LHC Machine Status Report Roberto Saban LHCC June 4 th 2014
Transcript
Page 1: LHC Machine Status Report

LHC Machine Status ReportRoberto SabanLHCC June 4th 2014

Page 2: LHC Machine Status Report

LHCC - Roberto Saban 2

LS 1 from February 16th 2013 to end December 2014

June 4th 2014

PhysicsBeam commissioning

ShutdownPowering tests

F M A M J J A S O N D J F J FM A M J J A S O N D

2013 2014 2015M A

LHC

SPS

PS

PS Boosterbeam to beam

available for works

June 4th 2014

Page 3: LHC Machine Status Report

LHCC - Roberto Saban 3

What’s new since March ?

June 4th 2014

From stable shutdown activities which included maintenance, consolidation, upgrade, repair, cabling and had been ongoing for almost one yearTo transient states

from shutdown to powering tests, from powering tests to beam commissioning

V 3.1DFBA repairs at P6 and P8CSCM in sectors 67 and 81A 2-week margin after flushing for solving non-conformitiesThe sector test from P2 to P3

Page 4: LHC Machine Status Report

LHCC - Roberto Saban 4

The Status of the LHC Injectors

June 4th 2014

Linac2

LS1 and check-out completedBeam setting up is ongoing since Easter (beam to Linac dump)Beam into switchyard on Monday May 26th (beam trough transfer line up to measurement lines)Presently 150 mA on Linac dump, normal intensity for setting up phase, is expected to go up to ~170 mA laterFirst beam injected into PSB on Monday June 2nd

Page 5: LHC Machine Status Report

LHCC - Roberto Saban 5

The Status of the LHC Injectors

June 4th 2014

The PS Booster

LS1 completedSlight overrun of LS1 due to the septum leakSeptum leak: completely fixed by now (varnished, vacuum now OK)Cold check out from week 20-22Mainly debugging controls, access system, diagnostics etc.First beam injected into PSB on Monday June 2nd Now setting up RF etc. (we have a new LL RF system)

Page 6: LHC Machine Status Report

LHCC - Roberto Saban 6

The Status of the LHC Injectors

June 4th 2014

The PS

LS1 completedThe commissioning of the new PS ventilation system is ongoing, Still in cold check-out phaseUsual debugging ongoing (e.g. magnet tests); so far no delays or showstoppers announcedFirst injection of beam from the PS Booster planned for June 20th

Page 7: LHC Machine Status Report

LHCC - Roberto Saban 7

The Status of the LHC Injectors

June 4th 2014

The SPS

LS1 not yet completedEquipment reinstallation activities, following the irradiated cable replacement campaign, still ongoingMonday a leak was discovered in a vacuum chamber of a magnet; the magnet was moved to the access point under the CCC and will raised to the surface this morningThe maintenance of all the equipment being completed

Page 8: LHC Machine Status Report

LHCC - Roberto Saban 8

The Status of the LHC Injectors the dashboards

June 4th 2014

PS Booster

PS

SPS

Page 9: LHC Machine Status Report

LHCC - Roberto Saban 9

Status of Cables and Fibres

June 4th 2014

~1000 km of copper and optical cables being installed during LS1

Page 10: LHC Machine Status Report

LHCC - Roberto Saban 10

Status of the LHC SMACC

June 4th 2014

Page 11: LHC Machine Status Report

LHCC - Roberto Saban 11

Status of the LHC SMACC

June 4th 2014

Page 12: LHC Machine Status Report

LHCC - Roberto Saban 12

Helium leak elimination & status April 11th

June 4th 2014

1 E-7 mbarl/s

Cryosorption pumping

Continuous turbo pumping

Additional turbo pumping

Cannot be pumped

1 E-5 mbarl/s1 E-2 mbarl/s

1 E-4 mbarl/s

Helium Leak ratein subsector(Cold, RT)

5 QRL leaks 1 cryomagnet leak( S34)

1 QRL leak 17 cryomagnet leaks

Triplet 5L – use-as-isDFBAK – to do

(DFBA CL flexibles in 2009)

A8R6.MQRL ssH 7-8Several others pre-LS1

Created inthermal

transients1 QRL leak (S45)

A23R8.M – on-going

Cour

tesy

Pau

l Cru

iksh

ank

Page 13: LHC Machine Status Report

LHCC - Roberto Saban 13

Status of the LHC

June 4th 2014

Point 1 All the equipment has been reinstalled and reconnectedCommissioning in progress

Point 4 The cabling for the relocation of the electronics for cryogenics is in progress

Point 5 Major cabling campaign completeSafe-room installation almost completeRR shielding installedCommissioning will start in July

Point 7 Major cabling campaign completeEquipment re-installed and being commissioned

The power converters in UL16

R2E

Page 14: LHC Machine Status Report

LHCC - Roberto Saban 14

Status of the LHC Sector by Sector

June 4th 2014

Sector 12 Leak test completed. One leak (10-5 mbar l/s) localized on a compensator of header C of the QRL and will be repaired after the ELQA

Sector 23 Pressure test ongoingSector 34 Insulation vacuum leak test ongoingSector 45 Insulation vacuum being closed and insulation vacuum

leak test ongoingSector 56 DFBAK leak repairedSector 67 Cool down in progress in parallel with the smoothing of

the magnet alignmentSector 78 Leak test ongoingSector 81 Pressure test done. Leak test on going. Cool down starts

on June 23rd

Page 15: LHC Machine Status Report

LHCC - Roberto Saban 15

Status of the LHC The Cooldown of Sector 67

June 4th 2014

http://hcc.web.cern.ch/hcc/field.php

Page 16: LHC Machine Status Report

LHCC - Roberto Saban 16

The Schedule v3.1 http://cern.ch/ls1dashboard

June 4th 2014