+ All Categories
Home > Documents > Limited Tickets Available - Builders' Exchange of Santa...

Limited Tickets Available - Builders' Exchange of Santa...

Date post: 27-Apr-2018
Category:
Upload: lekien
View: 264 times
Download: 6 times
Share this document with a friend
82
Our Price: $40.00 Adult (ages 12 & up) $30.00 Child (ages 6-11) $25.00 Kiddies (ages 2-5) Limited Tickets Available Tickets are available on a first come first serve basis and all ticket orders MUST be in by May 4, 2018. Order your tickets TODAY - DO NOT DELAY! PLEASE NOTE: Tickets purchased after May 4th will be increased $5.00 per ticket if available. To order your tickets, fill in the order form below and send in with payment to the address listed. Checks should be made payable to Builders’ Exchange. Tickets may also be purchased at the Builders’ Exchange during business hours, please contact Mary Fortin for availability @ 408-727-4000. Admission includes unlimited rides, private beach volleyball area, exclusive picnic area, all you can eat BBQ, beer, wine and unlimited sodas. Maximum 70 tickets per company. Open to members, members employees and their families. Ticket prices cannot be combined with any other discount program. 21st Annual Family Day Saturday, May 19, 2018 Picnic Information All-you-can-eat-BBQ includes: BBQ Chicken, Ribs & Hot dogs Ranch Style Beans, Salads, Chips and Ice Cream Location - The Beach Deck Exclusive Picnic Area: 11am-2:30pm Beverages Served: 11am-2:30pm All-you-can-eat BBQ: 11:30am-2:00pm Private Beach Volleyball Area: 11am-3:00pm Unlimited Rides: 11am-8:00pm *Casino Arcade Exclusive 9am-11am *Casino Arcade - we must have 700 Picnic Participants to qualify. Must be wearing event wristband to enter picnic area & rides!!! Company Name: Contact Name & Phone: Company Address: City, State, Zip: Tickets Needed : (70 maximum) Ages 12 & up x $40.00 = $ Ages 6-11 x $30.00 = $ Ages 2-5 x $25.00 = $ Total Amount Enclosed $ * Discount parking coupons available * Please Note Total Discount Parking Coupons Needed Send your check made out to the Builders’ Exchange to: Builders’ Exchange 21st Annual Family Day 400 Reed Street Santa Clara, CA 95050 (408) 727-4000 If you’re interested in more that 70 tickets, indicate quantity here: _______. DO NOT SEND IN PAYMENT FOR ADDITIONAL TICKETS WITH THIS FORM. If additional tickets are available, the Builders’ Exchange will notify you based on receipt of your original reservation.
Transcript
Page 1: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Our Price:

$40.00 Adult (ages 12 & up) $30.00 Child (ages 6-11) $25.00 Kiddies (ages 2-5)

Limited Tickets Available Tickets are available on a first come first serve basis and all ticket orders MUST be in by May 4, 2018. Order your tickets TODAY - DO NOT DELAY! PLEASE NOTE: Tickets purchased after May 4th will be increased $5.00 per ticket if available.

To order your tickets, fill in the order form below and send in with payment to the address listed. Checks should be made payable to Builders’ Exchange. Tickets may also be purchased at the Builders’ Exchange during business hours, please contact Mary Fortin for availability @ 408-727-4000. Admission includes unlimited rides, private beach volleyball area, exclusive picnic area, all you can eat BBQ, beer, wine and unlimited sodas.

Maximum 70 tickets per company. Open to members, members employees and their families. Ticket prices cannot be combined with any other discount program.

21st Annual Family Day Saturday, May 19, 2018

Picnic Information All-you-can-eat-BBQ includes: BBQ Chicken, Ribs & Hot dogs

Ranch Style Beans, Salads, Chips and Ice Cream

Location - The Beach Deck Exclusive Picnic Area: 11am-2:30pm

Beverages Served: 11am-2:30pm

All-you-can-eat BBQ: 11:30am-2:00pm

Private Beach Volleyball Area: 11am-3:00pm

Unlimited Rides: 11am-8:00pm

*Casino Arcade Exclusive 9am-11am*Casino Arcade - we must have 700 Picnic

Participants to qualify.

Must be wearing event wristband to enter picnic area & rides!!!

Company Name:

Contact Name & Phone:

Company Address:

City, State, Zip: Tickets Needed : (70 maximum)

Ages 12 & up x $40.00 = $

Ages 6-11 x $30.00 = $

Ages 2-5 x $25.00 = $

Total Amount Enclosed $ * Discount parking coupons available* Please Note Total Discount Parking Coupons Needed

Send your check made out to the Builders’ Exchange to: Builders’ Exchange 21st Annual Family Day 400 Reed Street Santa Clara, CA 95050 (408) 727-4000

If you’re interested in more that 70 tickets, indicate quantity here: _______. DO NOT SEND IN PAYMENT FOR ADDITIONAL TICKETS WITH THIS FORM. If additional tickets are available, the Builders’ Exchange will notify you based on receipt of your original reservation.

Page 2: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,
Page 3: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Weekly Projects Bidding 4/27/2018

Reasonable care is given in gathering, compiling and furnishing the information contained herein which is obtained from sources believed to bereliable, but the Planroom is not responsible or liable for errors, omissions or inaccuracies.

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Monday, April 30, 2018

Public Works

831-624-3693831-624-2110Neill Engineers Corp

Prebid Conf:

Addenda:

4/30/18 1:00 PM

2

18-00910

4/12 @ 11am- Second Floor of the Terminal Bldg

The work consists of placing an asphalt concrete overlay for general utility Runway 10L-28R, placing shoulder backing, markingpavement, raising threshold lights, and electrical improvements for installation of PAPI and REIL navigational aids.

PREVAILING WAGE

Questions: Sherman LowEmail: [email protected]

Monterey

Plan Issuer:

Bidders:

RUNWAY 10L-28R OVERLAY AND IMPROVEMENTS (PAPI/REIL) AT MONTEREY REGIONAL AIRPORT

Ph:Granite Construction General Contractor 831-763-6100 831-761-1042Fax:

Ph:Granite Rock Company General Contractor 408-574-1400 408-365-9548Fax:

Commercial

760-804-1878760-804-1838Tri-North Builders

Addenda:

4/30/18 11:00 AM

3

18-01011

Framing, finishes, floor polishing, concrete and electrical systems, installation of owner furnished lighting, lighting controls, HVAC units,EMS system, all MEP fire alarm and data.

Burlingame

Plan Issuer:

Bidders:

SCOL124

FLOOR & DECOR OUTLETS

Ph:Tri-North Builders General Contractor 760-804-1838 760-804-1878Fax:

Commercial

801-294-5085801-296-2150Stout Building Contractors [email protected]

Addenda:

4/30/18 12:00 PM

0

18-01116

This is a new ground up 7 Eleven. Scopes that are included but not limited to: Demolition of 3 existing buildings, Earthwork, Concrete,Utilities, Structural and Architectural Steel, Plumbing, Electrical, HVAC, Masonry, Paint, Metal Stud Framing, Drywall and WallCoverings, Roofing, Storefront System and Tile. Canopies and work at the gas pumps will be done by 7 Eleven.

Project Contact: Estimator: Jeff Lamb - [email protected] Nielson - [email protected]

Greenfield

Plan Issuer:

Bidders:

7 ELEVEN - GREENFIELD

Ph:!!!There may be other GC's bidding thisproject that we are unaware of

General Contractor 000-000-0000 Fax:

Ph:Stout Building Contractors General Contractor 801-296-2150 801-294-5085Fax:

School

510-412-4540WCCUSD

Prebid Conf:

Addenda:

4/30/18 2:00 PM

1

18-01109

MAND 4/6 at 10AM

Div 1-2, 6-7 & 9. The Project consists of: South exterior wall rehabilitation including but not limited to existing exterior siding windowsand doors.

Richmond

Plan Issuer:

Bidders:

CESAR CHAVEZ ELEMENTARY SCHOOL SOUTH EXTERIOR WALL REPAIRS

1000002708Contract #:

Ph:A & E Emaar General Contractor 510-253-5337 510-527-3614Fax:

Ph:Angotti & Reilly, Inc. General Contractor 415-575-3700 415-575-1470Fax:

Ph:ERA Construction General Contractor 510-830-5955 510-743-4153Fax:

Ph:Overhaul Construction General Contractor 209-968-1947 000-000-0000Fax:

Ph:Streamline Builders General Contractor 415-828-0135 415-664-5717Fax:

Ph:TSE Construction General Contractor 510-812-3466 510-323-2528Fax:

Page 4: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

510-412-4540WCCUSD

Addenda:

4/30/18 3:00 PM

0

18-01045

The West Contra Costa Unified School District (“District”) is requesting submission of statements of qualifications and proposals fromqualified firms, partnerships, corporations, associations, persons, or professional organizations (“Firm(s)”) to performconstruction/project management services (“Proposal”) for projects within the District’s current Bond Program, plus other projects orservices as directed by the District.

The selected Firm must be prepared to perform some or all of the Services described in the form of Agreement for Construction/ProjectManagement Services (“Agreement”) attached hereto as Attachment “1.” The exact scope for each project would be determined by theDistrict on a project-by-project basis depending on the needs of each project.

Questions: Must be in writing and may be directed to Melissa Payne at: [email protected]. Firms are directed to not contact anyother person with inquiries regarding this RFQ/P.

Richmond

Plan Issuer:

RFQ CONSTRUCTION/PROJECT MANAGEMENT SERVICES - WCCUSD

2018-CM/PMContract #:

Public Works

650-329-2271City of Palo Alto - DPW

Prebid Conf:

Addenda:

4/30/18 3:00 PM

4

18-01040

MAND 4/19 at 10AM (3201 East Bayshore Rd, Palo Alto- Parking Lot)

Pond maintenance.

Project Contact: Samantha Engelage 650-329-2123Email; [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

$250,000Palo Alto

Plan Issuer:

SC23E

RFQ RENZEL MARSH FRESHWATER POND MAINTENANCE

171739Contract #:

Tuesday, May 01, 2018

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/1/18 1:00 PM

0

18-01136

MAND 4/17 at 2:45PM (Admin Building)

The Project consists of the pool replacement at Branham High School. This pool replacement project includes the demolition of theexisting pool and all associated equipment and facilities. New construction includes regrading, the pool, pool decking, all associatedmechanical and plumbing systems, miscellaneous site furnishings and associated fencing.

San Jose

Plan Issuer:

SCOL10

BRANHAM HIGH SCHOOL SWIMMING POOL ALTERATIONS - CAMPBELL UNION HIGH SCHOOLDISTRICT

School

408-343-2802408-252-3000Cupertino Union School District

Prebid Conf:

Addenda:

5/1/18 1:00 PM

2

18-01023

MAND 4/3 at 10AM, 10480 Finch Ave, Cupertino)

Demolition and removal of a house and out building. Removal of approximately 300 cubic yards of contaminated soil in accordancewith the Removal Action Workplan (RAW) dated January 2018 prepared by Padre Associate Inc. and approved by the Department ofToxic Substance Control (DTSC).

Cupertino

Plan Issuer:

SCOL140

SEDGWICK ELEMENTARY SCHOOL EXPANSION PROPERTY- CUPERTINO UNION SCHOOL DISTRICT

18-B03-24Contract #:

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/1/18 1:20 PM

0

18-01172

MAND 4/17 at 3:30PM (Front of Admin Bldg)

Demolition of the existing pool and all associated equipment and facilities. New construction includes regrading, the pool, pool decking,all associated mechanical and plumbing systems, miscellaneous site furnishings and associated fencing.

Campbell

Plan Issuer:

SCOL113

WESTMONT HIGH SCHOOL SWIMMING POOL ALTERATIONS - CAMPBELL UNION HIGH SCHOOLDISTRICT

17049Contract #:

Page 5: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

831-624-3693831-624-2110Neill Engineers Corp

Addenda:

5/1/18 1:30 PM

0

18-00941

Construction of street and parking lot improvements and the enhancements of Lovers Point Park.

PREVAILING WAGE

Questions: Daniel GhoEmail: [email protected]

Pacific Grove

Plan Issuer:

Bidders:

RECREATION TRAIL ACCESSIBILITY IMPROVEMENTS

Ph:Granite Construction General Contractor 831-763-6100 831-761-1042Fax:

Ph:Granite Rock Company General Contractor 408-574-1400 408-365-9548Fax:

Ph:Precision Grade Inc. General Contractor 831-800-1602 831-623-1002Fax:

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/1/18 1:40 PM

0

18-01173

MAND 4/17 at 4:15PM (Front of Admin Bldg)

Demolition of the existing pool and all associated equipment and facilities. New construction includes regrading, the pool, pool decking,all associated mechanical and plumbing systems, miscellaneous site furnishings and associated fencing.

San Jose

Plan Issuer:

SCOL115

DEL MAR HIGH SCHOOL SWIMMING POOL ALTERATIONS - CAMPBELL UNION HIGH SCHOOLDISTRICT

17048Contract #:

Public Works

650-991-8064City Of Daly City Engng

Addenda:

5/1/18 10:00 AM

0

18-01041

Removal of existing thermoplastic striping and markings, crack sealing, asphalt concrete repairs, street cleaning, application of slurryseal, and re-application of thermoplastic striping and markings.

Project Contact: Alexander Yuen

Daly City

Plan Issuer:

SCOL54

2018-19 ST. FRANCIS HEIGHTS SLURRY SEAL

School

650-329-3927Palo Alto Unified School District

Prebid Conf:

Addenda:

5/1/18 10:00 AM

0

18-00993

MAND 4/17 at 10AM (Admin Bldg)

Removal of an existing simplex fire alarm system including but not limited to any and all wiring, devises and equipment. Contractor isto then supply and install a new system using existing conduits (U.O.N.) including all devises, underground wiring, building wiring,electrical as may be needed to service new equipment.

Palo Alto

Plan Issuer:

SCOL73

CAMPUS WIDE FIRE ALARM REPLACEMENT HENRY GUNN HIGH SCHOOL- PALO ALTO UNIFIEDSCHOOL DISTRICT (PAUSD)

Public Works

000-000-0000650-306-4105Port of Redwood City

Prebid Conf:

Addenda:

5/1/18 10:00 AM

2

18-00881

MAND 4/10 at 10AM (Admin Building)

Demolish/removal and disposal of existing wiring from shore side Electrical Point Of Connection (EPOC) to C-Dock panel board (PanelA), removal of panel A, feeder wiring, and existing power pedestals. Disconnect and secure water service from each pedestal. Cleanexisting conduit from EPOC to Panel A, and all C dock embedded conduit.

Redwood City

Plan Issuer:

SCOL101

C-DOCK ELECTRICAL IMPROVEMENT PROJECT - PORT OF REDWOOD CITY

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/1/18 10:00 AM

0

18-01176

MAND 4/19 at 2:45PM (front of Admin Bldg)

Demolition, structural upgrades and all associated renovation and code compliance construction related to the seismic upgrades at theexisting Gymnasium and locker rooms.

San Jose

Plan Issuer:

SCOL118

LEIGH HIGH SCHOOL VOLUNTARY SEISMIC UPGRADE - CAMPBELL UNION HIGH SCHOOL DISTRICT

17027Contract #:

Page 6: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

Prebid Conf:

Addenda:

5/1/18 10:00 AM

4

18-01050

MAND 4/17 & 4/24 @ 10am- site

SITE IMPROVEMENTS INCLUDE THE DEMOLITION OF EXISTING SOFTSCAPE IN AREAS DESIGNATED ON PLANS.CONTRACTOR TO COMPLETE; EARTHWORK GRADING, SITE DRAINAGE, IRRIGATION IMPROVEMENT, INSTALL GRASSSOD FIELD AND DECOMPOSED GRANITE TRACK RENOVATION. CONTRACTOR SHALL COORDINATE ALL WORK WITH THEDISTRICT'S CONSTRUCTION MANAGER.

PREVAILING WAGE

Questions: Jeanie McCuneEmail: [email protected]

Seaside

Bidders:

SEASIDE HIGH SCHOOL TRACK & FIELD RENOVATION

Ph:Earthworks Paving Contractors General Contractor 831-475-1223 831-475-1173Fax:

Ph:Monterey Peninsula Engineering General Contractor 831-384-4081 831-384-5078Fax:

Ph:Norcal Contractor General Contractor 831-632-0116 831-632-0116Fax:

Ph:Redgwick Construction Co General Contractor 510-792-1727 510-792-1728Fax:

Ph:Robert A. Bothman., Inc. General Contractor 408-279-2277 408-279-2286Fax:

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/1/18 10:20 AM

0

18-01164

MAND 4/19 at 3:30PM (front of Admin Bldg)

Demolition, structural upgrades and all associated renovation and code compliance construction related to the seismic upgrades at theexisting Gymnasium and locker rooms.

Campbell

Plan Issuer:

SCOL92

WESTMONT HIGH SCHOOL VOLUNTARY SEISMIC UPGRADE - CAMPBELL UNION HIGH SCHOOLDISTRICT

17029Contract #:

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/1/18 10:40 AM

0

18-01163

MAND 4/19 at 4:15PM (front of Admin Bldg)

Demolition, structural upgrades and all associated renovation and code compliance construction related to the seismic upgrades at theexisting Gymnasium and locker rooms.

San Jose

Plan Issuer:

SCOL70

DEL MAR HIGH SCHOOL VOLUNTARY SEISMIC UPGRADE- CAMPBELL UNION HIGH SCHOOLDISTRICT

17024Contract #:

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/1/18 11:30 AM

2

18-01137

4/17 at 10AM (Administration Bldg)

Modernization includes, but is not limited to, mechanical and electrical upgrades, new roofing, and site work.

San Jose

Plan Issuer:

Bidders:

SCOL14

DEL MAR HIGH SCHOOL MUSIC FACILITIES MODERNIZATION BUILDING C - CAMPBELL UNION HIGHSCHOOL DISTRICT

17039Contract #:

Ph:Beals Martin General Contractor 650-364-8141 650-367-7645Fax:

Ph:Calstate Construction General Contractor 510-657-1800 510-657-1810Fax:

Ph:Swinerton Builders General Contractor 408-567-9755 408-567-9754Fax:

Ph:Tombleson Inc General Contractor 831-422-9696 831-422-0566Fax:

Ph:TSE Construction General Contractor 510-812-3466 510-323-2528Fax:

School

SFUSD - Simon Reyes

Prebid Conf:

Addenda:

5/1/18 2:00 PM

1

18-01014

MAND 4/12 at 1:30PM

Div 1-2, 26 & 28. The Project is generally described as: Provision of equipment, devices, appliances, accessories, design, installationand testing of a complete new fire alarm system as defined in specifications by William Duff Architects dated 3/26/2018 and any suchsubsequent addendums and instructions. Submit permit documents to the Authority Having Jurisdictio (AHJ) and include all permit andplan review fees. The area of Work will be occupied during the construction phase. Provide unit pricing for each type of field deviceand appliance utilized in the fire alarm system. Include costs for installation, materials, programming and testing in the unit pricing.Remove existing fire alarm system upon completion and acceptance of the new fire alarm system.

$500,000San Francisco

Plan Issuer:

1235 MISSION STREET OFFICE BUILDING - SCOPE 4 FIRE ALARM

11860.4Contract #:

Page 7: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Mixed-Use

916-630-4982916-630-7200Tilton Pacific Construction

Addenda:

5/1/18 2:00 PM

0

18-01005

This is a SCRAPE AND REBUILD for a new ground up mixed use building with two level of below grade parking and four story ofmixed use with retail, offices and 3 residential units.

Palo Alto

Plan Issuer:

Bidders:

SCOL117

429 UNIVERSITY AVENUE MIXED USE BUILDING

Ph:Tilton Pacific Construction General Contractor 916-630-7200 916-630-4982Fax:

School

707-996-8390707-933-0624Greystone West Company

Prebid Conf:

Addenda:

5/1/18 2:00 PM

3

18-00994

MAND 4/17 at 2PM (Admin Bldg)

Replacement of existing HVAC equipment and associated sitework. Removal and replacement of existing brick veneer tile, installationof new tile wainscot and repainting of exterior walls and trim campus wide.

San Jose

Plan Issuer:

Bidders:

SCOL26

ANDERSON ELEMENTARY SCHOOL HVAC REPLACEMENT & EXTERIOR FINISHES- MORELANDSCHOOL DISTRICT

Ph:Calstate Construction General Contractor 510-657-1800 510-657-1810Fax:

Ph:OnPoint Construction General Contractor 650-347-3090 650-347-3099Fax:

Ph:Pro-Ex Construction Inc General Contractor 916-970-0097 916-222-1478Fax:

Ph:RC Benson & Sons, Inc. General Contractor 650-965-3430 650-965-7139Fax:

Public Works

650-286-3390City of Foster City, Estero Municipal Improve Dist

Prebid Conf:

Addenda:

5/1/18 2:00 PM

0

18-01025

None

Repair work for E. Hillsdale Boulevard and Beach Park Boulevard.

Foster City

Plan Issuer:

SCOL75

BICYCLE & PEDESTRIAN IMPROVEMENTS ALONG EAST HILLSIDE BOULEVARD & BEACH PARKBOULEVARD

301-671Contract #:

School

925-370-6517925-299-6959Contra Costa Community College Dist-Jovan Esprit [email protected]

Prebid Conf:

to

Addenda:

5/1/18 2:00 PM

1

18-00984

MAND 4/12 at 10AM

In general, the Work consists of the following, but not limited to: installation of temporary facilities, safety signage, wayfinding signage,roads, fencing, and lighting; storm water pollution prevention; abatement of hazardous materials; demolition and removal of twobuildings, a pedestrian bridge, and above ground and below ground utilities; and all related work.

All questions related to this Project must be in writing and directed to: Jovan Esprit, Contracts Mgr, at: [email protected]

$1,600,000$1,200,000San Pablo

Plan Issuer:

Bidders:

C-4016 NEW SCIENCE BUILDING - INCREMENT 0, ABATEMENT AND DEMOLITION AT CONTRA COSTACOLLEGE

C4016Contract #:

Ph:W.C. Maloney, Inc. General Contractor 209-942-1129 209-942-2579Fax:

Public Works

510-670-5480Alameda Co Flood Control & Water Conservation

Addenda:

5/1/18 2:00 PM

1

18-00980

Implementing water pollution control work and construction site management; providing and implementing de-watering system;providing standby rescue personnel in compliance with confined space entry requirements; removing and disposal of the existing trashrack and the screen mesh; removing sediment in the pump station sump; saw cutting and constructing new sump roof openings;fabricating and installing new trash rack structure and fine mesh screens; furnishing and installing new grate cover for trash rackopening; furnishing and installing access hatch, fiber reinforced ladder; fabricating and installing access platform; furnishing andinstalling various sizes of heavy duty gravity backdraft dampers.

San Leandro

Plan Issuer:

SCOL65

DAVIS STREET PUMP STATION MECHANICAL & STRUCTURAL MODIFICATIONS

FC 13-46Contract #:

Page 8: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

415-899-8962City of Novato - DPW

to

Addenda:

5/1/18 2:00 PM

1

18-00991

Div 1-2, 12 & 31-33. The Project work consists of site grading, removal of irrigation system and lawn, installation of new irrigationsystem and lawn, installation of asphalt path and multiple concrete/ asphalt pads for new and existing amenities, installation of new siteamenities, new fencing and gates, relocation of signs, partial resurfacing of the parking lot to accommodate new asphalt walk and torelocate accessible parking stall, restriping of the parking lot, alternate items to install engineered wood chips instead of grass lawn,and to install new shade structure instead of relocating the existing shade structure and other items and details not mentioned abovethat are required by the plans, standard specifications, or these special provisions to be performed, placed, constructed or installed.

For any additional information or technical questions please contact Gosia Woodfin, ProjectEngineer, at (415) 899-8997, or by email at: [email protected]

$500,000$400,000Novato

Plan Issuer:

DOGBONE MEADOW PARK RENOVATIONS

CIP 15-005Contract #:

School

415-241-6148415-241-6152SFUSD

Prebid Conf:

Addenda:

5/1/18 2:00 PM

1

18-01038

MAND 4/9 & 4/16 at 1:30PM

Div 1, 3, 5-7, 9, 23 & 26. The Project includes, but is not limited to, new HVAC system (Rooftop and room units) for classrooms andoffices in building A, B and C, including new piping from the new rooftop units, new electrical panels and new classroom units.

$1,350,000San Francisco

Plan Issuer:

Bidders:

HERBERT HOOVER MIDDLE SCHOOL BUILDINGS A, B & C HVAC PROJECT

11958Contract #:

Ph:Angotti & Reilly, Inc. General Contractor 415-575-3700 415-575-1470Fax:

Ph:Arntz Builders General Contractor 415-382-1188 415-883-7529Fax:

Ph:E F Brett & Co General Contractor 415-524-8351 415-524-8349Fax:

Ph:GECO, Inc. General Contractor 415-299-0280 415-884-0760Fax:

Ph:S&H Construction Inc. General Contractor 510-579-7382 510-579-7382Fax:

Ph:Zolman Construction & Development, Inc. General Contractor 650-802-9901 650-802-9902Fax:

Public Works

510-670-5480Alameda Co Flood Control & Water Conservation

Prebid Conf:

Addenda:

5/1/18 2:00 PM

1

18-00866

MAND 4/18 at 10AM (San Lorenzo Community Park)

Consists of implementing water pollution control work and construction site management; clearing and grubbing; providing andimplementing de-watering system; constructing concrete structure; furnishing and installing 48-inch diameter flap gate; furnishing andinstalling rock slope protection; furnishing and installing fences and gates

San Lorenzo

Plan Issuer:

SCOL99

INSTALLATION OF FLAP GATE STRUCTURE LINE N-3 UNDERGROUND PIPE OUTFALL

FC-2-204Contract #:

Public Works

650-741-9176San Mateo County Harbor District

Prebid Conf:

Addenda:

5/1/18 2:00 PM

1

18-00756

MAND 4/4 at 10AM (2nd Floor)

Interior Alterations to (E) Office Space.

Project Contact: John MorenEmail: [email protected]

El Granada

Plan Issuer:

Bidders:

SCOL112

INTERIOR ALTERATIONS SAN MATEO COUNTY HARBOR DISTRICT ADMINISTRATIVE OFFICE

2018-03Contract #:

Ph:Alex Kushner General Contractor General Contractor 415-756-0945 415-358-5769Fax:

Ph:Eagle Builders General Contractor 925-241-5766 315-335-6485Fax:

Ph:Marcon Co. General Contractor 510-639-1914 510-639-1915Fax:

School

408-343-2802408-252-3000Cupertino Union School District

Prebid Conf:

Addenda:

5/1/18 2:00 PM

0

18-01073

MAND 4/16 at 10AM (Door 10, Facility Modernization)

Replace two existing air conditioning units with two new 5-ton units, replace all ductwork and diffusers with new, and reframe roof tohandle increased structural load as per architect’s Specifications and Plans.

Cupertino

Plan Issuer:

SCOL19

IT HVAC REPLACEMENT OPERATIONS CENTER - CUPERTINO UNION SCHOOL DISTRICT

18-B07-24Contract #:

Page 9: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

415-259-2949Ross Valley Sanitary District

Prebid Conf:

Addenda:

5/1/18 2:00 PM

2

18-00751

3/29 at 10:30AM (meet at District Offices, at 2960 Kerner Blvd, San Rafael)

The Project components are described below. Note that diameters listed are nominal pipe inside diameters unless otherwise stated.• Replacement of approximately 1,420 lf of 21-inch-diameter sanitary sewer mains with 28-inch outside-diameter HDPE pipe by pipebursting, and open cut construction of approximately 135 lf of 28-inch-outside-diameter pipe.• Open cut construction of approximately 25 lf of 8-inch-diameter, 280 lf of 16 inch-diameter, 80 lf of 20-inch-diameter, and 75 lf of 24-inch-diameter sanitary sewer mains.• Reconnection of lower laterals to new and rehabilitated sewers.• Sliplining of approximately 185 lf of existing 21-inch-diameter SS main with 12-inch-diameter slipline pipe, and open cut constructionof approximately 55 lf of 12-inch-diameter pipe on the same reach.• Construction of 6 sanitary sewer manholes (SSMH), replacement of 2 existing SSMHs with new SSMHs, and abandonment orremoval of 2 existing SSMHs.• Utility potholes, CCTV inspection, sewage flow control, traffic control, site and pavement restoration.

Questions: Katherine Hayden at (415) 259-2949 x217, or by email at: [email protected]

$2,500,000Ross and San Anselmo

Plan Issuer:

LARGE DIAMETER GRAVITY SEWER PROJECT II-3A - UPPER SHADY LANE/ROSS COMMON

Public Works

650-259-2339City Of Millbrae, DPW

Prebid Conf:

Addenda:

5/1/18 2:00 PM

1

18-00943

4/10 at 10AM (621 Magnolia Ave., Millbrae)

Mobilization, traffic control and construction signage, water pollution control, dust prevention and control, site cleanup, asphalt concreteremoval, asphalt concrete installation, asphalt concrete base repair, ADA ramp construction, PCC curb & gutter removal andreplacement, PCC median curb removal and replacement, median removal and replacement, PCC sidewalk removal and replacement,PCC driveway removal and replacement, storm drain inlet installation, storm drain pipe installation, utility cover lowering & restoring tograde, utility cover grade adjustment, underground utility location, survey monument reinstallation, replacement of traffic loops,pedestrian push button improvements, sign/striping removal & replacement/

Millbrae

Plan Issuer:

SCOL147

OLD BAYSHORE HIGHWAY & ROLLINS ROAD PAVEMENT REPAIR PROJECT

State-Federal

916-445-5386Office of State Publishing (OSP)

Prebid Conf:

Addenda:

5/1/18 2:00 PM

1

18-00904

MAND 4/17 at 11AM

Project comprises labor, material and services necessary for: Replacement of existing Roof, including; tear off, deck preparation, baseflashings, new PVC roofing and multizone HVAC unit, including; removal of existing HVAC, electrical connections, curb and structuralroofing mods, mechanical registers, suspended ceiling, duct cleaning, air balancing and ceiling access panels.

Question: Robert Palomba, Project Director, at (916) 376-1713.

$880,000Pleasanton

Plan Issuer:

Bidders:

SCOL51

PLEASANTON DMV ROOF AND HVAC REPLACEMENT

141938Contract #:

Ph:Andy's Roofing Co., Inc. General Contractor 510-777-1100 510-777-1102Fax:

Ph:Omni Construction Services Inc General Contractor 650-685-2490 650-685-2491Fax:

Ph:Pioneer Contractor, Inc. General Contractor 415-671-1070 415-671-0448Fax:

Ph:S&H Construction Inc. General Contractor 510-579-7382 510-579-7382Fax:

Ph:Saboo Inc. General Contractor 626-260-2849 626-821-9314Fax:

Ph:Western Roofing Service General Contractor 510-686-4951 510-357-1160Fax:

Public Works

925-313-2000Contra Costa Co, DPW

Prebid Conf:

Addenda:

5/1/18 2:00 PM

1

18-00871

4/16 at 10AM (meet at 255 Glacier Dr, Martinez)

The Work to be done generally consists of removal of existing sidewalk and construction of bulb outs, curb ramps, pedestrian refugeislands, installation of pedestrian flashing beacons, and drainage modifications along Pomona Street at the intersections of 3rd Avenueand Rolph Avenue in the Crockett area.

Questions: John Honey, Design/Construction Division, at (925) 313-2371.

$167,000Contra Costa County

Plan Issuer:

POMONA STREET PEDESTRIAN SAFETY IMPROVEMENT PROJECT

0662-6R4090Contract #:

Page 10: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

831-338-7986831-338-2153San Lorenzo Valley Water District

Addenda:

5/1/18 2:00 PM

7

18-00764

The project consists of replacing the existing 100,000 gallon redwood water storage tank with a modern steel 530,000 gallon storagetank.

PREVAILING WAGE

Project Contact: Holly MorrisonEmail: [email protected]

$1,400,000Felton

Plan Issuer:

PROBATION TANK REPLACEMENT

Public Works

510-670-5480Alameda Co Flood Control & Water Conservation

Prebid Conf:

Addenda:

5/1/18 2:00 PM

0

18-00850

MAND 4/10 at 10AM (1401 Lakeside Dr, Rm201, Oakland)

Provide underwater pump station maintenance.

Project Contact: David Lewis 510-670-5599Email: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

Alameda County

Plan Issuer:

SC32E

RFQ UNDERWATER STRUCTURES MAINTENANCE SERVICES

FL02018266Contract #:

Public Works

925-313-2000Contra Costa Co, DPW

Prebid Conf:

Addenda:

5/1/18 2:00 PM

1

18-00891

4/16 at 10AM (meet at 255 Glacier Dr, Martinez)

The Work consists of 525 feet of pedestrian and bicycle improvements: 5 foot wide pervious concrete sidewalk, curb, gutter,driveways, driveway conforms, storm drain improvements, pavement repair, pavement widening, embankment construction, rock slopeprotection, 5 foot wide bike lane, flashing LED signs and a speed feedback sign in the Bay Point area.

Questions: Homira Shafaq, Design/Construction Division, at (925) 313-2304.

$439,000Contra Costa County

Plan Issuer:

RIO VISTA ELEMENTARY PEDESTRIAN CONNECTION PROJECT

0662-6R4141Contract #:

School

925-776-3473925-776-2005Antioch USD

Prebid Conf:

Addenda:

5/1/18 2:00 PM

3

18-00925

MAND 4/3 & 4/9 at 2PM

Div 1-3, 5-12, 20, 22-23, 26, 28 & 31-32. The Work of this modernization project involves:

Replacement of existing built-up roofing with metal standing seam roof panels all buildings.Replacement of existing HVAC units at buildings A, B, C, D, E1, and E2.Replacement of chiller/boiler/pump at building M.Relocation of administration area at building E1.Alterations to classrooms at buildings A, B, C, D, and E2.Construction of addition to kitchen at building E1 (Alternate 1).Site improvements.Construction of entrance canopy (Aternate 2).Construction of canopy at drop-off area (Alternate 3).

Questions: Sajeev Madhavan, AUSD Facilities Director, by email at: [email protected]

Antioch

Plan Issuer:

Bidders:

TURNER ELEMENTARY SCHOOL MODERNIZATION LEASE LEASE-BACK PROJECT

A1018Contract #:

Ph:Bobo Construction, Inc. General Contractor 916-383-7777 916-383-1681Fax:

Ph:Flint Builders, Inc. General Contractor 916-757-1000 916-797-7400Fax:

Ph:Roebbelen Contracting Inc. General Contractor 916-939-4000 916-939-4027Fax:

Ph:Stronger Bldg Services General Contractor 510-487-8363 510-487-8246Fax:

Page 11: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

925-943-5899City Of Walnut Creek, DPW

Addenda:

5/1/18 2:30 PM

0

18-01012

The Project includes, but is not limited to, performing the following Work:01. Temporary traffic control02. Demolition of sidewalk, curb, gutter and asphalt paving03. Concrete sidewalk, ramp, curb and gutter installation04. Hot mix asphalt installation05. Type III Service equipment and foundation installation06. Traffic signal rewire07. Traffic signal conduit installation08. Video detection camera system installation09. Pull box cover replacement10. Signage11. Curb painting

Questions: Sarah Lee, Project Contact, at (925) 943-5899 x2232, or by email at: [email protected]

$88,000Walnut Creek

Plan Issuer:

BROADWAY AND MOUNT DIABLO BLVD TRAFFIC SIGNAL IMPROVEMENTS

18-03Contract #:

Public Works

831-636-4913831-636-4340City of Hollister

Addenda:

5/1/18 3:00 PM

0

18-00824

Construct an Asphalt Concrete basketball court at Valley View Park in the City of Hollister.

PREVAILING WAGE

Project Contact: Kevin FlynnEmail: [email protected]

$57,500Hollister

Plan Issuer:

Bidders:

VALLEY VIEW SPORTS COURT

C1604Contract #:

Ph:South Bay Grading General Contractor 408-691-6766 000-000-0000Fax:

Public Works

650-947-2780City of Los Altos - Engineering

Addenda:

5/1/18 4:00 PM

0

18-01007

Provide construction inspection services for various capital improvement projects in the city.

Project Contact: Victor ChenEmail: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

Los Altos

Plan Issuer:

SC6E

RFP CONSTRUCTION INSPECTION SERVICES FOR VARIOUS CAPITAL IMPROVEMENT PROJECTS

Wednesday, May 02, 2018

School

831-624-5867831-624-6311Carmel Unified School District [email protected]

Prebid Conf:

Addenda:

5/2/18 1:00 PM

1

18-01067

MAND 4/25 @ 10am- site

Pavement Reconstruction at Carmel Middle School.

PREVAILING WAGE

Project Contact: Dan PaulEmail: [email protected]

Carmel

Plan Issuer:

Bidders:

PAVEMENT RECONSTRUCTION AT MAINTENANCE, OPERATIONS AND TRANSPORTATION FACILITY

9357Contract #:

Ph:Granite Construction General Contractor 831-763-6100 831-761-1042Fax:

Page 12: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

Prebid Conf:

Addenda:

5/2/18 2:00 AM

3

18-00591

3/15 @ 9:30am- 10333 El Camino Real, Atascadero

The Contractor will furnish all labor, materials, non-consumable supplies, equipment, and transportation including travel and per diem,to include all items and expense necessary to remove existing roof and gutter system and to install a new roof and gutter system asspecified herein for the California Department of Corrections and Rehabilitation, Atascadero Parole Office located at 10333 El CaminoReal, Atascadero, CA 93423.

Questions: Veronica [email protected]

Atascadero

ROOF AND GUTTER SERVICES

C5607734-DContract #:

Public Works

650-903-6311City Of Mountain View, DPW

Prebid Conf:

to

Addenda:

5/2/18 2:00 PM

0

18-01096

4/19 at 11AM (500 Castro St, Mountain View)

Furnishing and installing landscaping and irrigation improvements and other appurtenances in the medians along Castro Street, fromChurch Street to California Street.

Project Contact: Rey Rodriguez 650-903-6527Email: [email protected]

$500,000$425,000Mountain View

Plan Issuer:

SCOL82

CASTRO STREET MEDIANS

16-19Contract #:

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/2/18 2:00 PM

0

18-01175

MAND 4/19 at 1PM (Front of Admin Bldg)

installation of (3) temporary 24’x40’ portables PC#328 relocated from (2) Prospect High School (DSA #01-110270) AND (1) Leigh HighSchool (DSA #68997). Tie in relocated portable underground utilities and associated site work.

San Jose

Plan Issuer:

SCOL116

DEL MAR INTERIM HOUSING - CAMPBELL UNION HIGH SCHOOL DISTRICT

218-970205-030Contract #:

Public Works

925-931-5650City of Pleasanton - Engineering

Prebid Conf:

Addenda:

5/2/18 2:00 PM

3

18-00654

3/29 at 1:30PM

Work shall consist of, but is not limited to, the renovation of the approximately 2,600 square foot locker rooms by removing andreplacing the men and women gang showers with new compartmental showers, lockers, concrete slabs, toilets, urinals, sinks,counters, lights, walls, doors, HVAC unit & ducting, and skylights. It shall also include work related to the installation of exterior deckshowers on both the 50-meter pool and the recreation pool, the replacement of the chain link fencing and the chain link gates with anupdated exiting mechanism, all within the Dolores Bengtson Aquatic Center on 4455 Black Avenue, Pleasanton, CA.

(Previously scheduled bid date was 11/30/17)

$1,600,000Pleasanton

Plan Issuer:

SCOL62

DOLORES BENGTSON AQUATIC CENTER LOCKER ROOM RENOVATION - REBID

17706Contract #:

Commercial

714-333-9792714-491-1317Gray Builders

Addenda:

5/2/18 2:00 PM

0

18-01029

Gap Store #4663 tenant improvement project. Specifications are on the floor plans.

For technical questions, contact Brent Reed at: [email protected] or at (714) 412-4478.

Novato

Plan Issuer:

Bidders:

GAP STORE #4663

Ph:Gray Builders General Contractor 714-491-1317 714-333-9792Fax:

Page 13: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

916-797-7400916-757-1000Flint Builders, Inc.

Prebid Conf:

Addenda:

5/2/18 2:00 PM

2

18-01021

4/20 @ 1pm- 536 Palm Street, Santa Cruz

Flint Builders, Inc. is requesting bids from qualified firms for the above referenced project. You may submit your bid via FAX to (916)797-7400 or via email to [email protected].

This project includes the demolition of an existing modular classroom building, and the renovation and relocation of the WPENSmodular classroom at Bay View Elementary School. Also included is associated demolition and sitework to facilitate access forconstruction operations. Site construction activities will commence on June 8, 2018 and are required to be substantially complete onJuly 27, 2018.

$1,000,000Santa Cruz

Plan Issuer:

PORTABLE CLASSROOM RELOCATION/RENOVATION AT BAY VIEW ELEMENTARY SCHOOL

School

NEW

408-371-0960Campbell Union High School District [email protected]

Prebid Conf:

Addenda:

5/2/18 2:00 PM

1

18-01177

MAND 4/26 at 9AM (1570 Branham Ln, San Jose)

Construction of Press boxes as shown in project documents including all permanently installed furnishings and materials within thebuilding envelope and all associated structural supports, rigging, decking, footings and or slab directly related to the press box.

San Jose

Plan Issuer:

SCOL93

PRESS BOXES SUPPLY ASSEMBLY PROJECT - CAMPBELL UNION HIGH SCHOOL DISTRICT

17041.01 / .02 / .03/ .04 / .05

Contract #:

Public Works

831-636-4176831-636-4170County of San Benito

Prebid Conf:

Addenda:

5/2/18 2:00 PM

3

18-01055

4/10 @ 10am- 1220 Monterey St, Hollister

Construction of 3200 ft. roadway and underground water pipeline.

Project Contact: Adam GoldstoneEmail: [email protected]

Hollister

Plan Issuer:

Bidders:

RIVER PARKWAY PHASE I (ACCESS ROAD)

PWB-1801Contract #:

Ph:Granite Rock Company General Contractor 408-574-1400 408-365-9548Fax:

Ph:Teichert Construction General Contractor 925-621-5703 925-621-5799Fax:

Public Works

831-634-4913831-636-4316City of Hollister

Prebid Conf:

Addenda:

5/2/18 2:00 PM

1

18-01017

4/18 @ 10am- 375 Fifth Street, Hollister

The project involves the furnishing of all labor, materials, incidentals, and equipment necessary for the construction of the RoadRehabilitation Program 2017/2018 CIP C1701 including: pavement fabric, 3/4” AC Leveling Course, 2.5” AC overlay, 6’ wide wedgegrind existing pavement, 25’ conform grind, 5’ shoulder backing, 4” mill and fill with AC, remove and replace driveway approach, adjustvalve covers, monument casings, traffic loop junction box, and/or cleanout covers, adjust manhole rim to grade, remove and replacetraffic loop detectors, striping, pavement markings, pavement hatching, and other related work as described within the contractspecifications and drawings.

Project Contact: Renee PeralesEmail: [email protected]

$3,018,400Hollister

Plan Issuer:

Bidders:

ROAD REHABILITATION PROGRAM 2017/2018

CIP C1701Contract #:

Ph:Granite Construction General Contractor 831-763-6100 831-761-1042Fax:

Ph:Granite Rock Company General Contractor 408-574-1400 408-365-9548Fax:

Ph:Teichert Construction General Contractor 925-621-5703 925-621-5799Fax:

Public Works

805-781-7198805-781-7200City of San Luis Obispo

Addenda:

5/2/18 2:00 PM

0

18-01072

In general the project includes replacement and/or installation of punch posts and signs in various locations.

PREVAILING WAGE

Project Contact: Jennifer Rice at (805) 781-7058

$50,000San Luis Obispo

Plan Issuer:

SIGN REPLACEMENT PROJECT

90943AContract #:

Page 14: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

NEW

415-554-6229City & Co of San Francisco

Addenda:

5/2/18 2:30 PM

0

18-01141

THIS PROJECT IS A REBID

Div 1-3, 5-6, 9-10, 12, 26 & 31-33. The Work to be done under this Contract is located at Potrero Hill Recreation Center, 801 ArkansasStreet, San Francisco and includes:

Renovation of a baseball and a softball field; grading, drainage, planting of new athletic field turf and irrigation; new chain link fencingand gates; concrete walkways, steps and retaining walls; metal handrails; asphalt paving.

Installation of new quick couplers and lighting at existing trail, including installation of new pedestrian pole lights and new PG&E powerpanel.

The project includes environmental work related to the management of excavated material and importation of soils. Project is expectedto import soil to fill the athletic field site in the amount of approx. 6,000 CY.

Questions: Paulina Araica, Project Manager, at (415) 581-2558.

(Previously scheduled bid date was 3/30/18)

$3,000,000San Francisco

Plan Issuer:

Bidders:

POTRERO HILL RECREATION CENTER (REBID)

1000008752(R)Contract #:

Ph:CF Contracting General Contractor 415-721-7160 415-296-6437Fax:

Public Works

408-730-7403City of Sunnyvale DPW

Addenda:

5/2/18 3:00 PM

0

18-00978

Installation of new dedicated bike lanes along Maude Avenue, from Borregas Avenue to Fair Oaks Avenue, including pedestrian facilityupgrades such as ADA ramps, crosswalk, and pedestrian signals, and minor sidewalk repair, minor pavement repair and geometricmodification to the Sunnyvale-Saratoga and Maude Avenue intersection.

Project Contact: Lisa Vo 408-730-7608Email: [email protected]

Sunnyvale

Plan Issuer:

SCOL27

MAUDE AVENUE BIKEWAY & STREETSCAPE

PW18-06Contract #:

School

805-756-7566805-756-1299Cal Poly Facilities Planning & Capital Projects

Prebid Conf:

Addenda:

5/2/18 3:00 PM

3

18-00957

4/11 @ 10am- Facilities (Bldg 70), room 114

In general the work consists of, but is not limited to, providing all labor, equipment and services required for installation of new waterline improvemet and partial replacement on the California Polytechnic State University campus in San Luis Obispo, California inaccordance with the Plans and Specifications.

Bid Contact: Stephanie Albright(805) [email protected]

San Luis Obispo

Plan Issuer:

WATER LINE IMPROVEMENT

MIN18-SR5335Contract #:

Residential

408-429-7701408-429-7700Palisade Builders

Addenda:

5/2/18 5:00 PM

0

18-01093

New North and South apartment buildings of 518 units with one level underground parking and one and two level above grade garage.

San jose

Plan Issuer:

SCOL80

JAPAN TOWN APARTMENTS

Page 15: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Thursday, May 03, 2018

Public Works

510-596-4330City of Emeryville, DPW

Addenda:

5/3/18 10:00 AM

1

18-01044

Reconstruction of asphalt pavement; adjustment of water valve covers, sewer manholes, storm drain manholes, and electric manholes;replacement of traffic striping and markings; and installation of signs.

Project Contact: Ryan O'Connell

$1,300,000Emeryville

Plan Issuer:

Bidders:

SCOL88

2017/2018 STREET REHABILITATION & PREVENTIVE MAINTENANCE PROJECT

EPW 17-104Contract #:

Ph:Ghilotti Brothers Inc General Contractor 415-454-7011 415-454-8376Fax:

Public Works

650-802-4219City Of San Carlos, DPW

to

Addenda:

5/3/18 10:00 AM

1

18-01068

Removal of eucalyptus trees, the removal of the eucalyptus tree stumps, debris removal and disposal, clean up associated with thesearborist activities, and restoring the asphalt, sidewalk, fences, retaining walls, and surface.

$300,000$200,000San Carlos

Plan Issuer:

SCOL36

SAN CARLOS AVENUE EUCALYPTUS TREE REMOVAL - PHASE I

C1722Contract #:

Public Works

510-627-1364Port of Oakland

Prebid Conf:

Addenda:

5/3/18 12:00 PM

3

18-00947

4/11 at 9AM (Shepard-Glenn Bldg)

Install temporary barricades; remove existing asphalt concrete, striping markings, and concrete joint sealant; install new asphaltpavement; install new install new Portland cement concrete pavement; striping markings; install new concrete joint sealant; repairconcrete joint edge spalls; seal concrete pavement cracks; electrical work.

Project Contact: Owen He 510-627-1197Email: [email protected]

$1,600,000Oakland

Plan Issuer:

Bidders:

SCOL149

CONSTRUCTION OF SOUTHFIELD PAVEMENT IMPROVEMENTS-OAKLAND INTERNATIONAL AIRPORT- PORT OF OAKLAND

2018-03-A1Contract #:

Ph:OC Jones and Sons General Contractor 510-526-3424 510-526-0990Fax:

Public Works

650-522-7300City of San Mateo - DPW

Addenda:

5/3/18 2:00 PM

2

18-00920

Please refer to specifications for complete scope of work.

Project Contact: Vatsal Patel 650-522-7282

$240,000San Mateo

Plan Issuer:

SCOL67

2017-18 SANITARY SEWER ROOT FOAMING (NORTH BASIN)

469933-46000-9151-46320

Contract #:

Public Works

415-551-4603City & Co of San Francisco - Utilities

Prebid Conf:

to

Addenda:

5/3/18 2:00 PM

2

18-00858

4/2 at 9:30AM (meet at Contractor's Assistance Ctr, 150 Executive Park Blvd, Ste1300, SF)

Div 1-4, 6, 12 & 31-33. The Work to be done under this Contract consists of green infrastructure work, pavement renovation, sewerwork, drainage work, landscaping work, water main work, and traffic control which includes constructing concrete curb ramps withdetectable surface tiles, bulbouts, bioretention planters, infiltration galleries, slope stabilization features, rain garden and permeablepavement on Seacliff Avenue between.25th Avenue and 26th Avenue, 25th Avenue North Cul-de-Sac and El Camino Del Mar between32nd Avenue and 34th Avenue in San Francisco, CA.

$7,000,000$6,000,000San Francisco

Plan Issuer:

Bidders:

BAKER BEACH GREEN STREETS

WW-627Contract #:

Ph:CF Contracting General Contractor 415-721-7160 415-296-6437Fax:

Ph:Mitchell Engineering General Contractor 415-227-1040 415-227-1049Fax:

Ph:Ranger Pipelines Inc. General Contractor 415-822-3700 415-822-3703Fax:

Page 16: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

510-368-3621City of Oakland, DPW

Prebid Conf:

Addenda:

5/3/18 2:00 PM

0

18-01054

4/19 at 10AM (250 Frank H. Ogawa Plaza, Oakland)

Perform preventive maintenance work on various bridges within the City. The work includes sidewalk and asphalt concrete repairs atapproaches, pressure cleaning and epoxy injection of soffit cracks, application of Methacrylate and concrete patch on bridge decks,repair of damaged fence and bridge joints and installation of signage.

Project Contact: Mohammed Barati 510-238-7708Email: [email protected]

$621,970Oakland

Plan Issuer:

SCOL104

BRIDGE PREVENTIVE MAINTENANCE PROJECT

1000819Contract #:

School

650-574-6161San Mateo Community College District - Facilities

Prebid Conf:

Addenda:

5/3/18 2:00 PM

6

18-00834

MAND 4/3 & 4/9 at 10AM (Bldg 9 Room 12354)

Repairing the exterior envelope of Cañada College Building 9, which includes removing and replacing the stucco finish of the buildingenvelope and waterproofing the perimeter of the 2nd and 3rd level terrace, windows and sunshades.

Project Contact: Thomas Lo 650-387-7319Email: [email protected]

Redwood City

Plan Issuer:

Bidders:

SCOL125

CANADA COLLEGE BUILDING 9 EXTERIOR ENVELOPE REPAIR PROJECT - SAN MATEO COUNTYCOMMUNITY COLLEGE DISTRICT

86772Contract #:

Ph:Alex Kushner General Contractor General Contractor 415-756-0945 415-358-5769Fax:

Ph:BHM Construction General Contractor 707-643-4580 707-643-4581Fax:

Ph:Exbon Development General Contractor 714-539-2222 714-536-2223Fax:

Ph:Saarman Construction General Contractor 415-749-2700 415-749-2709Fax:

Ph:WE Lyons Construction General Contractor 925-658-1600 925-658-1604Fax:

Public Works

805-237-3904805-237-3861City of Paso Robles

Addenda:

5/3/18 2:00 PM

0

18-00936

The work is generally described as the provision of high quality street sweeping services on City streets removing litter, leaves, sand,dirt and other debris.

Paso Robles

Plan Issuer:

CITYWIDE STREET SWEEPING SERVICES RE-BID

DPW No. 18-04.1Contract #:

School

408-300-5160Aedis Architects

Prebid Conf:

Addenda:

5/3/18 2:00 PM

1

18-01051

MAND 4/5 at 1PM (Operatioins Bldg)

Removal and Replacement of 2 Existing Parking Lots, Associated Concrete Flatwork and Landscaping.

Sunnyvale

Plan Issuer:

SCOL78

COLUMBIA MIDDLE SCHOOL PARKING LOT REPLACEMENT - SUNNYVALE SCHOOL DISTRICT

2018021Contract #:

Page 17: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

510-412-4540WCCUSD

Prebid Conf:

Addenda:

5/3/18 2:00 PM

1

18-01064

MAND 4/6 at 11:30AM

THIS PROJECT IS A REBID

Div 1-3, 5-10, 22-23 & 26. The Project consists of: Remodeling eight restrooms including concrete floor slab removal and replacementas well as new non-load bearing wood stud wall construction. The scope of work includes new floor, wall, and ceiling finishes, newpartitions, new exhaust ventilation, new plumbing piping and fixtures, and new electrical power and lighting systems. The scope ofwork also includes addition of a man-door connecting the special education classroom with an adjacent classroom lab as well as 2,000sq. ft. of classroom flooring replacement.

(Previously scheduled bid date was 7/21/16)

El Sobrante

Plan Issuer:

Bidders:

CRESPI MIDDLE SCHOOL RESTROOM RENOVATION - PHASE II - REBID

1000002709Contract #:

Ph:A & E Emaar General Contractor 510-253-5337 510-527-3614Fax:

Ph:Angotti & Reilly, Inc. General Contractor 415-575-3700 415-575-1470Fax:

Ph:ERA Construction, Inc. General Contractor 510-830-5955 510-743-4153Fax:

Ph:Hung Construction Inc. General Contractor 510-812-8558 510-280-1655Fax:

Ph:Streamline Builders General Contractor 415-828-0135 415-664-5717Fax:

Ph:TSE Construction General Contractor 510-812-3466 510-323-2528Fax:

Ph:Wilburn-Diaz Construction General Contractor 415-686-3575 510-372-0224Fax:

Ph:Wilson General Contracting, Inc. General Contractor 925-915-1606 Fax:

Public Works

415-551-4603City & Co of San Francisco - Utilities

Prebid Conf:

Addenda:

5/3/18 2:00 PM

1

18-00890

4/17 at 10AM (meet at 1680 Mission St, 2nd Fl Conf Rm, San Francisco)

Div 1-3, 5 & 31-33. The objective of the Project is to replace the existing sewers and street pavement at various locations within theCity and County of San Francisco. The Work is to be performed in San Francisco, CA.

$2,300,000San Francisco

Plan Issuer:

Bidders:

CUTLER AVENUE, LOWER GREAT HIGHWAY, SLOAT BOULEVARD & WAWONA STREET SEWERREPLACEMENT

WW-611Contract #:

Ph:Cratus, Inc General Contractor 415-939-2840 415-520-6037Fax:

Ph:LC General Engineering & Construction, Inc. General Contractor 415-643-2888 415-643-2889Fax:

Ph:Mitchell Engineering General Contractor 415-227-1040 415-227-1049Fax:

Ph:Precision Engineering General Contractor 415-621-4882 415-621-4812Fax:

Page 18: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

831-469-1958831-426-0199Santa Cruz Metro Transit District [email protected]

Prebid Conf:

Addenda:

5/3/18 2:00 PM

2

18-00819

4/10 @ 10am- site

THIS PROJECT CONSISTS OF NEW BARRICADES TO PROTECT EXPOSED PIPING FROM DAMAGE BY VEHICLES AT THEJUDY K. SOUZA OPERATIONS BUILDING. NEW BARRICADES ARE TO BE INSTALLED AT THE GROUND LEVEL AND PARKINGDECK LEVEL.THE BARRIERS ARE INTENDED TO FUNCTION AS DETERRENTS TO MINIMIZE RISK OF DAMAGE TO EXPOSED PIPINGFROM VEHICLES.

PREVAILING WAGE

Questions: Erron Alvey, Purchasing ManagerE-mail: [email protected]

Santa Cruz

Plan Issuer:

Bidders:

INSTALLATION OF BOLLARDS AND PIPE PROTECTION AT THE JUDY K. SOUZA OPERATIONSFACILITY

18-13Contract #:

Ph:Alex Kushner General Contractor General Contractor 415-756-0945 415-358-5769Fax:

Ph:Arktos Incorporated General Contractor 510-728-2144 510-356-2760Fax:

Ph:C2 Builders Inc. General Contractor 831-818-7956 000-000-0000Fax:

Ph:Don Chapin Co General Contractor 831-449-4273 831-449-0700Fax:

Ph:Earthworks Paving Contractors General Contractor 831-475-1223 831-475-1173Fax:

Ph:George H. Wilson General Contractor 831-423-9522 831-423-9903Fax:

Ph:Granite Rock General Contractor 408-574-1400 408-365-9548Fax:

Ph:Mike Hinson Construction, Inc. General Contractor 831-662-3834 831-685-2345Fax:

Ph:Miken Construction General Contractor 909-243-7815 909-373-6044Fax:

Ph:Reber Construction General Contractor 831-429-9777 831-429-0102Fax:

Ph:Roger Cook dba Gadda Construction General Contractor 916-425-7242 000-000-0000Fax:

Ph:S. Chaves Construction Inc. General Contractor 805-543-9340 805-543-9341Fax:

Ph:T. Boyd Construction General Contractor 831-332-1446 208-769-4746Fax:

Ph:Tidal Marine Construction, Inc. General Contractor 925-609-6464 925-609-6466Fax:

Public Works

831-883-5929Marina Coast Water District - Engineering Office [email protected]

Prebid Conf:

Addenda:

5/3/18 2:00 PM

0

18-00955

MAND 4/12 @ 10am- 2840 4th Ave, Marina

Install approximately 3,500 linear feet of new 18-inch ductile iron pipe (DIP) water main in Inter-Garrison Road, from approximately200’ east of Shoonover Road to approximately 500’ west of the intersection with Sherman Blvd. in East Garrison. The new main willconnect to existing 12” water mains at both its eastern and western ends. This work includes all associated fittings, valves,appurtenances, pavement removal and restoration, reconnecting existing mains and services along these pipes, and abandonmentgrouting of existing water mains within the right-of-way.

PREVAILING WAGE

Project Contact: Andrew Racz (831) 883-5933

Marina

Plan Issuer:

Bidders:

INTER-GARRISON RD WATER DISTRIBUTION PIPELINE

CIP NO. OW-0206Contract #:

Ph:Specialty Construction General Contractor 805-543-1706 805-543-1722Fax:

Page 19: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

925-370-6517925-299-6959Contra Costa Community College Dist-Jovan Esprit [email protected]

Prebid Conf:

to

Addenda:

5/3/18 2:00 PM

2

18-00969

MAND 4/9 at 1PM (meet at Los Medanos College, 2700 E. Leland Dr, Pittsburg)

Div 1-3, 5-12, 21-23, 25, 26-28 & 31-33. In general, the Work consists of the construction of one-story, 54,973 GSF, fully sprinklerededucational and administration facility. The building is designed as four wings-laboratory, Classroom, Administration and StudentCommons and Classrooms. Site work includes surface parking and landscaping, bio retention areas, landscaped courtyards and pathsand a fire access lane.

All questions related to this Project must be in writing and directed to: Jovan Esprit, Contracts Mgr, at: [email protected]

$43,000,000$35,000,000Brentwood

Plan Issuer:

Bidders:

L-630 NEW BRENTWOOD CENTER FOR LOS MEDANOS COLLEGE

L-630Contract #:

Ph:Balfour Beatty Construction General Contractor 510-903-2060 510-903-2066Fax:

Ph:C. Overaa & Co. General Contractor 510-234-0926 510-237-2435Fax:

Ph:Lathrop Construction Assoc. General Contractor 707-746-8000 707-746-8080Fax:

Ph:SJ Amoroso Construction Co., Inc. General Contractor 650-654-1900 650-654-9002Fax:

School

650-616-3803650-246-5974South San Francisco Unified School District- Bonds

Prebid Conf:

Addenda:

5/3/18 2:00 PM

1

18-01090

MAND 4/24 at 10AM (Administratioin Building)

Restrooms upgrades.

South San Francisco

Plan Issuer:

SCOL47

MARTIN ELEMENTARY SCHOOL RESTROOMS MODERNIZATION - SOUTH SAN FRANCISCO UNIFIEDSCHOOL DISTRICT

02-18Contract #:

Public Works

415-508-2130City of Brisbane DPW

Addenda:

5/3/18 2:00 PM

5

18-00768

Construction of a new library.

Project Contact: Randy Breault

Brisbane

Plan Issuer:

Bidders:

SCOL111

NEW BRISBANE LIBRARY

9016Contract #:

Ph:DL Falk Construction, Inc General Contractor 510-887-6500 510-887-6501Fax:

Ph:Gonsalves & Stronck Construction General Contractor 650-802-2960 650-802-2970Fax:

Ph:Pacific - Mountain Contractors General Contractor 925-603-2652 925-687-8430Fax:

Ph:Thompson Builders Corp General Contractor 415-456-8972 415-459-0665Fax:

Public Works

805-773-4684805-773-4656City of Pismo Beach .

Addenda:

5/3/18 2:00 PM

0

18-00967

To provide a Parking Lot and limited Street Sweeping service to the City of Pismo Beach on a regularly scheduled basis, by removinglitter, leaves, sand, dirt, and debris from City owned parking lots and some streets and alleys. This program shall leave the streets witha presentable appearance and free from dust and debris.

Project Contact: Cindy RansdellEmail: [email protected]

Pismo Beach

Plan Issuer:

PARKING LOT AND STREET SWEEPING

Page 20: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

916-797-7400916-757-1000Flint Builders, Inc.

Prebid Conf:

Addenda:

5/3/18 2:00 PM

1

18-01113

4/20 @ 1pm- 536 Palm Street, Santa Cruz

Flint Builders, Inc. is requesting bids from qualified firms for the above referenced project. You may submit your bid via FAX to (916)797-7400 or via email to [email protected].

This project includes the demolition, renovation, relocation and associated site work for multiple existing modular classroom buildingsat DeLaveaga Elementary School. Site construction activities will commence on June 8, 2018 and are required to be substantiallycomplete on July 27, 2018.

PREVAILING WAGE

Project Contact: Mantas Juska or Jared WrightEmail: [email protected] or [email protected]

$1,000,000Santa Cruz

Plan Issuer:

PORTABLE CLASSROOM MODIFICATIONS AT DE LAVEAGA ELEMENTARY

School

415-241-6148415-241-6158SFUSD -- Fe Bongolan, Contracts Dept

Prebid Conf:

Addenda:

5/3/18 2:00 PM

2

18-01046

MAND 4/12 & 4/19 at 10AM

THIS PROJECT IS A REBID

Div 1, 3, 5-6 & 31-33. The Project consists of green schoolyard improvements including, but not limited to, demolition and removal ofasphalt, carpentry, concrete work, construction of planting areas and stormwater management/green infrastructure features,installation of new site furnishings, earthwork to create “natural play areas,” and irrigation/drainage work.

(Previously scheduled bid date was 4/3/18)

$525,000San Francisco

Plan Issuer:

Bidders:

REBID - RL STEVENSON ES GREEN SCHOOLYARD AND STORMWATER MANAGEMENT PROJECT

11622Contract #:

Ph:Angotti & Reilly, Inc. General Contractor 415-575-3700 415-575-1470Fax:

Ph:Eternal Construction Inc General Contractor 650-692-6638 650-692-6686Fax:

Ph:Reilly Construction, Inc. General Contractor 415-317-3603 415-334-7632Fax:

Public Works

650-286-3390City of Foster City, Estero Municipal Improve Dist

Prebid Conf:

Addenda:

5/3/18 2:00 PM

0

18-00945

4/17 at 10AM (610 Foster City Blvd., Foster City)

Installation of six (6) new sanitary sewer manholes, rehabilitation or reconstruction of six (6) sanitary sewer manholes, rehabilitation ofthree (3) sanitary sewer lift stations, and seven (7) sanitary sewer pipeline projects.

Foster City

Plan Issuer:

SCOL66

SEWER SYSTEM REHABILITATION PROJECT

CIP 455-611Contract #:

Public Works

510-528-5760City of Albany - Community Development

Prebid Conf:

Addenda:

5/3/18 2:00 PM

0

18-00916

4/20 at 10AM, 540 Cleveland Ave, Albany)

Repair of sidewalks.

Albany

Plan Issuer:

SCOL44

SIDEWALK REHABILITATION PHASE 1 PROJECT

C18-35Contract #:

School

408-343-2802408-252-3000Cupertino Union School District

Prebid Conf:

Addenda:

5/3/18 2:00 PM

0

18-01071

MAND 4/19 at 10AM (Admin building)

Install unperforated mineral board (tackboard) in wings A, B, C, D, E, and F. Cutting around existing tackboard and wall devices.

Saratoga

Plan Issuer:

SCOL42

TACKBOARD INSTALLATION PHASE 2 MCAULIFFE ELEMENTARY SCHOOL - CUPERTINO UNIONSCHOOL DISTRICT

18-B06-24Contract #:

Page 21: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

NEW

805-466-5176805-466-1038Wysong Construction [email protected]

Prebid Conf:

Addenda:

5/3/18 2:00 PM

3

18-01140

4/20 @ 3:15pm- site walkthru

WYSONG CONSTRUCTION IS THE DISTRICT SELECTED CONTRACTORMODERNIZATIONSITE WORK: Path of travel upgrades includes the following: remodel accessible parking, remodel accessible path at sidewalk,remodel accessible loading, increase accessible loading area, install ramps at path among Buildings A, B, C & D; remodel existingramp at Building A, remodel exterior landings at existing doorways. Other accessible upgrades include remodeled concrete pathsalong East side of Building A and between Buildings C & D; other site work includes replacement of existing fencing and access gates,separation of Fire Alarm system from adjacent Templeton Middle School, reorganize existing data and fire alarm raceways to newexterior closet at Building A, upgrade existing electrical vault.BUILDING MODERNIZATIONBuilding A: New Electrical/Server RoomBuilding B: Replace exterior windows, replace ceiling system, replace/upgrade lighting system, remove/reinstall electrical outlets,install data outlets, install/upgrade fire alarm system, replace gypsum wallboard, painting, reface cabinets, remodel/sink upgrades andreplace flooring.BUILDING C&D: Replace doors, replace windows, replace ceiling system, replace/upgrade lighting system, remove/reinstall electricaloutlets, install data outlets, install/upgrade fire alarm system, replace gypsum wallboard, painting, reface cabinets, remodel/sinkupgrades and replace flooring.

Project Contact: Will FerraroPhone: (805) 466-1038

$2,600,000Templeton

Plan Issuer:

Bidders:

TEMPLETON ELEMENTARY SCHOOL- MODERNIZATION

Ph:Wysong Construction General Contractor 805-466-1038 805-466-5176Fax:

Public Works

510-494-4620City of Fremont-Engineering

Addenda:

5/3/18 2:00 PM

1

18-01043

Remove and dispose of existing concrete paving and sub grade, remove trees, remove existing sod, clear and grub existingvegetation, import topsoil, amend existing soil, install permeable paver maintenance band, cobblestone paving on concrete pad, installtrees and shrubs, install bubbler irrigation system, with irrigation controllers. Protect in place existing water meters, street signage, lightpoles and utility boxes.

Project Contact: Andrew Mayes 510-494-4741

$900,000Fremont

Plan Issuer:

SCOL79

WATER CONSERVATION & MEDIAN UPGRADES MOWRY AVENUE

PWC 8889Contract #:

School

408-300-5160Aedis Architects

Prebid Conf:

Addenda:

5/3/18 3:00 PM

5

18-01070

MAND 4/12 at 10AM

Removal and replacement of the existing roof at the existing Gymnasium building. The scope also includes removal and replacementof selective HVAC rooftop units and installation of new roofing throughout. Interior scope of work includes, but is not limited to, removaland replacement of new lighting, electrical and fire alarm, removal of existing ceiling and modifications to interior finishes.

San Jose

Plan Issuer:

Bidders:

SCOL46

LEYVA MIDDLE SCHOOL GYMNASIUM & ROOF REPLACEMENT - EVERGREEN SCHOOL DISTRICT

2016044Contract #:

Ph:101 Builders General Contractor 408-422-6807 000-000-0000Fax:

Ph:Beals Martin General Contractor 650-364-8141 650-367-7645Fax:

Ph:Calstate Construction General Contractor 510-657-1800 510-657-1810Fax:

Ph:Seward L. Schreder Construction Inc. General Contractor 530-229-0001 530-229-0070Fax:

Ph:SLS Construction General Contractor 408-842-3355 000-000-0000Fax:

Page 22: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

415-554-6229City & Co of San Francisco

4/18 at 1:30PM SITE VISIT

Prebid Conf:

Addenda:

5/3/18 4:00 PM

6

18-00708

3/27 & 4/18 at 11AM (meet at 1155 Market St, 4th Fl, Executive Conf Rm, SanFrancisco)

The City intends to contract with a qualified Contractor to provide all design and construction services necessary for the successfuldelivery of the renovation of approximately 25,000sq.ft. of existing office space into administrative offices and a homeless outreachaccess point for the San Francisco Department of Homelessness and Supportive Housing (HSH).

The Contractor, shall perform all design, construction and related services necessary to successfully deliver the renovation of 440 TurkStreet project to meet the functional and operational requirements of HSH administrative offices and homeless outreach access pointto provide programs and services for the homeless population of San Francisco.

Questions: [email protected]

$4,500,000San Francisco

Visit

Plan Issuer:

RFQ DESIGN-BUILD SERVICES FOR THE RENOVATION OF 440 TURK STREET

1000009329Contract #:

Commercial

619-241-8744619-577-4010xt105

RDS Construction, Inc.

Addenda:

5/3/18 4:00 PM

1

18-01009

New ground up, 140,000sf 3-story Self Storage.

San Jose

Plan Issuer:

Bidders:

SCOL45

TROJAN SELF STORAGE- KNOX AVENUE

Ph:Diede Construction General Contractor 209-369-8255 209-368-0600Fax:

Ph:RDS Construction, Inc. General Contractor 619-577-4010xt105 619-241-8744Fax:

Friday, May 04, 2018

Commercial

NEW

661-324-3900661-324-3000Klassen Corporation

Addenda:

5/4/18 1:00 PM

0

18-01145

The Work consists of the renovation and reconstruction of a one-story CMU bearing and structural steel frame on CMU or poured inplace foundations over concrete footings; stucco veneer with metal stud and CMU backup, aluminum storefront windows; newplumbing, HVAC, and electrical work, including a loading area, sidewalks and other site improvements.

Project Contact: Jason ReneauEmail: [email protected]

Arroyo Grande

Plan Issuer:

Bidders:

ALDI GROCERY STORE - ARROYO GRANDE

Ph:!!!There may be other GC's bidding thisproject that we are unaware of

General Contractor 000-000-0000 Fax:

Ph:Klassen Corporation General Contractor 661-324-3000 661-324-3900Fax:

State-Federal

000-000-0000000-000-0000Department of Veterans Affairs

Addenda:

5/4/18 10:00 AM

2

18-01075

Replace (3) compressors on the AC condenser of the HVAC unit at Bldg. 348 for the Veterans Affairs Palo Alto Health Care System(VAPAHCS),

Project Contact: Charee Harris 775-788-5511

Menlo Park

Plan Issuer:

Bidders:

SCOL30

VAPAHCS REPLACE FOUR COMPRESSORS

36C26118B0402Contract #:

Ph:Patriot Construction General Contractor 209-982-9900 209-249-5301Fax:

Page 23: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

Prebid Conf:

Addenda:

5/4/18 11:00 AM

0

18-00992

MAND 4/18 @ 2pm- site

Project consists of the demolition of nine existing relocatable buildings. Installation of one new 72' x 40' relocatable building fromstockpile on a permanent concrete foundation. Site work will include various site walks and parking lot revisions for accessibility, newfencing for campus security, a new trash enclosure, and a new parking lot. The project also includes a 120V, 20 amp circuit for a newelectric rolling gate, connected from an existing electrical panel in building 'B' (no other electrical work required in this building).

PREVAILING WAGE

Project Contact: Erin GarciaEmail: [email protected]

Castroville

Bidders:

NORTH MONTEREY COUNTY HIGH SCHOOL ACCESS CONTROLS

16-10169Contract #:

Ph:Norcal Contractor General Contractor 831-238-1513 831-238-1513Fax:

RFP / RFQ /SOQ

805-489-9657805-473-4520City of Grover Beach [email protected]

Addenda:

5/4/18 12:00 PM

2

18-00966

The basic services to be provided include the overall Construction Management functions, including but not limited to the followingspecific duties, all in accordance with Federal-Aid requirements pursuant to all relevant FHWA and/or Caltrans guidelines, policies andprocedures:• Will provide a Resident Engineer (RE) in responsible charge of the construction contract; RE will be responsible for weekly RE Report• Will provide Assistant Resident Engineer (or equivalent construction inspection) staff who will be responsible for day-to-day field leveloperations, as documented in daily diaries or inspection reports• Will assure that the Contractor’s construction operations are being conducted in a safe manner in accordance the project’s TrafficControl Plan and the CAL-OSHA Construction Safety Orders• Will administer the project to assure that all elements of the actual construction are furnished, installed and constructed inaccordance with the Project Plans and Specifications and the 2015 Caltrans Standard Specifications.• Will create and maintain a well-organized construction records/files in accordance with the Caltrans Uniform File ManagementSystem or equivalent records management system that is compatible with Federal-aid requirements and enables the quick retrieval ofparticular documentation as may be requested

Questions: Greg RayEmail: [email protected]

Grover Beach

Plan Issuer:

RFP - CONSTRUCTION MANAGEMENT & MATERIALS TESTING FOR TRAIN STATION EXPANSION

3312Contract #:

School

NEW

510-412-4540WCCUSD

Prebid Conf:

Addenda:

5/4/18 2:00 PM

1

18-01129

MAND 4/16 & 4/23 at 1PM

THIS PROJECT IS A REBID

Div 1-3, 5-11, 14, 22-23, 26 & 31-33. The Project consists of: Seismic upgrades to an existing two story concrete gymnasium buildingand adjacent one story modular classroom building. Accessibility upgrades to the locker room restrooms. Site improvements include anew modular elevator to the second floor of the gymnasium building, an ADA ramp with guardrails and removal and replacement ofconcrete walkway.

(Previously scheduled bid date was 4/4/18)

El Sobrante

Plan Issuer:

CRESPI MIDDLE SCHOOL GYM SEISMIC RETROFIT - REBID

20610154-00RContract #:

Page 24: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

Prebid Conf:

Addenda:

5/4/18 2:00 PM

1

18-00939

4/17 @ 10am- 1555 El Morro Ave, Los Osos

Removal and replacement of asphalt paving including but not limited to: base construction, paving, sealing, striping and all relatedwork to provide a complete project. Please note this project will be scheduled as follows: Los Osos Middle School paving to becompleted prior to the start of paving at the Morro Elementary School.

PREVAILING WAGE

Questions: Karen BrightEmail: [email protected]

$1,000,000San Luis Obispo County

LOS OSOS MIDDLE SCHOOL AND MORRO ELEMENTARY SCHOOL PAVING

Bid #296Contract #:

RFQ-Consulting

Firm/Architectural

000-000-0000Judicial Council of California

Prebid Conf:

Addenda:

5/4/18 2:00 PM

1

18-00003

4/6 at 11AM

PURPOSE OF THIS RFQThe Judicial Council seeks the services of qualified general contractors with experience in performing construction services related tofacility modification projects (“Contractor(s)”) with expertise in all phases of construction as required to perform a variety of facilitymodification projects and other construction projects in court facilities, usually in the $25,000 to $10,000,000 range. The Contractorswill be evaluated and selected to provide services in one or more of the three regions: Bay Area/North Coastal, Northern/Central, andSouthern regions. A map of the three regions is included in this RFQ as Attachment B. Contractors should indicate, in Attachment A,the region(s) for which they wish to be considered.

SCOPE OF SERVICESThe scope of services required by this RFQ includes some or all of the following services:3.1 Services: Contractor is to provide general construction services related to all phases of construction on various court facilityprojects in California on an as-needed basis. These Projects involve renovation projects, program-wide projects, and infrastructureprojects. Work will include a variety of construction related activities including new construction, modifications, renovation, and repairsat numerous court facility locations throughout California including but is not limited to: general and specialized construction activitiesfor example, demolition, mechanical, electrical, plumbing, HVAC, security/fire systems, roofing, tile, cabinetry and workstationmodifications or other incidental related work as directed by Judicial Council’s project manager. It is anticipated that some Projectsmay require some limited design and/or preparation of construction documents necessary for a turn-key operation based on job walksconducted by the Judicial Council project manager and for the purposes of obtaining permits. It is intended that the Contractor willdeliver a total and complete construction project as requested. Contractor agrees to provide all necessary expertise and services toprofessionally and diligently prosecute the work authorized by Project specific Service Work Order(s) (“SWO”) to be issued by theJudicial Council. A Statement of Work will be provided with each Service Work Order; the contract terms and conditions, and thespecifications, drawings, and special conditions will be provided with the Service Work Order, when applicable.

Call in information for the pre-proposal conference:Date and Time: April 6, 2018 from 11AM to 12PMCall-in Number: 1-877-820-7831Participant Code: 440984

Questions: [email protected]

Various Counties

Plan Issuer:

RFQ GENERAL CONTRACTORS IDIQ SERVICES IN VARIOUS COUNTIES

RFQ-FSO-GC-Services-IDIQ-2018-01-JP

Contract #:

Page 25: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

510-234-4221510-234-4200Alten Construction, Inc [email protected]

Prebid Conf:

Addenda:

5/4/18 2:00 PM

0

18-01123

4/25 at 3:30PM (meet at Admin Bldg C, Visitor Check-In)

SCOPE: Lease/Leaseback Guaranteed Max Price Project. Demolition of 7 existing buildings, the construction of underground siteelectrical and data utilities and the alteration of portions of 2 existing buildings to support the site utilities work. NO PLA, BUTPREVAILING WAGE IS REQUIRED.

TRADES NEEDED (but not limited to): Surveying; Site Demolition; Structure Demolition; Selective Building Demolition; StructureMoving; Earthwork; Erosion & Sediment Control; Utility Structures; Water Utilities; Sanitary Sewerage Utilities; Storm Drainage Utilities;Metal Fabrications; Misc. Rough Carpentry; Architectural Woodwork; Hollow Metal Doors & Frames; Wood Doors; Louvers; GypsumBoard; PC Plaster, Resilient Base; Linoleum Flooring; Carpeting; Painting & Coating; Signage; Plumbing; Electrical; Communications;and Electronic Safety & Security.

$2,000,000San Rafael

Plan Issuer:

Bidders:

VENETIA VALLEY ELEMENTARY SCHOOL INCREMENT 1 (DEMO)

Ph:Alten Construction, Inc General Contractor 510-234-4200 510-234-4221Fax:

School

831-459-5540831-459-2366UCSC Physical Planning & Construction

Prebid Conf:

Addenda:

5/4/18 2:30 PM

1

18-01036

MAND 4/17 @ 10am- Physical Plant Training Room Located in the trailer behind theCarriage House

Furnish and install new refrigeration equipment. Alternates for additional work will include:1. Replacement of dishwasher and repair of adjacent wall.2. Replacement of existing underground sanitary sewer lines located in kitchen area.3. Replacement of underground sanitary sewer lines located in servery area.

Questions: Steven IrieEmail: [email protected]

$900,000Santa Cruz

Plan Issuer:

Bidders:

RACHEL CARSON COLLEGE- KITCHEN INFRASTRUCTURE RENOVATION

5303-035Contract #:

Ph:Aaron Tovar Construction General Contractor 831-524-2998 831-638-9192Fax:

Ph:Cen-Con, Inc. General Contractor 831-459-9270 831-459-9297Fax:

Ph:CRW Industries General Contractor 831-426-0743 831-466-9597Fax:

Ph:ICC General Contractors General Contractor 408-733-6656 408-733-6657Fax:

Ph:Mike Hinson Construction, Inc. General Contractor 831-662-3834 831-685-2345Fax:

Public Works

510-528-5760City of Albany - Community Development

Addenda:

5/4/18 5:00 PM

0

18-00797

Seeking consultants to develop Climate Mitigation and Adaptation Plan.

Hard copies also available for review at Builders Exchange of Santa Clara

Albany

Plan Issuer:

SC18E

RFP PLANNING CONSULTING SERVICES ALBANY CLIMATE MITIGATION & ADAPTATION PLAN

Page 26: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Monday, May 07, 2018

School

925-682-8000Mt. Diablo USD

Prebid Conf:

Addenda:

5/7/18 10:00 AM

0

18-01087

MAND 4/24 at 10AM (meet at 1480 Gasoline Alley, Maint & Ops Dept, Concord)

Div 1-2 & 8-9. Door replacements at multiple school sites as follows:1 Bancroft2 Administration3 Diablo View4 Gregory Gardens5 Loma Vista6 Maintenance and Operations7 Shadelands8 Strandwood9 Silverwood10 Sunrise11 Westwood12 Willow Creek

Questions: John Willford at (925) 682-8000 x5421, or by email at: [email protected]

Contra Costa County

Plan Issuer:

DOOR REPLACEMENTS FOR MULTIPLE SITES SUMMER 2018

1803Contract #:

School

925-682-8000Mt. Diablo USD

Prebid Conf:

Addenda:

5/7/18 10:30 AM

0

18-01088

MAND 4/24 at 10:30AM

Div 1-2 & 31-32. Hardscape repair at multiple school sites.

Questions: John Willford at (925) 682-8000 x5421, or by email at: [email protected]

Contra Costa County

Plan Issuer:

HARDSCAPE REPAIR AT MULTIPLE SITES SUMMER 2018

1804Contract #:

School

NEW

209-249-5301209-982-9900Patriot Construction [email protected]

Prebid Conf:

Addenda:

5/7/18 12:00 PM

0

18-01182

MAND 4/26 at 10AM

Renovate Durand Dining Servery, kitchenette and dish washing wall space. Also, provide new quarry tile flooring under existing stove.

Project Contact: Kristen McIlrathEmail: [email protected]

Mountain View

Plan Issuer:

Bidders:

SCOL68

DURAND ASSET RENEWALS PROJECT- STANFORD UNIVERSITY

Ph:Patriot Construction General Contractor 209-982-9900 209-249-5301Fax:

School

Prebid Conf:

Addenda:

5/7/18 2:00 PM

1

18-00960

MAND 4/19 @ 9am- 1661 Via Alta Mesa, Nipomo

Clean and prepare surfaces and then seal coat or slurry seal approximately 280,000 square feet of asphalt.

PREVAILING WAGE

Project Contact: Cindy NaberEmail: [email protected]

Nipomo & Pismo Beach

ASPHALT MAINTENANCE AT VARIOUS LOCATIONS

Bid No. 17-15Project No. 18302

Contract #:

Page 27: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

510-412-4540WCCUSD

Prebid Conf:

Addenda:

5/7/18 2:00 PM

1

18-00968

MAND 4/5, 4/16 & 4/23 at 10AM (meet at Main Gate on Portola Dr)

THIS PROJECT IS A REBID

The Project consists of: Provide a fire sprinkler system for all campus buildings. Modification of existing AC paving at ramps for ADAcompliance. Modification to storm drainage system.

(Previously scheduled bid date was 3/9/18)

El Cerrito

Plan Issuer:

WILSON ELEMENTARY SCHOOL TEMP CAMPUS CONVERSION - REBID

1000002668RContract #:

Residential

805-503-6268Family Care Network, Inc.

Addenda:

5/7/18 5:00 PM

0

18-01092

The project consists of rehab and updating of a four unit apartment building funded with City and County of San Luis ObispoCommunity Development Block Grant (CDBG) support. Attention of bidders is particularly called to the various federal, state and localrequirements related to this project including, but not limited to: Equal Employment and Affirmative Action requirements, MBE/WBEand Section 3 business participation, and bonding and insurance requirements. All construction contracts in excess of $2,000 mustinclude a provision for compliance with the Davis Bacon Act (40 USC 276a to a-7) as supplemented by the Department of Laborregulations (29 CRF Part 5). All Contractors and Subs must be licensed, bonded and insured, and registered with the Department ofLabor.

Questions: Joanna Balsamo-Lilien 805-503-6268

San Luis Obispo

Plan Issuer:

REHABILITATION A FOUR UNIT APARTMENT COMPLEX

Tuesday, May 08, 2018

Public Works

NEW

Prebid Conf:

to

Addenda:

5/8/18 11:00 AM

0

18-01188

5/2 @ 10:30am- site

(A) Re-roofing City Hall as described in this bid document, (B) Perform tenting of the structures to prepare the building for commercialtermite fumigation services, and (C) Conduct structural and commercial fumigation services to eradicate termite and prevent long-termtermite re-infestation.

PREVAILING WAGE

Questions: Patrick DobbinsEmail: [email protected]

$150,000$130,000San Juan Bautista

CITY HALL RE-ROOFING & FUMIGATION

Public Works

831-763-4058831-768-3577City of Watsonville

Prebid Conf:

Addenda:

5/8/18 11:00 AM

3

18-00985

4/19 @ 11am- site

Seal cracks in existing AC pavement on Runway 2-20. The crack will be thoroughly cleaned and then blown out with compressed air. Anew hot sealant conforming to ASTM D 5329 specs will be placed. A thin 2” wide “Band-aid seal will be placed on top of each sealedcrack to deter the separation of the seal from the pavement. Seal coat the runway and taxiways after the airfield marking has beenremoved and cracks have been sealed. The slurry seal coat is an emulsified asphalt seal coat in accordance with item P-626 of theFAA Standard Specifications. Prior to placing this seal coat all existing markings will be removed as necessary by water blasting orlight grinding and the pavement will be cleaned of all deleterious materials. The Airfield will be marked to FAA standards conforming toAdvisory Circular 150/5340-1L Standards for Airfield Markings. In all areas of marking the paint will be applied in two coats at separatetimes to minimize discoloration of the markings from bleeding of underlying asphalt. Reflectorizing marking will be obtained usingbeads spread on the wet paint of the second coat of paint. In order to avoid bleeding of asphalt though the new paint the specifiedperiods of curing will be allowed after slurry seal application and the application of the first coat of marking paint.

Project Contact: Maria CarrancoEmail: [email protected]

$868,175Watsonville

Plan Issuer:

SEAL CRACKS, SLURRY SEAL AND REMARK RUNWAY 2-20 AND TAXIWAYS A, D AND E

AP-18-01Contract #:

Page 28: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

831-763-4058831-768-3577City of Watsonville

Prebid Conf:

Addenda:

5/8/18 11:00 AM

4

18-00986

MAND 4/19 @ 11am- site

Remove existing signs and install an entirely new sign system on Runway 2-20 and related taxiways that meets current F.A.A.Standards. All new airfield guidance signs will conform to the requirements of Advisory Circular 150/5345-44K, Specification forTaxiway and Runway Signs. Lighted guidance signs will be LED Type L858Y, L858R, or L858L, Style 2, Size 1, Class 1. All lightedguidance signs will be installed on new or existing sign bases. Where necessary, the existing sign foundation will be extended toaccommodate the larger signs. Some existing signs will be removed complete with isolation transformers and light bases and deliveredto the Airport or relocated as an unlighted sign on Runway 9-27. The existing concrete sign pads will also be removed. These signs willbe installed on new concrete sign pads and will have the capability of being retrofitted to lighted guidance signs in the future. Thepanels in the signs being relocated as unlighted signs will be replaced with new panels to reflect the new designation in the newlocation. The new sign panels will match existing and fit into the existing sign. A new 2-unit Runway End Identifier Light System (REIL)will be furnished and installed at the threshold for Runway 02. This unit will be a L849I REIL, Style E, powered by constant current 6.6-amp power supply that currently powers the edge light system on Runway 2-20. A new isolation transformer and power converter willbe installed in the runway circuit to power the REIL.

Project Contact: Maria CarrancoEmail: [email protected]

$392,900Watsonville

Plan Issuer:

UPGRADE AIRFIELD GUIDANCE SIGNS AND RUNWAY 2 REILS

AP 18-02Contract #:

Mixed-Use

415-986-4406415-677-0682Cahill Contractors

4/19 at 10AM JOB WALK (meet at job site)

Prebid Conf:

Addenda:

5/8/18 2:00 PM

5

18-00997

4/23 at 1PM (meet at Cahill's Office, 425 California St., Ste 2200, San Francisco)

681 Florida will be a 9 story, Type 1, family housing project at 681 Florida Street in San Francisco. The area of the building isapproximately 145,000 sq.ft. with 130 units plus ground level PDR/Art area, residential common areas & property managementspaces.

REQUESTED DESIGN-BUILD TRADES:•Exterior Building Maintenance•Elevators (DESIGN ASSIST)•Signage•Fire Sprinkler•Solar Hot Water•Shoring/Underpinning•Crane Service

San Francisco

Visit

Plan Issuer:

Bidders:

681 FLORIDA STREET - EARLY BID TRADES

Ph:Cahill Contractors General Contractor 415-677-0682 415-986-4406Fax:

School

NEW

Prebid Conf:

Addenda:

5/8/18 2:00 PM

0

18-01169

MAND 4/30 @ 9am- site

Project consists of: Field Engineering; Site Preparation; Subsurface Investigations; Site Demo; Site Clearing; Earthwork; Site Grading;Trenching, Backfilling, and Compacting; Subgrade and Roadbed; Storm Drainage; Aggregate Base; Asphalt Concrete Paving.

PREVAILING WAGE

Project Contact: Cindy NaberEmail: [email protected]

Arroyo Grande

AGHS SITE WORK FOR 2 RELOCATABLE BLDGS

17-21Contract #:

Page 29: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

Prebid Conf:

Addenda:

5/8/18 2:00 PM

0

18-01081

MAND 4/23 @ 9am- site

REMOVAL OF EXISTING BAND ROOM/CHOIR BUILDING AND FOUNDATIONS. UTILITIES DEMOLITION OR CAPING TO BECOORDINATED WITH ALL DISCIPLINES.

PREVAILING WAGE

Project Contact: Cindy NaberEmail: [email protected]

Arroyo Grande

ARROYO GRANDE HIGH SCHOOL BAND ROOM DEMOLITION

Project No.0408/Bid No. 17-16

Contract #:

School

925-552-5986San Ramon Valley USD

Prebid Conf:

Addenda:

5/8/18 2:00 PM

3

18-00725

MAND 4/9 at 10AM (meet at intersection of Mangos Dr & Ensenada Dr, San Ramon)

The Work consists of repair of wooden pedestrian bridge. The Work includes, but is not limited to, all labor and materials needed forremoval and reinstallation of existing chain link fencing, removal, disposal and replacement of wood decking, repair of glued, laminatedwood beams, cleaning and painting.

Questions must be submitted in writing prior to April 17, 2018 at 4PM. All inquiries shall be emailed to Michelle Sandusky at:[email protected]

San Ramon

Plan Issuer:

CALIFORNIA HIGH SCHOOL PEDESTRIAN BRIDGE REPAIRS

760Contract #:

Public Works

510-799-2970Rodeo Sanitary District

Prebid Conf:

Addenda:

5/8/18 2:00 PM

1

18-00774

MAND 4/2 & 4/3 at 10AM (meet at Rodeo Sanitary Dist Admin Office, 800 San PabloDr, Rodeo)

Div 1-3, 5 & 15. The project work is generally described as: Installation of approximately 2,280 linear feet of new or replacementsewers ranging from 6 inches to 8 inches in diameter. The sewer work will include pipe bursting rehabilitation of approximately 736linear feet of 6-inch diameter VCP sewer with 6 and 8-inch diameter HDPE SDR-17 pipe; open-cut replacement of approximately 953linear feet of 6 and 8-inch VCP or PVC or HDPE sewer with 6 and 8-inch diameter PVC SDR-26 or HDPE SDR-17 sewer; open cutinstallation of approximately 587 linear feet of 6 and 8-inch PVC SDR-26 and HDPE SDR-17 sewer; open cut installation ofapproximately 60 linear feet of new building sewer extensions; replacement of 8 existing manholes with new manholes; installation of 6new manholes; replacement and or reconnection of approximately 42 building laterals; abandonment of approximately 598 linear feetof 4-, 6- and 8-inch VCP, HDPE and PVC sewer; traffic control, SWPPP requirements, and miscellaneous surface restoration work.

Questions regarding the bid package should be directed in writing as soon as possible (but no later than five (5) working days prior tothe opening of bids) to: Steven S. Beall, PE, District Manager, at: [email protected]

$1,024,000Rodeo

Plan Issuer:

COMPREHENSIVE WASTEWATER MASTER PLAN NEAR TERM IMPROVEMENTS SEWER YEAR 3CREVISED IMPROVEMENTS

Page 30: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

415-986-4406415-986-0600Cahill Contractors

Prebid Conf:

Addenda:

5/8/18 2:00 PM

1

18-01066

4/19 at 10AM

The Project is the renovation of the Dr. Marcus Foster Educational Leadership Complex of the Oakland Unified School District. This bidincludes renovations of two buildings (Ethel Moore and Paul Robeson).

o ETHEL MOORE BUILDING - Renovation of an existing 3-story wood frame building with a gross area of 14,091 sq. ft.

o PAUL ROBESON BUILDING - Renovation of an existing 4-story concrete building with a gross area of 71,445 sq. ft.

Total Project size: 85,536 sq. ft.

LABOR REQUIREMENTS: There is a Project Labor Agreement in place. All labor must conform to the PLA and workforce hiring goals.

Scope of work includes demolition, earthwork, asbestos abatement, lead material removal, mold remediation, below & above gradeutilities, new sanitary sewer lateral to public street, concrete footings and slab, rough & finish carpentry, structural steel, structuralanchors, plywood roof sheathing, building expansion joints, mechanical, electrical, plumbing, low voltage systems, exhaust hoods, firesuppression system, food service equipment, coiling roll-up counter door, doors & hardware, restroom fixtures & accessories, drinkingfountain, bottle filling station, lockers, urethane cement flooring, gypsum board, fiberglass reinforced panels, acoustical suspendedceiling, glue-on acoustical ceiling tiles, acoustical wall panels, attic access pull-down stairs, roof access ladder, rigid roof insulation,batt insulation, cabinetry, painting, exterior cement plaster, skylights, mineral cap built-up roofing, shingle composition roofing, roofsafety tie-off anchors, roof gutters, roof downspouts, asphalt paving, striping and markings, signage, chain-link fencing & gates.

Oakland

Plan Issuer:

Bidders:

DR. MARCUS FOSTER EDUCATIONAL LEADERSHIP COMPLEX - PHASE 2

Ph:Cahill Contractors General Contractor 415-986-0600 415-986-4406Fax:

Public Works

415-927-5017City of Larkspur - DPW

to

Addenda:

5/8/18 2:00 PM

1

18-01117

The Work generally consists of sawcutting, cold planing, removing and disposing of asphalt roadway section; placement of hot mixasphalt (HMA) and rubberized hot mix asphalt (RHMA) including construction of curb ramps, sidewalk, curb and gutter; raising andlowering utility covers; replacement of traffic striping and markings; installation of detector loops; 12” through 24” storm drain; stormdrain manholes & inlets; surface restoration and trench pavement repair/replacement; setup and maintenance of traffic control system;developing and implementing a water pollution control program; cleanup of the project area; and other items of work as shown on thePlans.

Questions: Alvin Tan at (415) 496-2403, or by email at: [email protected]

$3,000,000$2,000,000Larkspur

Plan Issuer:

FY 2017-2018 LOCAL STREETS PAVEMENT REHABILITATION PROJECT

500-2005-013-412001

Contract #:

Public Works

831-646-5686831-646-3997City of Monterey

Prebid Conf:

Addenda:

5/8/18 2:00 PM

0

18-01002

4/24 @ 9:30am- 601 Wave St, Suite 100, Monterey

In general, the work consists of repair, replacement and construction of any structure, shelter or enclosure and miscellaneousassociated work at such times and locations as required. The work shall be located in the City of Monterey.

Project Contact: LoriLynn WilliamsonEmail: [email protected]

Monterey

Plan Issuer:

Bidders:

GENERAL MUNICIPAL BUILDING IMPROVEMENTS ON-CALL CONTRACT 2018 FOR CITY PROJECTS

Ph:Murrer Construction, Inc. General Contractor 831-521-0131 831-372-1644Fax:

Page 31: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

831-646-5686831-646-3997City of Monterey

Prebid Conf:

Addenda:

5/8/18 2:00 PM

1

18-01003

MAND 4/24 @ 10:30am- Presidio of Monterey Museum parking lot, Cpl Ewing Rd,Monterey

In general, the work consists of repair, replacement and construction of any structure, shelter or enclosure and miscellaneousassociated work at such times and locations as required. The work shall be located in the Presidio of Monterey (POM), Ord MilitaryCommunity (OMC), Camp Roberts, Department of Defense building (DMDC building), and Naval Postgraduate School.

PREVAILING WAGE

Project Contact: Elvie CamachoEmail: [email protected]

Monterey

Plan Issuer:

GENERAL MUNICIPAL BUILDING IMPROVEMENTS ON-CALL CONTRACT 2018 FOR PMSA PROJECTS

Public Works

650-829-6652City of South San Francisco - Engineering

Addenda:

5/8/18 2:00 PM

4

18-00843

Traffic control; excavation; removals; hot mix asphalt paving; slurry seal; concrete curb, gutter, and paving; pervious concrete paving;signing and striping; utility adjustments; storm drainage modifications; bioretention planting and irrigation; and signal and lightingmodifications, located on El Camino Real at McLellan Drive to 300 feet south of Kaiser Way (north location), and at theChestnut/Westborough Avenue intersection to 250 feet north of Arroyo Drive (south location).

Project Contact Email: [email protected]

$6,002,300South San Francisco

Plan Issuer:

Bidders:

SCOL9

GRAND BOULEVARD INITIATIVE PROJECT

ST1403/ST1502Contract #:

Ph:CF Contracting General Contractor 415-721-7160 415-296-6437Fax:

School

415-338-2960SFSU, Capital Planning

Prebid Conf:

Addenda:

5/8/18 2:00 PM

1

18-00989

MAND 4/17 at 11AM (meet at CPDC Corp Yard, 2nd Fl Conf Rm 200)

This Notice to Contractors is for the intent to award up to three (3) Job Order Contracts (JOC). A JOC is a competitively bid, firm fixedpriced, indefinite quantity contract. The scope of work includes a collection of detailed repair and construction tasks and specificationsthat have established unit prices. It is placed with the “Contractor” for the accomplishment of repair, alteration, modernization,maintenance, rehabilitation, demolition and construction of infrastructure, buildings, structures, or other real property. Work isaccomplished by means of issuance of individual Job Orders against the JOC. Under the JOC concept, the Contractor furnishes allmanagement, documentation, labor, materials, and equipment needed to perform the work. A JOC awarded under this solicitation willhave a minimum value of $0.00 and a maximum value of $1,000,000.00, with the option to increase to the State a maximum of$3,000,000.00 within the term of the contract.

All questions during bidding should be addressed in writing to the Office of Capital Planning, Design and Construction, San FranciscoState University, 1600 Holloway Avenue, San Francisco, CA 94132; Attention: Patrick Ng, Phone (415) 338-7089, [email protected]

San Francisco

Plan Issuer:

JOB ORDER CONTRACTS E001001, E001002, E001003 AT SAN FRANCISCO STATE UNIVERSITY

School

408-343-2802408-252-3000Cupertino Union School District

Prebid Conf:

Addenda:

5/8/18 2:00 PM

0

18-01099

MAND 4/24 at 3:30PM (Flag pole in front of Admin Bldg)

Construct a new 9-foot wide x 1,161-linear foot running track per plans and specifications. Includes all grading, installation of redwoodheader boards,installation of 4 inches of base rock and paving with 3 inches of hot asphalt.

Saratoga

Plan Issuer:

Bidders:

SCOL91

NEW TRACK BLUE HILLS ELEMENTARY SCHOOL - CUPERTINO UNION SCHOOL DISTRICT

18-IB02-08Contract #:

Ph:Guerra Construction & Engineering, Inc General Contractor 408-279-2027 408-279-2044Fax:

Page 32: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

SFUSD - Simon Reyes

Prebid Conf:

Addenda:

5/8/18 2:00 PM

2

18-01062

MAND 4/20 at 10AM

The Project is generally described as: Demolition and removal of existing play structures and rubber tile surfacing, installation of newplay structure components and new rubber tile surfacing.

$200,000San Francisco

Plan Issuer:

Bidders:

NORIEGA EARLY EDUCATION SCHOOL A.D.A.SITE IMPROVEMENTS OF UPPER YARD

12004Contract #:

Ph:Alex Kushner General Contractor General Contractor 415-756-0945 415-358-5769Fax:

Ph:All Trusty Builders Inc General Contractor 415-987-7713 415-731-1803Fax:

Ph:Castle Construction General Contractor 415-368-5782 415-508-9381Fax:

Ph:Community Playgrounds, Inc. General Contractor 415-892-8100 415-892-3132Fax:

Ph:Eternal Construction Inc General Contractor 650-692-6638 650-692-6686Fax:

Ph:Reilly Construction, Inc. General Contractor 415-317-3603 415-334-7632Fax:

Ph:SGDM, LLC General Contractor 415-688-9869 415-226-1123Fax:

Public Works

925-973-2670City of San Ramon-Engineering

Addenda:

5/8/18 2:00 PM

0

18-01047

The Project consists of the following, including, but not limited to: hot mix asphalt overlays, mill & fill, and micro-surfacing in areasdesignated on the Plans. Related items of work include, but are not limited to: construction signage; concrete curb, gutter, sidewalk,and driveway replacement; base failure repairs; pavement repairs; pavement cold planing; raising and adjusting of utility covers andmanholes to grade; replacement of survey monument frame and covers; crack sealing; pavement striping and markings; and all otherwork necessary for a complete Project in accordance with the Plans and Specifications. Bids are required for the entire work describedherein.

Questions: Daniel Chavarria, Project Manager, at (925) 973-2681, or by email at: [email protected]

$2,085,000San Ramon

Plan Issuer:

Bidders:

PAVEMENT MANAGEMENT 2018 PROJECT

5560Contract #:

Ph:Ghilotti Construction Company, Inc. General Contractor 707-585-1221 707-585-1601Fax:

Public Works

925-313-2000Contra Costa Co, DPW

Prebid Conf:

Addenda:

5/8/18 2:00 PM

0

18-00951

4/23 at 10AM (meet at DPW, 255 Glacier Dr, Martinez)

The Work to be done generally consists of providing an asphalt concrete and concrete pedestrian path, providing a bus turnout,roadway construction and realignment, flashing beacon pedestrian crossing, landscaping, and street furniture including bus shelter,signing and striping.

Questions: Jenna Caldwell, Design/Construction Division, at (925) 313-2020.

$339,000Contra Costa County

Plan Issuer:

TICE VALLEY LINEAR PARK

0662-6R4016Contract #:

Public Works

510-464-6544BART-Bay Area Rapid Transit District

Prebid Conf:

to

Addenda:

5/8/18 2:00 PM

0

18-00817

4/4 @ 10AM (meet at District Offices, 300 Lakeside Dr, Conf Rm 1600, Oakland)

1-3, 5-6, 9-10, 20, 23, 26-28, 31-32 & 34. The Work, in general, includes furnishing all equipment, tools, required materials, labor,management, coordination, professional services, and any other services required to install and test TPSS equipment and to provideAC Switchgear, AC equipment house, Isolation Switch and other associated ancillary items as indicated in the Contract Drawings andContract Specifications.

The Work is for Replacement of BART traction power substation ASL (TPSS ASL) near San Leandro Station on San Leandro Street, inthe City of San Leandro. This Work shall include installation of equipment at four (4) locations, all as outlined in Contract Drawings andContract Specifications. The major TPSS equipment will be procured and delivered under a separate Procurement Contract No. 15EK-210, awarded to Powell Electrical Systems, Inc. (Powell). The Work of this Contract includes coordination with Contract No. 15EK-210,Procurement of Traction Power Substations Phase 1. The Contractor shall complete all Work indicated, specified and directed to beperformed under this Contract within four hundred and ten (410) Days after the effective date of the Notice to Proceed.

Bidder License Requirement: Classification C-10 - California Electrical License and an A - General Engineering Contractor or B -General Building Contractor License, and be in good standing with the Contractors' State License Board.

Questions: Leo Berry-Lawhorn, at (510) 464-7546 or email, at: [email protected]

$3,900,000$3,700,000San Leandro

Plan Issuer:

TRACTION POWER SUBSTATION REPLACEMENT ASL INSTALLATION - BART #15EK-140

15EK-140Contract #:

Page 33: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

831-454-2385831-454-2160County of Santa Cruz

Prebid Conf:

Addenda:

5/8/18 2:30 PM

0

18-01016

MAND 4/26 @ 1pm- 701 Ocean St, Rm 330, Santa Cruz

The Contractor shall promptly, and before the following conditions are disturbed, notify the County and Owner’s Representative, inwriting, of any:A. Material that the Contractor believes may be material that is hazardous waste, as defined in Section 25117 of the Health and SafetyCode, that is required to be removed to a Class I, Class II, or Class III disposal site in accordance with provisions of existing law,including but not limited to PCB's, lead or asbestos.B. Subsurface or latent physical conditions at the site differing from those indicated.C. Unknown physical conditions at the site of any unusual nature, different materially from those ordinarily encountered and generallyrecognized as inherent in work of the character provided for in the Contract.

Project Contact: Casey CarlsonEmail: [email protected]

$316,000Santa Cruz

Plan Issuer:

DAVENPORT COMMUNICATION TOWER INSTALLATION

17C1-013Contract #:

School

NEW

831-753-5208831-753-5696Salinas City Elementary School District [email protected]

Prebid Conf:

Addenda:

5/8/18 2:30 PM

0

18-01189

MAND 5/1 @ 2:30pm- site

The principal components of the work consists of: (i) crack fill & double emulsion seal coat, construction of bio-swales (ii) variousdepths of HMA overlay (iii) removals and pave backs and/or install PCC stairs and ramps at portables, pavement markings and (iv)related work. The work will be constructed in accordance with plans and specifications prepared by Pavement Engineering, Inc.

PREVAILING WAGE

Project Contact: Joe Ririe @ (805) 781-2265

Salinas

Plan Issuer:

EL GABILAN ELEMENTARY SCHOOL ASPHALT PAVEMENT REHABILITATION

School

NEW

831-753-5208831-753-5696Salinas City Elementary School District [email protected]

Prebid Conf:

Addenda:

5/8/18 2:30 PM

0

18-01190

MAND 5/1 @ 1pm- site

The principal components of the work consists of: (i) crack fill & double emulsion seal coat, construction of bio-swales (ii) variousdepths of HMA overlay (iii) removals and pave backs and/or install PCC stairs and ramps at portables, pavement markings and (iv)related work. The work will be constructed in accordance with plans and specifications prepared by Pavement Engineering, Inc.

PREVAILING WAGE

Questions: Joe Ririe @ (805) 781-2265

Salinas

Plan Issuer:

LINCOLN AND ROOSEVELT ELEMENTARY SCHOOL ASPHALT PAVEMENT REHABILITATION

School

510-537-3000Castro Valley Unified School District , Facilities

Prebid Conf:

Addenda:

5/8/18 3:00 PM

1

18-01008

MAND 4/17 & 4/24 at 3PM

Please refer to specifications for complete scope of work.

Project Contact George MelasEmail: [email protected]

$9,000,000Castro Valley

Plan Issuer:

Bidders:

SCOL5

CASTRO VALLEY HIGH SCHOOL HEALTH & WELLNESS CENTER, PROJECT LEAD THE WAY & 400BUILDING MODERNIZATION PROJECT- CVUSD - REBID

G 38-17/18Contract #:

Ph:DL Falk Construction, Inc General Contractor 510-887-6500 510-887-6501Fax:

Ph:Thompson Builders Corp General Contractor 415-456-8972 415-459-0665Fax:

Page 34: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

650-329-2271City of Palo Alto - DPW

Prebid Conf:

Addenda:

5/8/18 3:00 PM

0

18-01105

4/25 at 10AM (Magical Bridge Playground)

Installation of shade structure at the Mitchell Park Magical Bridge Playground.

Project Contact: Mark RibeiroEmail: [email protected]

Palo Alto

Plan Issuer:

Bidders:

SCOL106

MITCHELL PARK MAGICAL BRIDGE PLAYGROUND SHADE STRUCTURE INSTALLATION

171637Contract #:

Ph:Community Playground Inc General Contractor 415-892-1707 415-892-3132Fax:

Ph:Guerra Construction & Engineering, Inc General Contractor 408-279-2027 408-279-2044Fax:

RFP / RFQ /SOQ

805-434-4820805-434-4900Templeton Community Services District

Addenda:

5/8/18 4:00 PM

0

18-01079

Templeton Community Service District Office is seeking a weed abatement contractor for a one year contract.

Questions: Tony BroomEmail: [email protected]

Templeton

Plan Issuer:

2018 WEED AND RUBBISH ABATEMENT

Residential

925-820-1993925-820-0600James E. Roberts-Obayashi Corp

Prebid Conf:

Addenda:

5/8/18 5:00 PM

3

18-01108

4/23 at 10:30AM (meet at One S Van Ness, 5th Fl Situation Rm 5080, SanFrancisco)

This Project has received funding from the Mayor’s Office of Housing, and as such requires Prevailing Wages in accordance with theState of California. Please refer to the most recent State Package on the DIR website on the Department of Labor Website.Classifications need to be listed on the wage package to determine the prevailing wage rate. Due to the height of the building (9stories), wage rate should be based on ‘Commercial’ rates (not Residential).

Scope of the work includes the construction of one hundred twenty-seven (127) affordable housing units in a nine-story concrete (TypeI-B). This work includes all general construction trades EXCEPT for Elevators, Photovoltaic and Hot Water Solar, Fire Sprinklers andERRC/DAS. These trades were previously awarded.

For all questions regarding this Project, please contact Chuck Kaplan (Senior Estimator) at(925) 820-0600 x116 or (925) 309-8138, or by email at: [email protected]

San Francisco

Plan Issuer:

Bidders:

FOLSOM STREET FAMILY HOUSING

Ph:James E. Roberts-Obayashi Corp General Contractor 925-820-0600 925-820-1993Fax:

Wednesday, May 09, 2018

Public Works

NEW

415-258-4623Town of San Anselmo

Addenda:

5/9/18 10:00 AM

0

18-01181

SCOPE: The bid shall cover all costs for all work involved and furnishing of the resources and activities that are required for theSLOPE STABILIZATION 139 OAK SPRINGS DRIVE. The Work to be performed under this Contract consists of, but is not limited to:constructing a 97-foot long cast-in-drilled-hole (CIDH) with tiebacks retaining structure adjacent to 139 Oak Springs Drive in SanAnselmo. The Work shall include asphalt removal, roadway construction, excavation, drilling, traffic control and other miscellaneousitems not mentioned above.

$180,000San Anselmo

Plan Issuer:

SLOPE STABILIZATION 139 OAK SPRINGS DRIVE

Page 35: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

510-528-5760City of Albany - Community Development

Prebid Conf:

Addenda:

5/9/18 2:00 PM

1

18-00946

MAND 4/24 at 10AM & 4/26 at 2PM (540 Cleveland Ave, Albany)

Rehabilitate sewers located beneath sidewalks and in roadways at seventeen (17) locations.

Project Contact: Robert Glnzales 510-559-4270Email: [email protected]

$3,840,000Albany

Plan Issuer:

SCOL148

2018 SANITARY SEWER REHABILITATION PROJECT

C18-10Contract #:

School

NEW

925-768-0430RGM & Associates [email protected]

Prebid Conf:

Addenda:

5/9/18 2:00 PM

0

18-01174

MAND 5/2 @ 2:30PM

Div 1, 10 & 31-33. The Project consists of expansion of the parking lot, including demolition, relocation and repair irrigation systemsand sod, grading, storm drainage, construction of concrete curbs and asphalt paving at Alhambra High School.

Questions: Judy Novero, RGM & Associates (Contract Administrator) at: [email protected]

Martinez

Plan Issuer:

ALHAMBRA HIGH SCHOOL PARKING LOT EXTENSION

Public Works

408-630-3088SCVWD- Santa Clara Valley Water District

Prebid Conf:

to

Addenda:

5/9/18 2:00 PM

1

18-00714

MAND 4/11 at 10AM

Clearing and grubbing within the project limits, including the removal of vegetation, and other miscellaneous items; Levee excavation;Levee reconstruction and replacement of unsuitable material; Reconstruction of Levee access maintenance access road including AB,AC, slurry seal and striping; Installation and anchoring of chain link fabric along the finished surface of the levee/embankment slopes;Control of water.

Project Contact: Keiron Nawbatt 408-630-2896Email:[email protected]

$1,500,000$900,000San Jose

Plan Issuer:

Bidders:

SCOL122

COYOTE CREEK LEVEE RODENT DAMAGE REPAIR UPSTREAM OF SR237 - SCVWD

C0639Contract #:

Ph:Granite Rock Company General Contractor 408-574-1400 408-365-9548Fax:

State-Federal

Prebid Conf:

Addenda:

5/9/18 2:00 PM

1

18-00933

MAND 4/12 @ 1pm- parking lot of Building 738

Install new Sidings and Windows for the CSTI Buildings 901, 903, 908, 910 and 904 (Alternative Bid Item) at California Army NationalGuard Training Site, Camp San Luis Obispo.

Questions: Chief Warrant Officer Four Tom ClarkeEmail: [email protected]

$1,600,000San Luis Obispo

Bidders:

G1012 CSTI BUILDINGS SIDINGS AND WINDOWS

G1012Contract #:

Ph:Precon Industries General Contractor 805-345-3147 805-345-3148Fax:

Public Works

NEW

408-866-2150City of Campbell, DPW

Prebid Conf:

Addenda:

5/9/18 2:00 PM

1

18-01168

MAND 5/2 at 10AM (Rincon Parking Lot)

Overlay to the existing asphalt pathway and construct two (2) concrete pads for picnic benches.

Project Contact: Ron Taormina 408-866-2734Email: [email protected]

Campbell

Plan Issuer:

JOHN D. MORGAN PARK ASPHALT PAVING OF PEDESTRIAN PATHWAY & PARK BENCH PADS -REBID

Page 36: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

925-455-7555Livermore Amador Valley Transit Authority (LAVTA)

Prebid Conf:

Addenda:

5/9/18 2:00 PM

0

18-01094

4/24 at 10AM

Provide for the resurfacing of a concrete area at the LAVTA Rutan Maintenance facility.

Hard copies also available for review at Santa Clara Builders Exchange

Livermore

Plan Issuer:

SC21E

LAVTA RUTAN MAINTENANCE AREA RESURFACING PROJECT

#2018-06Contract #:

School

831-796-7080Salinas Union High School District [email protected]

Prebid Conf:

Addenda:

5/9/18 2:00 PM

0

18-01102

MAND 5/2 @ 10am- 726 S Main Street, Salinas

Project consists of: Fixture Replacement

This technical specification guide is governed by the California Proposition 39: California Clean Energy Jobs Act – 2016 ProgramImplementation Guidelines that is administered by the California Energy Commission. The Salinas Union High School District(SUHSD) has received Proposition 39 grant funds based on a pre-approved project plan to implement the exact scope of workidentified in this technical specification. Therefore, drastic changes to the scope of work or product specifications are not encouraged.The following tables show pre-selected product specifications for this project: “Detailed LED Replacement Guide by Location”, and“District-Wide LED Product Quantity Summary.” Contractors are encouraged to specify and install these fixtures.

Project Contact: Rick AlvarezEmail: [email protected]

Salinas

Plan Issuer:

PROPOSITION 39 DISTRICT WIDE ENERGY EFFICIENCY LED RETROFIT PROGRAM, PHASE THREE

RFP / RFQ /SOQ

415-554-6229City & Co of San Francisco

Addenda:

5/9/18 2:00 PM

1

18-00907

San Francisco Public Works (Public Works), a department of City and County of San Francisco (City) announces a Request forQualifications (RFQ) for the provision of pavement condition survey services on an as-needed basis.

The City intends to award up to four (4) master agreements, each having a five (5) year term and a not to exceed value of up to$400,000 for each master agreement. The City reserves the right to change the number of contracts and contract amount limits to beawarded. Contract Service Orders or tasks will be issued during the first four years only. This is an “as-needed” contract. Award of acontract neither guarantees all or a portion of the contract amount, nor does it guarantee that the projected amount would beexpended.

A pre-proposal meeting is not required for this RFQ. Questions regarding the RFQ must be submitted no later than April 11, 2018 byemail to the Contract Manager at: [email protected].

San Francisco

Plan Issuer:

RFQ AS-NEEDED PAVEMENT CONDITION DATA COLLECTION SERVICES NO.2

1000009350Contract #:

School

925-.42-6.4335Pleasanton Unified School District

Prebid Conf:

Addenda:

5/9/18 2:00 PM

0

18-01100

MAND 4/30 at 7:30AM (Main Bldg)

Roof replacement at Amador Valley High School, "I" Building.

Pleasanton

Plan Issuer:

SCOL90

ROOF REPLACEMENT AMADOR VALLEY HIGH SCHOOL- PLEASANTON UNIFIED SCHOOL DISTRICT

2017-18.08Contract #:

Page 37: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

415-554-6229City & Co of San Francisco

Prebid Conf:

Addenda:

5/9/18 2:30 PM

1

18-01001

4/18 at 1PM (meet at 30 Van Ness Ave, 4th Fl Main Conf Rm, San FranciscoFOLLOWED BY SITE VISITS)

Div 1-2, 4-5 & 7-10. The Work to be completed under this contract is located at Fire Station 24, 100 Hoffman Avenue, and Fire Station34, located at 499 41st Avenue.

AT FIRE STATION 24, 100 HOFFMAN AVE: The Work includes, but is not limited to, comprehensive cleaning, repair and restorationof historic building exteriors, including, but not limited to, hazardous material abatement work, masonry and mortar cleaning, repair andrestoration, grout joint repointing, wood window repair and painting, cement plaster cleaning and repair, and exterior painting. Work willbe done in accordance with historic treatment procedures and protections.

AT FIRE STATION 34, 499 41ST AVE: The Work includes, but is not limited to, comprehensive cleaning, repair and restoration ofhistoric building exteriors, including, but not limited to, hazardous material abatement work, masonry and mortar cleaning, repair andrestoration, grout joint repointing, steel window repair and painting, cement plaster cleaning and repair, and exterior painting. Work willbe done in accordance with historic treatment procedures and protections.

Questions: Sherry Katz, Project Manager, at (415) 557-4759.

$2,000,000San Francisco

Plan Issuer:

Bidders:

E.S.E.R. BOND 2014 EXTERIOR ENVELOPE AT FIRE STATIONS 24 AND 34

1000008386Contract #:

Ph:Wickman Development & Construction General Contractor 415-239-4500 415-239-4511Fax:

Public Works

415-554-6229City & Co of San Francisco

Prebid Conf:

Addenda:

5/9/18 2:30 PM

4

18-00680

3/22 at 10:30AM (meet at 30 Van Ness Ave, 3rd Fl Electrical Conf Rm, SanFrancisco)

Div 1-3, 5, 26 & 31-34. The Work is located along Folsom Street, from 2nd Street to Spear Street, in San Francisco, California andconsists of pavement renovation, curb ramp construction, sewer, water, AWSS, hazardous material removal, landscaping, greeninfrastructure, street lighting, traffic signal, traffic control and all associated work. The time allowed for completion is 650 consecutivecalendar days.

Questions: Suzanne Suskind, Project Manager, at (415) 558-5259.

$10,700,000San Francisco

Plan Issuer:

Bidders:

TRANSBAY FOLSOM STREETSCAPE IMPROVEMENTS

1000007914Contract #:

Ph:Mitchell Engineering General Contractor 415-227-1040 415-227-1049Fax:

Public Works

650-780-7380City of Redwood City, Engineering

to

Addenda:

5/9/18 3:00 PM

0

18-01077

Remove and Replace I Furnish and Install approximately 5,522 lineal feet of existing 6 and 8 inch diameter Vitrified Clay Pipe (VCP)with new 8 inch diameter Polyvinyl Chloride (PVC) SOR 26 sanitary sewer line by open cut method.

Project Contact: Jeffrey Chou 650-780-7362

$4,000,000$3,200,000Redwood City

Plan Issuer:

SCOL35

2017-2018 SANITARY SEWER REPLACEMENT PROJECT

Public Works

408-730-7403City of Sunnyvale DPW

Prebid Conf:

Addenda:

5/9/18 3:00 PM

1

18-01053

MAND 4/24 at 10AM (155 South Mary Ave, Sunnyvale)

Removal of existing interior lining and replacing with a new lining on all interior surfaces, modifications to the inlet, outlet piping and tothe existing manway, and install a new manway.

Project Contact: Husam Aburabi 408-730-7627Email: [email protected]

Sunnyvale

Plan Issuer:

SCOL103

MARY CARSON TANK NO. 2 REFURBISHMENT

PW18-17Contract #:

Page 38: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

408-535-8300City of San Jose - DPW

Addenda:

5/9/18 3:00 PM

6

18-00780

Provide design-build services.

$65,082,000San Jose

Plan Issuer:

SCOL84

RFQ OF DESIGN-BUILD ENTITIES FOR SAN JOSE - SANTA CLARA REGIONAL WASTEWATERFACILITY DIGESTED SLUDGE DEWATERING FACILITY PROJECT

7758Contract #:

Thursday, May 10, 2018

School

805-543-0514805-543-7411Maino Construction

Prebid Conf:

Addenda:

5/10/18 12:00 PM

1

18-01022

MAND (M.E.P. TRADES ONLY) 4/26 @ 9am

PHASE I – CONSTRUCTION OF THE NEW MULTI-USE BUILDING- Construction of a new 9,386 S.F. Multi-Use Building- Installation of new utilities and services for the new Multi-Use Building- New A/C paving and exterior improvements surrounding the new Multi-Use Building, not including existing paved areas.- Automatic fire sprinkler system- Fire Alarm at new Multi-Use Building only (not included in Campus-Wide Fire Alarm)PHASE II – MODERNIZATION AND OFFICE CONVERSION- Office conversion (Demo and new construction associated with existing building)- Utilities and services that do not serve the new Multi-Use Building.- Any A/C paving to be repaired or replaced- Site fencing and gates- Campus-Wide Fire Alarm (not including new Multi-Use Building Alarm)

Questions: [email protected]

$8,128,000San Luis Obispo

Plan Issuer:

BISHOP'S PEAK ELEMENTARY SCHOOL NEW MULTI-USE BUILDING AND OFFICE CONVERSION -PHASE I AND PHASE II

RFP / RFQ /SOQ

415-464-6028Marin Clean Energy

Addenda:

5/10/18 12:00 PM

0

18-01048

Marin Clean Energy (MCE), a California Joint Powers Authority, seeks a qualified organization or individual contractor to complete anyor all of the scopes of work, identified below, associated with its Solar Panel & Electric Vehicle Parking Lot Project at the San Rafaeloffice located at 1125 Tamalpais Ave, San Rafael, CA.

PROPOSED SCOPE OF WORK:Contracts will be awarded for the scopes of work detailed below, subject to revision. Ideally, any proposal submitted should address anentire scope of work, however proposals for a partial scope of work will also be considered. All references to MCE’s parking lot refersto MCE’s San Rafael office located at 1125 Tamalpais Avenue, San Rafael, CA.a. Scope A - Landscape and fence demolition services, and landscape, fence, and irrigation installation services in MCE’s parking lot.(Attached as Appendix A).b. Scope B - Paving services in MCE’s parking lot, including milling, patching, and seal/stripe. (Attached as Appendix B).

KEY DEADLINES & SUBMISSION REQUIREMENTS:Submission Deadline. Proposals will be accepted until all contracting needs are met. All offers should be submitted by email or mail to:MCE Director of Internal Operations1125 Tamalpais AvenueSan Rafael, CA [email protected]

San Rafael

Plan Issuer:

Bidders:

RFP MCE PARKING LOT PROJECTS

Ph:Ghilotti Brothers Inc General Contractor 415-454-7011 415-454-8376Fax:

Page 39: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

000-000-0000Montara Water & Sanitary Dist

Addenda:

5/10/18 2:00 PM

0

18-01065

The Work includes the furnishing of all labor, materials and equipment for the construction and rehabilitation of sanitary sewer mainsand complete laterals by pipeburst and open trenching methods, sewer main and manhole spot repairs, including excavation, piping,concrete work, new pipe materials, backfill and surface restoration work, closed circuit television (CCTV), public notification, togetherwith all appurtenances, connections, labor, permits and testing, for the completed and operational project as shown on the Plans andas specified.

Montara

Plan Issuer:

SC25E

2017-2018 SEWER IMPROVEMENT PROJECT AND SPOT REPAIRS

Public Works

NEW

925-671-3361City of Concord - Engineering

to

Addenda:

5/10/18 2:00 PM

0

18-01131

The Work to be done in general consists of mobilization, remove and replace HMA, crack seal, and slurry seal, adjusting utility cover,and all other work as specified in these Special Provisions.

Questions: Jeff Rogers, Project Manager, at (925) 671-3448.

$2,250,000$1,800,000Concord

Plan Issuer:

2018 CITYWIDE RESIDENTIAL PAVEMENT MAINTENANCE PROJECT

PJ 2434Contract #:

Public Works

925-625-9194925-625-7000City of Oakley, DPW

Prebid Conf:

Addenda:

5/10/18 2:00 PM

0

18-01000

MAND 4/19 at 10AM

Div 2 & 4-9. The Work to be performed under this Contract generally consists of, but is not limited to the following: interior remodeling,drywall, electrical work, and other work as shown on the Contract Plans, as specified in the Contract Documents, and as directed bythe City Engineer.

Oakley

Plan Issuer:

Bidders:

3330 MAIN STREET BUILDING REMODEL PROJECT

CIP 198Contract #:

Ph:Alex Kushner General Contractor General Contractor 415-756-0945 415-358-5769Fax:

Ph:Woodland Construction General Contractor 209-545-1987 209-545-2114Fax:

School

NEW

408-535-6071SJUSD-San Jose Unified School District

Prebid Conf:

Addenda:

5/10/18 2:00 PM

1

18-01153

MAND 4/18 & 4/26 at 10AM

Replacement of approximately 125,000 square feet of existing roof and 135,000 square feet of exterior painting at the Lincoln HighSchool campus. This work will also include some repairs and replacement of gutters, fascia, signage, doors and hardware, and otherbuilding accessories.

San Jose

Plan Issuer:

SCOL4

80042 2018 ROOFING REPLACEMENT LINCOLN HIGH SCHOOL - SJUSD

80042/3051CContract #:

Public Works

805-237-3904805-237-3861City of Paso Robles

Prebid Conf:

Addenda:

5/10/18 2:00 PM

0

18-00935

4/19 @ 10am- site

The work shall include, but is not limited to, retrofit of pedestrian path and parking lot luminaries with specified LED lighting fixtures.

PREVAILING WAGE

Project Contact: Freda BermanEmail: [email protected]

$55,000Paso Robles

Plan Issuer:

BARNEY SCHWARTZ PARK LIGHTING RETROFIT

DPW 18-08Contract #:

Page 40: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

415-551-4603City & Co of San Francisco - Utilities

Prebid Conf:

Addenda:

5/10/18 2:00 PM

1

18-00833

4/10 at 10:30AM (meet at 525 Golden Gate Ave, 6th Fl, San Francisco)

Div 1-3, 26 & 31-34. The objective of the Project is to replace and rehabilitate sewer and water mains and install fiber optic conduitsalong Geary Boulevard from Stanyan Street to Van Ness Avenue. The Work is to be performed in San Francisco, CA.

Questions: Contract Services at 551-4603, or email to: [email protected]

$14,500,000San Francisco

Plan Issuer:

Bidders:

GEARY BOULEVARD SEWER AND WATER IMPROVEMENTS

WW-674Contract #:

Ph:Cratus, Inc General Contractor 415-939-2840 415-520-6037Fax:

Ph:JMB Construction, Inc. General Contractor 650-267-5300 650-267-5302Fax:

Ph:KJ Woods Construction, Inc. General Contractor 415-759-0506 415-468-1359Fax:

Ph:M Squared Construction General Contractor 415-661-6902 415-661-6976Fax:

Ph:Mitchell Engineering General Contractor 415-227-1040 415-227-1049Fax:

Ph:NTK Construction Inc. General Contractor 415-643-1900 415-643-1300Fax:

Ph:Precision Engineering General Contractor 415-621-4882 415-621-4812Fax:

Ph:Ranger Pipelines Inc. General Contractor 415-822-3700 415-822-3703Fax:

Public Works

NEW

831-439-9748831-438-5854City of Scotts Valley

Addenda:

5/10/18 2:00 PM

0

18-01142

Construction of asphalt concrete pavement, asphalt roadway pavement widening, milling and hot mix asphalt, and pavement markings.Other items or details not mentioned above, that are required by the Plans, Standard Specifications, or these Special Provisions, shallbe performed, constructed or installed.Bids are required for the entire Work described herein.The contract time shall be 60 WORKING DAYS.

PREVAILING WAGE

Project Contact: Jessica KahnEmail: [email protected]

Scotts Valley

Plan Issuer:

Bidders:

GLEN CANYON AND GREEN HILLS ROAD BIKE LANE - REBID

Ph:Granite Construction General Contractor 831-763-6100 831-761-1042Fax:

Ph:Granite Rock Company General Contractor 408-574-1400 408-365-9548Fax:

School

831-649-4175831-645-1200Monterey Peninsula Unified School District

4/30 @ 3pm- site (job-walk, non-mandatory)

Prebid Conf:

Addenda:

5/10/18 2:00 PM

2

18-00883

MAND 4/10 @ 3pm- site

Project consists of: Existing Conditions; Concrete; Metals; Wood and Plastic; Thermal and Moisture Protection; Doors and Windows;Finishes; Specialties; Food Service Equipment; Roller Window Shades; Plumbing; HVAC; Mechanical General; Electrical; StructuredCabling; Fire Alarm System Existing; Earthwork; Exterior Improvements; Utilities.

PREVAILING WAGE

Project Contact: Tom MillmanEmail: [email protected]

Seaside

Visit

Plan Issuer:

Bidders:

HAYES/CENTRAL COAST HIGH SCHOOL KITCHEN/RESTROOM - MODERNIZATION

Ph:Avila Construction General Contractor 831-372-5580 831-372-5584Fax:

Ph:Selden & Son General Contractor 831-722-9949 831-722-9360Fax:

Ph:Tombleson Inc General Contractor 831-422-9696 831-422-0566Fax:

Page 41: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

650-616-3803650-246-5974South San Francisco Unified School District- Bonds

Prebid Conf:

Addenda:

5/10/18 2:00 PM

0

18-01078

MAND 4/19 at 1:30PM & 4/25 at 10AM (Admin Building)

The Work of this Contract consists of the following: Demolition and construction necessary for the installation of new modularclassroom buildings, including associated civil, architectural, structural, plumbing, mechanical and/or electrical work as indicated in theDrawings and Specifications.

Project Contact: Bill SavidgeEmail: [email protected]

South San Francisco

Plan Issuer:

SCOL38

MARTIN ELEMENTARY SCHOOL NEW MODULAR CLASSROOM BUILDINGS & SITE WORK - SOUTHSAN FRANCISCO UNIFIED SCHOOL DISTRICT

03-18Contract #:

Public Works

650-330-6740City of Menlo Park - Engineering

Prebid Conf:

Addenda:

5/10/18 2:00 PM

1

18-00990

4/12 at 11AM (800 Middle Ave., Menlo Park)

Design new playground improvement.

Hard copies also available for review at Santa Clara Builders Exchange

Menlo Park

Plan Issuer:

SC2E

RFQ PROFESSIOINAL CONSULTING SERVICES FOR NEALON PARK, BURGESS PARK & WILLOWOAKS PARK PLAYGROUND IMPROVEMENT

School

NEW

805-466-5176805-466-1038Wysong Construction [email protected]

Addenda:

5/10/18 2:00 PM

0

18-01183

MODERNIZATION OF EXISTING MULTIPURPOSE BUILDINGAlterations to existing floor plan including but not limited to new accessible staff restrooms, kitchen, administration area, classroom,staff workroom/lounge and multipurpose space.REHABILITATIONRehabilitation of existing structure to comply with current building codes.ALTERNATES: 1; Wood platform, 2; window shades, 3; shade structure and 4; resilient flooring.

Project Contact: WILL FERRARO, (805)466-1038Email: [email protected]

$2,600,000Lockwood

Plan Issuer:

SAN ANTONIO ELEMENTARY SCHOOL-MULTIPURPOSE BUILDING MODERNIZATION

Public Works

408-885-5810Santa Clara Valley Health & Hospital- Co of Santa Clara

Prebid Conf:

Addenda:

5/10/18 2:00 PM

5

18-00781

3/30 at 1:30PM (777 Turner Drive, San Jose)

Landscaping improvements including tree removals, new trees, shrubs, berms, ground cover complete with irrigation system.

Project Contact: Marsh MendezEmail: [email protected]

$20,000,000San Jose

Plan Issuer:

SCOL87

SANTA CLARA VALLEY MEDICAL CENTER (SCVMC) CAMPUS LANDSCAPE IMPROVEMENTS

921-S53-08-13Contract #:

Public Works

831-454-2385831-454-2160County of Santa Cruz

Addenda:

5/10/18 2:00 PM

0

18-01083

This project involves the construction of thermoplastic striping, pavement markers, and thermoplastic pavement markings in thesouthern portion of Santa Cruz County.

Project Contact: Jeffrey delosSantosEmail: [email protected]

$239,031Santa Cruz County

Plan Issuer:

SOUTH COUNTY STRIPING PROJECT

Page 42: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

Addenda:

5/10/18 2:00 PM

0

18-01061

In general, the Base Bid Work shall be to expand the train station site to the south to incorporate a bus passenger loading/unloadingarea, a bus shelter, and approximately 40 additional parking spaces. On site improvements include but are not necessarily limited tograding, paving, landscaping, site lighting, signage/striping, and the installation of curb, gutter, sidewalk, water and sewer lines,driveways and a retaining wall. The work also includes traffic control, water pollution control practices, pre- and post-constructionsurvey monument protection and establishment, adjustment of pavement surface features (water utility boxes and valves, sewermanholes, storm drain manholes, and survey monument wells), clearing and grubbing of debris (plant, soil, etc.) within the Work limits,accessibility improvements, signage and installation of pavement markings. Bids are required for the entire work described herein.

PREVAILING WAGE

Questions: [email protected]

$1,940,900Grover Beach

TRAIN STATION EXPANSION

3312Contract #:

Public Works

831-420-5161831-420-5425City of Santa Cruz [email protected]

Prebid Conf:

Addenda:

5/10/18 2:00 PM

0

18-01020

4/24 @ 10am- site

Provide environmental control, surface preparation, coating application and testing of a complete new coating system on all steelequipment and materials installed in the Wastewater Treatment Facility Secondary Clarifier #2.

Project Contact: Anne HoganEmail: [email protected]

$250,000Santa Cruz

Plan Issuer:

WASTEWATER TREATMENT FACILITY SECONDARY CLARIFIER #2 COATING PROJECT

m401303Contract #:

Public Works

NEW

408-993-4600County of Santa Clara Facilities & Fleet

Prebid Conf:

Addenda:

5/10/18 3:00 PM

0

18-01202

None

Establish a term contract with a contractor to provide exterior painting services on an “as needed” basis.

Project Contact: Ruben Castro 408-918-2771Email: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

$175,000Santa Clara County

Plan Issuer:

SC8E

EXTERIOR PAINTING SERVICES

ITB-FAF-FY18-0229

Contract #:

Public Works

NEW

408-993-4600County of Santa Clara Facilities & Fleet

Prebid Conf:

Addenda:

5/10/18 3:00 PM

0

18-01201

None

Establish a term contract with a contractor to provide interior painting services on an “as needed” basis.

Project Contact: Ruben Castro 408-918-2771Email: [email protected]

Hard copies also available for review at Santa Clara Builders Exchange

$175,000Santa Clara County

Plan Issuer:

SC3E

INTERIOR PAINTING SERVICES

ITB-FAF-FY18-0230

Contract #:

Page 43: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Commercial

NEW

330-453-0647330-453-2566Eckinger Construction

Addenda:

5/10/18 3:00 PM

0

18-01147

The scope of new work includes tenant improvements of an existing space. Trades include new MEP & Fire Protection systemsconnected to existing base building systems & utilities. No change to existing core or exterior walls.

Trades Needed: Demo, Drywall, Acoustical Ceiling, Painting, Doors/Frames/Hardware, Painting, Flooring, Masonry, Concrete,Plumbing, HVAC, Electric, Structural Steel

Questions: Gina Smith, Construction Coordinator, at Eckinger Construction Co, 2340 Shepler Church Ave, Canton, OH 44706 at (330)453-2566, or by email at: www.eckinger.com

San Ramon

Plan Issuer:

Bidders:

WEST ELM STORE AT BISHOP RANCH

Ph:Eckinger Construction General Contractor 330-453-2566 330-453-0647Fax:

Public Worksto

Addenda:

5/10/18 3:30 PM

1

18-00998

Pavement rehabilitation of 1.7 miles of roadway and minor drainage and ADA improvements. Cold in place recycling overlay.

Project Contact: Dawn PattersonE-mail: [email protected]

$1,500,000$1,300,000Atascadero

EL CAMINO REAL AND SAN ANSELMO PAVEMENT REHABILITATION

C2016R01Contract #:

Public Works

NEW

415-473-7877County of Marin, DPW

Prebid Conf:

Addenda:

5/10/18 4:00 PM

0

18-01204

5/1 at 2PM

PLANS & SPECIFICATIONS WILL BE AVAILABLE ONLINE AFTER 2PM ON MON, APR 30TH!!!

Scope of work includes construction of two (2) accessible parking spaces, expansion of the parking lot to accommodate threeadditional standard parking spaces, reconstruction of portions of concrete sidewalks and curb ramps, and miscellaneous associatedwork.

$75,000Fairfax

Plan Issuer:

FAIRFAX LIBRARY PARKING LOT AND PATH OF TRAVEL IMPROVEMENTS

CAP 18-5402Contract #:

Public Works

831-420-5201831-420-5220City of Santa Cruz - Water Department

Prebid Conf:

to

Addenda:

5/10/18 4:00 PM

0

18-01074

4/26 @ 1:30pm- 180 El Refugio Way, Santa Cruz

The work of this contract includes construction of a replacement Inlet/Outlet Pipeline and yard piping, including installation of atemporary bypass pipe; construction of an Overflow/Drain Structure and piping; and all appurtenant work.

Project Contact: Taylor RonneEmail: [email protected]

$600,000$500,000Santa Cruz

Plan Issuer:

REPLACEMENT OF U5 INLET/OUTLET PIPELINE, RELATED PIPING, AND SITEWORK

Friday, May 11, 2018

Public Works

510-627-1364Port of Oakland

Prebid Conf:

Addenda:

5/11/18 12:00 PM

3

18-00971

4/16 at 9AM (Shepard-Glen Bldg, Rooms A&B)

Removal of certain existing airfield signs and foundations; installing new airfield sign foundations with new base cans, new airfieldsigns, new conduit and conductors; providing required temporary circuit bypass at certain airfield sign locations; installing replacementsign panels at certain existing airfield signs; installing bird deterrent spikes onto all new airfield sign.

Project Contact: Bill Russell 510-627-1439Email: [email protected]

$3,600,000Oakland

Plan Issuer:

SCOL22

AIRFIELD SIGNAGE REPLACEMENT OAKLAND INTERNATIONAL AIRPORT - PORT OF OAKLAND

2018-03-A2Contract #:

Page 44: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

SFUSD - Simon Reyes

Prebid Conf:

Addenda:

5/11/18 2:00 PM

0

18-01015

MAND 4/12 at 2:30PM & 4/26 at 1:30PM

The Project is generally described as: Remedial work to three (3) traction elevator as defined in specifications by William DuffArchitects dated 3/26/2018 and any such subsequent addendums and instructions. Additionally, a 12-month full preventivemaintenance service contract, as described in these Specifications, shall be included as part of the Project.

$180,000San Francisco

Plan Issuer:

1235 MISSION STREET OFFICE BUILDING - SCOPE 5 ELEVATORS

11860.5Contract #:

Public Works

510-368-3621City of Oakland, DPW

Prebid Conf:

Addenda:

5/11/18 2:00 PM

1

18-01057

4/24 at 10AM (250 Frank H.Ogawa Plaza, Oakland)

Evaluate the roadway AC and base on both approaches leading to 23rd Avenue Bridge over crossing Union Pacific railroad and reviewthe delamination and corrosion of the columns supporting 98th Avenue bridge and provide the City with reports and repairrecommendation for both bridges.

Project Contact: Mohammad N. Barati 510-238-7280Email: [email protected]

Oakland

Plan Issuer:

SCOL97

23RD AVENUE & 98TH AVENUE BRIDGE ENGINEERING SERVICES

1000819Contract #:

School

NEW

831-459-5540831-459-2366UCSC Physical Planning & Construction

Prebid Conf:

Addenda:

5/11/18 2:00 PM

3

18-01165

MAND 4/27 @ 11am- Physical Planning, Development & Operations Conference Rm#151H, Barn G

Existing overflow Lot 5 will be expanded to accommodate additional parking. Approximately 40,455 SF of stockpile area shall becleared and paved with Truegrid Pro Plus permeable paving. Additionally a 1,110 SF exit aisle shall be constructed through a treeplanter area and connected to the East Remote Lot. Work incudes removal of specified trees in East Remote Lot.

Project Contact: Nathan WeinerEmail: [email protected]

$675,000Santa Cruz

Plan Issuer:

Bidders:

EAST REMOTE PARKING LOT 5 IMPROVEMENTS

8880-002AContract #:

Ph:Granite Construction General Contractor 831-763-6100 831-761-1042Fax:

Public Works

650-508-6270Samtrans

Prebid Conf:

Addenda:

5/11/18 2:00 PM

11

18-00499

3/7 at 10AM (1250 San Carlos Ave., San Carlos)

Civil construction modifications and overhead catenary system installation for tunnels for Caltrain corridor locations.

Project Contact: Alicia Fraumeni 650-508-6442Email: [email protected]

$25,000,000San Francisco

Plan Issuer:

ELECTRIFICATION PROJECT TUNNEL MODIFICATIONS - CALTRAIN

18-J-C-070Contract #:

Page 45: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

RFQ-Consulting

Firm/Architectural

000-000-0000Judicial Council of California

Prebid Conf:

Addenda:

5/11/18 3:00 PM

1

18-00006

4/17 at 3PM (Call 877-820-7831; Participant Code: 421340)

The Judicial Council seeks to retain the services of a qualified Firm with expertise in all Phases of the above referenced project(“Project”) as described herein and in the Contract Documents. The Project phases are the Working Drawings Phase and theConstruction Phase. The Judicial Council hereby solicits SOQs and Proposals to furnish Preconstruction Services and ConstructionManagement Services for the Project, subject to the conditions prescribed by this RFQ/P.

The New Sacramento Courthouse will be a 543,290 gross square feet seventeen story building, plus a mechanical penthouse. TheProject is the site development and construction of a new building for a trial court facility comprised of fifty three (53) courtrooms, tohouse fifty three (53) judges and support staff, approximately limited to all building structure, enclosure, interior improvements,mechanical, electrical, telecommunication, audio visual, signage and security systems. The project also includes approximatelyseventy (70) enclosed secure basement parking spaces for judge and executive staff parking. The site development includes but isnot limited to site preparation, underground utilities, landscape, hardscape, vehicular drives, basement parking, security barriers,fencing, and gates. The site development includes mitigation of construction impacts to traffic, and other mitigation measures thatapply to the CMR, per Attachment 6 (Mitigation Monitoring Plan).

Questions regarding the RFP should be submitted in writing to the Judicial Council of California at:[email protected] on April 20, 2018, by 5PM.

Sacramento

Plan Issuer:

RFQ NEW SACRAMENTO COURTHOUSE CMR - PRECONSTRUCTION AND CONSTRUCTION PHASESERVICES

RFQ/P-FSO-2018-11-JMG

Contract #:

Residential

000-000-0000415-963-1562Invesco Real Estate [email protected]

Addenda:

5/11/18 5:00 PM

0

18-01049

Replacing existing CFL lighting with LED lighting in the common area spaces of the residential apartment community. This includes,but is not limited to, corridors, trash rooms, garages, utility rooms, and storage space. The scope does not include LED lighting in theresidential units.

Dublin

Plan Issuer:

SCOL135

RFP LED LIGHTING RETROFIT- ECLIPSE DUBLIN STATION APARTMENTS

Monday, May 14, 2018

Public Works

415-820-3566MJM Management Group

Prebid Conf:

Addenda:

5/14/18 10:00 AM

0

18-00848

MAND 4/9 at 10AM

This Project will address various building envelope issues at two facilities in Yerba Buena Gardens: South of Market ChildDevelopment Center (CDC) and Children’s Creativity Museum. A variety of conditions around roofs, skylights, and walkway transitionswill be addressed. The project drawings and specifications provide a detailed description of the specific details to be addressed.

Questions: Clinton Cleveland, MJM Management Group, at (415) 820-3550, or by email at: [email protected]

San Francisco

Plan Issuer:

Bidders:

CHILDREN'S CREATIVITY MUSEUM YERBA BUENA GARDENS EXPANSION JOINT REPAIRS & SELECTBLDG ENVELOPE REPAIRS

Ph:CF Contracting General Contractor 415-721-7160 415-296-6437Fax:

School

831-459-5540831-459-2366UCSC Physical Planning & Construction

Prebid Conf:

Addenda:

5/14/18 2:00 PM

1

18-00785

MAND 3/22 @ 9am- Physical Planning, Development & Operations Conference Rm#151H, Barn G

Construction of Cogen and upper campus buildings fire alarm upgrades includes demolition of existing devices, installation of newdetectors, horns, strobes, panels and other associated equipment and described in the plans and specifications.

PREVAILING WAGE

Project Contact: Shawn HowardEmail: [email protected]

$699,600Santa Cruz

Plan Issuer:

CAMPUS WIDE FIRE ALARM UPGRADES – COGEN AND UPPER CAMPUS BUILDINGS - REBID

9400-006Contract #:

Page 46: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

831-883-0516831-883-6182Monterey One Water [email protected]

Prebid Conf:

Addenda:

5/14/18 2:00 PM

0

18-01115

MAND 4/25 @ 10am- 14811 Del Monte Blvd, Marina

Provide complete system installation, including all labor, equipment, materials and services. Cooling must be provided in building at alltimes.Remove (E) Rooftop AC Unit.Install new rooftop AC Unit at (E) location.Install new VRF fan coils and condensing units as shown on drawings.Install new concrete pad for condensing unit.Install VRF fan coils and condensing unit system first. Do not replace rooftop AC unit until VRF system is operational and providescooling.

Project Contact: Jennifer GonzalezEmail: [email protected]

Salinas

Plan Issuer:

SALINAS PUMP STATION - VFD ROOM HVAC PROJECT

School

831-459-5540831-459-2366UCSC Physical Planning & Construction

Prebid Conf:

Addenda:

5/14/18 2:30 PM

1

18-00786

MAND 3/22 @ 9am- Physical Planning, Development & Operations Conference Rm#151H, Barn G

Construction of Fire Alarm Upgrades includes demolition of existing devices, installation of new detectors, horns, strobes, panels andother associated equipment and described in the plans and specifications.

PREVAILING WAGE

Project Contact: Shawn HowardEmail: [email protected]

$1,030,900Santa Cruz

Plan Issuer:

SINSHEIMER LABORATORIES AND SCIENCE LIBRARY FIRE ALARM INSTALLATIONS

10000-208Contract #:

School

831-459-5540831-459-2366UCSC Physical Planning & Construction

Prebid Conf:

Addenda:

5/14/18 3:00 PM

1

18-00787

MAND 3/22 @ 9am- Physical Planning, Development & Operations Conference Rm#151H, Barn G

Construction of OPERS Fire Alarm Upgrades includes demolition of existing devices, installation of new detectors, horns, strobes,panels and other associated equipment and described in the plans and specifications.

PREVAILING WAGE

Project Contact: Shawn HowardEmail: [email protected]

$611,000Santa Cruz

Plan Issuer:

PHYSICAL EDUCATION FACILITIES - OPERS FIRE ALARM INSTALLATION

8300-027Contract #:

Public Works

408-535-8300City of San Jose - DPW

Prebid Conf:

Addenda:

5/14/18 3:00 PM

0

18-01101

MAND 4/26 at 10AM

Upgrade two (2) Dover passenger elevators at the City of San Jose Police Communications Building,

Project Contact: Theresa Porter 408-535-7053Email: [email protected]

San Jose

Plan Issuer:

SCOL89

RFB TWO DOVER PASSENGER ELEVATORS UPGRADE

RFB 17-18-43Contract #:

Page 47: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

415-554-6229City & Co of San Francisco

Addenda:

5/14/18 4:00 PM

0

18-01089

San Francisco Public Works (Public Works), City and County of San Francisco (City), is seekingto award master agreements (“contracts”) to Consultants and/or joint venture teams to providelearning and training services on an as-needed basis. Consultants may respond withqualifications on one or more of the following Service Scope Types:Type 1: Project Management

Type 2: Facilitation and Presentation Training for Technical ProfessionalsType 3: Strategic Planning and Professional Development CoachingType 4: Negotiation, Mediation, and Departmental Partnering TrainingType 5: Organizational Development and Learning, Strategic Planning Development and Evaluation, and Process Improvement.

Questions regarding the RFQ must be submitted no later than 4PM Pacific Time, May 4,2018, by email to the Contract Manager at: [email protected]

San Francisco

Plan Issuer:

RFQ AS-NEEDED LEARNING AND TRAINING SERVICES NO. 3

1000009656Contract #:

Tuesday, May 15, 2018

Public Works

NEW

408-846-0234City of Gilroy - DPW

Addenda:

5/15/18 11:00 AM

0

18-01166

Clearing vegetation around fire hydrants, painting fire hydrants, installing City provided fire hydrant ID tags, installing blue pavementreflectors where needed, and submit a complete list of all fire hydrants with GPS coordinates.

Gilroy

Plan Issuer:

SCOL52

FIRE HYDRANT PAINTING/ ID TAGS

18-P"W-243-2Contract #:

School

408-928-6860Alum Rock Union Elementary School District [email protected]

Prebid Conf:

Addenda:

5/15/18 2:00 PM

3

18-01039

MAND 4/10 at 10AM (2930 Gay Ave., San Jose)

Selective demolition, Fire Alarm upgrade and installations, ADA Accessibility, architectural, structural, mechanical, plumbing andelectrical work

San Jose

Plan Issuer:

SCOL1

2018 HVAC UPGRADES PROJECTS ARBUCKLE, CURETON, MCCOLLAM, RUSSO/MCENTEE & RYANELEMENTARY SCHOOLS - ALUM ROCK UNIOIN ELEMENTARY SCHOOL DISTRICT

B1718-BOND003Contract #:

Public Works

650-558-7230City of Burlingame, DPW

Addenda:

5/15/18 2:00 PM

0

18-01121

Removing and replacing sidewalk, driveway, curb ramps, curb and gutter and associated restoration work and removing trees andgrinding stumps.

$1,000,000Burlingame

Plan Issuer:

SCOL28

2018 SIDEWALK REPAIR PROGRAM

85250Contract #:

Public Works

510-464-6544BART-Bay Area Rapid Transit District

Prebid Conf:

to

Addenda:

5/15/18 2:00 PM

5

18-00924

4/12 at 10AM (meet at 300 Lakeside Dr, Conf Rm 1600, Oakland)

Div 1-3, 5, 33 & 41. The Work includes: Installation of an anchored wire mesh panel system intended to reduce hazards to movingtrains from fractured and potentially loose concrete in the reinforced concrete lining of the Berkeley Hills Tunnels at the locations wherethe main Hayward Fault trace crosses each Tunnel.

Questions: Claudia Horton at (510) 464-6362, or by email at: [email protected]

$1,300,000$1,100,000Oakland

Plan Issuer:

Bidders:

BERKELEY HILLS TUNNELS LINING SURFACE TREATMENT - BART #15TC-260

15TC-260Contract #:

Ph:Bosco Constructors, Inc. General Contractor 818-700-0304 818-700-0307Fax:

Ph:Bugler Construction General Contractor 925-416-0700 925-416-7746Fax:

Ph:DMZ Builders General Contractor 925-826-5387 925-826-5766Fax:

Ph:Saboo Inc. General Contractor 626-260-2849 626-821-9314Fax:

Ph:TPA Construction General Contractor 916-919-1624 916-488-8768Fax:

Page 48: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

510-799-8241City of Hercules

Prebid Conf:

Addenda:

5/15/18 2:00 PM

0

18-01085

MAND 5/2 at 10AM

The Work to be performed consists of removal and replacement of approximately 16,400 sq. ft. composition shingle roof covering andexisting gutter and downspout system.

$160,000Hercules

Plan Issuer:

COMMUNITY CENTER REROOF PROJECT

F18003Contract #:

Public Works

510-544-2300EBRPD-East Bay Regional Park District

Prebid Conf:

Addenda:

5/15/18 2:00 PM

0

18-00972

MAND 4/16 at 9:30AM (Intersection of Deer Valley Rd & Empire Mine Rd)

Grading/earthwork; construction of vernal pools re-alignment of creek; seeding and erosion control; demolition of existing road; stockpond berm repair; fence replacement.

Project Contact: Karla CueroEmail: [email protected]

$791,821Antioch

Plan Issuer:

Bidders:

HORSE VALLEY CREEK & WETLAND RESTORATION - EAST BAY REGIONAL PARK DISTRICT (EBRPD)

154700Contract #:

Ph:Granite Rock Company General Contractor 408-574-1400 408-365-9548Fax:

Public Works

510-307-8091City of Richmond - Engineering

Prebid Conf:

Addenda:

5/15/18 2:00 PM

0

18-01106

MAND 5/1 at 10AM

Div 1-10, 26 & 31-33. Project consists of site improvements for the Richmond Marina Park and adjacentparking lot.

Questions: Yader A. Bermudez at (510) 774-6300, or by email at: [email protected]

$230,000Richmond

Plan Issuer:

MARINA PARK SITE IMPROVEMENTS PROJECT

Public Works

510-524-9543City of Albany, DPW

Prebid Conf:

Addenda:

5/15/18 2:00 PM

1

18-01082

5/3 at 10AM

Full remodel of two existing park restrooms with two stalls each, existing shell of building to remain, demo of the existing interior wallsurfaces, partitions, and plumbing and electrical fixtures. The remodel to include all new plumbing fixtures, all new toilet roomaccessories, new wall and ceiling finishes, new flooring surfaces, specialty 3D wall panels on one wall in each restroom, new electricalwiring and fixtures and new entry doors with door activators.

$99,800Albany

Plan Issuer:

SCOL49

MEMORIAL PARK RESTROOM RENOVATIONS

C18-27Contract #:

Public Works

925-313-2000Contra Costa Co, DPW

Addenda:

5/15/18 2:00 PM

0

18-01030

The Work generally consists of installing sidewalk, curb and gutter at two sites, roadway widening, removing concreted rock slopeprotection (RSP), extending an 8’x6’ concrete box culvert, placing RSP, and a temporary stream diversion system.

Questions: Tianjun Cao, Design/Construction Division, at (925) 313-2110.

$466,000Contra Costa County

Plan Issuer:

PACHECO BOULEVARD SIDEWALK GAP CLOSURE PHASE III

0662-6U4008Contract #:

School

NEW

831-477-5640831-477-5613Cabrillo Community College District

Prebid Conf:

Addenda:

5/15/18 2:00 PM

0

18-01157

MAND 5/2 @ 10am- Bldg 2030

Furnish all labor, materials, apparatus, tools, equipment, transportation, temporary construction and special or occasional services asrequired to make a complete working security camera installation, as shown on the drawings and /or as described in the specifications.This to include electrical, data and Power-Over-Ethernet (POE).

PREVAILING WAGE

Questions: Gale StevensEmail: [email protected]

$128,000Aptos

Plan Issuer:

REPLACE SECURITY SYSTEMS, UPPER CAMPUS P1

B18-05Contract #:

Page 49: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

510-215-3137City of San Pablo - DPW

Prebid Conf:

Addenda:

5/15/18 2:00 PM

1

18-01028

MAND 5/3 at 10AM

Construct Entry Remodel included partially removing walls, installing glulam beam and supports, constructing new walls, relocating airduct and air vent, constructing new office with window, doorway and flooring, including patching up and painting, and all works asshown on Plans and Specifications.

ADD ALTERNATE: Resilient flooring at entry.

Questions: John Bothwell at (510) 215-3079, or by email at: [email protected]

San Pablo

Plan Issuer:

RFP CHURCH LANE SENIOR CENTER ENTRY REMODEL PROJECT

CLS-CRMContract #:

School

510-659-2559xt1244

Fremont Unified School District- FUSD Facilities

Prebid Conf:

Addenda:

5/15/18 2:00 PM

0

18-01120

4/24 at Pm & 5/1 at 3:30PM (Admin Bldg)

The Project consists of:1. HVAC System upgrades to improve air quality.2. Replace all angle stops at classrooms.3. Limited slurry coat at pitted surface from tree intrusion4. Replacement of safety locks at all applicable doors.5. Water Service line.6. Alternate 1 Front Area Upgrades.7. Alternate 2 Repair and/or replacement of existing flooring.8. Refer to Appendices A, B, C for Abatement requirements.

Fremont

Plan Issuer:

Bidders:

SCOL13

SCHOOL MODERNIZATION MISSION VALLEY ELEMENTARY SCHOOL - FREMONT UNIFIED SCHOOLDISTRICT

258-05-15-18Contract #:

Ph:Cal Pacific Construction General Contractor 415-824-8871 650-557-1239Fax:

Ph:Roebbelen Contracting Inc. General Contractor 916-939-4000 916-939-4027Fax:

Public Works

415-388-4033City Of Mill Valley, DPW

Prebid Conf:

to

Addenda:

5/15/18 2:00 PM

0

18-01118

5/3 at 11AM

Work will include concrete pad; semi-portable restroom with ADA ramp; sewer, water and electrical connections; minor irrigationrelocation.

Questions: Michael Hanlon at (415) 384-4830, or by email at: [email protected]

$185,000$180,000Mill Valley

Plan Issuer:

SYCAMORE PARK RESTROOM

16-8Contract #:

School

NEW

510-644-6430Berkeley Unified School District -BUSD

Prebid Conf:

Addenda:

5/15/18 2:30 PM

0

18-01184

MAND 5/1 at 1PM (Tennis courts)

Renovation of existing tennis courts.

Berkeley

Plan Issuer:

SCOL57

KING MIDDLE SCHOOL TENNIS COURT RENOVATION- BERKELEY UNIFIED SCHOOL DISTRICT

#132.1802Contract #:

Public Works

NEW

510-577-3428City of San Leandro - Engineering

Prebid Conf:

to

Addenda:

5/15/18 3:00 PM

0

18-01135

5/3 at 10AM & 5/8 at 2:30PM (835 E. 14th St., San Leandro)

Installing concrete curb ramps, applying asphalt rubber chip seal and slurry seal, and removing and reinstalling traffic stripes andmarkings on City streets.

Project Contact: John O'Driscoll 510-577-3494Email: [email protected]

$5,000,000$1,000,000San Leandro

Plan Issuer:

SCOL7

ANNUAL STREET SEALING 2017-18

2018.0070Contract #:

Page 50: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

NEW

650-329-2271City of Palo Alto - DPW

Prebid Conf:

Addenda:

5/15/18 3:00 PM

0

18-01178

5/1 at 11AM

Replaces the existing boardwalk at the Lucy Evans Baylands Nature Interpretive Center with a new accessible boardwalk of the samelength and on the same alignment as the existing boardwalk.

Project Contact: Elizabeth AmesEmail: [email protected]

Palo Alto

Plan Issuer:

Bidders:

SCOL94

BAYLANDS BOARDWALK REPLACEMENT PROJECT

171910Contract #:

Ph:R.E. Staite Engineering, Inc. General Contractor 619-233-0178 619-233-3706Fax:

School

NEW

805-756-7566805-756-1299Cal Poly Facilities Planning & Capital Projects

Prebid Conf:

Addenda:

5/15/18 3:00 PM

0

18-01149

4/26 @ 1pm- Building 043A (Kinesiology) Room 150

In general, the work consists of, but is not limited to, remove faulty HVAC equipment on roof. Replace with (OFCI) CHW unit. b. Re-zone 4th floor c. Remove built-up roof under HVAC equipment and replace w/ single-ply d. Connect CHW piping to Utilidor and extendto roof meeting performance specifications per construction documents.

Bid Contact: Jeanette Paolucci(805) [email protected]

San Luis Obispo

Plan Issuer:

KINESIOLOGY HVAC & ROOF REPAIR

MIN16-SR5345Contract #:

Public Works

NEW

650-329-2271City of Palo Alto - DPW

Prebid Conf:

Addenda:

5/15/18 3:00 PM

0

18-01146

MAND 4/30 at 10AM

Install new piping and abandon in place the existing piping of portions of the landfill gas collection and control system and leachatecollection and removal system in the Phase IIA and Phase IIB sections of the closed City of Palo Alto Landfill.

Project Contact: Elise SbarboriEmail: [email protected]

Palo Alto

Plan Issuer:

SCOL37

LANDFILL GAS COLLECTION & CONTROL SYSTEM & LEACHATE COLLECTION SYSTEMIMPROVEMENTS

171689Contract #:

Public Works

510-215-3137City of San Pablo - DPW

Prebid Conf:

Addenda:

5/15/18 3:00 PM

1

18-01027

MAND 5/3 at 1PM

Construct Retractable Wall Partitions, including partial wall and ceiling removal and constructing a steel beam and steel columns tosupport movable panels, constructing a storage closet for movable panels, installing tracks and movable wall panels, modifying HVACand ducting for 2-zone control, reconstructing wall, including patching up and paint, and all works as shown on Plans andSpecifications.

Questions: John Bothwell at (510) 215-3079, or by email at: [email protected]

San Pablo

Plan Issuer:

RFP CHURCH LANE SENIOR CENTER OPERABLE PARTITION PROJECT

CLS-COPContract #:

Page 51: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

510-307-8091City of Richmond - Engineering

Addenda:

5/15/18 3:00 PM

0

18-01098

THIS PROJECT IS A REBID

Project consists of construction for the Richmond Plunge Pool Plaster Replacement Project, Richmond, CA, as indicated in ContractDocuments and as summarized as follows:1. Removal and disposal of existing construction including:a. Pool Plaster.b. Pool Tile.c. Grout at existing ceramic tile surfaces.d. Pool Gutter Grates (See Alternate No. 1).e. Accessible Lift (See Alternate No. 2).

2. Temporary Relocation, Storage, and Reinstallation of an existing stainless steel pool bulkhead.3. Installation of new construction including:a. Pool Plaster.b. Pool Tile.c. Grouting of existing ceramic tile surfaces.d. Stair Tread Revisions.e. Pool Gutter Waterproofing and Grates (See Alternate No. 1).f. Accessible Lift (See Alternate No. 2).

Hazardous Materials Removal: Known hazardous materials shall be removed under separate Contract (NIC) if encountered duringcourse of construction. Inform Owner immediately where materials suspected of being hazardous are encountered.

Questions: Yader A. Bermudez at (510) 774-6300, or by email at: [email protected]

(Previously scheduled bid date was 3/13/18)

$220,000Richmond

Plan Issuer:

RICHMOND PLUNGE POOL PLASTER REPLACEMENT PROJECT - REBID

Wednesday, May 16, 2018

Public Works

510-287-1040EBMUD-East Bay Municipal Utilities District

Prebid Conf:

to

Addenda:

5/16/18 1:30 PM

0

18-01018

4/25 at 9AM (meet in the parking lot directly below, and east of, the District's WalnutCreek WTP along Larkey Lane in Walnut Creek)

Div 1-3, 5, 7-9, 13, 22, 26-28, 31-33 & 40. Work includes rehabilitation of three steel reservoirs whose volumes range from 0.2 milliongallons (MG) to 2.9 MG. The reservoirs are located in Castro Valley, Orinda, and Walnut Creek, California.

Work includes demolition and removal of three existing wooden roofs, construction of a 0.28 MG temporary bolted-steel tank,construction of three aluminum dome roofs, abrasive blasting and recoating of the tank interiors, low-pressure water cleaning, primingand top-coating of the tank exteriors, and constructing civil, structural, pipeline, mechanical and electrical appurtenances at eachreservoir.

$5,500,000$4,500,000Castro Valley, Orinda andWalnut Creek

Plan Issuer:

Bidders:

ARCADIAN, LARKEY, AND RHEEM RESERVOIRS REHABILITATION - EBMUD

2129Contract #:

Ph:DMZ Builders General Contractor 925-826-5387 925-826-5766Fax:

Ph:GSE Construction, Inc. General Contractor 925-447-0292 925-447-0962Fax:

Ph:Ichor Restoration General Contractor 910-801-9160 866-335-7721Fax:

Ph:Integra Construction Services, Inc. General Contractor 925-398-8290 925-398-8245Fax:

Ph:Manito Construction, Inc. General Contractor 925-600-0220 925-600-1098Fax:

Ph:Steve P Rados, Inc General Contractor 916-475-1654 916-475-1655Fax:

Ph:Thompson Builders Corp General Contractor 415-456-8972 415-459-0665Fax:

Ph:Valentine Corporation General Contractor 415-453-3732 415-457-5820Fax:

Public Works

510-287-1040EBMUD-East Bay Municipal Utilities District

Prebid Conf:

to

Addenda:

5/16/18 1:30 PM

2

18-00812

4/11 at 8:30AM

Project has been CANCELLED per Addendum #2 received on 4/23/18

$3,000,000$2,000,000Berkeley

Plan Issuer:

UNIVERSITY PUMPING PLANT REPLACEMENT - EBMUD

2116Contract #:

Page 52: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

650-949-6165Foothill De Anza College District (Foothill)

Prebid Conf:

Addenda:

5/16/18 2:00 PM

1

18-01103

MAND 4/25 at 10AM (Bldg D160)

1. Demolition of the existing flooring systems in its entirety (down to concrete).2. Demolition of finishes adjacent to flooring such as base, walk-off mats (including frames),3. Removal and disposal of all items from the job site.4. Preparation of surfaces for new finishes in accordance with standard industry practices for tile work.5. Provide and installation of new flooring systems and finishes.

Los Altos

Plan Issuer:

SCOL96

CAMPUS CENTER FLOORING FOOTHILL COLLEGE

#1798Contract #:

Public Works

415-554-6229City & Co of San Francisco

Prebid Conf:

Addenda:

5/16/18 2:30 PM

0

18-01063

4/27 at 10AM (meet at 1680 Mission St, 3rd Fl Conf Rm, San Francisco)

Div 1-3, 26 & 31-34. The Work is located along San Bruno Avenue, from Arleta Avenue to Silver Avenue in San Francisco, CA andconsists of curb ramp, pedestrian and transit bulb construction, drainage, water, traffic signal work, landscaping, traffic control, and allassociated work.

Questions: Erika Heineken, Project Manager, at (415) 919-8064.

$1,500,000San Francisco

Plan Issuer:

SAN BRUNO AVENUE MULTIMODAL IMPROVEMENT PROJECT

1000008473Contract #:

Public Works

415-554-6229City & Co of San Francisco

Prebid Conf:

Addenda:

5/16/18 2:30 PM

1

18-01084

5/1 at 9AM (meet at 30 Van Ness Ave, 4th Floor Main Conf Rm, San Francisco)

The Work to be done under this Contract consists of bridge rehabilitation work, cleaning and painting, fender system and substructurerepair and electrical and mechanical work along Third Street at Mission Channel, in San Francisco, CA, all as shown on the Drawingsand as specified in these Specifications.

Questions: Thomas Roitman, Project Manager, at (415) 558-4077, or by email at: [email protected]

$27,000,000San Francisco

Plan Issuer:

THIRD STREET BRIDGE REHABILITATION PROJECT

1000007012Contract #:

Public Works

NEW

408-730-7403City of Sunnyvale DPW

Prebid Conf:

Addenda:

5/16/18 3:00 PM

0

18-01198

5/8 at 9:30AM (Conference Room)

Demolition, sealing, trenching and shoring, dewatering, piping, junction structures, diversion structures, sampling ports, roof drainconnections, pump station, wet well, flow meter and sampling vault and all associated appurtenances, curb drop inlet, HDPE piping(force main and gravity), electrical conduits, control devices, wiring, SCADA system installation and testing, and repairing all disturbedpaved and unpaved areas ready for use,

Project Contact: Lisa Vo 408-730-7608Email: [email protected]

Sunnyvale

Plan Issuer:

SCOL100

SMART STATION STORM WATER MANAGEMENT SYSTEM UPGRADE RE-BID

YU-15-01Contract #:

Public Works

650-947-2780City of Los Altos - Engineering

Prebid Conf:

Addenda:

5/16/18 4:00 PM

1

18-01095

5/4 at 10AM (707 Fremont Ave., Los Altos)

Provide On-call tree maintenance services.

Project Contact: Theresa Yee 925-947-2625Email; [email protected]

Los Altos

Plan Issuer:

SC5E

RFP ON-CALL CITY WIDE TREE MAINTENANCE SERVICES

Page 53: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Thursday, May 17, 2018

School

NEW

000-000-0000408-927-8110McKim Design [email protected]

Prebid Conf:

Addenda:

5/17/18 1:00 PM

0

18-01206

MAND 5/2 at 9AM (Front of McAfee Theater Bldg offHerriman Rd)

Modernization of the Saratoga High School 800 Wing.

Saratoga

Plan Issuer:

SCOL59

SARATOGA HIGH SCHOOL 800 WNG PROJECT- LOS GATOS-SARATOGA JOINT UNION HIGH SCHOOLDISTRICT

1735Contract #:

Public Works

NEW

925-671-3361City of Concord - Engineering

Addenda:

5/17/18 11:00 AM

0

18-01193

To provide sanitary sewer restoration and remediation services at the request of and by direction of City of Concord staff or the city’srepresentative. This contract shall include labor, equipment and materials, for the assigned projects, or work.

Submit all questions no later than May 7, 2018, at Noon to: Debbie Wellnitz by email at: [email protected]

$100,000Concord

Plan Issuer:

RFB SANITARY SEWER OVERFLOW RESTORATION SERVICES

2404Contract #:

Public Works

415-388-4033City Of Mill Valley, DPW

Addenda:

5/17/18 2:00 PM

1

18-01122

Furnishing all labor, materials, equipment, and performing all work necessary and incidental to the construction of the project known asCamino Alto South End Bike Lanes Project including, but not limited to: roadway grinding, spot HMA overlay treatments, partial mediandemolition and reconstruction with light pole removal, partial roadway slurry seal, pavement marking striping and sign removal andinstallation to reflect new bike facilities on the existing roadway, relocating roadside signs and traffic signals, traffic signal infrastructureupgrades including LED modules, accessible pedestrian signals, relocated inductive loops and more, plus other items of work,according to Plans, Specifications, and the Contract Documents.

Questions: David Eshoo at (415) 384-4755, or by email at: [email protected]

$262,440Mill Valley

Plan Issuer:

Bidders:

CAMINO ALTO SOUTH END BIKE LANES

PW14-1Contract #:

Ph:Ghilotti Brothers Inc General Contractor 415-454-7011 415-454-8376Fax:

Public Works

NEW

831-420-5201831-420-5220City of Santa Cruz - Water Department

Prebid Conf:

Addenda:

5/17/18 2:00 PM

0

18-01124

5/3 @ 2pm- site

The work to be completed under this Contract consists of furnishing all materials, labor, equipment, fuel and tools required to removean existing 75’ long by 8’ high inflatable rubber bladder and to install its in-kind replacement, as shown on the Plans and detailed in theSpecifications. The City will procure the rubber bladder and have it delivered to the project site.

Project Contact: Matt ZemanEmail: [email protected]

Felton

Plan Issuer:

FELTON DIVERSION INFLATABLE DAM RUBBER BLADDER REPLACEMENT

2017-002Contract #:

Public Works

510-368-3621City of Oakland, DPW

Prebid Conf:

Addenda:

5/17/18 2:00 PM

1

18-00979

4/17 at 11AM & 4/30 at 2PM (250 Frank H. Ogawa Plaza, Oakland)

Demolition of the existing pool deck, retaining wall, and fencing while preserving the pool shell; replacement of existing soil around thepool shell with engineered fill; repair and installation of electrical raceways and systems around the pool; construction of new retainingwalls, concrete deck, code compliant fencing, railing, drainage system, and other pool appurtenances; and improvements to ADAparking and path of travel.

Project Contact: WooJae KimEmail: [email protected]

$620,000Oakland

Plan Issuer:

SCOL74

LIONS POOL RENOVATION - DIAMOND PARK RECREATION CENTER

1003434Contract #:

Page 54: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

NEW

650-558-7230City of Burlingame, DPW

Addenda:

5/17/18 2:00 PM

0

18-01170

Construction of new storm drain inlets, storm drain mains, curbs and gutters, sidewalk, valley gutters, curb ramps, drivewayapproaches, and replacement of existing storm drain facilities in public right of ways and storm drain easements.

$1,100,000Burlingame

Plan Issuer:

SCOL60

NEIGHBORHOOD STORM DRAIN PROJECT #10

84900Contract #:

School

NEW

805-473-5594805-474-3000Lucia Mar Unified School District

Prebid Conf:

Addenda:

5/17/18 2:00 PM

0

18-01185

MAND 5/1 @ 9am-Site

PROJECT WILL CONSIST OF THE RELOCATION OF (6) EXISTING PORTABLES TO BE USED AS TEMPORARY HOUSINGDURING CONSTRUCTION OF NEW MODULAR CLASSROOM CONSTRUCTION (UNDER SEPARATE BID). DEMOLITION ANDREMOVAL OF REMAINING PORTABLES AND EXISTING SITE CONDITIONS AS INDICATED; DISCONNECTION OF (E) UTILITIESAND SERVICES,SITE GRADING AND CONSTRUCTION OF NEW BUILDING PAD AND WALKWAY, TRENCHING ANDCONNECTION OF PROPOSED UTILITIES AND SERVICES, AND ACCESSIBILITY UPGRADES AS INDICATED.

Project Contact:Cindy [email protected]

Nipomo

Plan Issuer:

NIPOMO ELEMENTARY SITE WORK FOR 6 PORTABLE CLASSROOMS

Public Works

415-551-4603City & Co of San Francisco - Utilities

Prebid Conf:

Addenda:

5/17/18 2:00 PM

7

18-00514

3/13 & 3/29 at 10AM

Div 1-2 & 7-9. The objective of the Project is to selectively perform hazardous paint mitigation, remove, replace and upgrade theexisting deficient and deteriorated facility doors and frames, various industrial grade Fiberglass Reinforced Plastic (FRP) and stainlesssteel metal single and double-leaf type pedestrian access door assemblies and door hardware accessories and appurtenances at theOceanside Water Pollution Control Plant (OSP). The Work is to be performed in San Francisco, CA.

Questions: (415) 551-4603, or email at: [email protected]

$2,100,000San Francisco

Plan Issuer:

Bidders:

OCEANSIDE WATER POLLUTION CONTROL PLANT DOOR ASSEMBLY UPGRADE

WW-673Contract #:

Ph:Roebuck Construction General Contractor 415-255-1506 415-255-1508Fax:

Ph:Rubecon General Contracting General Contractor 415-206-7740 415-206-1750Fax:

Ph:SJ Amoroso Construction Co., Inc. General Contractor 650-654-1900 650-654-9002Fax:

School

408-864-5888Foothill De Anza College District (De Anza)

Prebid Conf:

Addenda:

5/17/18 2:00 PM

1

18-01111

MAND 4/26 at 10AM (Plant Corp Yard Conference Rm, #120)

The Bid #1800 Science Center Roof Repair project at De Anza College will clean and power wash the entire roof area. Remove allponding water and any oil or chemical spill. Install temporary air filters for the duration of the project. Provide notice to the district if anymechanical equipment needs to be shut down. Provide performance logs prior to and after roofing work. Cut and remove all blisters orcracked membrane. Remove any delaminated material and solvent wipe area. Remove and replace any walk pads necessary toaccess damaged existing roofing material. Patch blisters with Permaflash system. Repair all scuppers. Clean and prepare outside faceof scupper to receive Permaflash coating. Provide watertight tie-in to existing stucco without damaging (e) stucco. Stucco damageduring the course of the work shall be repaired by the contractor at no cost to the owner. Repair damaged downspout and conductorheads. Clean and prepare counterflashing. Remove and replace sealant at coping cap along parapet wall. Match color of the existingsealant and coping cap. Remove and reinstall Dura-blocks as necessary to repair roof. Clean and snake all existing drains. Clean andprepare (e) round penetrations for application of Permaflash system all round and 6” up penetration. Verify locations in the field. Repair(e) base flashing cracks/blisters/holes. Clean and prepare prior to Permaflash system application. Verify locations in the field.

$100,000Cupertino

Plan Issuer:

Bidders:

SCOL127

SCIENCE CENTER ROOF REPAIR DE ANZA COLLEGE

#1800Contract #:

Ph:Stronger Bldg Services General Contractor 510-487-8363 510-487-8246Fax:

Page 55: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

NEW

831-649-4175831-645-1200Monterey Peninsula Unified School District

Prebid Conf:

Addenda:

5/17/18 2:00 PM

0

18-01167

MAND 4/24 @ 2pm- site

Project consists of: Drilling Sawcutting & Removal; Site Demo; Temporary Tree and Plant Protection; Selective Building Demo;Concrete; Metal Railings; Electrical; Earthwork; Exterior Improvements; Utilities.

PREVAILING WAGE

Seaside

Plan Issuer:

SEASIDE HIGH SCHOOL NEW CLASSROOMS - INCREMENT 1

Public Works

NEW

408-535-8300City of San Jose - DPW

Prebid Conf:

Addenda:

5/17/18 3:00 PM

0

18-01199

MAND 5/3 at 2PM (W. San Tomas Aquino Rd/Crockett Ave, Campbell)

Up sizing of approximately 6,222 feet of 6-inch, 8-inch, and 10-inch sanitary sewer pipes to 15- and 18-inch pipe and 175 feet of 27-inch lined sanitary sewer pipe to 30-inch lined pipe.

Project Contact: Mellownie Salvador

$3,616,405San Jose

Plan Issuer:

SCOL105

6724-RINCON AVENUE-VIRGINIA AVENUE SANITARY SEWER IMPROVEMENT

6724Contract #:

Public Works

NEW

408-535-8300City of San Jose - DPW

Addenda:

5/17/18 3:00 PM

0

18-01200

Installation of signage and striping, PCC sidewalk, AC roadway pavement, curb and gutter, drainage improvements, driveways andnew wheel chair ramps with detectable warning surface.

Project Contact: Chris Dayley 408-793-5310

$443,808San Jose

Plan Issuer:

SCOL108

7013-SAFE PATHWAYS TO DIRIDON STATION IMPROVEMENT PROJECT

7013Contract #:

School

831-443-7207Santa Rita Union School District [email protected]

Prebid Conf:

Addenda:

5/17/18 3:00 PM

3

18-00987

4/12 @ 10am- site

The Project consists of all labor, materials equipment and services necessary to remove, replace, and re-grade approximately 8,034 sfof asphalt paving.

PREVAILING WAGE

Project Contact: [email protected]

Salinas

Plan Issuer:

ASPHALT REPAIRS AT LA JOYA ELEMENTARY SCHOOL

Bid No. 4-2018-26,Bid Package LJ4-2018-26

Contract #:

Friday, May 18, 2018

School

NEW

831-477-5640831-477-5613Cabrillo Community College District

Prebid Conf:

Addenda:

5/18/18 2:00 PM

0

18-01156

MAND 5/8 @ 10am- Bldg 2030

This project involves replacing the existing pressure reducing valve assemblies (PRV) on Buildings 300 & 1300. This project will alsoinvolve installing domestic reduced pressure zone back flow assemblies (RPZ) on the existing domestic service lines for Buildings 300,350, 400 & 1300.

PREVAILING WAGE

Questions: Gale StevensEmail: [email protected]

$70,000Aptos

Plan Issuer:

CW REPAIR & REPLACE WATER DISTRIBUTION P1-3

B18-06Contract #:

Page 56: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

NEW

408-321-7189SCVTA -Santa Clara Valley Transportation Authority

Prebid Conf:

Addenda:

5/18/18 2:00 PM

0

18-01158

5/3 at 10AM (3331 N. First St., San Jose)

One-year contract for rail grinding services.

Project Contact: Florante TanadaEmail: [email protected]

Santa Clara County

Plan Issuer:

SCOL50

MAINTENANCE SERVICE CONTRACT FOR RAIL GRINDING - SCVTA

M18057Contract #:

Request forProposal

NEW

000-000-0000Judicial Council of California

Prebid Conf:

Addenda:

5/18/18 2:00 PM

0

18-00008

4/27 at 11AM (Pre-Proposal Teleconference (Optional) 1-877-820-7831 P/C 692309)

The Judicial Council of California (“Judicial Council”), chaired by the Chief Justice of California, is the primary policy making body ofthe California judicial system. The Security Operations unit, within the office of Facilities Services, provides certain security services tothe Superior Courts of California, including services related to electronic security systems.

The Judicial Council, through this Request for Proposal (“RFP”) is soliciting Proposals from Firm(s) with expertise in complex electronicsecurity systems consultation to provide consultation services necessary to evaluate the condition of and provide recommendationsand options for refreshment or replacement of electronic security systems in court facilities throughout California. The responsible partyshall be licensed to do business in California. All work shall be performed under and approved by an established, qualified andexperienced representative firm. Firm team shall be comprised of staff familiar with electronic security systems including but notlimited to: security video, electronic access control, intercom, and wireless duress systems. Firm shall be familiar with the integrationof the security systems described above. The purpose of this RFP is to gather information, and will not result in any award(s) fordesign, installation or refreshing of the systems being evaluated.

Questions regarding the RFP should be submitted in writing to the Judicial Council of California [email protected] on May 4, 2018, by end of business day.

Proposals must be received by no later than 2:00 p.m. (Pacific Time) on May 18, 2018.

Hard copies of proposals must be delivered to:Judicial Council of CaliforniaAttn.: Lenore Fraga-Roberts455 Golden Gate Avenue, 6th FloorSan Francisco, CA 94102

Various Counties

Plan Issuer:

RFP CONSULTATION SERVICES FOR ELECTRONIC SECURITY SYSTEMS EVALUATIONS

RFP-FS-2018-02-JP-Security-Systems-Evaluation

Contract #:

School

NEW

650-306-8870650-369-1411Sequoia Union High School District

Prebid Conf:

Addenda:

5/18/18 2:00 PM

0

18-01154

MAND 5/2 at 10AM

Provide lease-leaseback construction services for the District’s Sequoia High School Media Center Renovations project and theSequoia High School Multi-Use Room (“MUR”) Food Service Renovation project.

Project Contact: Usha NarayamEmail: [email protected]

Redwood City

Plan Issuer:

SCOL41

RFP FOR LEASE-LEASEBACK (LLB) SERVICES FOR SEQUOIA HIGH SCHOOL MEDIA CENTERRENOVATIONS & MULTI-USE (MUR) FOOD SERVICE RENOVATION - SUHSD

Page 57: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Monday, May 21, 2018

Public Works

NEW

925-229-7100CCCSD-Central Contra Costa Sanitary District

Prebid Conf:

Addenda:

5/21/18 2:00 PM

0

18-01180

5/8 at 10AM (meet at 5019 Imhoff Pl, District Board Meeting Rm, Martinez)

Div 1 & 2. The Work generally consists of CIPP lining, as needed, over a two-year period, of sewer pipe in varied lengths ranging indiameter from 8-inch to 15-inch pipe, reinstating of laterals, ferreting and CCTV. In addition, the work includes ten (10) required CIPPlining sites to be completed within 90 days from the Notice to Proceed.

Questions: Damasio Zepeda Aragon at (925) 229-7332, or by email at: [email protected]

$350,000Contra Costa County

Plan Issuer:

CURED-IN-PLACE PIPE (CIPP) CONTRACT 2018-2020

8441Contract #:

School

NEW

Prebid Conf:

Addenda:

5/21/18 2:00 PM

0

18-01148

MAND 4/27 @ 9am- site

Construction of a new Outdoor Learning Center in the central area of the existing campus. Remove portions of the existing concretewalks and install new walks compliant with accessibility codes. Construction of a concrete paver, tiered area with cast in placeconcrete elements and an outdoor secure markerboard. Install and connect all underground utilities and all other required elements toprovide a fully functioning learning area.

PREVAILING WAGE

Project Contact: Cindy NaberEmail: [email protected]

Oceano

FAIRGROVE ELEMENTARY OUTDOOR LEARNING CENTER/SITE WORK

Project No.0429/Bid No. 17-19

Contract #:

School

NEW

925-370-6517925-299-6959Contra Costa Community College Dist-Jovan Esprit [email protected]

Prebid Conf:

to

Addenda:

5/21/18 2:00 PM

0

18-01195

MAND 5/4 at 11AM (meet in Room PS2 20)

This Project is a public works project and is subject to Prevailing Wage rate laws.

In general, the Work consists of application of a fluid applied membrane, installation of new tapered insulation, installation of a modifiedbitumen roof system and single-ply modified bitumen roof system as shown on the L-527 College Complex Sector 13 RoofReplacement Drawings and Specifications prepared by Steelhead Engineering. Refer to Terracon hazardous material report dated8/28/15 regarding existing roof and Salas O’Brien Air Handling Unit Replacement drawings for reference. Demolition work will becompleted by others. Roof must be protected from water intrusion during adverse weather conditions. Work to be coordinated withmechanical contractor and be substantially complete by July 9, 2018 to allow completion of mechanical work. The Project is located atLos Medanos College, 2700 East Leland Road, Pittsburg, CA.

All questions related to this Project are to be directed in writing, no later than May 9, 2018 prior to 2PM for any addenda to be issuedby Jovan Esprit, Contracts Manager, Contra Costa Community College District.Email: [email protected]; COPY: [email protected] AND [email protected]

$150,000$125,000Pittsburg

Plan Issuer:

L-527 COLLEGE COMPLEX SECTOR 13 ROOF REPLACEMENT AT LOS MEDANOS COLLEGE

L-527Contract #:

School

NEW

Prebid Conf:

Addenda:

5/21/18 2:00 PM

0

18-01152

MAND 4/27 @ 10:30am- site

Construction of a new asphalt paved playground on the upper lawn area of the site and a new concrete paver Outdoor Learning Centerand associated drainage and landscaping. Install a new 8’-0” high chain link fence on the west side of the new playground and OLC.Install a new concrete access ramp to comply with current access codes. Install and connect all underground utilities and all otherrequired elements to provide a fully functioning learning area.

PREVAILING WAGE

Project Contact: Cindy NaberEmail: [email protected]

Arroyo Grande

OCEAN VIEW ELEMENTARY OUTDOOR LEARNING CENTER/ASPHALT COURT

Project No.0455/Bid No. 17-20

Contract #:

Page 58: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Tuesday, May 22, 2018

Public Works

NEW

805-473-5444City of Arroyo Grande [email protected]

Prebid Conf:

Addenda:

5/22/18 2:00 PM

0

18-01179

5/10 @ 2pm- 1375 Ash Street, Arroyo Grande

In general the project consists of asphalt repairs, including: cold planning, Hot Mix Asphalt (HMA) paving, striping, traffic control andrelated items of work as shown on the plans, as specified in the Standard Specifications and these special provisions, and as directedby the Engineer.

PREVAILING WAGE

Project Manager: Jill McPeek at (805) 473-5444

$885,200Arroyo Grande

Plan Issuer:

2018 STREET REPAIRS

2018-04Contract #:

School

NEW

650-306-8870650-369-1411Sequoia Union High School District

Prebid Conf:

Addenda:

5/22/18 2:00 PM

0

18-01186

MAND 5/3 (no time given)

Selective demolition and renovation of the existing Ceramics Classroom C-14.

Project Contact:Salom SamadEmail: [email protected]

Redwood City

Plan Issuer:

SCOL61

CERAMICS CLASSROOM RENOVATION WOODSIDE HIGH SCHOOL - SEQUOIA UNION HIGH SCHOOLDISTRICT

School

NEW

Prebid Conf:

Addenda:

5/22/18 2:00 PM

0

18-01127

MAND 4/26 @ 9am- site

LMUSD Groundwater Recovery Project (DROPS). Replace approximately 5,400 square feet of asphalt with permeable interlockingpavers, install approximately 3,100 square feet of combined bio-retention basins and rain gardens.

PREVAILING WAGE

Project Contact: Cindy NaberEmail: [email protected]

Oceano

DROPS GRANT AT OCEANO ELEMENTARY

Bid 17-22/Project17199

Contract #:

Public Works

NEW

415-289-4180City Of Sausalito, DPW

Prebid Conf:

Addenda:

5/22/18 2:00 PM

0

18-01132

4/25 at 10AM (meet at 420 Litho St., City Hall Council Chambers, Sausalito)

Div 5-6, 26 & 31-33. The Project is located east of Bridgeway between Napa and Locust Street and is described as follows: Work shallinclude demolition of existing park features, grading of site, installation of underground utilities and site lighting, new parking lot andwalkways, shoreline access area, foundations for the restroom and trash enclosure structures, bike racks and removable bollards,placement of planting soil, installation of partial irrigation, and hydroseeding the finish-graded disturbed soils to protect against rainyseason erosion and prepare the site for a subsequent phase of planting and finish irrigation elements.

All bid questions must be in writing and can be emailed to Andrew Davidson at: [email protected]

$2,400,000Sausalito

Plan Issuer:

DUNPHY PARK IMPROVEMENT PROJECT

Page 59: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

School

408-239-8807408-270-6431San Jose Evergreen Community College [email protected]

Prebid Conf:

Addenda:

5/22/18 2:00 PM

0

18-01119

MAND 5/4 at 10AM (Parking Lot 5)

The Project entails Repairs and renovations to the student cafeteria and study spaces to improve student service functions. Thedesigns will include reorganization of the space, electrical improvements, interior finishing upgrades and lighting improvements forstudent collaboration space. Contractor must coordinate its work with a scheduled power shut-down, as well as ongoing day-to-dayoperations of an active school site.

Project Contact: Mark Miller at 408-531-6194Email: [email protected]

$640,000San Jose

Plan Issuer:

Bidders:

SCOL12

GULLO STUDENT SPACE REPURPOSE & RENOVATION EVERGREEN VALLEY COLLEGE (EVC)

G2010.0188Contract #:

Ph:Cal Pacific Construction General Contractor 415-824-8871 650-557-1239Fax:

School

NEW

Prebid Conf:

Addenda:

5/22/18 2:00 PM

0

18-01128

MAND 4/25 @ 9am- site

The Project consists of the General Contractor to install utilities, slab on grade including embed plates per plans provided by JTSModulars Inc. General Contractor to provide all work shown on the plans exclusive of buildings, mechanical systems, and carpeting.

PREVAILING WAGE

Project Contact: Cindy NaberEmail: [email protected]

Arroyo Grande

HARLOE ELEMENTARY SCHOOL CLASSROOM BUILDINGS

Project No.0403/Bid No. 17-18

Contract #:

School

NEW

Prebid Conf:

Addenda:

5/22/18 2:00 PM

1

18-01138

MAND 4/24 @ 9am- site

The Project consists of the General Contractor to install utilities, slab on grade including embed plates per plans provided by JTSModulars Inc. General Contractor to provide all work shown on the plans exclusive of buildings, mechanical systems, and carpeting.

PREVAILING WAGE

Project Contact: Cindy NaberEmail: [email protected]

Oceano

OCEANO ELEMENTARY SCHOOL NEW CLASSROOMS

Project No.0407/Bid No. 17-17

Contract #:

Public Works

650-752-0541Town of Atherton - DPW

Prebid Conf:

Addenda:

5/22/18 2:00 PM

1

18-00829

MAND 4/5 at 10AM

Demolishing the existing Administration/Police Department (PD) buildings (fixed and modular), PD garage, Library, renovation of thehistoric Town Hall, building, a Town Hall, Library, site improvements and removing, realigning and rebuilding sections of the existingAshfield Road and Station Lane.

Atherton

Plan Issuer:

Bidders:

SCOL83

TOWN CENTER PROJECT

54015Contract #:

Ph:C. Overaa & Co. General Contractor 510-234-0926 510-237-2435Fax:

Ph:Hensel Phelps Construction General Contractor 408-452-1800 408-452-1855Fax:

Ph:Lathrop Construction Assoc. General Contractor 707-746-8000 707-746-8080Fax:

Ph:Swinerton Builders General Contractor 415-617-1467 415-984-1204Fax:

Ph:Thompson Builders Corp. General Contractor 415-456-8972 415-459-0665Fax:

Ph:XL Construction General Contractor 916-282-2900 916-282-2901Fax:

Page 60: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

650-829-6652City of South San Francisco - Engineering

Prebid Conf:

Addenda:

5/22/18 2:00 PM

1

18-01004

4/24 at 10AM

Traffic control; excavation; removals; hot mix asphalt paving; slurry seal; concrete curb, gutter, and paving; pervious concrete paving;signing and striping; utility adjustments; storm drainage modifications; bioretention planting and irrigation; and signal and lightingmodifications.

$44,000,000South San Francisco

Plan Issuer:

Bidders:

SCOL114

WATER QUALITY CONTROL PLANT WET WEATHER & DIGESTER IMPROVEMENTS PROJECT

ST1403/ST1502Contract #:

Ph:GSE Construction Co. Inc. General Contractor 925-447-0292 925-447-0962Fax:

School

NEW

510-537-3000Castro Valley Unified School District , Facilities

Prebid Conf:

Addenda:

5/22/18 3:00 PM

0

18-01130

MAND 5/1 & 5/9 at 3PM Canyon Middle School 19600 Cull Canyon Road CastroValley

Modernization of Canyon Middle School see specs for complete scope of work.

Electronic documents from Facilities Office of the District, direct to [email protected]

Castro Valley

Plan Issuer:

SCOL6

CVUSD CANYON MIDDLE SCHOOL PHASE 1 & 2 MODERNIZATION PROJECT RE-BID

G 42-17/18Contract #:

Public Works

NEW

510-577-3428City of San Leandro - Engineering

Addenda:

5/22/18 3:00 PM

0

18-01134

Replacing the current Operations Shop (metal building) with an upgraded and complete metal building.

Project Contact: Julie JenkensEmails: [email protected]

San Leandro

Plan Issuer:

SCOL3

WATER POLLUTION CONTROL PLANT (WPCP) OPERATIONS SHOP UPGRADE

17-18.047Contract #:

Wednesday, May 23, 2018

Public Works

NEW

650-522-7300City of San Mateo - DPW

Addenda:

5/23/18 2:00 PM

0

18-01150

Remove and replace concrete sidewalk.

Project Contact: Otis Chan 650-522-7305

$500,000San Mateo

Plan Issuer:

2017-18 SIDEWALK REPAIR PROJECT

463231Contract #:

Public Works

NEW

650-593-3762650-573-3700County of San Mateo

Addenda:

5/23/18 2:00 PM

0

18-01187

Crack sealing, pavement repair, and placing either a cape or slurry seal on various streets in the El Granada, Montara, Princeton bythe Sea, La Honda, Emerald Lake Hills, Oak Knoll Manor, Palomar Park, and District 4 areas.

Project Contact: Alex Zhang 650-599-1411Email: [email protected]

$1,370,000San Mateo County

Plan Issuer:

SCOL31

2018 COUNTYWIDE CAPE & SLURRY SEAL PROJECT

RW804Contract #:

Public Works

408-630-3088SCVWD- Santa Clara Valley Water District

Prebid Conf:

to

Addenda:

5/23/18 2:00 PM

1

18-01091

MAND 4/26 at 10AM (Cypress Pavilion)

Please refer to specifications for complete scope of work.

$6,000,000$4,700,000San Jose

Plan Issuer:

Bidders:

SCOL58

CUNNINGHAM FLOOD DETENTION CERTIFICATION PROJECT- SCVWD

C0641Contract #:

Ph:Granite Rock Company General Contractor 408-574-1400 408-365-9548Fax:

Page 61: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

650-375-7444Town of Hillsborough - DPW

Addenda:

5/23/18 2:00 PM

0

18-01112

This Project includes construction of cleaning and CCTV/Video inspection of sanitary sewer mainline segments within two sanitarysewer drainage sub-basins within the Town of Hillsborough, including manhole inspections of both the upstream and downstreammanhole of the selected segment. The video inspection equipment must be able to maneuver in four inch pipes and larger. The pipesegments are to be cleaned by the contractor before inspecting them. There may be inherent conditions requiring multiple attempts toinspect and/or attempts from both ends. Some of the access manholes are in the street, while others are in landscaped or unimprovedeasements across private property (owners are required to allow crews to access public facilities within easements).

Hillsborough

Plan Issuer:

SCOL72

FY17-18 VIDEO INSPECTION & SANITARY SEWER CLEANING PROJECT

602.47Contract #:

Public Works

NEW

650-375-7444Town of Hillsborough - DPW

Prebid Conf:

Addenda:

5/23/18 2:00 PM

0

18-01151

None

Replacing approximately 719 traffic regulatory signs, 462 warning signs and 17 guide signs on existing poles; replacing damaged signposts on an as-needed basis; installing approximately 42 new sign posts with traffic warning and regulatory signs in six schoollocations

Hillsborough

Plan Issuer:

SCOL2

SIGN INVENTORY REPLACEMENT PROJECT VARIOUS LOCATIONS

State-Federal

Prebid Conf:

Addenda:

5/23/18 2:00 PM

0

18-01110

MAND 5/9 @ 10am- 10333 El Camino Real, Atascadero

Project comprises labor, material and services necessary for: Demolition, fire sprinklers, fire alarms, doors, plumbing, HVAC, fixtures,toilets, beds, concrete, electrical raceway, wiring, cable, and related work.

Project Contact: Nathan HigginsEmail: [email protected]

$6,000,000Atascadero

Bidders:

STATEWIDE ENHANCED TREATMENT UNITS AT ATASCADERO STATE HOSPITAL

137497AContract #:

Ph:Silverstrand Construction General Contractor 858-444-1974 858-369-7971Fax:

Public Works

NEW

831-454-2710831-454-2210County of Santa Cruz

Prebid Conf:

Addenda:

5/23/18 2:30 PM

0

18-01155

5/9 @ 10am- site

This project is for licensed contractors with a Type B, General Building Contractor license to remove and replace with new existingsiding, windows, trim, gutters and down spouts. Also, replace interior affected wall coverings and paint.

PREVAILING WAGE

Questions: Scott Moats at 831-454-5497

$170,000Santa Cruz

Plan Issuer:

1070 EMELINE SIDING AND WINDOW REPLACEMENT - REBID

16C1-010Contract #:

Thursday, May 24, 2018

Public Works

NEW

415-551-4603City & Co of San Francisco - Utilities

Prebid Conf:

Addenda:

5/24/18 2:00 PM

0

18-01133

5/8 at 10AM (meet at 3801 3rd St.,,Ste 600 Main Conf Rm, SF CA)

The objective of the Project is to provide as-needed sewer cleaning and inspection at locations to be determined within the City of SanFrancisco.

Questions: Contract Services at (415) 551-4603, or by email at: [email protected]

$2,100,000San Francisco

Plan Issuer:

AS-NEEDED SEWER CLEANING AND INSPECTION (FY19)

WW-676Contract #:

Page 62: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Commercial

916-630-4982916-630-7200Tilton Pacific Construction

Prebid Conf:

Addenda:

5/24/18 2:00 PM

3

18-01060

4/19 at 11AM (Job Walk)

Tenant improvement

Milpitas

Plan Issuer:

Bidders:

SCOL120

BIG AL'S

Ph:Tilton Pacific Construction General Contractor 916-630-7200 916-630-4982Fax:

Public Works

NEW

510-544-2301East Bay Regional Parks District-EBRPD

Prebid Conf:

Addenda:

5/24/18 2:00 PM

0

18-01203

5/8 at 11AM

Div 1-2, 5, 9 & 11. Rehabilitate a boat launch facility composed of: replace, remove and dispose of existing floating docks, raisedwood walkway, aluminum transition plate, fishing dock, and four timber piles; and fabricate and install new boarding docks, new fishingpier dock, and two new steel piles, including all incidentals and appurtenant items as shown on the Plans and specified herein.

All questions during bidding must be emailed before 5PM on Monday, May 14, 2018. If necessary, responses will be included in anaddendum. Send questions to: Marvin Yee at: [email protected]

$225,000Antioch

Plan Issuer:

CONTRA LOMA REGIONAL PARK BOAT LAUNCH FACILITY IMPROVEMENTS (PHASE 2)

520300Contract #:

Public Works

415-551-4603City & Co of San Francisco - Utilities

Prebid Conf:

Addenda:

5/24/18 2:00 PM

5

18-00981

4/17 at 10AM (meet at 525 Golden Gate Ave, 3rd Fl Tuolumne Conf Rm, SF)

Div 1-5, 7-11, 22-23, 26, 28, 31-33, 40-41 & 43. The objective of the Project is to demolish the existing pump station and reconstructthe Mariposa Street Wastewater Dry Weather Pump Station Building, wet-well, electrical services, and the associated appurtenances.

Questions: Contract Services at (415) 551-4603, or by email at: [email protected]

$16,200,000San Francisco

Plan Issuer:

Bidders:

MARIPOSA DRY WEATHER PUMP STATION IMPROVEMENTS

WW-667Contract #:

Ph:Blocka Construction Inc. General Contractor 510-657-3686 510-657-3688Fax:

Ph:JMB Construction, Inc. General Contractor 650-267-5300 650-267-5302Fax:

Ph:Kiewit Infrastructure West Co General Contractor 707-439-7300 707-439-7301Fax:

Ph:Monterey Mechanical Co. General Contractor 510-632-3173 510-632-0761Fax:

Ph:NTK Construction Inc. General Contractor 415-643-1900 415-643-1300Fax:

Ph:Proven Management General Contractor 510-671-0000 510-671-1000Fax:

Ph:Rubecon General Contracting General Contractor 415-206-7740 415-206-1750Fax:

Ph:Shimmick Construction Co. Inc. General Contractor 510-777-5000 510-777-5099Fax:

Public Works

NEW

831-420-5161831-420-5428City of Santa Cruz [email protected]

Addenda:

5/24/18 2:00 PM

0

18-01125

The work to be done in general consists of removing existing headwall and wood fencing at the upstream end of the culvert and steelrailing atop the downstream end- wall. Minor grading to reform approximately 25 feet of drainage channel upstream of new culvert inletincluding installation of post-construction erosion control measures and basic landscaping. Installation of angled pipe extension,construction of reinforced concrete headwall, fabrication/installation ofsteel pedestrian handrail, and installation of traffic rated guardrail bordering both sides of the street.

Project Contact: Steve WolfmanEmail: [email protected]

$70,000Santa Cruz

Plan Issuer:

Bidders:

PARK WAY & ALLERTON STREET STORM DRAIN DISASTER REPAIRS

Ph:South Bay Grading General Contractor 408-691-6766 000-000-0000Fax:

Page 63: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

NEW

925-284-1951City of Lafayette Engng

Addenda:

5/24/18 2:00 PM

0

18-01194

Provide general and landscape maintenance, including but not limited to scheduled landscape maintenance and irrigation maintenanceand repair services, storm drain and ditch cleaning, minor sidewalk and road repairs, pathway maintenance, tree maintenance, weedcontrol, stormwater pollution prevention activities and required reporting, unanticipated or additional related work as directed by theCity, and emergency response and emergency work as needed. Additional information is shown and described in the Request forProposal (RFP) package.

Questions: Donna Feehan, Public Works Manager, at: [email protected] or at (925) 935-1238.

$700,000Lafayette

Plan Issuer:

RFP GENERAL AND LANDSCAPE MAINTENANCE

School

NEW

Prebid Conf:

Addenda:

5/24/18 2:00 PM

1

18-01126

MAND 5/1 @ 3pm- site

Project consists of: Site Demo; Selective Building Demo; Concrete; Structural Steel and Misc Iron; Metal Stairs; Metal Railings;Thermoplastic Sheet Waterproofing; Joint Sealers; Expansion Joint Covers; Aluminum Windows; Glass Glazing; Lath and Plaster;Painting; Mechanical General; Plumbing; HVAC; Electrical; Structured Cabling; Fire Alarm System Exiting; Earthwork; ExteriorImprovements; Utilities.

PREVAILING WAGE

Project Contact: Tom MillmanEmail: [email protected]

Seaside

SEASIDE HIGH SCHOOL CORROSION REPAIR

Public Works

NEW

925-875-2245Dublin San Ramon Services District

Addenda:

5/24/18 2:00 PM

0

18-01144

Installation of Cured-in-place (CIPP) for sectional point repairs within sanitary sewers.

Project Contact: Jackie YeeEmail: [email protected]

$125,000Dublin

Plan Issuer:

SCOL32

SEWER COLLECTION SYSTEM CURE-IN-PLACE PIPE SPOT REPAIR - DUBLIN SAN RAMON SERVICESDISTRICT (DSRSD)

CIP 16-S034Contract #:

Public Works

NEW

650-593-3762650-573-3700County of San Mateo

Addenda:

5/24/18 2:30 PM

0

18-01192

The Work to be done consists, in general, of the repair of Madera Lane Bridge over El Corte De Madera Creek: Replace exteriorconcrete girders, patch spalled concrete, construct polyester concrete overlay, regrade and pave the roadway approaches, andreplace bridge and approach railings for 60 foot long, 21 foot wide reinforced concrete T-beam bridge, as well as any other items anddetails not mentioned above, but required by the Project Plans, Standard Specifications and these Special Provisions, and thedirections of the Engineer.

Project Contact: Anthony Lum 650-599-1491Email: [email protected]

$720,000San Mateo County

Plan Issuer:

SCOL34

PREVENTATIVE MAINTENANCE MADERA LANE BRIDGE - SAN GREGORIO AREA

RM102Contract #:

Public Works

NEW

650-947-2780City of Los Altos - Engineering

Addenda:

5/24/18 4:00 PM

0

18-01205

Replace the existing wooden bridge material to improve the condition of the bridge.

Los Altos

Plan Issuer:

SCOL21

RFP ENGINEERING SERVICES FOR FREMONT AVENUE PEDESTRIAN BRIDGE REHABILITATION

TS-01055Contract #:

Page 64: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Monday, May 28, 2018

Public

707-285-8256Sonoma-Marin Area Rail Transit [email protected]

Addenda:

5/28/18 2:00 PM

0

18-00005

SMART is soliciting qualified submittals for Transit-Oriented Development on its +/- 5.4-acre property at Railroad Square in SantaRosa, CA.

The Sonoma-Marin Area Rail Transit District (SMART) is seeking submittals for Transit-Oriented Development (TOD) on its +/- 5.4acre property at Railroad Square in Santa Rosa. Following the review of submittals, SMART will select one or more developmentteams with which to negotiate and enter into an exclusive negotiating agreement (ENA) to develop the site.

The Transit Oriented Development project and goals are characterized by a development that is physically and functionally integratedwith the transit facility; enhances surrounding area connections to transit stations; provides residential, commercial and/or mixed-usedevelopment, including housing and convenience goods and services with office space possibly included in the mix; promotes andenhances ridership; expands sales and local tax base, sales and income tax base; and generally encourages revitalization the transitstation area and community.

This Solicitation is intended to establish a short list of qualified developers who possess demonstrated expertise and experience insimilar TOD projects and who have the development capacity and financial strength to expeditiously develop the SMART property.Once the short list is established, SMART will review the submittals and thereafter may in, its sole discretion, enter into an ExclusiveNegotiating Agreement (ENA) with the selected developer. SMART is open to the consideration of a variety of project sizes, structuresand business arrangements, including but not limited to: development contracts; long-term ground and facility leases; sale of feeinterests and/or a combination of arrangements. The intent of this Solicitation is to garner development concepts that may determinethe nature, scope and specifics of ENA.

View and Download Solicitation Documents at:http://sonomamarintrain.org/railroad-square-project

Email Questions To: [email protected];

Santa Rosa

Plan Issuer:

SMART TRANSIT ORIENTED DEVELOPMENT AT RAILROAD SQUARE

OT-PS-18-001Contract #:

Tuesday, May 29, 2018

Public Works

510-464-6544BART-Bay Area Rapid Transit District

Prebid Conf:

to

Addenda:

5/29/18 2:00 PM

3

18-00893

4/24 at 9AM (meet at District's Offices, 300 Lakeside Dr, Conf Rm 1700, Oakland)

Div 1-7, 9, 20, 27, 34, 41. The Work shall include providing all materials, labor, supervision, hardware, tools, equipment, andappurtenances necessary for the upgrading of BART's 34.5 kiloVolt (kV) subtransmission system. The Work involves upgrading of the34.5 kV system that includes replacement and installation of sections of34.5 kV feeder cable circuits (MLC and MRC circuits), on M2and MI tracks between MVS Switching Station, MTF, MSS, MCC, MPS, MMS and MTW Substations as described in ContractSpecifications Section 01 11 00 Summary of Work.

Questions: Sunni Gunawardena, or by email at: [email protected]

$51,000,000$46,000,000Various

Plan Issuer:

34.5 KV CABLE REPLACEMENT M-LINE MVS SWITCHING STATION & MTF, MSS, MPS & MTWSUBSTATIONS - BART #15EJ-171

15EJ-171Contract #:

Wednesday, May 30, 2018

Public Works

NEW

000-000-0000650-306-4105Port of Redwood City

Prebid Conf:

Addenda:

5/30/18 10:00 AM

0

18-01197

MAND 5/9 at 10AM (Admin Bldg)

Demolition and removal of existing walkway an ramp, and construction of new concretewalkway and ramp, demolition and removal of several items in the bathroom and installation of new items for ADA compliant restroom,such as water closet, shower, lavatory, urinal, toilet partition with door, laminate folding counter, steel stud wall, painting andassociated components.

Project Contact: Donald SnamanEmail: [email protected]

$135,000Redwood City

Plan Issuer:

SCOL16

C-DOCK RESTROOM PROJECT- PORT OF REDWOOD CITY

Page 65: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Commercial

831-372-1644831-521-0131Murrer Construction, Inc. [email protected]

Prebid Conf:

Addenda:

5/30/18 11:00 AM

0

18-01069

MAND 5/9 @ 11am- site

Bid opening will occur at the Community Human Services office located at 2560 Garden Road #201B, Monterey.

Remodel downstairs bathroom for ADA compliance - including enlarging door/Remodel upstairs and downstairs kitchens with newcounter tops, sink, faucets, and install new exhaust hood at first floor with new ADA cabinet, as well as associated work to bring areaof work to code/Street POC to fire protection riser/Electrical service sub-panel relocation and panel upgrade including dryer forincreased loads/Comply with items as noted in report by S-Tech Consulting dated November 28th, 2017 - concluded that all demolitionmust be performed under containment/Remove, replace and reuse existing ceiling systems as needed to install fire sprinkler. Installbuilding interior fire sprinkler system. Install a monitored fire alarm system/Remove existing chimney/match finishes as close aspossible/Replace stair handrails at two exit stairs - one interior, one exterior/Replace (2) two windows with anodized flush fin retrofitcasement windows.Trades requesting bids for: Demolition/Abatement, Rough Finish Carpentry, Drywall, Acoustical Ceiling, Fry Toilet Accessories,Counter Tops, Doors and Hardware, Glazing, Painting, Flooring, Plumbing, Electrical, Fire Sprinkler Systems.

DBE

Construction Manager: Murrer ConstructionPhone: 831-521-0131Plans & Specs available for review at 1219 Forest Ave. Ste H, Pacific Grove, CA

$165,000Monterey

Plan Issuer:

Bidders:

SAFE PLACE SHELTER - PHASE 2

Ph:Silcon, Inc./Silverie Properties General Contractor 831-274-2518 831-274-2519Fax:

School

NEW

415-565-4605Hastings College Of Law, Purchasing

Prebid Conf:

Addenda:

5/30/18 4:00 PM

0

18-01191

MAND 5/8 at 11AM

Invitation to Bid #78-0190 is to furnish all labor and materials to complete the necessary Tenant Improvements for the University ofCalifornia, Hastings College of Law. The 200 McAllister 6th Floor Tenant Improvements Project will be performed at one (1) building ofHastings College of Law campus. It is located at 200 McAllister Street, San Francisco, California. Work on the Project must be inaccordance with the engineering Drawings and Specifications.

San Francisco

Plan Issuer:

200 MCALLISTER 6TH FLOOR TENANT IMPROVEMENTS - UC HASTINGS COLLEGE OF LAW

78-0190Contract #:

Thursday, May 31, 2018

Public Works

NEW

650-853-3100City of East Palo Alto - DPW

Prebid Conf:

Addenda:

5/31/18 2:00 PM

0

18-01143

5/7 at 2PM

Construction of remaining work of phase 2 which consists of street lighting along entry road of Cooley Landing, remaining work ofphase 3 of the prefabricated restrooms and trash enclosures, phase 4 consisting of outdoor classroom, picnic area, and extension ofmain pathways, and finally phase 5 consisting of secondary trails, seating areas, and interpretive signage.

Project Contact: Fanny YuEmail: [email protected]

East Palo Alto

Plan Issuer:

SCOL23

COOLEY LANDING PARK PHASE 4 & 5

CIP-PK-01Contract #:

Page 66: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Public Works

NEW

415-551-4603City & Co of San Francisco - Utilities

Prebid Conf:

to

Addenda:

5/31/18 2:00 PM

0

18-01139

5/1 at 10AM (meet at Bldg 930, 2nd Fl OSP Conf Rm, San Francisco)

Div 1, 3, 5-10, 21-23, 26-27, 31, 33, 40, 42-43 & 48. The objective of the Project is to sequentially remove, replace, and upgrade theexisting deficient and deteriorated digester biogas internal combustion cogeneration systems at the Oceanside Water Pollution ControlPlant (OSP). OSP must remain in operation during the contract work so, detailed construction activity sequencing, temporary powercabling, and temporary process equipment have been included as part of the contract work. The contract improvement work alsoincludes: selective demolition; civil work (site excavation, yard piping/utilities, paving restoration); hazardous material mitigation;architectural work; structural work; mechanical work (digester biogas gas conditioning and storage, compressor equipment, heatexchanger and pump assemblies, exhaust gas conditioning systems, the relocation of dual gas fueled boiler assemblies, retrofit andextension of the mechanical biogas, No. 3 water, compressed air, commercially supplied (PG&E) natural gas and plant hot water pipesystems, and installation of above ground diesel fuel tank); electrical work (electrical power system upgrades, new motor control centerand electrical substation, lighting system upgrades, packaged stand-by diesel engine generator assembly, diesel fuel leak monitoringsystem, and modification of the fixed gas monitoring system); instrumentation & controls work; and, start-up testing andcommissioning.

$36,300,000$30,500,000San Francisco

Plan Issuer:

OCEANSIDE WATER POLLUTION CONTROL PLANT DIGESTER GAS UTILIZATION UPGRADES

WW-639Contract #:

Tuesday, June 05, 2018

RFP / RFQ /SOQ

NEW

805-781-7198805-781-7200City of San Luis Obispo

Prebid Conf:

Addenda:

6/5/18 2:00 PM

0

18-01160

5/8 @ 10am- 25 Prado Road, San Luis Obispo

The City of San Luis Obispo is requesting sealed Statements of Qualification from Control Systems Integration Subcontractors for theCity’s Water Resource Recovery Facility Project. The City has determined that all general contractors, electrical subcontractors, andcontrol systems integrators interested in bidding on this Project must be prequalified prior to submitting a bid. Candidates with a provenrecord as a control systems integrator and substantial experience as a supplier/integrator of real-time computer data acquisition,control and communication systems utilized on large scale municipal wastewater, recycled water, or potable water treatment plantconstruction are invited to participate in the prequalification process. Candidates must complete the prequalification package and bedeemed prequalified by City to be eligible to submit bids for the control systems integration scope of the Project to prequalified generalcontractors.

Project Manager: Justin PickardEmail: [email protected]

San Luis Obispo

Plan Issuer:

CONTROL SYSTEMS INTEGRATION SUBCONTRACTORS FOR WATER RESOURCE RECOVERYFACILITY

91363CSContract #:

RFP / RFQ /SOQ

NEW

805-781-7198805-781-7200City of San Luis Obispo

Prebid Conf:

Addenda:

6/5/18 2:00 PM

0

18-01161

5/8 @ 10am- 25 Prado Road, San Luis Obispo

The City of San Luis Obispo is requesting sealed Statements of Qualification from Electrical Subcontractors for the City’s WaterResource Recovery Facility Project. The City has determined that electrical subcontractors interested in bidding on this Project mustbe prequalified prior to submitting a bid (to general contractors). Electrical subcontractors specifically experienced with large-scalemunicipal wastewater, recycled water, or potable water treatment plant construction are invited to participate in the prequalificationprocess. Candidates must complete the prequalification package and be deemed prequalified by City to be eligible to submit bids forthe electrical scope of the Project to prequalified general contractors.

Project Manager: Justin PickardEmail: [email protected]

San Luis Obispo

Plan Issuer:

ELECTRICAL SUBCONTRACTORS FOR WATER RESOURCE RECOVERY FACILITY

91363ESContract #:

Page 67: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

RFP / RFQ /SOQ

NEW

805-781-7198805-781-7200City of San Luis Obispo

Prebid Conf:

Addenda:

6/5/18 2:00 PM

0

18-01162

5/8 @ 10am- 25 Prado Road, San Luis Obispo

The City of San Luis Obispo is requesting sealed Statements of Qualification from General Contractors for the City’s Water ResourceRecovery Facility Project. The City has determined that all general contractors, electrical subcontractors, and control systemsintegrators interested in bidding on this Project must be prequalified prior to submitting a bid. General contractors specificallyexperienced with large-scale municipal wastewater, recycled water, or potable water treatment plant construction are invited toparticipate in the prequalification process. Each general contractor wishing to bid on the contract to construct the Project must fullycomplete the Prequalification Package and provide all information and materials requested and satisfy the prequalification criteria.

Project Manager: Justin PickardEmail: [email protected]

San Luis Obispo

Plan Issuer:

GENERAL CONTRACTORS FOR WATER RESOURCE RECOVERY FACILITY

91363GCContract #:

Public Works

408-993-4600County of Santa Clara - Capital Programs

Prebid Conf:

Addenda:

6/5/18 2:00 PM

1

18-00847

MAND 4/25 at 1PM (Front Lobby)

Video surveillance, electrical work, security electronics, HVAC systems, work station furniture.

Project Contact: Michael Llagan 408-993-4647Email; [email protected]

San Jose

Plan Issuer:

SCOL33

JUVENILE HALL VIDEO SURVEILLANCE & SECURITY SYSTEMS UPGRADE PROJECT

RFP-FAF-FY18-0186

Contract #:

Wednesday, June 06, 2018

Public Works

NEW

408-630-3088SCVWD- Santa Clara Valley Water District

Prebid Conf:

Addenda:

6/6/18 2:00 PM

0

18-01196

MAND 5/9 at 1PM (Intersection of Yuba Dr & Stevens Creek Trail, Mtn View)

Please refer to specifications for complete scope of work.

Santa Clara County

Plan Issuer:

SCOL15

STEVENS CREEK BANK & ACCESS/TRAIL ROAD REPAIR DOWNSTREAM OF EL CAMINO REAL (SR82) PROJECT - SCVWD

C0638Contract #:

Tuesday, June 19, 2018

School

Addenda:

6/19/18 4:00 PM

0

18-01114

By means of this Request for Qualifications (RFQ), the District invites proposals from qualified developers or Developer's Teams(Developer) to plan, design, finance, construct and operate an income-generating proposed Project. The selected proposed Project willbe sited at the District’s North County Campus located at 2800 Buena Vista Drive, Paso Robles, California 93446 pursuant to a longterm revenue-generating ground lease identifying the District as the Lessor and Developer as Lessee. The selected Developer will,upon the Governing Board’s direction, have an opportunity to submit further detailed Project Proposals to the District and its GoverningBoard.

Questions: [email protected]

Paso Robles

RFQ - DEVELOPER OWNED AND OPERATED PROJECT AT CUESTA COLLEGE NORTH COUNTYCAMPUS

Page 68: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Name Bid Date & Time EstimateLocationOPR# Project TypePlan#

Wednesday, June 27, 2018

State-Federal

NEW

Prebid Conf:

Addenda:

6/27/18 1:00 PM

0

18-01171

MAND 5/17 @ 11am- site

This project proposal includes, but is not limited to: the replacement of the existing improvements at the facility, which includes thedemolition of the existing structures and the design and phased construction of a standard 14-bed barracks/messhall (4,093± sf), a 3-bay apparatus building (1,999± sf), administration building (512± sf), a building (400± sf), a vehicle wash rack with treatment/recyclingequipment, a generator/pump/storage building with generator, transfer switch and fuel supply, a hose wash rack, and a fuel storagetank canopy. Also included in the project are: site perimeter fencing and gates, grading and trenching, landscaping, irrigation,approximately 100,000 square feet of paving and flatwork installation of approximately 2280 Lf of 8” sanitary sewer, replacement andconnections for all utilities, curbing, sidewalks, landscaping, appurtenances and demolition of the existing barracks, apparatus buildingand miscellaneous out-buildings, utilities, paving and other associated improvements.

PREVAILING WAGE

Project Contact: Jonathan PikeEmail: [email protected]

Paso Robles

Bidders:

PASO ROBLES FIRE STATION - REPLACE FACILITY

3400MAA07004Contract #:

Ph:Silverstrand Construction General Contractor 858-444-1974 858-369-7971Fax:

Page 69: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Cal Trans Projects BiddingBid Date & Time Location Project TypePlan# Name OPR# Estimate

Tuesday, May 01, 2018

Bidders:

Calpella $2,330,000

Bonded wearing course, widen roadway, guardrail In Mendocino County Near Calpella From 0.1 Mile West Of Cold Creek (#1) BridgeTo Cold Creek (#2) BridgeThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00155

2

2:00 PM5/1/18

Addenda:DOT 01-0E4704 BONDED WEARING COURSE, WIDEN ROADWAY, GUARDRAIL

Cal-Trans

General Contractor Fax: 707-585-1601Office: 707-585-1221Ghilotti Construction Company, Inc.

General Contractor Fax: 707-443-0277Office: 707-443-6371Mercer-Fraser Company

Alameda County $2,010,000

Patch spalls and repair AC approach In Alameda County At Various LocationThe Contractor must have either a Class A license or one of the following Class C licenses: C-8.

18-00205

0

2:00 PM5/1/18

Addenda:DOT 04-2K0104 PATCH SPALLS AND REPAIR AC APPROACH

Cal-Trans

Bidders:

Fresno $1,040,000

Widen ramp and install traffic signal In Fresno County Near Fresno At 0.2 Mile North Of Central Avenue OvercrossingThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-10.

18-00188

1

2:00 PM5/1/18

Addenda:DOT 06-0V5604 WIDEN RAMP AND INSTALL TRAFFIC SIGNAL

Cal-Trans

Supplier Fax: 209-384-2395Office: 209-723-8846Central Valley Concrete, Inc.

Los Angeles $1,120,000

PATCH DECK SPALLS, PLACE METHACRYLATE SEALS, APPROACH SLABS REPAIRS In Los Angeles County In Los Angeles OnRoute 10 From Hoover Street To Los Angeles River Bridge And Overhead And On Route 60 From Los Angels River Bridge AndOverhead To Soto Street OvercrossingThe Contractor must have either a Class A license or one of the following Class C licenses: C-8.

18-00209

0

2:00 PM5/1/18

Addenda:DOT 07-3W2404 PATCH DECK SPALLS, PLACE METHACRYLATE SEALS, APPROACH SLABSREPAIRS

Cal-Trans

Wednesday, May 02, 2018

Bidders:

Vacaville $11,400,000

Cold plane AC pavement and overlay with RHMA-G (BWC) In Solano County In Vacaville From 505/80 Separation To Yolo CountyLineThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12.130 Working Days * DVBE participation incentive up to $250,000 *

18-00206

1

2:00 PM5/2/18

Addenda:DOT 04-3K6704 COLD PLANE AC PAVEMENT AND OVERLAY WITH RHMA-G (BWC)

Cal-Trans

General Contractor Fax: 707-585-1601Office: 707-585-1221Ghilotti Construction Company, Inc.

Sub-Contractor/SpecialtyContractor

Fax: 209-367-0572Office: 209-334-2112Frank C. Alegre Trucking, Inc.

Page 70: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

Fresno County $2,140,000

Concrete polyester overlay and construct approach slabs In Fresno County At Various LocationsThe Contractor must have either a Class A license or one of the following Class C licenses: C-8.

18-00197

1

2:00 PM5/2/18

Addenda:DOT 06-0V4704 CONCRETE POLYESTER OVERLAY AND CONSTRUCT APPROACH SLABS

Cal-Trans

Los Angeles $1,650,000

Bridge Preservation In Los Angeles County In Los Angeles At Route 134/5 SeparationThe Contractor must have either a Class A license or one of the following Class C licenses: C-33.

18-00211

1

2:00 PM5/2/18

Addenda:DOT 07-3W5804 BRIDGE PRESERVATION

Cal-Trans

Riverside County $7,600,000

COLD PLANE, OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (GAP GRADED) In Riverside County From 0.1 Mile South OfMurrieta Hot Springs Road To 0.1 Mile North Of Abelia RoadThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00214

1

2:00 PM5/2/18

Addenda:DOT 08-1F9404 COLD PLANE, OVERLAY WITH RUBBERIZED HOT MIX ASPHALT (GAP GRADED)

Cal-Trans

Thursday, May 03, 2018

Bidders:

Yuba And NevadaCounties

$21,000,000

Curve Realignment and Shoulder Widening In Yuba And Nevada Counties Near Smartsville From 0.5 Mile West Of Mcganney LaneTo Mooney Flat RoadThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00119

4

2:00 PM5/3/18

Addenda:DOT 03-2F5904 CURVE REALIGNMENT AND SHOULDER WIDENING

Cal-Trans

General Contractor Office: 707-742-6016Flatiron

General Contractor Fax: 530-226-6401Office: 530-226-6400Steelhead Constructors Inc.

General Contractor Fax: 530-222-4908Office: 530-222-0810Steve Manning Construction, Inc.

General Contractor Fax: 530-406-4299Office: 530-406-4243Teichert Construction

Bidders:

San Mateo $3,380,000

Cold plane AC pavement and overlay with RHMA-O In San Mateo County Near San Mateo From Pilarcitos Creek Road To Route280/92 SeparationThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00204

2

2:00 PM5/3/18

Addenda:DOT 04-0P6504 COLD PLANE AC PAVEMENT AND OVERLAY WITH RHMA-O

Cal-Trans

General Contractor Fax: 408-327-7090Office: 408-327-7000Granite Construction

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Bardsdale $970,000

MAINTAIN ROADWAY WITH ASPHALT OVERLAY In Ventura County At Bardsdale And In Fillmore From Grimes Canyon Bridge ToRoute 126The Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00210

2

2:00 PM5/3/18

Addenda:DOT 07-3W4304 MAINTAIN ROADWAY WITH ASPHALT OVERLAY

Cal-Trans

Page 71: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

Rancho Palos VerdesAnd Los Angeles

$2,460,000

APPLY SLURRY SEAL TO ROADWAY In Los Angeles County In Rancho Palos Verdes And Los Angeles From Avenida Aprenda ToRoute 213/405 JunctionThe Contractor must have either a Class A license or one of the following Class C licenses: C-12, C-32.

18-00212

1

2:00 PM5/3/18

Addenda:DOT 07-4W0604 APPLY SLURRY SEAL TO ROADWAY

Cal-Trans

Lucerne Valley $2,670,000

CONCRETE OVERLAY In San Bernardino County Near Lucerne Valley At Various Locations From 0.1 Mile South Of Stony RidgeRoad To 0.9 Mile South Of Oakdale AvenueThe Contractor must have either a Class A license or one of the following Class C licenses: C-8, C-12.

18-00215

0

2:00 PM5/3/18

Addenda:DOT 08-1H8004 CONCRETE OVERLAY

Cal-Trans

Tuesday, May 08, 2018

El Dorado And PlacerCounties

$670,000

Replace Crash Cushions In El Dorado And Placer Counties At Various LocationsThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-13, C-32.

18-00217

0

2:00 PM5/8/18

Addenda:DOT 03-0H8604 REPLACE CRASH CUSHIONS

Cal-Trans

Grass Valley $410,000

Superelevation Correction In Nevada County Near Grass Valley At Mother Lode RoadThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00218

0

2:00 PM5/8/18

Addenda:DOT 03-2H0904 SUPERELEVATION CORRECTION

Cal-Trans

San Francisco $530,000

Treat bridge decks with methacrylate and replace joint seals In The City And County Of San Francisco At Various Locations FromThird Street Undercrossing To Cesar Chavez Street UndercrossingThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-61D06.

18-00221

0

2:00 PM5/8/18

Addenda:DOT 04-1K6004 TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALS

Cal-Trans

Fresno $380,000

Construct concrete barrier In Fresno County In Fresno At Southbound On-ramp From Friant RoadThe Contractor must have either a Class A license or one of the following Class C licenses: C-8.

18-00208

0

2:00 PM5/8/18

Addenda:DOT 06-0V2704 CONSTRUCT CONCRETE BARRIER

Cal-Trans

Fresno $1,660,000

PCC grind and install joint seals In Fresno County In Fresno From Divisadero Street Overcrossing To Shields Avenue UndercrossingThe Contractor must have either a Class A license or one of the following Class C licenses: C-8.

18-00228

0

2:00 PM5/8/18

Addenda:DOT 06-0W7704 PCC GRIND AND INSTALL JOINT SEALS

Cal-Trans

Page 72: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

Thousand Oaks $720,000

Perform highway planting, signs and electrical In Ventura County In The City Of Thousand Oaks From County Line To 0.4 Mile NorthOf Moorpark Road UndercrossingThe Contractor must have either a Class A license or one of the following Class C licenses: C-27.

18-00231

0

2:00 PM5/8/18

Addenda:DOT 07-4U0004 PERFORM HIGHWAY PLANTING, SIGNS AND ELECTRICAL

Cal-Trans

Santa Ana & Anaheim $24,500,000

ADD HOV LN, REM CONC BARR, WIDEN OUTSIDE LN, REM HOV ACCESS MAIN ST In Orange County In Santa Ana AndAnaheim From 0.4 Mile South Of Grand Avenue Undercrossing To Ball Road OvercrossingThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-8.

18-00179

1

2:00 PM5/8/18

Addenda:DOT 12-0C8904 ADD HOV LN, REM CONC BARR, WIDEN OUTSIDE LN, REM HOV ACCESS MAIN ST

Cal-Trans

Bidders:

Redding

This is an on-call multiple provider solicitation for the repair of highway facilities affected or damaged by storm water runoff includingtesting, monitoring, and reporting requirements in District 2 (Lassen, Modoc, Plumas, Shasta, Siskiyou, Tehama, Trinity counties,State Route 70 in Butte County, and US 395 in Sierra County between Nevada State Line and Lassen County). Three (3) agreementsmay be awarded as a result of this solicitation.

UNSPSC Classification UNSPSC Classification Description46161500 Traffic control70111708 Mulching services70131503 Erosion control services70171501 Water quality assessment services70171802 Storm water drainage72141205 Drainage system construction service

18-00252

0

2:15 PM5/8/18

Addenda:02-A1722 MULTI-PROVIDER STORM WATER REPAIR-VARIOUS CA COUNTIESNEW

Cal-Trans

General Contractor Fax: 530-222-4908Office: 530-222-0810Steve Manning Construction, Inc.

Wednesday, May 09, 2018

Bidders:

Weott $4,290,000

RBWC-GG and HMA overlay with MGS In Humboldt County Near Weott From 1.0 Mile South Of Newton Road Undercrossing ToSouth Fork Eel River BridgeThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00216

0

2:00 PM5/9/18

Addenda:DOT 01-0H3204 RBWC-GG AND HMA OVERLAY WITH MGS

Cal-Trans

General Contractor Fax: 707-443-0277Office: 707-443-6371Mercer-Fraser Company

Bidders:

Esparto $20,300,000

Add turn lanes & roundabout, align curve, widen shoulder, culvert work In Yolo County Near Esparto From 0.3 Mile West To 0.4 MileEast Of County Road 79 And From 0.1 Mile East Of Plainfield Street To 0.1 Mile East Of County Road 90The Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00160

0

2:00 PM5/9/18

Addenda:DOT 03-0C4724 ADD TURN LANES & ROUNDABOUT, ALIGN CURVE, WIDEN SHOULDER, CULVERTWORK

Cal-Trans

General Contractor Fax: 707-585-1601Office: 707-585-1221Ghilotti Construction Company, Inc.

General Contractor Fax: 408-365-9548Office: 408-574-1400Granite Rock Company

Page 73: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

Napa County $300,000

Replace joint seals and repair approach slabs In Napa County At Various LocationsThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12, C-61D06.

18-00222

0

2:00 PM5/9/18

Addenda:DOT 04-1K6104 REPLACE JOINT SEALS AND REPAIR APPROACH SLABS

Cal-Trans

Stratford $1,240,000

Cold plane existing pavement, resurface and widen shoulder In Kings County Near Stratford From 0.3 Mile South Of Kansas AvenueTo 0.3 Mile North Of Kansas AvenueThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00225

0

2:00 PM5/9/18

Addenda:DOT 06-0T2404 COLD PLANE EXISTING PAVEMENT, RESURFACE AND WIDEN SHOULDER

Cal-Trans

Lynwood, South GateAnd Bell

$5,700,000

Cold plane AC Pvmt and place rubberized HMA (Type G) In Los Angeles County In Lynwood, South Gate And Bell From 0.3 MileSouth Of Imperial Highway To Standard Oil Pipeline OvercrossingThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00229

0

2:00 PM5/9/18

Addenda:DOT 07-3W7404 COLD PLANE AC PVMT AND PLACE RUBBERIZED HMA (TYPE G)

Cal-Trans

Chino And Chino Hills $1,530,000

REPLACE ASPHALT CONCRETE SURFACING & SEAL COAT In San Bernardino And Riverside Counties In And Near Chino AndChino Hills On Route 71 From Lost Angeles County Line To 0.2 Mile South Of Santa Ana River Bridge And On Route 83 From Route71 To 0.1 Mile South Of Philadelphia StreetThe Contractor must have either a Class A license or one of the following Class C licenses: C-32.

18-00232

0

2:00 PM5/9/18

Addenda:DOT 08-1H9304 REPLACE ASPHALT CONCRETE SURFACING & SEAL COAT

Cal-Trans

Thursday, May 10, 2018

Bidders:

Meridian $5,200,000

Rubberized Asphalt Concrete Overlay In Sutter County Near Meridian From 0.1 Mile East Of Meridian Road To Sutter Bypass BridgeThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00182

3

2:00 PM5/10/18

Addenda:DOT 03-0G1204 RUBBERIZED ASPHALT CONCRETE OVERLAY

Cal-Trans

General Contractor Fax: 916-757-6499Office: 916-757-6427Teichert Construction

Sacramento $2,470,000

Upgrade metal beam guard rail and add concrete barrier In Sacramento County In Sacramento At Various LocationsThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-13, C-32.

18-00219

0

2:00 PM5/10/18

Addenda:DOT 03-4F6104 UPGRADE METAL BEAM GUARD RAIL AND ADD CONCRETE BARRIER

Cal-Trans

Saratoga AndCupertino

$800,000

Upgrade from the standard 4-inch-wide stripes to 6-inch-wide stripes In Santa Clara County In Saratoga And Cupertino From 0.5 MileNorth Of Winchester Boulevard Overcrossing To 0.5 Mile South Of Steven Creek Boulevard OvercrossingThe Contractor must have either a Class A license or one of the following Class C licenses: C-32.

18-00220

0

2:00 PM5/10/18

Addenda:DOT 04-0Q9404 UPGRADE FROM THE STANDARD 4-INCH-WIDE STRIPES TO 6-INCH-WIDE STRIPES

Cal-Trans

Page 74: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

Alameda, ContraCosta And SolanoCounties

$32,000,000

INSTALL FIBER OPTIC COMMUNICATION SYSTEM In Alameda, Contra Costa And Solano Counties At Various LocationsThe Contractor must have either a Class A license or one of the following Class C licenses: C-10.

18-00142

2

2:00 PM5/10/18

Addenda:DOT 04-155004 INSTALL FIBER OPTIC COMMUNICATION SYSTEM

Cal-Trans

Sebastopol $2,630,000

Cold plane AC pavement and place HMA (A) In Sonoma County In And Near Sebastopol From Mill Station Road To 0.1 Mile East OfCooper RoadThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00223

0

2:00 PM5/10/18

Addenda:DOT 04-3K6104 COLD PLANE AC PAVEMENT AND PLACE HMA (A)

Cal-Trans

Bidders:

Bakersfield $1,100,000

Widening bridge in the median In Kern County Near Bakersfield At Lerdo Canal BridgeThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-32.

18-00207

0

2:00 PM5/10/18

Addenda:DOT 06-0S5504 WIDENING BRIDGE IN THE MEDIAN

Cal-Trans

Supplier Fax: 702-432-3360Office: 702-432-3330National Trench Safety, LLC

Los Angeles County $500,000

Place pipe liner and repair culverts In Los Angeles County At Various Locations On Route 105 From 0.1 Mile West Of Bullis RoadUndercrossing To Clark Avenue Overcrossing And On Route 710 At 105/710 SeparationThe Contractor must have either a Class A license or one of the following Class C licenses: C-42.

18-00230

0

2:00 PM5/10/18

Addenda:DOT 07-3W9704 PLACE PIPE LINER AND REPAIR CULVERTS

Cal-Trans

Bidders:

La Mirada $8,800,000

Replace Pavement Delineation In Los Angeles County In La Mirada And At Gorman From The Orange County Line To The KernCounty LineThe Contractor must have either a Class A license or one of the following Class C licenses: C-32.

18-00134

5

2:00 PM5/10/18

Addenda:DOT 07-4W2404 REPLACE PAVEMENT DELINEATION

Cal-Trans

General Contractor Fax: 951-736-7646Office: 951-736-7600All American Asphalt

General Contractor Fax: 909-884-7106Office: 909-884-7170Cal Stripe, Inc.

General Contractor Fax: 510-656-2397Office: 510-656-2840Chrisp Company

General Contractor Fax: 760-727-8702Office: 760-727-8700Pave-Tech Inc.

General Contractor Office: 503-885-0420Specialized Pavement Marking, Inc.

General Contractor Office: 818-834-8199Sterndahl Enterprises, Inc.

Supplier Fax: 707-443-0989Office: 707-407-6609BT Metals

Tuesday, May 15, 2018

Humboldt County $890,000

Place Hot Mix Asphalt (Type A) In Humboldt County At Various LocationsThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.

18-00236

0

2:00 PM5/15/18

Addenda:DOT 01-0G7404 PLACE HOT MIX ASPHALT (TYPE A)NEW

Cal-Trans

Page 75: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

San Mateo County $1,470,000

Cold plane and overlay with rubberized bonded wearing course In San Mateo County On Route 35 From 2 Miles South Of JunctionRoute 92 To Route 92 And In Menlo Park On Route 109 From Notre Dame Avenue To Route 84The Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00224

0

2:00 PM5/15/18

Addenda:DOT 04-3K6304 COLD PLANE AND OVERLAY WITH RUBBERIZED BONDED WEARING COURSE

Cal-Trans

Riverside $1,110,000

Replace existing metal beam guardrail with concrete barrier In Riverside County In Riverside And Moreno Valley At 60/91/215Separation And At 60/215 Separation.The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-32.

18-00248

0

2:00 PM5/15/18

Addenda:DOT 08-0P4904 REPLACE EXISTING METAL BEAM GUARDRAIL WITH CONCRETE BARRIERNEW

Cal-Trans

Needles $980,000

Widen Shoulders and Place Ground-In Rumble Strip In San Bernardino County Near Needles From 2.7 Miles To 3.1 Miles North OfHavasu Lake RoadThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00213

2

2:00 PM5/15/18

Addenda:DOT 08-1E5814 WIDEN SHOULDERS AND PLACE GROUND-IN RUMBLE STRIP

Cal-Trans

Amador County $1,890,000

Construct rumble strip and striping In Amador County At Various LocationsThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-32.

18-00250

0

2:00 PM5/15/18

Addenda:DOT 10-1C4304 CONSTRUCT RUMBLE STRIP AND STRIPINGNEW

Cal-Trans

Irvine $2,640,000

RESURFACE AC WITH OGAC, INSTALL MGS AND NEW DELINEATION In Orange County In Irvine From 0.1 Mile South Of AltonParkway Overcrossing To 0.8 Mile South Of Jeffrey Road OvercrossingThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00234

0

2:00 PM5/15/18

Addenda:DOT 12-0N6504 RESURFACE AC WITH OGAC, INSTALL MGS AND NEW DELINEATION

Cal-Trans

Wednesday, May 16, 2018

Clearlake Oaks $2,840,000

RUBBERIZED HOT MIX ASPHALT - GAP GRADED AND MIDWEST GUARDRAIL SYSTEM In Lake County Near Clearlake OaksFrom 0.6 Mile East Of New Long Valley Road To North Fork Cache Creek Bridge And From 1.4 Miles East Of Abbot Mine Road ToColusa County LineThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.

18-00237

0

2:00 PM5/16/18

Addenda:DOT 01-0H3704 RUBBERIZED HOT MIX ASPHALT - GAP GRADED AND MIDWEST GUARDRAILSYSTEM

NEW

Cal-Trans

Santa Clara County

Treat bridge decks with methacrylate and replace joint seals In Santa Clara County At Various LocationsThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-8, C-61D06.

18-00242

0

2:00 PM5/16/18

Addenda:DOT 04-1K5704 TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALSNEW

Cal-Trans

Page 76: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

Fresno And MaderaCounties

$5,200,000

Bridge deck overlays and joint seals In Fresno And Madera Counties At Various LocationsThe Contractor must have either a Class A license or one of the following Class C licenses: C-8.

18-00227

0

2:00 PM5/16/18

Addenda:DOT 06-0V4604 BRIDGE DECK OVERLAYS AND JOINT SEALS

Cal-Trans

Costa Mesa AndSanta Ana

$1,060,000

Remove & Replace Exist Rdwy Struct Sect with PCC In Orange County In Costa Mesa And Santa Ana At Route 55/405 SeparationThe Contractor must have either a Class A license or one of the following Class C licenses: C-8.

18-00235

0

2:00 PM5/16/18

Addenda:DOT 12-0Q6604 REMOVE & REPLACE EXIST RDWY STRUCT SECT WITH PCC

Cal-Trans

Thursday, May 17, 2018

Vallejo $4,860,000

Cold plane AC pavement and place RHMA-O (Friction Course) In Solano County In Vallejo From Carquinez Bridge Toll Plaza To 0.4Mile West Of Redwood Street OvercrossingThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.

18-00239

0

2:00 PM5/17/18

Addenda:DOT 04-0P6804 COLD PLANE AC PAVEMENT AND PLACE RHMA-O (FRICTION COURSE)NEW

Cal-Trans

San Leandro $700,000

Install Safety Lighting In Alameda County In San Leandro At Southbound Route 238 / Southbound Route 880 Connector Ramp.The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-10.

18-00240

0

2:00 PM5/17/18

Addenda:DOT 04-1J0104 INSTALL SAFETY LIGHTINGNEW

Cal-Trans

El Rio $1,730,000

Slurry Seal and Shoulder Backing In Ventura County At And Near El Rio From Route 232/10 Separation To Route 118The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.

18-00247

0

2:00 PM5/17/18

Addenda:DOT 07-3W7204 SLURRY SEAL AND SHOULDER BACKINGNEW

Cal-Trans

Irvine $1,690,000

Relocate facilities, roadside paving, improve workers safety In Orange County In Irvine From 0.5 Miles South Of Route 405 To Route241 InterchangeThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12.

18-00233

0

2:00 PM5/17/18

Addenda:DOT 12-0N1004 RELOCATE FACILITIES, ROADSIDE PAVING, IMPROVE WORKERS SAFETY

Cal-Trans

Tuesday, May 22, 2018

Solano County $870,000

Treat bridge decks with methacrylate and replace joint seals In Solano County At Various LocationsThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-61D06.

18-00243

0

2:00 PM5/22/18

Addenda:DOT 04-2K0004 TREAT BRIDGE DECKS WITH METHACRYLATE AND REPLACE JOINT SEALSNEW

Cal-Trans

Page 77: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

Bidders:

Oakhurst $3,110,000

Resurface roadway with HMA (Type A) In Madera County At Oakhurst From 0.5 Mile North Of Road 426 To 0.1 Mile North Of AllenRoad.The Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.

18-00245

0

2:00 PM5/22/18

Addenda:DOT 06-0R1604 RESURFACE ROADWAY WITH HMA (TYPE A)NEW

Cal-Trans

Supplier Fax: 209-384-2395Office: 209-723-8846Central Valley Concrete, Inc.

Dardanelle $3,130,000

HMA resurfacing In Tuolumne County Near Dardanelle From 0.9 Mile West Of Donnell Vista Point To Mono County LineThe Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00176

3

2:00 PM5/22/18

Addenda:DOT 10-1H4804 HMA RESURFACING

Cal-Trans

Orange $1,100,000

PROPOSE PARK AND RIDE LOT FOR TOTAL OF 182 SPACES INCLUDING HC In Orange County In Orange At Lincoln AvenueUndercrossingThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-12.

18-00251

0

2:00 PM5/22/18

Addenda:DOT 12-0Q4604 PROPOSE PARK AND RIDE LOT FOR TOTAL OF 182 SPACES INCLUDING HCNEW

Cal-Trans

Wednesday, May 23, 2018

Bidders:

Clearlake Oaks $7,400,000

Construct Roundabout In Lake County Near Clearlake Oaks On Route 20 From 0.5 Mile West To 0.2 Mile East Of Route 53 And OnRoute 53 From 0.4 Mile South Of Route 20 To Route 20The Contractor must have either a Class A license or one of the following Class C licenses: C-12.

18-00203

0

2:00 PM5/23/18

Addenda:DOT 01-0C8104 CONSTRUCT ROUNDABOUT

Cal-Trans

General Contractor Fax: 707-585-1601Office: 707-585-1221Ghilotti Construction Company, Inc.

General Contractor Fax: 707-443-0277Office: 707-443-6371Mercer Fraser

Manufacturer Fax: 408-291-8888Office: 408-799-8888Universal Precast Concrete, Inc

San Luis ObispoCounty

$2,470,000

Landscape planting and wetland mitigation In San Luis Obispo County About 9 Miles North Of San Simeon From 0.3 Mile North OfPiedras Blancas Lighthouse Road To Arroyo De La Cruz BridgeThe Contractor must have either a Class A license or the following Class C license which constitutes a majority of the work: C-27.

18-00244

0

2:00 PM5/23/18

Addenda:DOT 05-492824 LANDSCAPE PLANTING AND WETLAND MITIGATIONNEW

Cal-Trans

Thursday, May 24, 2018

Woodland $11,700,000

Bonded Concrete Overlay Over Asphalt In Yolo County In And Near Woodland From 0.1 Mile South Of Route 5/113 Separation AndOverhead To Knights Landing Ridgecut BridgeThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12.

18-00238

0

2:00 PM5/24/18

Addenda:DOT 03-0G9304 BONDED CONCRETE OVERLAY OVER ASPHALTNEW

Cal-Trans

Page 78: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Bid Date & Time Location Project TypePlan# Name OPR# Estimate

Bidders:

Shaver Lake $11,300,000

HMA resurfacing and rehab culverts In Fresno County In And Near Shaver Lake From 0.2 Mile West Of Auberry Road To Kaiser PassRoadThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-42.

18-00226

0

2:00 PM5/24/18

Addenda:DOT 06-0U09U4 HMA RESURFACING AND REHAB CULVERTS

Cal-Trans

General Contractor Fax: 916-757-6499Office: 916-757-6400Teichert Construction

Norco $790,000

CONSTRUCT A SECOND LEFT-TURN LANE In Riverside County In Norco At Second Street Undercrossing.The Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-12, C-8.

18-00249

0

2:00 PM5/24/18

Addenda:DOT 08-1H0904 CONSTRUCT A SECOND LEFT-TURN LANENEW

Cal-Trans

Wednesday, May 30, 2018

Ventura $12,600,000

Cold Plane AC Pvmt, Place Rubberized AC (Type G), and Replace PCC Pvmt In Ventura County In And Near Ventura From Route33/101 Separation To 0.1 Mile South Of Park View DriveThe Contractor must have either a Class A license or any combination of the following Class C licenses which constitutes a majority ofthe work: C-8, C-12, C-32.

18-00246

0

2:00 PM5/30/18

Addenda:DOT 07-303404 COLD PLANE AC PVMT, PLACE RUBBERIZED AC (TYPE G), AND REPLACE PCCPVMT

NEW

Cal-Trans

Page 79: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Introduction to the NEW Online

Planroom!

Version 2.0

May 11, 2018 @ 11:00 am

Come explore the new Online Planroom! This free one hour training will demonstrate the new functionality available from the updated platform. It offers new tools such as:

Expanded Saved Searches by county, keyword, or project type.

A Contractors Watch Lists that allow you to follow Agencies and / or Contractors.

Improved grids that allow you to plot projects an interactive location map.

One nightly email that includes new project, new addenda, changes to saved projects, and new projects matching your saved searches.

Best of all, it is compatible with any device; PC, Mac, Smart Phone, or Tablet!

The training will be held at the Builders’ Exchange of Santa Clara, 400 Reed Street, Santa Clara

To register or for questions, please contact the Builders’ Exchange of Santa Clara

408-727-4000 or email [email protected]

About the new 2.0 Online Planroom:

All users have been transitioned into the new powerful platform. The

upgrade to Planroom 2.0 occurred automatically, with no extra software to

download. The launch, made possible by the cooperation of 13 planrooms across

the state into the Golden State Plan Service, will provide Santa Clara members

with the most efficient way to find construction projects near and far.

Page 80: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Company Name

Main Contact

(Please Check Box)

Student Names Tax Law Liens

Total Enclosed

Phone Fax

Reserve your spot by

mailing check made

out to the Builders’

Exchange for the

seminar by Apr. 27 to:

Seminars

Builders’ Exchange

400 Reed St.

Santa Clara, CA 95050

Upcoming Seminars at the

Builders Exchange

May 3 How the New Tax Law Affects Your Business (2 Hours) It’s important for you to understand how the Tax Cuts and Job Act of 2017 effects your busi-

ness. Rob Trammell of Abbott, Stringham & Lynch will be at the Exchange to focus on the tax

law and how you need to manage your business going forward. Subjects include-

A. Corporate Structure B. Equipment Purchases

C. Material Purchases D. Taking Money out of the Business Start time: 12 Noon Cost: $25 until 4/27;$35 after

Location: Builders’ Exchange (Santa Clara) Lunch Included

May 4 Mechanics Liens and Stop Notices (2 Hours)

Come hear how to protect your rights as a contractor to get paid. This law changed again

July 1 2012 and its important for you to hear what this law means to you. You will be given a

nuts and bolts presentation of how to handle stop notices, bonds and liens. This class is great for

everyone from the beginner to the experienced contractor.

Start time: 9:00 AM Cost:$20 until 4/27;$30 after

Location: Builders’ Exchange (Santa Clara)

Page 81: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Capitol Connection Q&A for Contractors Week of 4/30/18

By Shauna Krause of Capitol Services, Inc.

.

Some state’s contractor exams are hard while others can be an ‘open book’. However, our first contractor

gets a ‘pass’ on one exam and ‘cracks’ the book on another. A NV question has a ‘foreign’ accent, while I

demonstrate how to ‘cut red tape’ for a multi-state contractor…

Q: I am going to be taking the Arizona Construction Business exam. I don’t believe I have to take the

“CR-39” (Air Conditioning & Refrigeration) trade exam, although I’d like you to check on that for me if

you could. I read in PSI’s informational packet it is permitted to bring a book in the Business exam with

me. Do you have the book and am I allowed to take notes within the book?

A: With regards to the trade exam, I checked your CA license and you just recently took the exams to

get your “C-20” (HVAC) license, which is considered the equivalent to Arizona’s “CR-39” exam. Your CA

license is also currently Active, so based on those two factors you should not have to take the trade

exam in Arizona. Just be aware Arizona ROC (Registrar of Contractors) does not do their own research

so you will need to get verification of your CA license to submit to Arizona. Contact our office if you’d

like assistance with obtaining the verification. As you stated, Arizona’s Business Management is open

book. They do not allow you to make notes in the books, however you can tab the book with PSI’s pre-

made tabs. We have the book we can send out to you, or you can order it online.

Q: I have a Limited Liability Company (LLC) Registered in Nevada related to my Nevada contractor’s li-

cense; can I use the same LLC I have there to apply for a California license, or do I need to form a sepa-

rate LLC?

A: Yes, you can. You can apply as a “foreign” LLC in CA. That will allow you to use your existing NV LLC

to do business in CA. We can help you with the licensing process in CA. You may qualify for Reciprocity

as well, so contact me to look into this option in particular.

Q: We are currently licensed in California and Utah as a General Building contractor. Will this speed up

the process of obtaining a license in Nevada?

A: It will not necessarily “speed up” the process in Nevada, however there may be less paperwork in-

volved based on your CA or UT license. If your Qualifying Individual has been licensed (Actively) for five

out of the last seven years and passed the trade exam when they were originally licensed in CA or UT,

they will qualify for Reciprocity in Nevada. While it doesn’t speed up the process of obtaining the license

(since the Business/Management exam is still required), it does eliminate the need for references and a

resume, therefore reducing the amount of paperwork involved.

CSLB ‘Strikes’ Scammers Out- According to news from the Board, unlicensed contractors were busted in

an April ‘sting’ operation by SWIFT and local law enforcement in Napa County. Fourteen suspects busted

for (Strike One) contracting without a license, twelve also cited (Strike Two) for unlawful advertising and

(Strike Three) six bidders required excessive down payments. A first-time conviction could result in a fine

up to $5000 and/or up to six months jailtime for unlicensed contracting.

While knowledge is power, knowing where to go for the answers is half the battle. Get expert assistance

immediately when you call 866-443-0657, email [email protected], or write us at Capitol Services,

Inc., 1225 8th St. Ste. 500, Sacramento, CA 95814. Research past columns at www.cutredtape.com.

Page 82: Limited Tickets Available - Builders' Exchange of Santa ...bxscco.com/wp-content/uploads/2014/01/bulletin.pdfWeekly Projects Bidding 4/13/2018 Reasonable care is given in gathering,

Tailgate Topic

Tailgate Topic provided by http://www.toolboxtopics.com

REFUELING EQUIPMENT - "FILL'ER UP!"

The above evaluations and/or recommendations are for general guidance only and should not be relied upon for legal compliance purposes. They are based solely on the information provided to us and relate only to those conditions specifically discussed. We do not make any warranty, expressed or implied, that

our workplace is safe or healthful or that it complies with all laws, regulations or standards.

Supervisor’s Signature____________________________________________________________________________

Meeting attended by

X_____________________________________________ X___________________________________________

X_____________________________________________ X___________________________________________

X_____________________________________________ X___________________________________________

When you hear this request at a service station, you can be pretty sure the job will be done safely. Service sta-

tion operations and equipment are designed with safety in mind. But what happens when you fill up that front-

end loader or portable generator on the job? Do you do it the safe way so you won't get hurt?

RULES TO REMEMBER

1.Never smoke during refueling operations. And don't refuel near an open flame. Keep a C02 (carbon dioxide),

or an ABC Dry Chemical extinguisher handy, just in case.

2.If there's a chance of a vehicle rolling while being refueled, chock the wheels. Before filling the fuel tank,

shut off the engine.

3. If the tank is near the engine or other hot areas, such as the manifold or muffler, let the engine cool before

filling the tank.

4. When transferring fuel from a can, mobile tank or fuel truck, keep the spout or nozzle in contact with the

fuel tank. Few people know this, but as fuel is poured, it can generate static electricity. If a spark ignites the

vapors, it's all over for you.

5.Don't spill the fuel because it might ignite when it comes in contact with something hot. And don't make one

of the most common mistakes - overfilling the tank. If the equipment is in the hot sun, the fuel will expand and

eventually overflow. Leave enough space in the tank to compensate for expansion or tilting.

6. After refueling has been completed, be sure all fuel has been drained from the hose and that any spills are

cleaned up immediately.


Recommended