, such as the last ten [10] years, the period is to be measured backwards from the date this Level I prequalification questionnaire is required to be submitted to the University of California at San Diego.)

Note: Submission of an incomplete and/or unclear Level I Prequalification Questionnaire may result in the determination of the prospective Construction Manager/Contractor (CM/Contractor) as NON-PREQUALIFIED.

SUBMITTED BY: _____________________________________________________________(Name and Title) Printed or Typed

____________________________________________________________(Signature)

____________________________________________________________(Firm Name. )

____________________________________________________________(Contact Name)

____________________________________________________________(Address)

____________________________________________________________(City, State, Zip Code)

________________________ ________________________ (Telephone Number) (Facsimile Number)

_______________________________________________________________________(E-mail Address)

Each prospective CM/Contractor must have the following California General Building Contractor’s License: B, current, active and in good standing with the California Contractor’s State License Board on the date and time of the Prequalification Questionnaire submittal is due. This Prequalification Questionnaire with all portions completed, including required attachments must be submitted.

Each prospective CM/Contractor must answer all of the following questions and provide all requested information, where applicable. Any prospective CM/Contractor failing to do so may be deemed to be non-responsive and not responsible with respect to this Prequalification at the sole discretion of the University. Each prospective CM/Contractor must submit three (3) printed sets and one (1) flash drive with complete submittal of the questionnaire. All CM/Contractor’s which have submitted a Level I Prequalification Questionnaire will be notified in writing of either successfully or not

UCSD 10/14/03 Page 2 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 3: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

successfully achieving Level I prequalification status. The decision of the University is final and is not appealable within the University of California system.

All information submitted for Prequalification evaluation will be considered official information acquired in confidence, and the University will maintain its confidentiality to the extent permitted by law.

It is critical that the prospective CM/Contractor complete all information required herein accurately, completely, truthfully and to the best of their knowledge. Ambiguous or incomplete information may lead to an unfavorable rating and subsequent status as non-prequalified.

WHERE NECESSARY, COPY THE FORMS IN THIS PACKAGE. USE ONLY THESE FORMS.

1. PREQUALIFICATION DECLARATION

I, ________________________________________________, hereby declare that I am the(Printed Name)

_________________________________ of ____________________________________(Title) (Name of Firm)

Submitting this Prequalification Questionnaire; that I am duly authorized to sign this Prequalification Questionnaire on behalf of the above named firm; and that all information set forth in this Prequalification Questionnaire and all attachments hereto are, to the best of my knowledge, true, accurate and complete as of its submission date.

The undersigned declares under penalty of perjury that all of the prequalification information submitted with this form is true and correct and that this declaration was executed in

________________________________ (County), __________________________, (State)

on ______________________________ (Date).

____________________________________(Signature)

UCSD 10/14/03 Page 3 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 4: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

2. ATTENDANCE AT MANDATORY LEVEL I PREQUALIFICATION CONFERENCE

Did a representative of your firm attend the Mandatory Level I Prequalification Conference at Capital Program Management, 10280 N. Torrey Pines Road, University of California, San Diego, La Jolla, CA 92037?

YES NO

Name/names of those attending: _____________________________________________________

Date Meeting Attended: ________________________________________

3. LICENSE

A. Does your firm hold the following California contractor's license, which is current, valid, and in good standing with the California Contractor's State License Board?

License Classification: B – General Building Contractor

YES NO

B. Provide the following information about your firm's contractor's license:

1. Name of license holder exactly as on file with the California Contractor's State License Board:__________________________________________________________________

2. License Classification: _______________________________________________

3. License Number: _____________________________________________________

5. Date Issued: _______________________________________________________

6. Expiration Date: ____________________________________________________

C. Can you truthfully state that your firm's contractor's license has never been suspended or revoked by the California Contractor's State License Board within the last five (5) years?

YES NO

If answer is “No,” explain on attached additional sheets.

UCSD 10/14/03 Page 4 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 5: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

D. Has a complaint ever been filed with the Contractor’s State License Board against your company that required a formal hearing or inquiry?

YES NO

E. Will your firm use computers with ability to log on to the Internet for this project?

YES NO

F. Does your firm have experience utilizing CPM logic, Primavera Project Planner scheduling software on your projects and would you utilize this experience on this project?

YES NO

If “No,” name the software application(s) used or the software application you would propose for use on this project for scheduling. _____________________________________________________________________

4. SURETY

Prospective CM/Contractor desiring to be prequalified are informed that they will be subject to and must fully comply with all fee bid conditions including 100% payment and 100% performance bonds.

Prospective CM/Contractor shall submit the below form, signed by representative of surety and notarized. If firm has used current surety for less than ten years, list sureties (ies) previously used and indicate number of years used to demonstrate ten (10) complete years of surety history.

A. Is the surety to be used listed in the latest published State of California Department of Insurance list of Insurance Organizations Authorized by the Insurance Commissioner to Transact Business of Insurance in the State of California?

YES NO

B. Is the prospective CM/Contractor able to obtain bonding up to and including the cost for this construction contract estimated at $2,800,000 of which no more than 50% is currently committed to other projects?

YES NO

UCSD 10/14/03 Page 5 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 6: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

C. Is it true that the surety has not paid out any monies for the construction activities of the prospective CM/Contractor whatsoever within the last ten (10) years?

YES NO

If answer is “No,” explain on attached additional sheets.

D. How long has the Prospective CM/Contractor been with this surety? years

E. Surety Declaration:

Provide this Declaration of your surety (ies) for completion. Do not have the surety submit this information directly to the University.

The undersigned declares under penalty of perjury that all of the above surety information is true and correct and that this declaration was executed in

County, California, on (date).

(Signature)

(Name and Title - Printed or Typed)

(Representing [Surety Name])

(Firm Name)

(Address) (City, State, Zip Code)

________________________________________________________________________________________________________Telephone Number) (Facsimile Number)

(Email Address)

(ATTACH NOTARIZATION of SURETY REPRESENTATIVE’S SIGNATURE)

UCSD 10/14/03 Page 6 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 7: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

5. INSURER

Prospective CM/Contractor desiring to be prequalified is informed that they will be subject to and must fully comply with all fee bid conditions including the following insurance coverage and associated limits.

Prospective CM/Contractor shall submit the below form, signed by representative of insurer and notarized. If firm has used current insurer for less than ten years, list insurer(s) previously used and indicate number of years used to demonstrate ten (10) complete years of insurer history.

A. Is the insurer to be used listed by Best with a rating of A- or better and a financial classification of VIII or better (or an equivalent rating by Standard & Poor’s or Moody's)?

YES NO

Indicate Best Rating:

Indicate Best Financial Classification:

B. Is the prospective CM/Contractor able to obtain insurance in the following limits for each of these construction contracts?

YES NO

MinimumComprehensive or Commercial Form General Liability Insurance - Limits of Liability RequirementEach Occurrence - Combined Single Limit for Bodily Injury and Property Damage $1,000,000Products - Completed Operations Aggregate$2,000,000Personal and Advertising Injury $1,000,000General Aggregate - Not Applicable to Comprehensive Form $2,000,000

Business Automobile Liability Insurance - Limits of Liabil ity Each Accident - Combined Single Limit for Bodily Injury and Property Damage$1,000,000

Professional Liability InsuranceEach Occurrence $1,000,000Aggregate $2,000,000

C. How long has the Prospective CM/Contractor been with this insurer? years

UCSD 10/14/03 Page 7 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 8: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

D. Insurance Declaration:

Provide this Declaration to your insurance carrier for completion. Do not have the carrier submit this information to the University.

The undersigned declares under penalty of perjury that all of the above insurer information is true and correct and that this declaration was executed in

County, California, on (date).

(Signature)

(Name and Title - Printed or Typed)

(Representing [Insurer Name])

(Firm Name)

(Address) (City, State, Zip Code)

(Telephone Number) (Facsimile Telephone Number)

(Email Address)

(ATTACH NOTARIZATION of INSURER REPRESENTATIVE’S SIGNATURE)

UCSD 10/14/03 Page 8 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 9: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

6. CONSTRUCTION EXPERIENCE

Submit Project Data on a minimum of three (3) and a maximum of five (5) comparable projects successfully completed within the last ten (10) years constructed in the United States of America one of which was constructed in the State of California.

A comparable project is defined as having a construction cost at the bid date of at least $2,000,000 or a total of $8,000,000 for the projects submitted, and one of the following example building types:

Physical Sciences and/or Engineering research laboratories, specifically laser laboratories or cleanroom facilities.

Other facilities that contain a high degree of technical complexity and

Such projects should have possessed the following construction challenges:

ISO cleanroom construction including the installation and commissioning of complex mechanical systems with extremely tight temperature and humidity controls.

Laboratory facilities utilizing displacement ventilation systems. Occupied campus site with limited construction and staging areas. Project complexity requiring tracking of multiple functions and phases. Relocation of major MEP/FS utilities in an occupied building with no/minimal

downtime. Project complexity requiring construction management services. Proactive preconstruction services including constructability reviews, productive

design team relationship, robust subcontractor prequalification process, accurate cost estimating, and effective procurement/scheduling strategies.

Construction coordination leading to the successful completion of projects within critical time frames on an accelerated schedule.

Documented critical path scheduling used to complete projects on time and within budget without compromising the aesthetics or construction quality of the project.

Two (2) of the projects submitted must include experience as CM/Contractor providing both pre-construction services and acting as General Contractor during construction phase on the same project.

A. Listed projects must have been managed and constructed under the business name submitted for Level I prequalification. Projects completed by employees for former employers are not acceptable.

B. Submit the following Project Data Sheets for each project submitted as evidence of your firm's CM/Contractor experience.

UCSD 10/14/03 Page 9 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 10: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

PROJECT DATA SHEET (A separate sheet must be prepared for each project submitted.)

1. Project Name: _________________________________________________________________

2. Project Location: ___________________________________________________________

3. Project Description: ___________________________________________________________

4. Constr. Type:

5. Size (gross sq. ft.): ____________

6. Business name of entity which constructed and managed this project: ______________________

______________________________________________________________________________

6. Did your firm act as a CM/Contractor during the entire construction phase of this project, providing both pre-construction services and acting as General Contractor during the construction phase for this project? (At least two of the five submitted projects must have included pre-construction services.)

YES NO

7. Was the project completed under a CM/Contractor construction contract?

YES NO

8. How is this project comparable to the UREY HALL BARREIRO LABORATORY RELOCATION project?__________________________________________________________________________ ______________________________________________________________________________

9. Was the project completed within budget?

Cost At Bid: $

Cost At Completion: $

Explanation: ____________________________________________________________________

UCSD 10/14/03 Page 10 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 11: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

10. For any differing amount between cost at completion and cost at bid, distribute the sources and/or causes of these changes into the following categories:

Document Problems: $ Unforeseen Conditions: $ Owner Generated Scope: $ Regulatory Agency: $ Other: $

11. Was construction begun and completed within the last ten (10) years?

YES NO

12. Was the project completed within the original contract time or the adjusted contract time?

YES NO

If completion did not occur within the original or the adjusted contract time, indicate elapsed time in whole calendar days between original or adjusted contract time and actual final completion. For projects that have not reached final completion, indicate current status with respect to contract time:

_________________________________________________________________________________

13. Did the project include occupied facilities adjacent to the project?

YES NO

14. Was this project completed within an occupied campus site with limited construction and staging area?

YES NO

15. Was this project completed within an existing and occupied building with no/minimal downtime?

YES NO

16. What communications strategies were used by your firm to assist the project team in mitigating the impacts of construction on the adjacent occupied facilities? ______________________________________________________________________________

UCSD 10/14/03 Page 11 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 12: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

17. Was the project for a university or public institution?

YES NO

18. What strategic decisions did your firm contribute to the project which supported the project’s success (e.g. value engineering, phasing, innovation, new technology, etc.)? ______________________________________________________________________________

19. Did the project include baseline critical path scheduling with adherence to updates and meeting a hard opening date?

YES NO

If “Yes,” how many construction activities were included on the schedule? ______________________________________________________________________________

20. What strategies did your firm use to adjust and/or correct for non-Owner generated slippage in the critical path schedule?

______________________________________________________________________________

21. Did the project include specialized equipment installation and coordination with owner representatives?

YES NO

If “Yes,” describe: _______________________________________________________________

22. Did the project contain a HVAC package that was designed to strict noise and vibration requirements?

YES NO

23. Did the project have tight temperature, humidity, vibration tolerances?

YES NO

If “Yes,” describe: _______________________________________________________________

UCSD 10/14/03 Page 12 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 13: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

24. Did the project contain a laser research facility?

YES NO

25. Did the project contain an ISO certified cleanroom?

YES NO

26. Did the project include the installation of specialized HVAC equipment and complex HVAC controls systems?

YES NO

If “Yes,” describe the system(s): ____________________________________________

27. Did your contract with the Owner require construction management services prior to construction?

YES NO

28. Did your contract with the Owner include construction cost estimating, constructability review or schedule analysis during pre-construction phases as a requirement of CM/GC contract with the Owner?

YES NO

If “Yes,” describe: _______________________________________________________________

29. Did your CM/GC contract with the Owner include assistance with the client in developing bid packages, prequalification of subcontractors or analysis of the bids?

YES NO

If “Yes,” describe: _______________________________________________________________

30. Did the project include a quality control program?

YES NO

UCSD 10/14/03 Page 13 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 14: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

If “Yes,” explain: _______________________________________________________________

31. Did the project include California State Fire Marshal review and approval (planning, scheduling and obtaining State Fire Marshal approval of materials, shop drawings, and systems testing)?

YES NO

32. Did the project include California Division of State Architect Handicapped Accessibility Compliance review and approval?

YES NO

33. Did the Owner assess any back-charges?

YES NO

If answer is “Yes,” explain: __________________________________________________________

34. Did the Owner assess any liquidated damages?

YES NO

If answer is “Yes,” explain: _________________________________________________________

35. Describe your firm's claim-avoidance strategy and/or philosophy: __________________________

_______________________________________________________________________________

_______________________________________________________________________________

36. Name of Senior Project Manager/Project Executive:____________________________________

Qualifications of this Senior Project Manager/Project Executive:__________________________________________________________________________________________________________

UCSD 10/14/03 Page 14 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 15: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

37. Name of Project Manager: ___________________________________________________

Qualifications of this Project Manager: _______________________________________________________________________________________________________________________

38. Name of Pre-Construction Manager: _________________________________________________

Qualifications of this Pre-Construction Manager: ______________________________________________________________________________________________________________________

39. Name of Project Superintendent: ___________________________________________________

Qualifications of this Project Superintendent: _______________________________________________________________________________________________________________________

40. Name of Project Engineer: ________________________________________________________

Qualifications of this Project Engineer: ____________________________________________________________________________________________________________________________

41. Did your firm self-perform any of the work?

YES NO

If “Yes,” please specify the trades you self-performed or have the capability to self-perform:

____________________________________________________________________________________

__

____________________________________________________________________________________

__

____________________________________________________________________________________

__

UCSD 10/14/03 Page 15 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 16: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

Client Firm Name:

Client Contact: Title:

Client Address:

Client City: State: _____Zip:

Client Phone: ( ) Fax: ( )

Client E-mail Address:

Architect/Engineer/Consultants:

Architect/EngineerContact Name: Phone:

Architect/EngineerE-mail Address:

(Attach additional pages with other pertinent project information as necessary.)

UCSD 10/14/03 Page 16 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 17: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

7. NOT USED8. NOT USED

9. STAFF EXPERIENCE AND PROJECT SAFETY

The Project Manager, and Project Superintendent listed will be considered qualified only if he/she has successfully completed at least two (2) comparable projects under a CM/Contractor Construction Contract.

A. CM/Contractor hereby commits as a minimum to assignment of the specific field staff as outlined below. Interviews with these individuals will take place during Level II of the Prequalification. CM/Contractor to submit a complete staffing chart as part of this package.

One Project Executive (part-time) during pre-construction and constructionThe Project Executive will be on site part-time for construction (i.e. Option Phase 2) and on site for construction meetings.

One Project Manager (a minimum of 2 full days per week on site) during constructionThe CM/Contractor will assign one project manager assigned to oversee, manage and coordinate the overall project as a whole. The magnitude and complexity of the project will necessitate that this position manage the entire construction process. This position will need to be involved with all aspects of the project including but not limited to all pre-construction scheduling and budgeting meetings, overall construction process development and execution, multi-staff operation management and coordination. The project manager will take the lead position in all architect and University issues including overall contract administration, constructability and logistic reviews, RFI, RFP and contract change order negotiations, campus and community relations. The project manager will maintain the point position on behalf of the general contractor and will be the key person in charge guiding the construction development process to successful closure, both budget wise and schedule wise.

One Project Superintendent (full-time on site) during constructionThe CM/Contractor will assign one project superintendent to manage, coordinate and facilitate the field supervision staff for each of the various components of the project construction process. The major function of this position will be in addition to the normal superintendent’s daily workload, subcontractor interaction and production, and various field related coordination issues.

One Project Engineer (part-time on site) during constructionThe Project Engineer shall perform Quality Control duties, and MEP coordination.

One Pre-Construction Manager (part-time) during pre-construction. The CM/Contractor will assign one (1) pre-construction manager assigned to oversee, manage and coordinate the pre-construction services. The magnitude and complexity of the project will necessitate that this position manage the entire pre-construction process.

UCSD 10/14/03 Page 17 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 18: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

This position will need to be involved with all aspects of the project including but not limited to all pre-construction scheduling, budgeting, value engineering, constructability review, bid package strategy and preparation, and attendance at University-Architect-Contractor meetings. The pre-construction project manager will maintain the point position on behalf of the general contractor and will be the key person in charge guiding the pre-construction project development.

One Clerical Assistant/Receptionist (part-time) during construction

B. At the time of fee bid, the successful CM/Contractor will be required to reconfirm staff assignments to the project based on this submittal. If any of the named staff submitted are no longer employed by the firm at the time the project starts, or are otherwise unavailable, the firm's fee bid may be considered non-responsive. Substitution of other individuals with equivalent experience may be considered by the University, however, resumes; comparable project history and other relevant information must be submitted to the University prior to the determination of the fee bid results.

C. Project ManagementThe CM/Contractor shall keep on the job throughout its duration a competent Project Manager and Project Superintendent, all of whom must be satisfactory to the University. The Project Manager and Project Superintendent shall be the same individuals proposed by the CM/Contractor during the procurement process for this project. The Project Manager shall represent the CM/Contractor, and all communication given to the Project Manager shall be as binding as if given to the CM/Contractor. The CM/Contractor shall not change either the Project Manager or the Project Superintendent on the project from those originally proposed for the project without the prior written consent of the University. The University will only grant written consent for such change in the case of undue hardship on the individual or if the Project Manager and Project Superintendent shall leave the employ of the CM/Contractor.

By submitting a proposal for this project, the CM/Contractor agrees to pay a training fee of $5,000 should they change Senior Project Manager/Project Executive, Project Manager, or Project Superintendent without the written consent of the University.

D. Safety ProgramThe safety of the CM/Contractor employees, employees of the Design Team and other visitors to the Project are of the utmost importance to the University. The CM/Contractor shall take whatever steps are necessary to maintain a clean and safe work environment for their employees, the employees of their Subcontractors and vendors, and any other visitors to the project.

UCSD 10/14/03 Page 18 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 19: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

E. Part - Time Project Executive: UREY HALL BARREIRO LABORATORY RELOCATION Project

1. The name of the specific Project Executive to be committed to this project on a part-time basis and continuously retained throughout this project is:

(Attach resume)

2. Total years of experience: years

3. Years at this position: ______years

4. Years with this firm: years

5. The Project Executive named above was assigned to the following comparable projects for which data sheets have been included in this questionnaire:

Project: Construction Cost:

a.

b.

c.

6. The Project Executive named above worked on the following similar projects that are described in the attached resume:

a.

b.

c._____________________________________________________________

F. Minimum of 2 full days per week Project Manager: UREY HALL BARREIRO LABORATORY RELOCATION (Note: This individual will be required to attend the Level II interview if applicable)

1. The name of the specific Project Manager to be committed to this project a minimum of 2 full day’s per week basis and continuously retained throughout this project is:

(Attach resume)

UCSD 10/14/03 Page 19 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 20: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

2. Total years of experience: years

3. Years at this position: years

4. Years with this firm: years

5. The Project Manager named above was assigned to the following comparable projects for which data sheets are included in this questionnaire:

Project:

a.

b.

c.

6. The Project Manager named above worked on similar projects that are described in the attached resume:

a.

b.

c.

G. Full-Time (on site) Project Superintendent: UREY HALL BARREIRO LABORATORY RELOCATION project (Note: This individual will be required to attend the Level II interview if applicable)

1. The name of the specific Project Superintendent to be committed to this project on a full-time basis and continuously retained throughout this project is:

(Attach resume)

2. Total years of experience: years

3. Years at this position: years

4. Years with this firm: years

UCSD 10/14/03 Page 20 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 21: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

5. The Project Superintendent named above was assigned to the following comparable projects for which data sheets have been included in this questionnaire:

Project:

a.

b.

c.

6. The Project Superintendent named above worked on similar projects that are described in this attached resume:

a.

b.

c._____________________________________________________________

H. Part-Time Pre-Construction Manager: UREY HALL BARREIRO LABORATORY RELOCATION project (Note: This individual will be required to attend the Level II interview)

1. The name of the specific Pre-Construction Manager to be committed to this project on a part-time basis during the pre-construction phase and continuously retained throughout this project is:

(Attach resume)

2. Total years of experience: years

3. Years in this position: years

4. Years with this firm: years

5. The Pre-Construction Manager named above was assigned to the following comparable projects for which data sheets have been included in this questionnaire:

Project:

UCSD 10/14/03 Page 21 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 22: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

a.

b.

c.

6. The Pre-Construction Manager named above worked on similar projects that are described in the attached resume:

a.

b.

c.

I. Part-Time (on site) Project Engineer: UREY HALL BARREIRO LABORATORY RELOCATION project (Note: It is optional for these individuals to attend the Level II interview)

1. The name of the specific Project Engineer to be committed part time (on site) to this project:

(Attach resume)

2. Total years of experience: years

3. Years at this position: ______years

4. Years with this firm: years

5. The Project Engineer named above was assigned to the following comparable projects for which data sheets have been included in this questionnaire:

Project:

a.

b.

c.

UCSD 10/14/03 Page 22 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 23: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

6. The Project Engineer named above worked on similar projects that are described in the attached resume:

a. ____________________________________________________________

b. ______________________________________________________________

c. ____________________________________________________________

10. ADDITIONAL CONSTRUCTION MANAGER-GENERAL CONTRACTOR REQUIREMENTS

A. If fully prequalified and a successful fee bidder, the CM/Contractor will be required to use the following computer software programs. Further, it shall be required that certain specific documents be submitted to the University and/or University’s Representative in such electronic format. Indicate computer program currently used by your firm:

Owner Standard Your FirmWord processing(e.g. letters, memos, etc.) Microsoft Word ____________

Cost Analysis Microsoft Excel

Project Scheduling Primavera Project Planner ____________

Project Management & Control E-Builder (pending) ____________

Email Outlook ____________

Web Browser Internet Explorer ____________

11. SAFETY PROGRAM

A. Does your firm have a written Injury and Illness Prevention Program (IIPP) that complies with California Code of Regulations, Title 8, Sections 1509 and 3203?

YES NO

UCSD 10/14/03 Page 23 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 24: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

Brief Description: _________________________________________________________

B. Does your firm have a written safety program that meets CAL/OSHA requirements?

YES NO

C. Will your firm have personnel permanently assigned and dedicated to Safety on this project?

YES NO

D. If “Yes,” state the names of all such personnel who will be assigned and individually list their specific duties:

Name, Title Specific Duties___________________________________ ______________________________________________________________________ ______________________________________________________________________ ______________________________________________________________________ ___________________________________

Attach resumes (include certification and safety related training received.)

E. Have you had accidents, which resulted in a construction fatality on any of your projects over the last 2 years?

YES NO

If the answer is “Yes,” please explain.________________________________________________________________________________________________________________________________________________

F. Is your firm’s current worker’s Compensation Experience Modification Rate (EMR) is equal to 1.25 or less?

YES NO

Provide your California Workman’s Compensation Modifier for each of the last three (3) years.

__________________________________________________________________

UCSD 10/14/03 Page 24 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 25: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

G. Provide EMR verification (regardless of whether EMR is under or over 1) from State of California or from insurance company for the most recently completed year.

H. Has your firm been cited by OSHA in the past 5 years?

YES NO

If the answer is “Yes,” please explain.________________________________________________________________________________________________________________________________________________

I. Does your firm have a Small Business/Underutilized Business Outreach Program?

YES NO

If “Yes,” please include a summary of your efforts (up to one [1] page).

12. QUALITY CONTROL PROGRAM (QC)

A. Does your firm have a written quality control program?

YES NO

B. Will your firm have personnel permanently assigned and dedicated to QC on this project?

YES NO

C. If “Yes,” state the names of all such personnel who will be assigned and individually list their specific duties:

Name, Title Specific Duties___________________________________ ______________________________________________________________________ ______________________________________________________________________ ___________________________________

D. Provide brief description of your Quality Control Program:

_______________________________________________________________________

_______________________________________________________________________

_______________________________________________________________________

E. Describe how your Program will be applied to this project:

_______________________________________________________________________

UCSD 10/14/03 Page 25 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 26: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

_______________________________________________________________________

_______________________________________________________________________13. BUSINESS CONSTRUCTION REVENUE

For the purposes of this Level I prequalification questionnaire, "business construction revenue" shall be defined as payments to prospective CM/Contractor for construction management pre-construction services, construction management, construction services, and contract prices as a CM/Contractor.

A. Can you truthfully state that your firm has had an average annual business construction revenue of an average of at least $10,000,000 (excluding any and all legal awards) over the last five (5) consecutive years?

YES NO

B. Can you provide audited financial statements for the last ten (10) years?

YES NO

If answer is “No,” what type of statements will you provide?_______________________

DO NOT INCLUDE FINANCIAL STATEMENTS WITH THIS PREQUALIFICATION QUESTIONNAIRE.

C. List average yearly volume of work for each of the past 5 years. Revenue and amount of reinvestment income.

YEAR REVENUE/VOLUME REINVESTED INCOME______________ __________________________ ______________________________________ __________________________ ________________________

______________ ________________________________________________________________ ________________________________________________________________ ________________________________________________________________ __________________________________________________

D. List value of work currently on backlog, with percent complete, as appropriate.

UCSD 10/14/03 Page 26 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 27: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

WORK VALUE %COMPLETE

____________________________________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ ____________________________________________________________ ________________________

E. What percent of your estimated volume from the next two (2) years would this project represent?

_____________ percent.

14. NOT USED15. NOT USED

16. DISCIPLINARY MEASURES HISTORY

A. Can you truthfully state that your firm has not been disqualified or barred from doing business with a public agency (e.g., federal, state, county, city, University of California System, California State University System, etc.) within the last fifteen (15) years?

YES NO

17. PRE-CONSTRUCTION SERVICES Pre-Construction Services will be required. These services may include:

Service Position/Title Hourly Rate BudgetScheduling ___________ ___________ _________Estimating ___________ ___________ _________Value Engineering/Constructability Review ___________ ___________ _________Bid Package Strategy &Preparation ___________ ___________ _________Attending University-Architect-Contractor Meetings ___________ ___________ _________

UCSD 10/14/03 Page 27 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 28: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

Total _________Total as % of Estimated Project Value of $2,800,000

Definitions

A. Schedule (Assume preparation of 1 preliminary schedule and 1 detailed schedules).

The successful CM/Contractor shall prepare a preliminary project schedule using Primavera Project Planner with no less than 50 activities. The successful CM/Contractor shall prepare detailed project schedules using Primavera Project Planner with no less than 150 activities. These schedules shall include phasing required for the work and any major milestones indicated by the University. Included in the schedules shall be allowances for normal delays caused by weather, etc.

B. Cost Estimating / Cost Control (Assume 2 detailed estimates).The CM/Contractor shall prepare a detailed estimate at Design Development, at 50% and 90% construction documents. The estimate shall be detailed to the extent that it includes quantities, unit prices, and extensions. This detailed estimate will be broken into the various bid packages that the CM/Contractor proposes to issue, and this estimate shall represent the CM/Contractors best estimate of the probable low bid received on bid day for that bid package.

C. Value Engineering Review and Constructability ReviewConcurrent with estimate, the CM/Contractor will also perform a detailed value engineering and constructability review of the project. It is the intent that this review provides recommendation to the University and the Design Team on possible alternate design schemes that could result in a similar final product but at a reduced cost or schedule for the University. Additionally, the University expects the CM/Contractor to review the document for any constructability issues such as hoisting, access, conflicting information on the documents, coordination issues between disciplines, and the like so these issues can be resolved prior to the start of construction. While it is not the intent of the University that CM/Contractor become a designer of record, it is the intent of the University that the University receives benefit of the CM/Contractor’s experience in the construction industry.

D. Bid Package Strategy and PreparationThe CM/Contractor shall develop for the University’s review a strategy for packaging the various elements for the project for bid to trade contractors. While the University may comment on the strategy developed by the CM/Contractor, the ultimate responsibility for the bid packaging and completion of the project and schedule rests with the CM/Contractor.

UCSD 10/14/03 Page 28 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)

Page 29: LEVEL 1 - rmp-public.ucsd.edurmp-public.ucsd.edu/fdc/Job Bids/UREY HALL BARREIRO LABORAT…  · Web viewLEVEL 1. PREQUALIFICATION QUESTIONNAIRE. For. UREY HALL BARREIRO LABORATORY

UREY HALL BARREIRO LABORATORY RELOCATION PROJECT NO.: 5166/A4L-450/968413UNIVERSITY OF CALIFORNIA, SAN DIEGO

E. University-Architect-Contractor Meetings (Assume 1 meeting per week for 6 months)

CM/Contractor shall identify and prepare a budget based upon hourly rates for attending University-Architect-Contractor Meetings during the pre-construction phase of the project.

The prospective CM/Contractors shall propose a budget for each of the above activities to be preformed during the pre-construction phase of the project. This budget shall include title or function of individuals working on the above pre-construction activities, hourly rates for each title or function, and extended costs.

18. GENERAL REQUIREMENTS

A. Has your Firm ever refused to perform change order or warranty work requested by an Owner?

YES NO

If the answer is “Yes,” please explain.________________________________________________________________________________________________________________________________________________

B. What is your Firm’s procedure for answering an Owner’s request to perform warranty work?

Please describe:________________________________________________________________________________________________________________________________________________

C. Describe your firm's claim-avoidance strategy and/or philosophy:________________________________________________________________________________________________________________________________________________

UCSD 10/14/03 Page 29 of 29 Level I Prequalification QuestionnaireCM @ Risk CM/C Lvl-1 P/Q Quest(UCSD Rev. 01/26/2016)