LHC Sync. Light Monitors Status and Plans. 05 Feb 2014 Emittance Meeting (~= BI-TB Jan 2014) F.Roncarolo A.Goldblatt , G.Trad , E.Bravin , S.Mazzoni , W.Andreazza , G.Shneider,M.Wendt , N.Chritin. Overview. BSRTM Design Option A: original design with ceramic pieces - PowerPoint PPT Presentation
Popular Tags:
15
LHC Sync. Light Monitors Status and Plans 05 Feb 2014 Emittance Meeting (~= BI-TB Jan 2014) F.Roncarolo A.Goldblatt, G.Trad, E.Bravin, S.Mazzoni, W.Andreazza, G.Shneider,M.Wendt, N.Chritin
Transcript
Page 1: LHC Sync. Light  Monitors Status and Plans

LHC Sync. Light Monitors Status and Plans

05 Feb 2014Emittance Meeting (~= BI-TB Jan 2014)

F.RoncaroloA.Goldblatt, G.Trad, E.Bravin, S.Mazzoni, W.Andreazza,

G.Shneider,M.Wendt, N.Chritin

Page 2: LHC Sync. Light  Monitors Status and Plans

2Federico Roncarolo

Overview

• BSRTM Design– Option A: original design with ceramic pieces– Option B (BASELINE): Longer mirror, support behind RF screen, all metal

• Optics– Low wavelength optics– Interferometer (B1 only)

• New calibration line (B1 only)• Change tank support from ‘chair’ to 3 pillars (B1 only?)• New light shielding

• SW– New functionalities to cope with new optics layout– Filter wheels pneumatic IN-OUT– Interferometer– Possible request of tomography meas. (ABP) fastest and synchronized

camera acquisition• Discussion on Digital Cameras

Page 3: LHC Sync. Light  Monitors Status and Plans

3Federico Roncarolo

New Calibration Line BSRTR B1

Page 4: LHC Sync. Light  Monitors Status and Plans

4Federico Roncarolo

New Calibration Line BSRTR B1

ECR circulatingSystem (BSRTR = BTVSI modified) in productionexpected delivery: MarchScheduled installation: March

Components outside vacuum to be ordered, not critical, will be installed fall 2014

Page 5: LHC Sync. Light  Monitors Status and Plans

5Federico Roncarolo

BSRTM Option A (ceramic)

• 2 systems in fabrication• Expected delivery• Keep as backup solution

Mirror holder components (except springs)

made in ceramic

Page 6: LHC Sync. Light  Monitors Status and Plans

6Federico Roncarolo

BSRTM Option B

• BASELINE Option• ECR submitted• 2 systems in fabrication• Expected Delivery: February• Schedule

– RF tests in the LAB?– To TE-VSC for testing: 15 March– Installation: April ?

For both option A and B, see BI-TB Oct 2013 for details on RF studies

Page 7: LHC Sync. Light  Monitors Status and Plans

7Federico Roncarolo

Tank Support

• Decision: change B1 support from ‘chair’ to 3 pillars (existing) to free space on optical table

Proposal: change B2 immediately, to free space for halo monitor

Page 8: LHC Sync. Light  Monitors Status and Plans

8Federico Roncarolo

Optics Layout

Page 9: LHC Sync. Light  Monitors Status and Plans

9Federico Roncarolo

New mirrors

• 2 mirrors compatible with option B, coating visible : arrived, backup solution

• 3 mirrors with coating in the UV (down to 230nm) for option A + 3 for Option B– Expected delivery end of February– Can be the bottleneck for scheduling

Page 10: LHC Sync. Light  Monitors Status and Plans

10Federico Roncarolo

New Light Shielding

Page 11: LHC Sync. Light  Monitors Status and Plans

11Federico Roncarolo

Digital Cameras

Page 12: LHC Sync. Light  Monitors Status and Plans

12Federico Roncarolo

Summary

Page 13: LHC Sync. Light  Monitors Status and Plans

13Federico Roncarolo

Page 14: LHC Sync. Light  Monitors Status and Plans

14Federico Roncarolo

https://espace.cern.ch/be-dep-bi-tb/Lists/Calendar/Attachments/840/LHC%20PROPOSAL.pptx

https://dfs.cern.ch/dfs//Departments/AB/Groups/BI/Sections/PM/Projects/LHC/BSR/Docs-Litterature-Publications/BSRTWG/2013-09-10/BSRT_WakefieldAnalysis.pptx

Page 15: LHC Sync. Light  Monitors Status and Plans

RF Simu (M.Wendt)


Recommended