Link Union Station (LINK US) Jeanet Owens, PE Senior Executive Officer Program Management / Regional Rail Presentation for LAUS Master Commercial Developer Industry Forum October 13 th 2017
Transcript
Page 1: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Link Union Station (LINK US)

Jeanet Owens, PESenior Executive Officer

Program Management / Regional Rail

Presentation for LAUS Master Commercial Developer Industry Forum October 13th 2017

Page 2: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Project Overview

1. A new expanded passenger concourse with passenger amenities, retail and potential mixed use development

2. Reconfiguration of the “throat” (station entry tracks), elevation of the rail yard, new run-through tracks and new loop track

3. Accommodation of California HSR and Metro’s West Santa Ana Branch LRT

4. New environmental process (DEIS/DEIR)

Page 3: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Project Need - Why Do We Need Link US?

1. LA Union Station (LAUS) is approaching operational capacity2. Ridership to grow from 110,000 to 200,000 daily passenger trips by

20403. Current “stub-end” (dead end) tracks limit efficiency and station capacity4. Critical transportation needs due to increase in forecasted ridership

Page 4: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Project Benefits – What Will Link US Provide?

Page 5: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Board Approved – Alternative 2: 6 RR + 2 HSR Integrated Design, HSR & WSAB Phased Accommodation

ALTERNATIVE 2 OVERVIEW6 Regional Rail Run-Through Tracks2 HSR Run-Through Tracks(Integrated Design and Phased Construction)7 Platforms (1 Gold Line, 1 WSAB Line, 1 HSR, 4 Regional Rail)

Other Alternatives with 6+4 and 6+0 are being studied in the CEQA and NEPA environmental processes.

Page 6: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

At Grade Passenger Concourse Concept

Page 7: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

World Class Transit Station

At Grade Passenger Concourse Concept

Page 8: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

Way FindingRestroomEscalatorElevator

Sample Images

Page 9: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

Waiting AreaBaggage Handing

Security

Sample Images

Page 10: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Link US- Potential Development

At Grade Passenger Concourse Concept

View from Alameda Street

Page 11: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Link US- Potential Development

At Grade Passenger Concourse ConceptView from West Plaza

Page 12: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Link US- Potential Development

At Grade Passenger Concourse ConceptView from West Plaza

Page 13: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

Metro Life at Union StationSample Images

Page 14: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

Retail Districts

Circulation Diagram

At Grade Passenger Concourse Concept

Page 15: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

At Grade Passenger Concourse Concept

Passenger Waiting/Arrival Areas Sample Images

Page 16: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

At Grade Passenger Concourse Concept

Chef ’s Corner Sample Images

Page 17: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

At Grade Passenger Concourse Concept

Grab-n-Go Sample Images

Page 18: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Link US- Potential Development

At Grade Passenger Concourse Concept

View from Patsaouras Bus Plaza

Page 19: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

Above Grade Passenger Concourse Concept

Page 20: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

Above Grade Passenger Concourse Concept

Page 21: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

New Expanded Passenger Concourse

Above Grade Passenger Concourse Concept

Page 22: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Commercial Street Corridor

Page 23: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Commercial Street CorridorPotential Urban Design Opportunities

Page 24: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Commercial Street CorridorPotential Active Transportation Opportunities

Page 25: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Commercial Street CorridorPotential Urban Design Opportunities

Sample Images

Page 26: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Commercial Street CorridorPotential Urban Design Opportunities

Sample Images

Page 27: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Planned Circulation & Active Transportation

Sample Images

Page 28: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Potential River Access

Sample Images

Page 29: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Project Phasing

Page 30: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Project Schedule

Public Involvement

Stage I

Notice of Intent/ Notice of

Preparation Comment Period

and Scoping Meeting

Summer 2016

Stage II

Alternatives Analysis

Summer 2016 to Winter 2017

Stage III

Draft EIR Comment Period

Spring 2018

Draft EIS Comment Period

Summer 2018

Stage IV

Final EIRWinter 2018

Final EIS and Record of Decision

Spring 2019

We Are Here

Tentative – Subject to Change

Page 31: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional

Project Cost and Funding Sources

Preliminary Estimate Project Cost range from $1.7 to $2.5 Billion1. Refining alternatives that reduce project costs including

Integrated Design or Phased Construction and Above or Below Grade New Expanded Passenger Concourse.

2. Estimated Project Cost does not include potential mixed use development on the east portal and west plaza.

Status of Funding1. Environmental and Preliminary Engineering – Funded 2. Design and Construction – Actively Pursuing Funding

Page 32: Link Union Station (LINK US)media.metro.net/projects_studies/.../LINK_US_10132017_presentatio… · Integrated Design, HSR & WSAB Phased Accommodation ALTERNATIVE 2 OVERVIEW 6 Regional