+ All Categories
Home > Documents > LIST OF FIGURES - Information and Library Network...

LIST OF FIGURES - Information and Library Network...

Date post: 12-Mar-2020
Category:
Upload: others
View: 5 times
Download: 0 times
Share this document with a friend
106
Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Fig. Appendix - I LIST OF FIGURES Areas of Mud bank formation along the Keraia-Karnataka coast. Pamba River System. Minachii River System. Muvattupuzha River System. Periyar River System. Sampiing Locations of Vembanad Lake Sediments (Pre- monsoon). Sampiing Locations of Vembanad Lake Sediments (Post- monsoon). Sampling Locations of the Mud Bank Sediments. Frequency distribution (in %) Vs Grain size parameters. Phi Mean Size Vs Pamba ar distance. Standard deviation Vs Pamba ar distance. Skewness Vs Pamba ar distance. Kurtosis Vs Pamba ar distance. Phi Mean size Vs Standard deviation. Phi Mean size Vs Skewness. Phi Mean size Vs Kurtosis. Standard deviation Vs Skewness. Standard deviation Vs Kurtosis. Frequency distributhmi (hi %) Vs Grain-size parameters. Phi mean size Vs Minachil ar distance. Standard deviation Vs Minachii ar distance.
Transcript

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Appendix - I

LIST OF FIGURES

Areas of Mud bank formation along the Keraia-Karnataka

coast.

Pamba River System.

Minachii River System.

Muvattupuzha River System.

Periyar River System.

Sampiing Locations of Vembanad Lake Sediments (Pre­

monsoon).

Sampiing Locations of Vembanad Lake Sediments (Post­

monsoon).

Sampling Locations of the Mud Bank Sediments.

Frequency distribution (in %) Vs Grain size parameters.

Phi Mean Size Vs Pamba ar distance.

Standard deviation Vs Pamba ar distance.

Skewness Vs Pamba ar distance.

Kurtosis Vs Pamba ar distance.

Phi Mean size Vs Standard deviation.

Phi Mean size Vs Skewness.

Phi Mean size Vs Kurtosis.

Standard deviation Vs Skewness.

Standard deviation Vs Kurtosis.

Frequency distributhmi (hi %) Vs Grain-size parameters.

Phi mean size Vs Minachil ar distance.

Standard deviation Vs Minachii ar distance.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

4.6 a.

4.6 b.

4.6 c.

4.6 d.

4.6 e.

4.7.

4.8 a.

4.8 b.

4.9 a.

4.9 b.

4.9 c.

4.9 d.

4.9 e.

4.10 a.

4.10 b.

4.10 c.

4.10 d.

4.11 a.

4.11 b.

4.11 c.

4.11 d.

Phi mean size Vs Standard deviation.

Phi mean size Vs Skewness.

Phi mean size Vs Kurtosis.

Standard deviation Vs Skewness.

Standard deviation Vs Kurtosis.

Frequency distribution Vs Grain-size parameters.

Phi mean size (M2) vs Muvattupuzha distance.

Standard deviation Vs Muvattupuzha distance.

Phi mean size Vs Standard deviation.

Phi mean size Vs Skewness.

Phi mean size Vs-kurtosis.

Standard deviation Vs Skewness.

Standard deviation Vs Kurtosis.

in the downstreamVariation of phi mean size

Periyar.

region of

Variation of Standard deviation in the downstream region

of Periyar.

Variation of Skewness in the downstream region of Peri­

yar.

Variation of kurtosis ‘Hi the downstream region of Peri­

yar.

Phi mean size Vs Standard deviation.

Phi mean size Vs Skewness.

Phi mean size Vs kurtosis.

Standard deviation Vs Skewness.

Fig. 4.11 e.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

4:12

4.13

4.18.

4.19.

Standard deviation Vs Kurtosis.

Typical CM diagram of River Sediments.

Sand-silt-clay’ contents of the Vembanad lake (Pre-mon­

soon) sediments.

Sand-silt-clay contents of the Vembanad lake (post­

monsoon) sediments.

Frequency distribution Vs Grain-size parameters (Pre-mon­

soon).

Frequency distribution Vs. Grain-size parameters (Post­

monsoon).

Phi mean size Vs Standard deviation.

Phi mean size Vs Skewness.

Phi mean size Vs Kurtosis.

Standard deviation Vs Skewness.

Skewness Vs Kurtosis.

Typical CM diagram of Vembanad lake sediments (pre­

monsoon).

Typical CM diagram of Vembanad lake sedimets (post­

monsoon).

Sand-silt-clay contents of Narakkal Mud bank and adjoin­

ing shelf sediments.

Sand-silt-clay contents of Purakkad mud bank sediments.

Temporal variations of sand-silt-clay % in the Narakkal

mud bank region.

Frequency’ distribution (in %) Vs Grain-size parameters

of Narakkal Mud bank sediments.

Fig.

Fig.

Fig.

Fig.

_Fi9­

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

4.27.

-P-l>-D

-b-D43

.25.

.26.

.28.

.29.

.30.

.31.

.32.

.33.

.34.

.35.

.36.

.37.

.38.

.39.

.40.

.41.

.42.

.43.

.44.

Phi mean size Vs Standard deviation.

Phi mean size Vs Skewness.

Phi mean size Vs Kurtosis.

Standard deviation Vs Skewness.

Skewness Vs Kurtosis.

Phi mean size Vs standard deviation.

(Purakkad mud bank sediments).

Phi mean size Vs Skewness.

Phi mean size Vs Kurtosis.

Standard deviation Vs. Skewness.

Phi mean size Vs standard deviation of different environ­

ments.

Phi mean size Vs Skewness of different environments.

Phi mean size \h5 standard deviation (Beach sands, pre­

monsoon).

Phi mean size Vs standard deviation (beach sands, post­

monsoon).

Phi mean size Vs Skewness (Beach sands, pre-monsoon).

Phi mean size Vs Skewness (Beach sands, post-monsoon).

Phi mean size Vs Kurtosis (Beach sands, pre-monsoon).

Phi mean size Vs Kurtosis (Beach sands, post-monsoon).

Standard deviation Vs Skewness (Beach sands, pre-monsoon).

Standard deviation Vs Skewness (Beach sands, post-mon­

soon).

(Beach sands,Standard deviation ,Vs Kurtosis pre-mon­soon).

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

Fig.

.45.

.46.

.47.

.10.

Standard deviaticni Vs Kurtosis (Beach sands, post-mon­

soon).

Skewness Vs Kurtosis (Beach sands, pre-monsoon).

Skewness Vs Kurtosis (Beach sands, post-monsoon).

Distribution of heavy minerals in Pamba ar sediments.

Distribution of heavy nnnerals in Manimala ar sediments.

Distribution of heavy nnnerals in Minachil ar sediments.

Distribution of heavy minerals in Muvattupuzha sediments.

Distribution of heavy minerals in Periyar sediments.

Average light minerals in river sediments.

Heavy mineral distribution in the innershelf sediments.

Heavy mineral distribution in the Vembanad lake sediments.

Clay mineral distribution in the different environments.

Temporal variation of clay minerals in the mud banksediments.

Clay percentage Vs organic matter.

Frequency distribution of chemical constituents inthe Vembanad lake sediments.

Frequency distribution of chemical constituents inthe mud bank sediments.

Total iron percentage Vs Phosphorus percentage.

Total iron percentage Vs Titanium percentage.

Total iron percentage Vs Manganese percentage.

Manganese percentage Vs Phosphorus percentage.

Manganese percentage Vs Titanium percentage.

Sodium prcentage Vs Potassium percentage.

Fig.

Fig.

Fig.

Fig.

6.10.

6.11.

6.12.

6.13.‘

Plates

Silica percentage Vs Alumina percentage.

Dendrogram showing bulk sediment (Mud bank) Geochemistry.

Dendrogram showing Vembanad lake sediment geochemistry.

Dendrogram showing Mud

Electron micrographs.

bank sediment geochemistry.

/ ‘v-A.UPPALA

P.-.QKUMBALA/'

ADAKKATHDEAH.\‘. \

AJANUR-N*§ELLA K ll R'hl4A T'/\ K IX

?

NATTIKA (VALAPPAD

NARAKKAL O

VYPEENMANASSERICHELLANAM

PUNNAPRAMRCUNNAM

,/#KAKKAZHAM—~+AMBALAPUZHA‘\+PuRAKKAo\\+THOTTAPPALLY

THRIKKUNNAPUZHA

o9

076]

\\

0 After Silas et ol. (I984)9

75°]

FlG-l..LAREAS OF MUDBANK FORMATION ALONG THE KERALA-'KARNATAKA COAST.

_>m:m>m mm>_m <m:>_<& _.m.o_h_

nmunum§_m_o_mw¢~o

. m._<om

ov

Wu ..<

.v .0

. bx» oevt

M Q?

\* O

.m_o>mmmmm _xx<x

evJ

44.,

,2 .39 .o_ » n

N. 224/14 9 \l/ .\ I

o w w\ om

\ P»\ m._v§<g o: ,o__ om

._. mmmmm <m_2E fvmév V

ow. .9 am. o _ 6 \

M om. mt

.~.»

mx<._ o<z<mz m >

_>n.Em>m mm>_m .__:o<z_s_ m.m.o_.._

m.._<Uw...

UD0T

L 0M7»

W m. s_<o<z_2 0..., AW m. 3A 0 W0 8O m_ . N. V. \%A\ //uV . V. %. Q‘ \ Ob/V . 0N v.\A¢ nu8 av AN )/xy mmav 1\, P Ax Jwxw VN 1 $u. NW N

w. W 0 om cm

<._L.wn5._L.<m_ mm mu

. mm

o 8 om vom

..<v_z:n_n_¢.: o - N ow

R

K

/\,

i

9.

8.

KAL ATTUKADAVU

zflmkm mm>_m <IN3n3C.<>:z m.m.o_..__

m3<om

2 om $4 .0

2 ¢0

v (0 2223. ~»<¥

Q onmm

3

xx /

om. / mv

00%». mm .

‘(W m:

2: E

. IN3n_D:.<>D

me. Q &<>:<\v.~/ Ema? / 4 .

on \ 0.4.u\ .

%e,

0%

'8 VHZNOVUVODH

z.u:m>m

xx» o

v ~

o

E>E m<>_$n_ Tm GI

on 2. 2 «E.

Wlllll.-.¢.’_

rx/r

2

F|G-3..5o.SAMPL|NG LOCATIONS OF VEMBANAD LAKE SEDIMENTS

(PRE- MONSOON)

76 no‘ 20' 76 30'AZHIKODE

PERIYARno‘ lo’ELANGUNNAPUZHA 7guo° Io°on OI

MATTANCHERY90

.994P\ERUMBALAM

0 999O950' 50'\ .

THANNEERMUKHAM40' 40 ­I27 RECLAIMED FOR

ALLEPPEY D IRf?’g(g)AT|ON76° lo‘ 30'

O I I O '76 I0 20 76 30HlKODE

PERIYAR I4o 0Id )7 10'

ELANGUNNAPUZHA

O[00 IOMATTANCHERY50' 50

40' 40'ALLEPPEY .56} RECLAIMED FOR- 5 59 IRRIGATION57 o .609° (fiqflm I--/“ 9°30' 75° Id 20' 76° 30' 30'

F|G_3-5b.SAMPL|NG LOCATIONS OF VEMBANAD LAKE SEDIMENTS(POST-MONSOON)

76° I5’ 76° 25'V\ T“’ ‘“"" "“‘I , \$%I

°3o~\) .2ON)lOlO NA $KKAL SCALE0 30 GOKMO o"~\\ 0,: 029” MALIPURAM O'0 °”"" ‘°"‘ 3°" Dbmouse '0‘27N| $7310.22” \EJJTHUVYPU.2“, ";.6I;4~.o.Q“VYPEEN

.(__ l4N2”‘ \{us~."3 B ACHROAD'33" '\I2~3": SAUDI

'22»: Gun 0'" 1'2m \\I I KANNAMALY

II I\ I9° \‘ \ 9°50 \ \ IO‘» \ CHELLANAM( \\ I\ \

\, U‘0 3 LIGHTHOUSE3, I %, Ir I‘\\ \1 Io .' I’9 \ 9°40] .28’, .:8P.'O8 40,

I

~ 1I‘ II I‘I

I. -' MARARIKKULAM0 WP‘27? I \I \| \I II I' I\

\\ I\\I90 I. .| 90I P '.-,0‘ \»,e;P2 -A“-E” E‘ 30

'25P :I4'24? \

I

I

I

I

\INDEX \\—-~ ISOBATH '23P . AMBALAPUZHA

o SAMPLE LOCATIONS 22*’

mp ”.P\ '\pIp PURAKKADI \._- l.. ._____.__.JO I76 :5 6.7 6 25'

FIG- 3-6. SAMPLING LOCATIONS OF THE MUDBANKSE DIMENTS

mmmE2<m<n_ Hum z_<mo m>o\oZ_ zo:.:m_Em_o Czmsomwt _.¢.or_

39V.LN332:l3d AQNEHOBHJ 3E)V.LN33H3d AONBOOBHJ

Ex Vm_moE:v. txmv mmmzzaxm

om n._ __._ m.o 5.0 o.._ mo _.o _.o-mo.. o._­

T O 4.. 1 O-9 m -2

m

now N now.6» w .8

M

2: .9» mm 3 .9»

m

non .; non

V

L8 mu. .8

:9 zo_»<_>mo om<oz<.rm E): mum 232 :.E

Q,» om o._ no mm.o __ o_ m m N m n v m N _ o T N­O 4. % T L _ q _ _ _ . O

-o_ m .910m m Lowlom m -om

M

-o¢ M noc

3

3v ;on W. 2: ..on_

g w

om 1. Low

mq <ms_<a

Ex 2; wozflma m< <mz<n_ m> ANS: mam z/$2 E%m.¢.oI

.25. z:muzSm_o mq <m2<a

I502 mm>_m 5224

o .N m NF 9 cm 2 mm mm 3 mm 9 am 0: Q3 em .4

.1 _ _ . _ _ _ _ fl _ _ _ _ . _ .. N ..

O I 0 0 0 O 0 0 [v3

0 O 0 w0 O A 0 0 O ( L ® T1M1 .V WB1 m Hm0 .1 ® R

. . . . . 12-2

mq <m_2<n_

2v. 2. mozéma ad <m2<n_ m> 3.8 mmmzamxm om.¢.w_.._

E82 $2”. 2x 2. muzflma 5 «$3;

.5224

o Q m 2. m: om «N mm mm 3 mm 2 om O: om_. om. <

_ a q W1 _ _ _ _ _ _ _ a _ _ _ _ F:

SM5 W3$1Q~),SMAZ

L

.6. z_ muzflma ma. <mz<n_ 2, :.E zo:<_>mo om<ozSmnm.q.oE

:50: Egg zx z_ muzfima mq $23 5924

o .N m S 2 ON 3 mm mm 8 mm 2 om o: om. om; <0

« _ _ _ _

4 _ a A _ 4 a a _ — .

O

O

O

‘I

I

1

O‘V

0

I

C.’(V

é c‘;Q .6” .(1.0) Nouvmao oavowws

mq qmzqa

Ex 2; mazflma m< $25 m> Ev: m_moE:x 5&0:

T7502 mm>_m Ex 2: muzfima mq <m2<& .5224

o u m E 2 ow «N mm mm 3 mm B om O: om of <

7 4 a _ _ _ _ 4 _ . . d A a A d O

MO I I I O I O I O O O 0 m0 0 0 0 0 0 0 0 0 9 0 0 0 Q _. :0;O O O 0 B0 S. w

ém

aq <mz<n_

txm; mmwzzmxm m> fix: mN_m 2&2 :&n_m.¢.wE

Is: wN_m 2&2 HIn_

0.9 o.m o.m cg om om 3 o.m 3. 3 o 3- o..~­

_ _ _ fl 4 _ . _ _ _ _ _ o._.­

O

|_@.©a

o .\ |.Oé

FE zo:<_>mo omézém m> E: mum 23.: En. om.¢oE

If mam 252 :5

Q9 o.m 3 ea o.m om 3 om o.~ S o 3- o.~­

_ a _ J 1 . _ 7 _ _ _ _ o._.­|.n.....©I

0 0 0 lo...fig lm.©

0

m4 $25 5..

(INS ) SSBNMBMS( Lo) NOLLVI/\3Cl ClUVCJNV.LS

o_.

Ev: m_moE3_ m> mN_m 232 Him om.¢&oE

Gs: mam 232 25

C)

"2 <mz<a

m m v m N _. oq _ _ _ _ _ _

o 0% oo o

6 o

00 Q0 00 O O%%

o

8 o m

o no

——u

Io.'—

1 13 L0N .1­(9 >1) SISOIHHX

SK EWNESS (SKI )

KURTOSIS (K 6)

PAMBA AR1-0­

0.5­

0.0..

-0.5_

_1.0 1 1 1 1 1 1 1 1 10 0-5 1-0 I-25 1-5 2-0 2-5 3-0 3-5 4.0STANDARD DEVIATION (0'1 )

FIG4-3dSTANDARD DEVIATION (G1) vs SKEWNESS (SKI)

25- o2-0— 0

81'5r- o1.0_ 00 8 C8 0° 00 O O8 8982’ o o 0' 8 o OO O 0 ooo O0 00-5- 0 °0 l 1 I 1 1 L I I0 0-5 1-0 1-5 2-0 2-5 3-0 3-5 4.0

STANDARD DEVIATION 10‘: )

FJG4-E’>e STANDARD DEVIATION (O"1) Vs KURTOSIS (Kc)

80

70

60

-B O

FR EQUENCY PERCENTAGE

DJ O _

I

M:NAcHn_:.A..R

(0)

60

50

40

30

2o

10

F R EOU E NCY PERCENTAG E

I'_:I

7

I

I

0 1-0 2-0 3-0 4-0 5-0 8-0 7-0 8-0 9PHI MEAN SIZE (M2)

(c)

0‘;---1-0 -0-3 -:0-1 -0-1 0-3 1-0

SKEWNESS (SKI)

I-'IG.4°_4-FREQUENCY DISTRIBUTION (IN °/o) Vs GRAIN SIZE PARAMETERS

-o1o~o

® 0 7

\J CDI

FREQUENCY PERCENTAGE

U‘ 0') C CDI I

5 O I

UL) (DI

!\J C I

._> C) ll 400-35 0-5 1-0 2-0 4.0 1STANDARD DEVIATION (0-1)

03 S I

U1 3 I

5 O I

l\J G I

R

(d)

FREQUENCY PERCENTAGE

‘<3 I

__,IO0

067 0-9 1'11 1-5 3-0KURTOSIS (K 6)

Ex 2: mozfima m< .___._o<z__>_ m> Q5: mum 2.32 Em .on.¢.wI

IFDOE mm>_m zx Z_ muzE.m_o m< n:IU<Z_$_ ._.DU_Z<

O N v w m o_ N. v. w. m_ ON MN «m mm mm on mm ov mv on no om no on <o.N..

. 4 . q . q 4 . _ . . q 1 4 _ _ q q q fl fi _ d _

mq .:I0<Z:>_

c‘:N

(zw) azns NVBW lHd

:5. ZS moz<.rm_o m< .:IU<Z:>_ m> A_.OvZO_._.<_>mD o.»m.w.

.52 Z_ moz<»m_o m< .:IQ<Z_Z

I._.DO_>_ mm>_m

O N m_ ON NN ¢N mm mm on on O¢ 9» on no om

1 u _ - q M 1 — _ q 4 _ — _ W

N. .V_ O.. q 4

N2 ::IU.<Z_S_

('0) NOLLVI/\3G ms

2.3 zo:<_>mn_ omézém m> ANEV mam z<m2 Him o®.¢.0E

22. wN_m 2%: :3

S \. m m V m N . o .T ~.I.

5 T . _ . _ _ _ W A o

& m o

O

o o o 8

00 000a. IF

oooooo

o .%@oo am.

Q. 9

O

o 1m1mL

«E .__Iu<z:2

nm5(1.0) NOILVI/\3O OUVONVLS

.8: m_moE3_ m> 22. mam z<mz HIn_ om..¢”o_.._

A3,: mam z<m.z HI&

9 m m N m m .~ m 9 N _ o 7 ~.._1 _ _ _ _ _ _ _ _ _ _ a o

[mo

0 O

O O O O0

0 o o ooom o

o .0 o®oooo

& O O O

o o o

G O

.%

my

m.

txm; mmmzzmxm m.> E: m_N_m z<mz SE n©¢.o_m%

.3: mam zqwz :5

o_. m m A m m u m N _ o o.T o.~­

_ a _ _ _ _ _ _ 00. w 0 d

O O OO

O

cow. 0 $0

0 o o omo

O O 0 $00

0 O O %

o oo o

O O

0

ma ...:__IU<Z:2

L3

(9>l) SISOIHHM(1)18) SS3NM3>lS

MINACHIL. AR

1-0~

oo o0 O o1‘. 0-s- °55 o33 o 0 95°0 0 0 00z 00*’ 8 ‘Bo <95 ° so 3 oX 0U) °o <9-0.5 1 J 1 _ L 1 1 _J0 0-5 1-0 1-5 2-0 2-5 3-0

STANDARD DEVIATION (O3)

FIG4-6d STANDARD DEVIATION (01) vs SKEWNESS (SKI)

25V

62-0­

'3X

£915‘ Q:U)

0 0£10“ o 0 00° 05’o 8 80,,O 4: 0° 0 ®$ 0 O O'0.5 I 1 O L OLD 1 I J0 0-5 1-0 1-5 2-0 25 3'0 3'5

STANDARD DEVIATION (03)

FlG§4.-6e'STANDARD DEVIATION (O‘I) Vs KURTOSIS (KG)

mmmm_z<m<n_ mum z_<mo m> T.\.. 23 zo_Sm_Em_o CzmS8m.._

Iv: m_moE3_

o.m m... :..mm.o$.o

13 o3 9VLN3383d AIJNB (103 H 3

I

31­

I

O(V

I

OQA: L

GL0

I

C(D

E: zo:<.>mo omqozfim

ohm ohm 3 o.~ o._. m.o..mm%L..

A 5 A1"? N -­39VlN332:I3d A3N3flO3H:J

:3

l

C)\‘Y

I

C)LG

I

G(D

<IN3n_3.E.<>D$_

O...

5.9 oi

fixm. mmmzamxm

co- mo- o..­

mo_[

ANZV mN_m zqmz HIQ

m

N

oO O(‘\| «­3S)VJ.N3383d AONBHOBEH

O("7

C)\T

3Ln

O(.0

(VO 3CD

I'—O O C)\T m N

39VlN33?:!3d A3N3f'|O3ti:!

GLn

(3co

:5. Z: moz<._m_o <INDn5._.._.<>DS_ m>AN$C mN_m Z<m:>_ _I& ou.¢.u_m

2x_s mozqpma <:N:a:»p<>:2 F2924

:50: mm>_mo v m m_ 9 cm vm mm mm ov 3 on no om mm on on om om oo_ o__ 4

ON0...»0.00.0_

<:N:a:»»<>32

ON...

(zw) :-xzns N\13|N|Hd

:5. zsmozqpma <INDn_3._.._.<>3S_ .u,> E: zo_»<_>mo Em .nm.v.o_n_

.5. z_, moz<.Co,_o <INDn_3._.._.<>D_>_

I505. mm>_m , ._.:o_z<o v m N. .w_ om wm mm mm ow 9 on no om mm 9. mm om om oo_ o__ 4

. — u

. q . . . q . _ . 1 . a _ . W . . O

0 1. 1.

\II

l

C?<5 0 95<'r ro % N

(Lo) NO|.L\7I/\3CJ 01$

<INDn_D._. ._.<>3_2

3.8 mmmzzmim m> E: mN_m 23: En. nm.¢_.o._n_

Ant: mN_m z<m_z HIQ

OP m m N w m V m N — O F... N:

T 4 . _ % _ _ _ _ _ W _ _ o..­o o o lm.Ou

ewe oo

o o o oo o 9 oo o o

o o o o oo o l0.0

0 0 0 & 0 00 000%

oo oo oo o

o

o [mo

:..Dv ZO:.<_>mQ Dm<QZ<._.m m> ANZV mN_m Z<w2 HIn_ O.®.¢..mv_n_ 1

ANEV wN_W Zd.w2 HIQ .

Q. m Q N w m .V m N — O _.u N:

a 0 _ _ _ 4 _ ._ 4 4 _ _ o

o oo S8 am. So ea. 0 W.00 o 80 I» nw& 9 mm... oo Bmooo

0..0 0 ..uu o IN E8 MNWN

1m

o Iflx

<INDn_D._.._.<>D2

(1)15) SS3NM3>1S

.33 m_moE3_ m> ANZV mN_m z<mz Him. um_w.9.o_.._

Cs: mN_m 23: HI&

m m N w m q m N _. o 7: ml

_ _ _ < q _ _ _ 4 _ _ o

o ..m.o

vnAimm.:6SIo -o.m

<INDn_D._:_.<>DZ

1-0_ MUVATTUPUZHA

C? o I

SKEWN|ESS (SKI )

O 3”

J L1 1 I I L05 1-0 15 20 2-5 30 3-5STANDARD DEVIATION ( O’1)

IGCD

F|G.4r9d STANDARD DEVIATION (0-1) Vs SKEWNESS (SKI)

2-0 0co1.5_ an

O

Q”

91-0~LnOI­%5:05­

0 1 I 1 I 1 1 10 0-5 1-0 1-5 2-0 2-5 3-0 35STANDARD DEVIATION (CT: )

FlG.4-9;e‘ STANDARD DEVIATION (O'1) Vs KURTOSIS (KG)

.zo_omm zqmmkmzaoo MI... Z.. mN_m zqmz

zoamm zqmmkmzsoo MI... Z. ZO....<_>mD Em u_O zo:.<_m<>.no_.¢.o_n_

Ex 23 uoz<._.m_o

V. 0. O. ON NN ¢N ON ON om

~ _ + _ _ —

ON¢®

___. a. O

Q O. N.. % _

R......n... .....O zo_._.<_m<> .oo_.¢.or..

:5. 23 moz<._.m_o

O. N. V. O. m_ ON NN ¢N ON mm on

. A 4 4 _ . _ _ 4 .

I...DO$. mm>E,..

O N— 4

wmm+4.

m<>_mmE

(Lo) NO|J.V|/\3CJ 01.9(Zw) 3213 NVBW |Hd

zoamm zqmmfimzaoo mi 2. m_moE3_ no zo_Z_m<> .uo_.¢.o_n_

I._.3OS_ mm>_m :5. ZS moz<.rm_o

O— .

m mo_

_ _ q _ _

N ¢u .

. _ 4 _ q A In

JLzo_omE _>_<mm._.mz>>oo mI._. Z_ mmmzamxm ...._O zo:.<_m<> oO_.¢.0E

1502 mm>_m :5. 2; mozqkma ,

o _ ¢ m m 9 m. 1 m_ m_ om mm vm mm

mm Om

N1 . d . 4 . 7 . _ _ . . 1 . .

TfK\f

m<>_mmn_

N. ¢_ 0. m_ ON NN ¢N ®N mm onOm.o

O._m._O.Nom

0

(SM) SlSO.l.Hfl>l('>1S) SS3NN\3)'|S

o_.

.—u

¢——1

CIDV zo:<_>mn_ omqazim m> ANS: mN_m 232 HIn_ _u__.-._.V.©_H_

E: mum 262 :3 .

N m m v m N _ o T N­J _ _ - . _ _ O

O

0o

I IO LOe‘— c’;NOILVIABO OHVONVLS

1

noe-'­

1

C.’N(1.0)

.mEms:omm 2353: .5. om. a<>_$n_

3.8 mmmzamxm m> E: wN_m 2%.: CE .£_..¢.oE

ANS: mN_m zqmz HIn_

OF m m N m m v m N P O _... N­

7 L 4 _ _ _ _ _ _ _ _ _ _ m.T

SM3!o.TMN3SSo 1m.Ou\$M

0 m.\ .

O O . O

O

0 00 AZ.

0 O O O O

O

O

l

7nLzmz_omm zqmmhmaa fix oi m<>_Ea

Ev: m_moE3. m> ANEV mN_m z<mz HIQ .o__x.T&.....O_..._

ANZV m_N_m zqmz HIQ

N m m w m N F o

:1

—_d

-—4

_ 4 _ fi _ «

Tu.:,_mz_omm E<mmhmn_D zx om. m<>_Em

(9)1) SlSO.|.Hfl>1

.59 mmwzzmxm .n.> 2.8 zo:<:.,mo omézflm. _u:.;V.0_n_

2.3 zo:<_>mo 2324;

Q.» Wm o.m ma om

M _ . _ —

Am;zmz_8m z<mEmn3 .5. om. a<>_$n_

me_

O...fi

we—

O*91­

I

Ln 0<5 2'­(I >1's) SS3NN\3>1S

QQWe

.3:m_moE3_ m> :13 zo:<_>.E m_m<oz<._.m m:.¢ .2”.

Anxb. zo:<_>mo om<oz<S

om m... o 4 m m o.m m ~ o N 3 3 m.o

O OO OO

O

O 0008

.m:m._z_Sm z<u~:.mn_: .552 «<55;

we33o.~3o.m

(9)!) SlS0.|.Uf‘.)!

ONE PERCENTILE IN MICRONS

PAMBA ARMU VATTUPUZHA

U MINACHILAR

10000

1000­

‘I00­

10 I1 15M = MEDIAN IN MICRONS

100 1000

FlG.4-I2 TYPICAL CM DIAGRAM OF RIVER SEDIMENTS

Azoomzoz-.nEn:

Bzmz_8m mv_<._ o<z<m2m> m:.: .._o Bzmhzoo ><d-:_m-oz<m om_.¢.oE

:_m - Ez<m oz<m ->:_m oz<m

3 0 X

§...§. .%

\\Q . Q 0

. .. 9M? .

0 /

,M..“.». ...”..”.w....

3» .. 3._, .3.w§..

...><._o

Azoomzoz -.—mon3

m:,_mz_om_m $3.. o<z<m2m> m_I» no m:fi:z8 ><.G-:_m-oz<m gm_.¢.0_.._

Him h:m->oz<m

O ,

oz<m->h:m

oz<m

90

80

O) Q

U1 (D

«B C)

LLJ G

K) C

FREQUENCY PERCENTAGE

C: 23

VEMBANAD

(0)

-—r—I——I—_I——l\)

\I o

O) o

0J4.>U|O O o

I\) G

FREQUENCY PERCENTAGE

8

3 4 5 6 7 8 9 1011PHI MEAN SIZE (M2)

(C)

0-14)-03-on 04 0'3 I-O

SKEWNESS (SKI)

LAKE (PRE-MONSOON)

90

O) C

U1 C)I

5 C)

OJ G

!\J G

FREQUENCY PERCENTAGE

3' 5

03 O

0'! o

(“"15CD CD

I

l\) (D

FREQUENCY PERCENTAGE

8

I

“I

(b)

I IO

1

STANDARD DEVIATION (CT: )

2 4 :>4"

‘T

(d)

I 4:<0-67 0-9

KURTOSIS (K G)1-11 1-5 30

FIG.4'I4 FREQUENCY DISTRIBUTION (IN °/o) VS GRAIN-SIZEPARAMETERS.

VEMBANAD LAKE (POST - MONSOON)r'- 100"~ 90"- E3 80­S_. ((1) § 70- (b)50- E 60­o.

UJ0 50- * 50­§ 2%8 40- 8 40­% LLJCL 30- E 30­>­% 20- 20*­LU§ 10- 10­U. 0 N O 1 J ;2 3 4 5 s 7 8 9 10 1 2 4 >4

PHI MEAN SIZE (M2) STANDARD DEVIATION (o'[)70- r‘60~ 60­(C) g (d)‘<3 5o~ 55 50­<[ Z*2 88 40- E 40­33 0.0. 30- >_ 30­>_. L)2’ 20» 5 20­L” :32 88 10- Q: 10"Q: U...LL 0—:—4 E O - . 4-1-0-0.3 -0-1 0-1 0-3 I-O <0b7 O-9 I-II I-I5SKEWNESS (SKI) KURTOSIS (KG)

FIG4-I5 FREQUENCY DISTRIBUTION (IN °/o) Vs GRAIN-SIZEPARAMETERS

I

Cbv zo:<_>wo omadzflm m> :3: mam 2&2 HI&®_.¢.o_u_

33>:m

mN_m z/$2 HIQm w

1."0"‘

O1"

-407

COmo oo o <

O ­

O O%nnvvO Q0 0%O 4 O O

O

Q 4

%

O O

mEm:.,__Bm zoomzoz Amen.m:,_wz_Bm zoomzozmm Q

m x<._ o<z<mzm>

_

_ _

:1

Q.o.~

(I_0) NOILVI/\3C] OUVONVLS9.»o.m

txm; mmmzzmxm m> ANZV mN_m z<m.z HIn_N_.V.o_u._

ANZV mN_m 23.: _..In_

S. 2 m m N. m m u m N o

T 4 7 _ _ _ _ _ _ _ ON­I1@.$l

oo 0 nflu O Q

0 O Oq 0

O O? 8 0 O 13

o omam o 42%. cqqq 4 < o q o o 00

ooo%.m.m&eo%w L 00¢ $4 $qu<o«%« awn,“ flu <%<< o<

% Q <4 0 dO.<.Q Qdd $8 4I O.%I

mEwz_omm zoomzozgmoa <m_zwz_omm zoomzoz mm; o

wx<.. o<z<mzm> 1o.~

(1)15) SS3NM3>1S

75$ m_moE3_ m> ANEV mum z<mz :.Em_.¢.e:

WZV mN_m. 232 HIn_

: 9 m m 5 m m .\ m N o

7 _ o a _ _ A _ _ _ 4 o

onmo o ommo .<nm.<<3<<€<u.<<<.€ 4 <<oo«< 4,5440 4 a

§ $<0®uO 04440 400g 0440 dd 4 O OO O

o 0 4 o Awoo

1o.m[emA3Sm

mEmz_omm zoomzozfimoa, 4

m:m_z_Sm zoomzoE.mEn_ ..

8.4.. 042 <ms_m>

(9 >1) SISOLUHX

VEMBANAD LAKE

PRE -MONSOON SEDIMENTS

A POST-MONSOON SEDIMENTS

O

1.0..

O

T: 0 5 0°X AAA3°£°°<%°dEofl %AAA£AoA;,§Ao§%°o°

33 o.o— A °°o£§><8°:> 0wL“ A 0 A0 0 o%_,0.5__

-1.0 1 L J J I I0 1 2 3 4 5STANDARD DEVIATION (cry)

F|G.4°|9 STANDARD DEVIATION (U1) VS SKEWNESS (SKI)

‘I-5'

OA lgcpoV A 3 O01’ °8§ °°o AA80 5—- ° Ag};:2 A A3 ‘*8¥ 0 1 1 I 1 1 J-10 -0-5 0 0'5 1'0

SKEWNESS (SKI)

F|G.‘4-ZOSKEWNESS (SK1) Vs KURTOSIS (KG)

‘I000

C : ONE PERCENTILE IN MICRONS

O

OO

OOO

OO O100­

O OO

0

O

0

O OO o o

10F‘ O0 0° goo

% %OO

.°8o§§oo.omO

o 3b1 1 11 10 100 1000

0 M=MEDlAN IN MICRONSF|G.4‘2|CJ TYPICAL CM DIAGRAM OF VEMBANAD LAKE

SEDIMENTS (PRE-MONSOON)

1000

100*­

C : ONE PERCENTILE IN MICRONS

o

11 10 100 1000M = MEDIAN IN MICRONS

FIG4-2|bTYP|CAL CM DIAGRAM OF VEMBANAD LAKE SEDIMENTS(POST- MONSOON)

Bzmz_8m fimxm.

oz_z_o3< oz< xz<mo:z ._$¢_<m<z .._o m:fi.:z8 ><._u-:_m-oz<m oNN...Q.0_..._

h.__m S_m->oz<m ozqm -»5_m ozqm

\\\\.. 1

X

>9_ w

0 K2 .49

9 vsd %

«N» x

C % .

SVK 0 ON4 u.

u ba, ... w

mm

o o

Bzmz_8m fiwzm oz_z_o3< x . o

m..2w2_omm xzqmoaz o

><;_u

mEmz_Bm uzmzm .

oz_z_o8< oz< xzqmoaz o<v§$5n_ no Bzmzzou ><._u-:_m-oz<mbmm.v.o_.._

S_m :_m .623 ozqm ->S_m . oz<m

90

Z \U") U

m»zm2_8m Smzm oz_z_o3<m=,_w2_omm xzqm O32

zoamm xzqm O32 4$§<m<z

mi z_ .5 ><d-:_m-oz<m no mzo:<_m<> 4<mon_2H.:mm..q.o_n_

mzkzoz

omo Famm o:< x:4~ mzan >42

-3om‘ OZ<m Om.3esm .om

AV13 ' HIS - CJNVS.o@

>440 .05

°/o

‘om.omoo_

73. V m_moE3.

om m; .3 m.o $.ov o. 2. 2. on3. Om

2.3

2.3 zo:<_>.u5 om<ozSm

ow mm 3 mm om oV .2.8. om. 3r omr 8Any -o~. om

39‘:/1N3I)ti3d A3N3fiU3ti:1 39V.lN33ti3d A3N3fl03U:i

m_zmz_8m v_z<m ODE

Zxxqaqz ...O mumzqmqa mam z_<mo m> <02. zo_Sm_Em_o 5zm:omm..:&.v.oE

Ex 3 mmmzzaxm.

o._ we 5 _.o-2..-o.

—I

~_

Aov

o-9..2-3-3-8-8

:2. mum 23: :.._&

:9m m N. w m q

T LLLI.

2:

39»;/1N33a3d A3N3nf_)3a_g 39VlN33U3d k3N3nU3U:i

._no,7.zo:<_>wo oaézsm ms 3,: mam 26: En. .n.N.¢..o_.._

ANZV mum 2,32 _In_

0.2 o .: o.o_ o.m Om 3 oo om o. q o.m

_.‘ _ A _ _ _ _ a 4 O

0..0 3.

O0 0000 O 00

o o o ooo xofiflvwxw Boo x

oo oo&o o.m

xoo oom

oo o

% x

3

mEmz_omm

Bmzm oz_z_o8< xmEmz_omm xz<m 032 o

._$.x<m<z

(1.0) NOl1V|l\3Cl GHVONVLS

SKEWNESS (SKI)

NARAKKAL

D MUD BANK SEDIMENTS+ ADJOINING SHELF SEDIMENTS

0.60 1­

+4'0.40 — ' ,-H P

+ 4'4. Dn0.20 - 8'

+ +4' {OP+ D D0.00 —- °* a.DD

% 0 Ban DC1 D9:9 E, m on-0.20 — 0°? °. an 5:00 9 E‘ Du D D

'30 u-0.40 - Dn

-0.60 —

_O_8O I I 1 I 1 I I I I 1 I J0.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00 8.00 9.00 10.00 11.00 12.00

PHI MEAN SIZE (M2)

F|G.4-26 PHI MEAN SIZE (M2) Vs SKEWNESS (SKI)

KURTOSIS (Kc)

NARAKKAL

MUD BANK SEDIMENTS

ADJOINING SHELF SEDIMENTS

3-0 0 ­

+

2-50 ­4­

+" Q .O+ 2' 01-50 — D

UD1°00 - D Q, 900 U u

+1-D El}, D0+ + +9030 Unnmg 0

§ 0 4* on [J EngQ.5() _. * DL L I 1 L J I J 1 J 1 J

000 100 2-00 300 4-00 5-00 6-00 7-00 800 9-00 1001 1-00 12-00PHI MEAN SIZE (M2)

F|G.4-27 PHI MEAN SlZE(Mz) Vs KURTOSIS (KG )

SKEWNESS (8 K1)

NARAKKAL

MUD BANK SEDIMENTS

ADJOINING SHELF SEDIMENTS

06

0-4

0'2

00

12100::

J I 1 I1-5 2.0 2-5 3-0STANDARD DEVIATION (of)

FIG4-28 STANDARD DEVIATION (Eff) Vs SKEWNESS (SKI)

l I05 1'0 1

3-5_.0.80-0 4-0

KURTOSIS (Kc)

NARAKKAL

:1 MUD BANK semmems+ ADJOINING SHELF seouwems

3.0 O I"

4*

2.50 ­‘I’

§2.00 — D ,+

0 D "’D1.50 - 0

CI

CI

— D 3. BO no 0 + DD +Bag DOD 9 UD D an n Unatnuna q: I: * + +D D D n D +0 D + Q’ 4' ‘V0.50 - D U +

0.00 ' I I I L I I I I I I I-0.60 -0.50 -0.40 -0.30 -0.20 -0.10 0.00 0.10 0.20 0.30 0.40 0.50

SKEWNESS (SKI)

F|G.4'29 SKEWNESS (SKI) VS KURTOSIS (KG)

SKEWNESS (SKI) STANDARD DEVIATION (U1)

PURAKKAD

0 MUD BANK SEDIMENT+ ADJOINING SHELF

SEDIMENTS

4 _ + ° 0. , + 3» °0‘? O 0:3 " + +0 3% 0* +++ % 0° 0°3.9g, 02 4 D * I I I 1 0 I4 5 7 8 9 I0 11 12

PHI MEAN SIZE (M2)

FIG.4-30 PHI MEAN SIZE (M2) Vs STANDARD DEVIATION (GT)0.8_

04 t I. + :4: * .++ +‘O — O o omfigfiv 0

° «#0 ., oo 0 88° 0 O 0’0'4 -— 0 ° °o

-0'8 I I I I L I I4 5 7 8 9 IO 11 12PHI MEAN SIZE (M2)

FIG.4’3I.PHI MEAN SIZE (M2) Vs SKEWNESS (SKI)

KURTOSIS (Kc 3

SKEWNESS (SKI)

2-0— +4,‘ + PURAKKAD

1_6_ + * * o MUD BANK SEDIMENTS+

+ ADJOINING SHELFSEDIMENTS

o1-2- ’ 8o

oo O 00° ° °oo 00 30'8 ‘ + +4, °°° %% ° 0+ ‘B O 0% 30% O O4­

<1­0.‘ 1 L 1 1 I 1 I J4 5 5 7 8 9 10 H 12PH] MEAN SIZE (M2)

F|G.4°-32 PHI MEAN SIZE (M2) Vs KURTOSIS (KG)

0-8 1­

++

0-4 - ,# + .* §+0 + +

0 ” 3% °.oo

og? O— <8° oooooo-0 4 O_ , 1 1 4 1 1 1 1 1O_80 1 2 3 4 5 6 7 3

STANDARD DEVIATION 103')

F|G.4°33 STANDARD DEVIATION (0?) Vs SKEWNESS (SK!)

O PAMBA SEDIMENTS

A VEMBANAD LAKE SEDIMENTS(POST MONSOON)

’‘ BEACH SEDIMENTS(POST MONSOON)

0 MUD BANK SEDIMENTS

-I

+ ADJOWING SHELF SEDIMENTS4-0F + 5++ "’ * * 4°” + A +:4 A A A-908 dad-5é3°0— A A4, AAAAAAO +° 0Z °§AfiAA * °B°° °:1 2-5 " 115541: A + 1%

AQ A AA 0 +1— O O A o O‘E: 0 ° "Q15 P ° °<:o 00 xx x< °° X xP— Xm — oo% oooxoo 89° X0° ° Xxo xO X

x §KXO-S — 10! Xx" xxx "_0 1 1 1 1 1 1 1 L 1 1 I I I I-2 -1 o 1 2 3 4 5 6 7 e 910111213

PHI MEAN SIZE (M2)

FIG4-34‘:PHI MEAN SIZE (M2) Vs STANDARD DEV|AT~lON (07 )

Em. mmwzmzmxm m> T2,: wN_m z<uz Him ,mm.¢.o_h_

E3 m~_m 23.2 Em

C N_. Z. 9 m m K m m e m N _. o _.I

_ _ _ T _ 4 _ _ . _ _ _ _ _ _

o go 1

oo o < o

O O m 0

0 am. 1

DD UDU..mumuo< ... oo % o

O

n _%< < D x 0 x x x o o

+ D + + % w okxx x Q 0 L

+ + o + + x xxmwo o o oo

04 d <d OXCOC X X§XX3}fiXxO 00 O L

m 8 + < «<<<< <<<<< x xv o oo o

+ duq % x o

+&+ on 4 < x o oo o

+ < L

m»zms__omm .._._m:m oz_z_o3< .

mLzmz_omm xz<m D32 0

Eoomzozémon:

m»zmz_omm :u<wm x

. .zoomzoz-»mon:

mpzmzomm ux<._ o<z<mzm> a

mEm2_omm m< <m2<a o

o.T.3.0..8.0..(1)18) SS3NM3)1Sm~.o.om.o

STANDARD DEVIATION (Du)

BEACH SANDS (PRE-MONSOON)

u BACK SHORE

A BERM

o FORE SHORE

+ LOW WATER MARK

2-50 F‘2.00 ­I-50 —

o O 0 UI-O0 — ° 0o C9 D on

A 4.00%.‘ Abcpro

0.50% 0 $50 Doq-00+ 013m” 3

+ ARA+ A

000"­

o-5o 1 . I I 1 I-2-O 0 2-0 40 6-0 80PHI MEAN SIZE (M2)

r=Ic3-4-36. PHI MEAN SIZE (Mz)\/s STANDARD DEVIATION (D1)

STANDARD DEVIATION (OW)

BEACH SANDS (F’OST- MONSOON)

:1 BACK SHORE

A BERM

O FORE SHORE

+ LOW WATER MARK

200 —

O

I-60 .­A

O +

+I-20 — AO

A

+

3 ++ +0-30 _ +0 +q-+ A0 Uc1°Ac1€fi g A

A Q] o B UM 5 0 UA A.4O O L- 0 +00 0

0-00 ­

—O4O I J 1 I 4-2- oo 0- 00 2-00 400 6OO 800PHI MEAN SIZE (M1)

FIGQ4-37. PHI MEAN S|ZE(N|z)Vs STANDARD DEV|AT|ON.(O‘I)

SKEWNESS (SKI)

BEACH SANDS( PRE — MONSOON)

E] BACK SHORE

A BERMFORE SHORE

4. LOW WATER MARK

O-BOT‘

++ A040- ° A +o + OA + moD 4' AAQDDAA 0°9 o :1ch 0 + o+00'' +-l9d:EA @059

+0 0 A AA

0 O: O-040- +A

-0804­

._|.2Q I 1 1 L J-20 0 2-0 4-0 6-0PHI MEAN SIZE (Mz)

FIG/4'38 PHI MEAN SIZE (Mz)Vs SKEWNESS (SKI)

SKEWNESS (SKI)

BEACH SANDS (POST- MONSOON)

BACK SHORE

5 BERMo FORE SHORE+ LOW WATER MARK

l-O­A

+Q.8_

0-6­

0-4­0 A+ DA0 El

8. _ O002 A + ocb U30 0A CA '1"4:3-m°A+ 0+ + +00 O0'0" E’9%“+ :1 ++ AD D O

+OOA

-O'4r—

_.O.6 ' 1 I I I Q-20 0-0 2-0 4-0 so 3.0PHI MEAN SIZE (M2)

F|G.4-39 PHI MEAN SIZE (Mz)Vs SKEWNESS (SKI)

KURTOSIS (KG)

BEACH SANDS (PRE-MONSOON)

D BACKSHOREA BERMo FORESHORE+ LOW WATER MARK

2'00? 0 oA+ +I-60­

A++ + Al'20" ‘(AA 00

0 U 0++ L? 03°C0 00 0° 0 Do 8 on

+11:

++A+8oBI-9:00O-80~ 0+ 0 O U+ +A + A 0*A

0

0-40-­

0 1 1 1 1-2-O 2-0 4-0 6-0 8-0PHI MEAN SIZE (Mz)

F|G.4°4O PHI MEAN SIZE (MZ)Vs KURTOSIS (KG)

KURTOSIS (KG)

I-60

I-20

I-00

0-80

0-60

0-40

020_2.OQ

B EACH SANDS (POST—MONSOON)

D BACK SHOREA BERMo FORE SHORE+ Low WAIT!-ZR MARK

TF''''

0r- A+ 0

+A

— o A 6%80 O U ++ A AUOUA D

+ +D+o or- UEO[%QDoAA,_,_AA D A g.. AW 0 +_+

+D__ '0_ o

1 W I I 1 ~ 50-0.0 2-00 400 600 800PHI MEAN SIZE (M2)

F|G.4-4| PHI MEAN SIZE W12) Vs KURTOSIS (KG)

sI5EwNE’ss (sum

BEACH SANDS (PRE-MONSOON)

0 BACKSHOREBERM

0 FORE SHORE+ LOW WATER MARK

0.30..

I "' +0-40.. + +­0 D0 +D +1300 D O +

n O :3 +O_O_ 0 U01’ +00 C1 +­O O Q +

0 O+0-40" +

..0.80..

_|.2O I I I D I I 4-0-5 o 0-5 I-O |~5 20 2-5STANDARD DEVIATION ( 0'.)

F|G.4°4_2 STANDARD DEV|AT|ON(O'I)Vs SKEWNESS (SKI)

SKEWNESS (SKI)

BEACH SANDS (POST—MONSOON)

D BACK SHOREA BERMo FORE SHORE+ LOW WATER MARK

|°O0 F­

A6-80. +0-60.. '*'0-40..

one +D D 50'20- °o 8°+0 13°05: ° 0 A

+ A°DE<i::4-. + +000- 309° * 1‘ A +A :1 o+00-O-20- A

-O'40~

-060 I J 1 1 I J-040 0°00 0-40 0-80 I-20 I-60 2°00STANDARD DEVIATION ( 0'. )

F|G.4~43 STANDARD DEVIATION 0': (Vs) SKEWNESS (SKI)

KURTOSIS (KG)

BEACH SANDS (PRE-MONSOON)

0 BACKSHOREA BERM0 FORESHORE+ LOW WATER MARK

1-60 F­o

AD -L"' AI-20 _ A0 031° 4. +°o‘%° + Apoo +AA 910:, 8O A AA o+++ + °O-80 '- 0 D A 4. ° +

++ Do

0°40 — 00

0-00 +­

_0.40 4 1 1 1 L J-0-40 0-00 0-40 0.30 |.20 1.50 2.00

STANDARD DEVIATION (cmF|G.4-44 STANDARD DEVIATION (O'I)Vs KURTOSIS (KG)

KURTOSIS (K0)

BEACH SANDS (POST M ONSOON)

CI BACKSHORE

A BERMo FORESHORE4- LOW WATER MARK

2-00r­

o

AI-60- +A

+A ++A|-20- ° 0°0 g+as o 9!! R +

‘B “*8 AOQDODA +1-aq° AU 0 + 4­

AA 8§°°+*080- O +aUA AD + ++

A

0

0-40­

0 I I 1 L 1— 0.50 0.50 I-O 1.5 2.0» 2.5STANDARD DEVIATION (O1)

F|G.4-45 STANDARD DEVIATION ((71) VS KURTOSlS (KG)

KURTOSIS (Ke)

I-60

I-40

I-20

I-00

0°80

060

0-40

0-20—|.5O

BEACH SANDS (PRE -MONSOON)

BACKSHOREBERMFORE SHORE

LOW WATE R MARK+090

1 1 1 1 J-l.00 -0.50 0.00 0.50 1.00SKEWNESS (sK.>

FIG. 4°46 SKEWNESS (SKI) Vs KURTOSIS (KG)

KURTOSIS (KG)

BEACH SANDS (POST-MONSOON)

BACK SHOREBERM

FORE SHORELOW WATER MARK-O-ODD

2~O0r

o oI-60 _ + 4‘A

+A + +I-20 - all °0 00+3 0 °

0 D 0 On A4-4: D00 “B0 0

+030” A U. ° A °0 80 — D o "’ U+ +­At '*'A

A

D

0-40­

0 I J 1 Q-|-20 -040 0 0-40 0-80SKEWNESS (SKI )

F|G.4-47 SKEWNESS SK: Vs KURTOSIS (KG)

3"||_LflZ:i

(IN 63 /1) SIZE GRADE)

IN PAMBA AR SEDIMENTS

(IN I25 /U SIZE GRADE)

FIG-5-I DISTRIBUTION OF HEAVY MINERALS

3J.|ZV/NOW

3Cl|SdO|(J/3.L|‘:)nV

v:>Iw

LBNHVS

3.L|NVW|Tl|S

30N31eNaoH

Nooam

‘3N|'lVINHnO_L _ 3_L|_LViSN3/3N3HiStI3dAH3.L|aO'IH3 sanovdo3"l|.Lm:i 1

ELWVAN

31nounv1s' 3iINVA>I3.LlZ\TNOw 3Cl|SdO'|C|/I-JJ.|E)nV

3.L‘|.LVdV G znnma:-I0IsdoIcI/ausnv E VZDIW "Nooanz E EI.LIZVNOV\| L’

31|NVw| 'I‘I|S % 1:aN_z;Iv9 L_L3NHVE) Q 3.L|N\7lN|'l1|S Lvanw E NOOUIZ

3<JN31eNaoI—I .2: 3CIN3'I8Nz:|OH/3N3?4fi'Si§;':/“E 3.Ll1VJ.SN3/3N3HJ.StI3dAH' S3flOVdO S3flOVdO

$§?,'9§%3I9'° .<é9§é?§.?Ié°SWVHBNIW A/\‘\'/3H JO 3E)VJ.-N3C)U%3d S'IVH.3N|W A-/\V3H ‘:10 39VJ.N3C)H3d

30|SdO|Cl/3.L|9flV

VOIW

I-LLIZVNOW

3.L|NVWl"|'||S

_L3NHV9

NOOUIZ

ECINEHBNHOH3.L|.LVJ.SN3

/3N3H.l.SH3dAH

S3flC)VdO

50.O(D

I-LLIZV NO W

3G|SdO|Cl/3.L|9flV

NOOHIZ

3J.|NVW|'l'l|S

.L EINHV9

VOIW

BGNBWBNHOH3_L|J.V.LSN3

/3N3H.LS2:|3dAH

S3flOVdO

40. 30­ 20 IO.

66(OLDT0

<1‘

ddr0N Q 0

SWVHBNIW A/\V3H JO 39VJ.N3C)2-J3d

G.D4(I(D

IJJEU)

2

3 zmzv NOW3 vonw3013:1010/:-msnv

amwwrrns3aN31eNaoH

3_LliV_LSN3/3N3HJ.S'H3dAH

Nooaa

sanovdo

/\ <5 :3LU (.0C)<K(D

LIJ

'2’.(D

20ION

E

40. 30­ 20. IO.

(IN 63 /U SIZE GRADE)

F|G.5-2 DISTRIBUTION OF HEAVY MINERAL-S IN MANIMALA AR SEDIMENTS

EIJJZVNOW

30|SdO|C] /3.L|!-DOV

VDIW

NOOHIZ

ll-INHVE)

3.L|NVINl'1'1|S [T3ON3'18NHOH

3.L|_LV_LSN3/3N3H.LS2:!3dAH

S3flDVdO

3.L|N\7A>| /

3.LlNVW|'1'l|S

.L3Nl:lV9

VUIIN

3ON3'18NHOH3_Ll.L\'/J.SN3

/3N3H.LSH3dAH

S3flOVdO

6 ' o' o' c‘: o‘OQ) |\ £0 I0 <I' 7”S"|VH3N||N A/\V3H JO 39V.LN332:l3d

o'N

0' 0(IN 250 /U SIZE GRADE) (IN I25 /u SIZE GRADE)

3G|SdO|C] /3.L|9flV

ELLIZVNOW

VOIW

_L3NHV93.L|J.V.LSN3

/3N3H.LSH3dAH

3_L|NVV\||"|‘1|S

3ClN3"|8NHOH‘

NOOHIZ

S3fiOVdO

c§o'o'<r rONso 39ViN3DH3d

I

260..

o‘ID

swaamnw AAVEIH

O

(IN 63 /U SIZE GRADE?

F|G°5-3 DISTRIBUTION OF HEAVY MINERALS IN MINACHIL AR SED|MENT$­

IN MUVATTUPUZHA SEDIMENTS.

(IN 63 /U SIZE GRADE)

auzvmow

awuna

vouw

3.LlHO'1H2) *3Cl|SdOIG/3.LI9nV L ALIJLBNHVO Eauwvwrrns 0

I3NODEIIZ (7)3_LI_LVJ.SN3 2GNBHLSHBCMH to :-zcnsdona/ausnv3CIN3'I8N8OH 9.‘ 31|J_n3

Zsanovdo : annvwanoi:-mzvwow

LBNHVS ‘3.L|NVWl'l‘I|S L

aunuswaNooauz /EIN3HJ.SE:I3cIAH3GISdOIC]/I-l.LI9nv ' 3gN3‘1aNaoH:-maowo ‘ Nooalz

awnvwanoi I S3fIOVdOL :3 T I I I I 1.~3;mvwrrns 2 O O O O O O OQ: co to v V0 (V1 ­‘7°”’" 0 s1va3NIwAAv3H so 39v_LN:-Joaad

LBNBVO §(0

3.Ll.LV.LSN3/3N3H.LSU3d/KH QC

3c1N3'1eNaoH 3sanovdo :15

c$o'ooooo'o|\(QI.Oq'I0(\I­STVHBNIW A/\V3H :IO 39V.LN30tI3d

F|G'5-4 DISTRIBUTION-OF HEAVY MINERALS

3ClN3'l8N80l'-I

3J.OCl|d3

3.LlJ.VdV

3_LlZVNOW

3N|'lVWE:lflO.L

3.Ll"lO8flVJ.S

3Cl|SdO|Cl/3.Ll9nV

.L3N2:lVE)

3.L|NVW|'|"l|SVOIW '“NOOHIZ [­3..|.|.LVJ.SN3

/ 3N 3HJ.SH 3dAH

S3nOVdO

Nooanz

30lSdOICl/3.L|9l"IV

Tums3.LLLV.LSN3‘/3N3HJ.S83d'AH

LBNHVS *VOIIN

:-umvwrrusEGNEWBNHOH

S3fiOVdO

fif % I I I r I rooooooodoan r~ co to <3- r0 cu ­'S"1VEi3N|lN /K/\V3H :10 39\'/J.N33H3d

{JO<K(D

LIJ

'1‘U)

QIf)E LENHVSZ snuna3.Ll.LV.LSN3/3N3H_LSU3dAH

auzvmow *vouw

auuvwrrns [L3C]ISdO|Cl/ELLISDFW

Nooauz

3oN31aNaoH

S3fiOVdO

f‘ ' or 5 c5 c5 6 ofi c3 0L51 |\. (D In <1‘ '0 N "E,‘ swvaamw AAVBH :10 39V.LN33H3dL9

LUN<7;

Q0ION

E

(IN 63 /0 SIZE GRADE)

F|G.5-5 DISTRIBUTION OF HEAVY MINERALS IN PERIYAR SEDIMENTS.

LL Lmm m

T . _ _ A

O 0 O O 0 0

m 8 6 /4 2

3452.: :5... Lo woqhzmuawa

<mz<m

<..<$__z<E

.__I U4 2:2

<INDn.D.:<>D2

m<>Ema

FIG. 5-6 AVERAGE LIGHT MINERALS IN RIVER SEDIMENTS

3'|l_1.flE:l

.L3N8V9

3.LINVA)*|

3_LIZVNOW

3.Ll_LOI8

NOOHIZ

3N3H_LSH3dM-I

3.L|NVW|'l"IIS

EIGN378 NHOH

S3fiOVdO

c5oT_o'(OI-Dd’T

OH)

ON E3 0

S"IV/BENIN A/\V3H .:lO 39V.LN3383d

(IN I20 /U SIZE GRADE)

FIG. 57 HEAVY MINERAL DISTRIBUTION

IN THE INNERSHELF

IN I25 /U SIZE GRADE

SEDIIVIENTS

mtz<>xm_._._mO.._IUm.__.Smm_._._N<ZO$_m_Z_:_<S_mDO._.

.Gzm<o Tm.:.S_m ff

zoo~:NmtE»mzm\mzm:»mmm_n_>:m_ozm._mzmo:mmaoqmomEz<s__._.__m

O O O O O

4 3 2 I

pzmomma ._<mmz_s_ >><m:

F|G.5-8 AVERAGE HEAVY MINERAL DISTRIBUTION IN THEVEMBANAD LAKE SEDIMENTS (IN I25 /U SIZE GRADE)

m:fi.§_zom_>zm :,_.uEm“E_o wI.— Z. zo_Sm_Em_o 252.: ><._u m.m.o_.._

zo_mzmn_m:m x z<m O32xz<m Q32 “E0 oassqum

xz<m 0323:35>E

..- O _.r_o..~«cm:0.,2.2-3E....8TE °/o NI (°/oN|).|.N3.l.NO3 3.|.INOTll80|N.|.NOW .|.N3.lNO3 31138819

EINIEIVW

ft

TVIHLSBHBSJ.

L:-2rom-3-8-2

°/o NI .lN3lNO3 3llN|'l0V)i .lN3.lNO3 3.ll'l'l|

\1 O

O’) C)

U1 O

(.0 CD

IQ O

PERCENTAGE OF CLAY MINERALS

_. L\

O O O

KAOLINITE

MONTMORILLONITE

I I I L 1 IMAY‘ ‘JUNE JULY AUG SEPT DEC

FIG. 5-IO TEMPORAL VARIATION OF CLAY MINERALSIN THE MUD BANK SEDIMENTS

mo$zmummn_ 5:42 u_z<omo m> moszwumma ><._u _.®.0E

moSzwumwn_ ><._u

O9 om om E om om O.» om ON 2 o

4 _ _ _ _ _ _ _ _ _ oo I F

4

O O 4 4 l X4 lm

O O OO O

O O O 0000 0 law

0

Quo 04 o 4 440 f 0 lm

o o o 4 4 4

o o 4 4 1%

O Q d 4 4 ®

4

4 4 In

4 4 4

4 noa

4 4

9

4

2

4

Bzm2_8m 5.4.. o<z<m2m>Bzmzamm xz<m Q32

4

NF

39\7’.LN3383d H3 LLVW CJINVOHO

mEmz_omm

9:: o<z<mzm> 9: z_ m»zmB:mzou ._<o.zm:u mo zo_5m_Em_o >uzw:owEm.m.o_.._

mzzommqu 23.0440 .9 amC<: u_z<omo .3 U2_N .2 5<mOU Np $36.2 .5 mman_ou.o_ s5_zS:.m

s5_mmSoa .0 $D_0OOm N mmmzqozqz .0 2oz. ._<._.OA.~ mnoaoxamoza ..~ z:_mmzo<z .m <z_sA=..m0< .N <u_.__m .—

0 m

.<. z. zo:<Ez8zou .5 z_ zozfitzmuzou .5 Z. zo:<EzH.5zou

9.0 3.0 .20 N00 00 00.0 00.0 .00 .2 m_. m_. S 0_ 0 0 N 3 0.. 0.0 0.0 .3 m.0 0

fill. rII+|l1 flrll_ _lll0 rllno

- 10_

I

1

I

©(‘'3

lN338 3d A3N3flD3U:!

Amv AN. A_.

.<. z_ zozqfizmuzou .<. z_ zo:<EzBz8 .5. z_ zo:<Ezmuz8

2 9 m m q ~ 2 3 .3 2 2 2 2 3 3 om 3 3 .3 3 3

WLIL _ . _HL _ o

1N3 383d A3N3flD3B:i

AZ. go:

Ema z_ zo_»<m»zwuzou Ema. z_ zozfitzmuzoo

om. om. om. o__ om om om om omw o.~ om. om. om. om. oz. om _m om

_ o _ o

H3low nommlom Lomm10% 4o<%MuLow lomm-om iowx

.lou Lou

2: 2: Ev

.>. z_ zo:<EzH.z8 .<. z_ zo:<Ezwoz8 .<. z_ zo:<Ezuoz8

Qm w, w. «e w_ o; ma we ma om 9. Q. no 0 m m g m N _

F||H\ Q l|LI|lO Fli o

o_ ao_ no.5Hmow -o~ lomn. m!om nom . commnow now loam3lam [om nommI.

now now now:2 Ion LE

Am.V Aq_. Am—v

sun. 2. zozfitzmozou 5%. z_ zo:<Ezmuz8 5%. z_ zo:<Ezm_oz8

Smmqmo Eemwqmo omomE8om3omo~2

II 0 Cl a O F I:_|o

o_. Jo_. 1o—.Jmmom 12 -oNmmom [om lomo.Aon -oq loamno-om Low -ommmnow .00 low

-oN [om -o~

2:

.:¢¢ z_ zo:<m~zmuzou

oo. om om ox om om oq om om O._ o.1o—3

I

ON

('3 o cl:Ln Q (77J.N33H3d )\3N3flD3?:l

I

OLO

I

Or\

mEmz_omm .

xz<m 032 ml» z_ m:,m2:mzoo ._<u_:wIu .._o zo_Sm_Em_o Szmsowfi m.m.o_n_

.n:<zomm<u z:_u._<o .9 mwE<s_ u_z<omo..: 55.2 .2

988 .m_ uz_~ .: mwnaou .2 23.23: .m z:_mm<Sn_ .m zaaom smmuz<oz<z .0 zom_ 35» .m maomozamoza ..~ _>5_mwzm<z .m <z_z3< .~ <u_.__m ._

.8. .5 2: .3

.\.z_ zo:.<Ezuuzou .\.. z_ zo:<Ezmozoo .\.z_ zo:<Ezm_ozou .\.z_ zo:<Ezmozoo

ma om 2 m: .2 mm om 3 3 mm $o.:.o NS 9.0 mo.omo.o om E E .2 fie

F _.|. E F.|{ 4.. Mu19 W.-2 3m1 on d3loqw3- omm

5.3 :3 .2 .3 _

.\. z_ zo:.<Ezmuzoo $2. zo:<E2uuzoo .5 z_ zo:<Ezuuz8 :. z_ zo:.«Ezmu2ou

2 mo so we mo 5 2 m m .~ N am 2 S 2 S 3 3 .3 3 3

_ _I|L.||.T O aux19 Mm-o~w..A1 on d3ud8 mm18L8

Am: ANS

Fin. 2_ zo:<Ezwuzoo 5%. 2_ zo:<Ezmuzou

on; Q2 Q2 om E om om om mm. 8 3 om m; o

_.|L o _|_ o

2 2wMom Emom ommon 3%3om BM

8 82 E.om 8

2: S: 3.

5%. z_ zozfltzmuzou Ema z_ zo:<Ezm5zou .<. z_ zo:<Ezmuzou

8 S 8 om 3 om om Sm mam. com mi of mm. 2: mm .2 m.. N. Z 2 m.o

0 _IL F] o _l o

o_ lo» 9.:mcm ow omm3om om ommA3 3 ovam“cm. om ommom 8 $1

2 on 2

NF

o\oE

z_m

Am:

zo:<Ezm5zou

w

v

N

o

_

o3ONam3om8E

T»:

o\o z_ zozfitzmuzou

m w

v

N

o

r.|1

CC)C(V\7

0 c3 0 Q@ uw rnJ.N33ti3d A3N3fl032dd

QI\

woszmumwa II..m.:mo_._n_mo:a m> moézmamma zom: ._<po_.¢.m.o_n_

mofizwumwa 22: 459

9 D 2 9 .2 2 E : 2 m m N

4

< JO 1oo oo o I

OO O O G

O 0 $ 0 Q .

o d 4

o 440 I

o o ac do a 4

o 4 4 < L

do < o d d

o o G 4 d I

o o 4

o o i q ­

O

<4

L

mpzmzzmm 3:: o<z<m2u> Q

m:,az_8m xzqmosz o

—.o~.ono.3wewewewewe3Z339V.|.N3C)B3d Sn8OHdSOHd

moflzmumma 23.25: m> moflzmumfi zom_ .35» m.m.o_n_

moflzmumma 75”: ._<::

2

9 2 m. .1

2

~_

Z

9

Bzm2_owm 92.. o<z<ms_m>

m»zmz_omm xz<m_ Q32

4

_

_

j

11nowenomo89.3N._.m._.1.2S52

39V.lN3383d W0|NV.l|.l

w.oSzmomwn_ mmm_z<ez42 m> wo<EH._omn.E 22: ._SoB.w.u_.._

wofizmummi 22: 44::

2 2 m_. 2 .2 .2 m. N_. :. 2 m m m

4 _ q _ _ A _ _ _ _ _ _

4 I4 44 4 4

o o44 o 4 4

o oo 8&8 4 4 4 4 1o o 4 4 4 Lo o oo o4 4 4 4 4 1ooo8ooo o o o 4 1oo o 4 I4 ..o L

8.0.43.mos8.0m...omg3.09.02.0

m:,mz_8m 8:3 o4z4mzw> 4mEmz_omm xz4mo:z o

2.0

39VJ.N332d3ci 3S3NV9NVW

moSzwomwn_ mamozamoxm m.> m_oSz.nUmH.E mmm_z<oz<s_».m.o_n_

m_o<:$o$n_ mmwz<uz<z

2.0 2.0 m8 3.0 2.o NB :.o oz. 8.0 8.0 8.0 8.0 8.o.B.o 8.0

— . _ 1 _

_ _ _ A _ _ . . _ o

<

-31 mo

0

1 mo.5

O0

o°c9&:8

1

4 l4 $9

o<

<14

< L be

<1-214000:

0=l<o<1<I

.. mo

69060604

Qpddo

O

-3.. I- 3

mEm_z_om_m mx<._ o<z<mzm> 4mLzwz_omm xzqmoaz o

39V.|.N33H 3d SflHOHdSOHd

mo<Emomwn_ 23.23:. m> woflzwummm wmm_z<oz<z m.m.o_n_

moflzwumma wmmzqozqz

8 mod moo So mod moo .B.o moo

m8 2.0 9.0 as .:.o 2.0 N8 :.o

W _ 7 _ _ _ _ _ _ —O

4

o o

4 06’ ocnooaoo o

oo<p4

m:,_mz_owmwx<._ o4z<m2m> <m»zm2_omm v_z<mo:2 o

_

.0 $4 000044

<4 <<O0<P

Odd

nonoNoweweo._.S.N...2.32m._.5239V.LN33H3d WHINV/ill

o MUD BANK SEDIMENTS

A VEMBANAD LAKE SEDIMENTS

Lcg 3.0 V<+­2 ALUE "- °LLI0- :AA23 1.0 —m A0<+­OCL 0 I A L 1 I J IO 1 2 3 4 5 6

SODIUM PERCENTAGE

FIG. 69 SODIUM PERCENTAGE Vs POTASSIUM PERCENTAGE

woSzwumm_n_ <2=>5._< m> moSzm_uEn_ <u_.__mo_.m.o_u_

woSz.u6mwn_ <u_.__m A

am am mm mm «m mm Nm .m om mq mu me mq mg qq mg Nq .q oq

_ 4 _ _ _ _ _ A _ _ _ _ _ _ _ _ _ _ .2I 2

<

O00 000‘ Q Q Q 4 ll

O C O C d 4 W0 ® <0 na W4 I4 q o u S W0 ad 0 o do 3m H.& 34 M I -q%..

O

4 4 oomum 0 _.nWU4

4

4 .1 «N

4 4

G

I S

Q

m:,m§_omm 9:3 o<z<m2m> 4 :3

92 mz_oum xzqm 032 o

-°l77 -046 -269 '49! °7l4 '93?Sand

Cu

Silt

CoCo

I.--288 --065 -I57 {$80 -603 -826CORRELATION COEFFICIENT

F|G_6...||.DENDROGRAM SHOWING BULK SEDIMENT

(MUD BANK) GEOCHEMISTRY

--I39 -O72 - 283 -493 704 -9l5

-°245 -°O34 -I77 -388 -599 -809CORRELATION COEFFICIENT

F|G-6..l2.DENDROGRAM SHOWING VEMBANAD LAKESEDIMENT GEOCHEMISTRY

"U

Cu

Co

Zn

"Mn

Mg

Fe

--I44 -070 -283 -497 -7lO -924

L 1 1 1 1 1 1 1 1 J 1 1--250 --O37 - I77 -390 -604 -817CORRELATION COEFFICIENT

FlG..6..|3. DENDROGRAM SHOWING MUD BANK

SEDIMENTS GEOCHEMISTRY

PLATE - l

A. KAOLINITE (VEMBANAD LAKE)

Dr

/I

B. KAOLINITE (MUD BANK)

PLATE - 2

A. ILLITE (VEMBANAD LAKE)

B. ILLITE (MUD BANK)

PLATE - 3

A. MONTMORILLONITE (MUD BANK)


Recommended