List of Completed Projects Project No. Project description Start Date Finish Date Client Main Client Location Project Type 917 Installation and Precommissioning of Instrumentation and Electrical Equipments in South Pars Project, Phases 6,7,8 10/18/2004 04/03/2008 TIJD(ToyoIdroJGCDAELIM) P.O.G.C IRAN/ Assaluye Construction 806 Daily, corrective, predictive and preventive maintenance of all equipments ( Mechanical , Machinery, Electrical, Instrumentation and HVAC ) of Pars Petrochemical Company 05/05/2006 07/03/2009  Pars  Petrochemical Company  Pars  Petrochemical Company Iran/Mahshahr Maintenance 307/2 Instrumentation Work of Process unit of South Pars Gas Field Development Phase 12 10/21/2012 03/21/2014 Joint Venture of Daelim, Sazeh (DSCT) POGC IRAN/Kangan Construction 936 Installation and Commissioning of Electrical and Instrumentation Equipments in Wide Roll Sheet factory 09/22/2007 09/20/2010 Khozestan Oksin Steal Co. Khozestan Oksin Steal Co. IRAN/Ahvaz Construction 307/1 Electrical Work of Process unit of South Pars Gas Field Development Phase 12 10/06/2012 03/21/2014 Joint Venture of Daelim, Sazeh (DSCT) POGC IRAN/Kangan Construction 812 Total maintenance Contract  ( Mechanical , Machinery, electrical, instrumentation , HVAC and communication ) of Amir Kabir Petrochemical Company 09/21/2007 09/19/2008 Amir Kabir Petrochemical Company Amir Kabir Petrochemical Company Iran/Mahshahr Maintenance
Transcript
Page 1: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

917Installation and Precommissioning of Instrumentation and Electrical Equipments in South Pars Project, Phases 

6,7,810/18/2004 04/03/2008

TIJD(Toyo‐Idro‐JGC‐DAELIM)

P.O.G.CIRAN/

AssaluyeConstruction

806

Daily, corrective, predictive and preventive maintenance of all equipments ( Mechanical , Machinery, Electrical, Instrumentation and HVAC ) of Pars Petrochemical 

Company

05/05/2006 07/03/2009 Pars

 Petrochemical Company

 Pars Petrochemical 

CompanyIran/Mahshahr Maintenance

307/2Instrumentation Work of Process unit of South Pars Gas 

Field Development Phase 1210/21/2012 03/21/2014

Joint Venture of Daelim, Sazeh (DSCT)

POGC IRAN/Kangan Construction

936Installation and Commissioning of Electrical and 

Instrumentation Equipments in Wide Roll Sheet factory 09/22/2007 09/20/2010

Khozestan Oksin Steal Co.

Khozestan Oksin Steal Co.

IRAN/Ahvaz Construction

307/1Electrical Work of Process unit of South Pars Gas Field 

Development Phase 1210/06/2012 03/21/2014

Joint Venture of Daelim, Sazeh (DSCT)

POGC IRAN/Kangan Construction

812Total maintenance Contract  ( Mechanical , Machinery, electrical, instrumentation , HVAC and communication ) 

of Amir Kabir Petrochemical Company09/21/2007 09/19/2008

Amir Kabir Petrochemical 

Company

Amir Kabir Petrochemical 

CompanyIran/Mahshahr Maintenance

Page 2: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

808Maintenance of electrical, instrumentation and HVAC systems in Tondgooyan Petrochemical Company(phase 

1)03/24/2007 08/29/2009

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

Iran/Mahshahr Maintenance

813Maintenance of 

electrical,instrumentation,communication and HVAC systems in Maroon Petrochemical Company. 

10/22/2007 11/20/2009Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIran/Mahshahr Maintenance

701Providing Electrical & InstrumentationTechnical 

Services(Engineering,Procurement,Construction) to all plants of BIPC 

10/18/1998 03/20/2008 BIPC BIPC IRAN/Mahshahr EPC

820Maintanance of electrical,instrumentation,HVAC and communication system  for Tondgooyan Petroch. Co.

02/21/2012 02/19/2013Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

Iran/Mahshahr Maintenance

805Maintenance of electrical , instrumentation and HVAC of 

Tondgooyan Petrochemical company10/02/2005 01/02/2007

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

Iran/Mahshahr Maintenance

809Total  Maintenance services plus completion of remaining installation and commissiong works in 

Borzuye Petrochemical Company07/01/2007 05/20/2008

Borzooyeh Petrochemical 

Company

Borzooyeh Petrochemical 

Company

Iran/Assaluye

Maintenance

Page 3: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

307/3Instrumentation Work of Utility Area of South Pars Gas 

Field Development Phase 1207/31/2013 03/21/2014

Joint Venture of Daelim, Sazeh (DSCT)

POGC IRAN/Kangan Construction

913Installation and Commissioning of Instrumentation and Electrical Equipments in DOROUD Oil Fields Expansion 

Project in Kharg Island04/09/2003 01/19/2005

PETROFAC/TOTAL ELF

Total & ELFIRAN/

Kharg IslandConstruction

500/1Fabrication & Supply of E/I Bulk Supporting Material for 

Phases 6,7,812/21/2004 03/20/2007

TIJD (Toyo‐Idro‐JGC‐DAELIM)

P.O.G.CIRAN/

AssaluyeProcurement

822Maintenance of Electrical & Instrumentation equipments of Kavian Petrochemical Company

03/12/2012 06/21/2013Kavian 

Petrochemical Company

Kavian Petrochemical 

Company

Iran/Assaluye

Maintenance

958Construction, Installation, Precommissioning and Commissioning of Electrical and Instrumentation 

Systems in Phase 16 Platform02/19/2013 03/21/2014

Techno Energy Sepehr 

Co.(TESCO)POGC

IRAN/Bandar Abbas

Construction

401Engineering , Procurement , Installation , Commissioning and Start‐up of the Refinery Feed Skid Metering System

03/12/2006 03/12/2007Tehran OilRefinery Co.

Tehran OilRefinery Co.

IRAN/Tehran

EPC

Page 4: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

305DCS Control System for Seawater Intake System in Soth 

Pars Gas Field Development Phases 22‐2410/09/2012 02/09/2013

Arya Petrosina Co.

POGCIRAN/

AssaluyeProcurement/Construction

909Installation and Precommissioning of Instrumentation 

and Electrical Equipments in Olefin plant.05/07/2004 12/21/2003 ECC Co.

Amir Kabir Petroch. Co

IRAN/Mahshahr Construction

801Maintenance of  instrumentation equipments in all units 

of Faravaresh Petrochemical Company09/21/2002 09/11/2005 Faravaresh Co. BIPC Iran/Mahshahr Maintenance

948Installation & Precommissioning of Instrumentation an 

Electerical systems in TCF ( Tange Bijar )06/25/2009 03/19/2012 N.I.S.O.C N.I.S.O.C

IRAN/ILAM/

TANGBIJARConstruction

945Installation of all Electrical and Mechanical work in 

utility No.2 (kashan)01/27/2009 08/21/2010

Saipa Engineering Expansion Co.

Saipa Co.IRAN/Kashan

Construction

912Installation of Instrumentation and Electrical 

Equipments in HDPE Plant06/22/2003 07/21/2005

Mehvar Sazan Co.

Maroon Petrochemical Companyl

IRAN/Mahshahr Construction

Page 5: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

956Installation, Pre‐commissioning and commissioning of electrical and instrumentation Equipments of propane 

and Bhutan Tank08/07/2011 03/21/2013 Darya Sahel Co.

Kharg 

Petrochemical.  Co.

IRAN/Kharg Island

Construction

804Maintenance of electrical and instrumentation 

equipments in All units of Amir Kabir Petrochemical Company

05/22/2005 05/21/2006Amir Kabir 

Petrochemical Company

Amir Kabir Petrochemical 

CompanyIran/Mahshahr Maintenance

937Installation & Commissioning of Electrical for Car Paint 

Saloon in Zamyad (2) Project10/13/2007 12/21/2009

Saipa Engineering Expansion Co.

Saipa Co.IRAN/Kashan

Procurement/Construction

915Installation and commissioning of Instrumentation and 

Electrical Equipments in EO/EG Plant10/31/2003 02/20/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

599/18Engineering and Supply of DCS,ESD,F&G System for 

Qom Sarajeh project03/18/2010 02/01/2011 O.T.C.C  N.G.S.C.

IRAN/Qom

Procurement

733Execution of Concrete Paving for LDPE Product 

Warehouse, Loading Area and North Road Modification of Future Area

10/06/2011 04/07/2012Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr Construction

Page 6: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

802Maintenance of electrical and instrumentation 

equipments in all units of  Tondgooyan Petrochemical Company

05/08/2004 09/05/2005Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

Iran/Mahshahr Maintenance

405Procurement and installation of Power cables for feeder 

"B" in 6KV substation of olefin cooling07/19/2011 01/18/2012

Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/MahshahrProcurement/Construction

816Total maintenance Contract  ( Mechanical , Machinery, electrical, instrumentation , HVAC and communication ) 

of Bistoon Petrochemical Company04/23/2008 04/22/2009

Bistoon Petrochemical 

company

Bistoon Petrochemical 

company

Iran/Kermanshah

Maintenance

705Re‐Instrumentation & control system upgrade(from 

Pneumatic to Fieldbus/Dcs system)02/08/2004 04/22/2008 BIPC BIPC IRAN/Mahshahr Engineering

907Installation and Commissioning of Instrumentation and 

Electrical Equipments in PTA1 Plant09/21/2001 03/21/2003 ECC Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

803Maintenance of electrical and instrumentation equipments in All units of Marun Petrochemical 

Company08/06/2004 10/07/2005

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIran/Mahshahr Maintenance

Page 7: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

954Installation of Electrical and Instrumentation 

Equipments in Unit 121 of South Pars  phases  15 and 1611/26/2010 01/20/2012

MAPNA BOILER Engineering & manufacturing

Sepanier Oil & Gas 

Engineering Company

IRAN/Assaluye

Construction

599/19Procurement Engineering and Procurement of field 

instruments of SARAJEH Gas Injection Project02/25/2010 07/11/2010 O.T.C.C  N.G.S.C.

IRAN/Qom

Procurement

909/1Commissioning of Instrumentation and Electrical 

Equipments in Olefin plant.03/24/2003 05/20/2005

Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr Commissioning

708Repairing and Calibration of Instrumentation and 

Electrical Equipment11/05/2004 02/05/2007

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr EPC

942Revamping & renovation Of Instrumentation & Control 

System in Sarcheshmeh Copper Coplex01/22/2008 03/21/2010

Tam Iran .Khodro Co

NICI COIRAN/Kerman

Engineering/Construction

723INSTRUMENT ENGINEERING CONSULTING OF OL  PLANT  

EXPANSION  AND CONTROL  SYSTEM  REVAMPING12/16/2008 09/20/2011 BIPC BIPC IRAN/Mahshahr Engineering

Page 8: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

807Maintenance of control and automation system , 

instrumentation equipments , workshops , laboratories and communication system in Esfahan steel Company

05/09/2006 08/06/2008Esfahan  Steel 

CompanyEsfahan Steel Company

Iran/Esfahan

Maintenance

403Electrical and Instrumentation Reconstruction of 

damaged areas in HD Plant of Bandar Imam Petrochemical Co. 

09/21/2010 03/21/2011 BIPC BIPC IRAN/Mahshahr EPC

916Installation & Commissioning of Instrmentation & 

Control System in PP‐Plant11/05/2004 04/22/2007

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

402 reshadat Platform test separation unit revamping 11/22/2009 01/20/2011 I.O.O.C I.O.O.CIRAN/Lavan

EPC

706Reparing and Calibration of Instrumentation & Electrical 

Equipment09/20/2004 09/21/2006

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/MahshahrEngineering/Co

nstruction

379PLC Control System renovation for 10 Oil Pumping 

Station in I.O.P.T.C09/01/2008 06/20/2011

I.O.P.T.C.Tehran Districted

I.O.P.T.CIRAN/Tehran

EPC

Page 9: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

302Procurment & Integration of PLC control system  the total control system for  2MTPY Iron Ore Concentrate 

Plant in Sirjan Iranian Steel Co. (Sisco)01/15/2012 04/16/2012

Tehran Fakor Sanat CO.

Sirjan Iranian Steel CO.

IRAN/Sirjan

Procurement/Manufacturing

707Providing Electrical & InstrumentationTechnical 

Services(Engineering,Procurement,Construction) to various parts/plants of BIPC under an open Contract.

10/04/2004 10/05/2006 BIPC BIPC IRAN/Mahshahr EPC

301Procurment & Integration of PLC control system  the total control system for  2MTPY Iron Ore Concentrate 

Plant in Zarand Iranian Steel Co. (Zisco)01/15/2012 04/16/2012

Tehran Fakor Sanat CO.

Zarand Iranian Steel CO.

IRAN/Tehran

Procurement/Manufacturing

708/1CONSTRUCTION OF INSTRUMENT DEVICES IN PP PLANT 

OF MAROON COMPLEX08/21/2004

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

381

Engineering, Designing,Integration, Installation and commissioning of PLC control system for Material 

Handeling unit of Razi Petrochemical CO.01/10/2009 01/05/2010

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr EPC

599/16Procurement Engineering and Procurement of field 

instruments of HD plant in Bandar Imam Petrochemical company

10/24/2009 02/05/2010 BIPC BIPC IRAN/Mahshahr Procurement

Page 10: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

908Installation of Instrumentation and Electrical 

Equipments in New car Painting saloon.09/21/2001 02/20/2002 Saipa Co. Saipa Co.

IRAN/Tehran

Commissioning

955Pre‐Commissioning and commissioning of Boilers in Unit 

121 of Phases 15 & 16 of South Pars07/22/2011 03/20/2012

MAPNA BOILER Engineering & manufacturing

Sepanier Oil & Gas 

Engineering Company

IRAN/Assaluye

Commissioning

723/2  Consulting Services Electrical & Instrument  Project HD 12/16/2008 09/20/2011 Basparan Co. BIPC IRAN/Mahshahr Engineering

818Annual Contract for Servicing, Calibration and 

Maintenance of Process On‐line Analyzer 02/24/2010 02/22/2013

Arabian Control Systems 

Company L.L.C

Oman Refineries and  Petrochemical Companies

Oman Maintenance

718Sepahan Oil Company detail / Procurement / 

Precommissioning /Construction /Engineering for Re‐Instrumentation from pnewmatic to Fcs/Dcs Project

11/10/2007 08/20/2008Sepahan Oil Refinery

Sepahan Oil Refinery

IRAN/Isfahan

Engineering/Construction

599/21Financial and credit services for Procurement of 

Electrical Motor Drives04/21/2010 09/19/2012

Maad Automation Co.

NICI CO IRAN/Kerman Procurement

Page 11: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

814 Maintenance of HVAC systems in SPGC,Phases 6,7,8 04/05/2008 11/30/2009TIJD(Toyo‐Idro‐JGC‐DAELIM)

Petropars Company

Iran/Assaluye

Maintenance

599/28Procurement of Lighting Cables for South Pars refinery 

phases 15 & 1604/20/2012 04/26/2012

Arya Shahab oil Co.

POGC IRAN/Assaluye Procurement

312 Execution of Electrical Heat Tracing System 09/21/2013 01/22/2014

Joint Venture of Daelim, 

Sazeh, Kayson (DSK)

POGC IRAN/Kangan Construction

924Construction , Termination & Loop Checking of Instrument & Control system in Gas Refinery

09/05/2006 03/20/2007Ahwaz Rad mechanic co.

Parsian refinery

IRAN/Lamerd

Construction

390Cabling and installation of instruments and electrical 

equipment for 2MTPY Iron Ore Concentrate Plant in Gol Gohar iron Ore Co.

07/31/2010 09/20/2011Tehran Fakor Sanat CO.

Gol‐E‐Gohar Iron Ore Co.

IRAN/Tehran

Construction

705/3Re‐Instrumentation &control system upgrade(from 

Pneumatic to Fieldbus/Dcs system)02/08/2004 04/22/2008 Basparan Co. BIPC IRAN/Mahshahr Engineering

Page 12: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

949Installation & Precommissioning of Control system in 

MCR Area (SARP/SUB/C‐045 )04/14/2010 04/14/2011

Consortium of SAZEH,SEL and 

ODCC

Shazand Arak Refinery

IRAN/Arak Construction

950Electrification to equipments of concentration factory in 

sarcheshme cooper03/30/2010 10/20/2011

Moshiran Company

NICI COIRAN/Kerman

Construction

385Design, Engineering and Integration of 

SCADA/Telemetry Control system for Shiraz water and wastewater company (Mianrood region)

12/22/2009 09/20/2011Water and Wastewater Fars Province

Water and Wastewater Fars Province

IRAN/Shiraz

EPC

309Complementary Equipment Procurement, Construction, Programming and Commissioning of Control System for 

Propane Butane Storage Facility06/09/2013 12/08/2013

Kharg Petrochemical 

Co.

Kharg Petrochemical 

Co.

IRAN/Kharg Island

Engineering/Procurement/Manufacturing

730Electrical and Instrument detail engineering of Ethylene 

plant in Gachsaran Petrochemical Complex12/07/2010 08/18/2014

AALI NAM INDUSTRY GROUP 

ENGINEERING

GachsaranPetroch. Co.

IRAN/Gachsaran 

Engineering

943 Loop test of olefin plant (BIPC)  01/12/2009 04/22/2009 BIPC BIPC IRAN/Mahshahr Construction

Page 13: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

824Future Area Electrification for Arya Sasol Polymer 

Company11/21/2012 11/20/2013 ASPC CO. ASPC CO. IRAN/Assaluye

Procurement/Construction

919Installation and Commissioning of Fire Alarm and 

Fighting System08/25/2005 11/20/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

817Supply ,installation Commissioning, Calibration , 

Repair& Maintenance of Analyzers in Isfahan Refinery Co.

05/18/2009 08/15/2010Isfahan 

Refinery Co.Isfahan 

Refinery Co.Iran/Isfahan

Maintenance

705/2Re‐Instrumentation &control system upgrade(from 

Pneumatic to Fieldbus/Dcs system)02/08/2004 08/22/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

707/2Cable ladder /tray Installation for OL‐plant expantion & 

revamping project07/26/2005 01/26/2006 BIPC BIPC IRAN/Mahshahr Construction

705/1Re‐Instrumentation &control system upgrade(from 

Pneumatic to Fieldbus/Dcs system)02/08/2004 08/22/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

Page 14: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/124Construction of Instrumentation and Electrical 

Equipment of PTA‐1 Project04/11/2003 10/05/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Engineering

901Revamping the Instrumentation and Renovation of 

Control System to DCS in Sulphuric Acid, Gas Purification and Sulphur Plants

03/17/1997 01/20/1998Razi

 Petroch. Co.Razi

 Petroch. Co.IRAN/Mahshahr Construction

701/105Engineering and Procurement Services for Upgrading the existing Control System of OL plant to FCS / DCS

12/31/2002 09/19/2008 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Pro

curement

739 Fire Alarm System Detail Engineering Services 06/21/2012 04/22/2013 N.I.S.O.C N.I.S.O.CIRAN/Ahvaz 

Engineering

386PLC control system Integration and commissioning  for 2MTPY Iron Ore Concentrate Plant in Gole‐Gohar Iron 

ore Co.01/05/2010 07/06/2010

Tehran Fakor Sanat CO.

Gol Gohar Iron Stone Co.

IRAN/Tehran

EPC

743Cable Pulling, Procurement & Installation of Cable Tray  

/ Ladder  from AIS PowerPlant to Sub‐Station 5

08/13/2013 09/27/2013Sahel 

consultant Co.

Damavand Petrochemical 

ComplexIRAN/Assaluye Construction

Page 15: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

953/3Installation and commisining of instrument and fire 

alarm system for 32'' line of 15 & 16 phases04/18/2013 07/21/2013

Sanat Gostar Kish

P.O.G.C IRAN/Assaluye Construction

391/1Engineering, Designing, Installation and commissioning of PLC control system and monitoring for water block of 

Fajr 2 petrochemical company (EC Contract)08/22/2010 10/19/2012 Zolal Iran Co.

Fajr Petroch. Co.

IRAN/MahshahrEngineering/Co

nstruction

723/1INSTRUMENT ENGINEERING CONSULTING OF OL  PLANT  

EXPANSION  AND CONTROL  SYSTEM  REVAMPING12/16/2008 01/22/2010 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

952Installation of communication system in Pars 

petrochemical port08/22/2010 10/20/2013

Pars Petroch. Seaport

N.I.P.CIRAN/

AssaluyeConstruction

735 3‐Phase Civil Project 11/22/2011 05/21/2012Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr Construction

906Installation and Precommissioning of Instrumentation 

and Electrical Equipments in AMMONIA Plant (Revamping project)

06/22/2001 01/24/2001Razi

 Petroch. Co.Razi

 Petroch. Co.IRAN/Mahshahr Construction

Page 16: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

738E&I Engineering , Procurement , Construction & 

Commissioning for Absorbtion Chillers of CA/VC Units04/10/2012 12/11/2013 BIPC BIPC IRAN/Mahshahr EPC

905Installation and Commissioning of Instrumentation and 

Electrical Equipments in Urea/ammonia Plant08/31/2000 12/23/2000 Shakhes Co.

Razi Petroch. Co.

IRAN/Mahshahr Construction

599/27Procurement of Earthing material for South Pars 

refinery phases 15 & 1604/11/2012 04/26/2012

Arya Shahab oil Co.

POGC IRAN/Assaluye Procurement

599/22Procurement Engineering and Procurement of Orifice flow elements, restriction orifices and high pressure 

venturi of SARAJEH Gas Injection Project05/01/2010 08/24/2010 O.T.C.C  N.G.S.C.

IRAN/Qom

Procurement

953/2Installation and commisining of instrument and fire 

alarm system for 32" line of 6,7 & 8 phases03/05/2013 05/20/2013

Sanat Gostar Kish

P.O.G.C IRAN/Assaluye Construction

711/9DETAIL & PROCUREMENT ENGINEERING OF INLINE 

FLOW METERS OF MASS & ENERGY BALANCE IN KIMIA COMPANY

11/18/2006 07/20/2008 Kimia Co.  BIPC IRAN/Mahshahr Engineering

Page 17: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

393PLC control system Integration and commissioning  for 2MTPY Iron Ore Concentrate Plant in Zarand Iranian 

Steel Co. (Zisco)11/24/2010 07/21/2011

Tehran Fakor Sanat CO.

Zarand Iranian Steel CO.

IRAN/Tehran

Engineering/Procurement/Manufacturing

941Procurment and Cable Laying for Power Transformers between fajr and Maroon Petrochemical Complex 

10/31/2007 03/21/2009Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

722Basic and detail engineering of see water intake project 

for gas condensate refinery10/06/2008 09/20/2010

Iran Marine industrial Co.(Sadra)

Persian Gold Star Oil Co.

IRAN/Bandar Abbas

Engineering

599/23Procurement Engineering and Procurement of field 

instruments of Golgohar POLYCOM project08/03/2010 12/04/2010

Fakor Sanat Tehran 

Co.

Gol Gohar Iron Ore Co.

IRAN/Tehran

Procurement

394PLC control system Integration and commissioning  for 

Purge Gas Recovery plant in Razi Pet. Co.04/19/2011 08/17/2011

AALI NAM INDUSTRY GROUP 

ENGINEERING

Razi Petroch. Co.

IRAN/MahshahrEngineering/Procurement/Manufacturing

706/9INSTALLATION OF FIRE ALARM SYSTEM FOR KHOUZESTAN PETROCHEMICAL COMPLEX

10/21/2004KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Construction

Page 18: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

810Design, Engineering, Procurement, Construction & Commissioning of Electrical & Intstrumentation 

equipments in Tang Bijar07/02/2007 04/08/2008 N.I.S.O.C I.C.O.F.C

Iran/Ilam/

Tange‐BijarEPC

201Training of New Operational Perssonel ( Specialized 

Course for Electrical & Instrumentation Group)09/21/2006 02/20/2008

South Pars Gas Refinery

South Pars Gas Refinery

IRAN/Mahshahr & Assaluye

Training

720Detail / Procurement Engineering for Gachsaran 

Petrochemical Complex , OL Plant  ( Instrumentation / Electrical  )

02/21/2008 03/20/2009

AALI NAM INDUSTRY GROUP 

ENGINEERING

GachsaranPetroch. Co.

IRAN/Gachsaran 

Engineering

737Instrument Engineering Consulting for sarab Aliumina 

project04/06/2012 12/05/2012

Sahand research Co.

Sahand research Co.

IRAN/Tabriz Engineering

929Installation , Commissioning & Start‐up of 

Instrumentation & Control System in Gas Refinery (Tabnac)

01/26/2007 08/21/2007 Payandan co.Parsian refinery

IRAN/Lamerd

Construction

951Performing Piping and bridging gasoline tanks to pump house in Saipa automobile manufacturing site in Kashan 

06/19/2010 01/20/2011 Saipa Co. Saipa Co.IRAN/Kashan

Construction

Page 19: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

599/31Procurement of Protection system‐surveillance camera 

(CCTV)08/06/2012 05/09/2013

Petrochemical Kala

BIPC (Basparan  Co. 

)IRAN/Mahshahr

Procurement/Construction

728/206 Field Engineering Services 04/12/2011 05/21/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEngineering

392PLC control system Integration and commissioning  for 2MTPY Iron Ore Concentrate Plant in Sirjan Iranian Steel 

Co. (Sisco)10/16/2010 07/21/2011 FST CO.

Sirjan Iranian Steel CO.

IRAN/Tehran

Engineering/Procurement/Manufacturing

701/175Procurement Services for the upgrade project Control 

System07/06/2007 09/19/2008 Basparan Co. BIPC IRAN/Mahshahr Engineering

700/248ENGINEERING CONSULTING SERVICES TO KAZEROON 

PETROCHEMICAL COMPLEX02/21/2010 06/21/2011

farsan control Co.

Kazeroon Petrochemical 

Co.IRAN/Kazeroon Engineering

819 Analyzer Maintenance Services for Aromatic Oman L.L.C 10/11/2010 04/08/2012Arabian Control 

Systems Company L.L.C

Aromatic Oman L.L.C ( 

AOL )Oman Maintenance

Page 20: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

202Specific Instrumentation Training course  for South Pars 

Gas Engineers Phases 9 & 1001/26/2009 05/25/2008 Petro pars co. Petro pars co.

IRAN/Shiraz

Training

363Design & Production of ACPD/PTC

 Model No. 729 Electronic Card (60 Sets)09/30/2004 09/30/2005 Kimia Co.  BIPC IRAN/Mahshahr

Design & Manufacturing

910Engineering, Procurement Services,Installation and 

procommissioning  of Electrification of New units in 3rd ammonia plant.

04/25/2003 05/14/2004 P.I.D.E.M. Co.Razi

 Petroch. Co.IRAN/Mahshahr Construction

599/5 Procurement & Supply of Piping Valves 08/24/2008 11/20/2009Tehran 

Refinery Co.Tehran 

Refinery Co.IRAN/Tehran

Procurement

383Engineering , Procurement, Installation and 

commissioning of Electrical Distribution Panles for SINA Chemical Industry

10/04/2009 05/21/2010Sina

Petroch. Co.Sina

Petroch. Co.IRAN/Shiraz

EPC

701/63Procurement, Installation and Commissioning of Instrumentation and Electricalworks of Jetty No.2

09/18/2001 04/07/2002 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

Page 21: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

368Design & Production of ACPD/PTC

model No. 998‐3 Electronic Card (60 Sets)06/25/2005 03/12/2007 Kimia Co.  BIPC IRAN/Mahshahr

Design & Manufacturing

712Providing Consulting Services of Electerical and Instrumentation To Faravaresh Petrochemical Co.

01/22/2006 01/20/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

914Engineering , Procurement and Execution of 

Electrification of Sea Water Pumps10/30/2004 03/16/2005 P.I.D.E.M. Co.

Razi Petroch. Co.

IRAN/Mahshahr Construction

395PLC control system Integration and commissioning  for 

incinerator unit of Fajr Pet. Co.08/19/2011 10/19/2011 KSS

Fajr Petroch. Co.

IRAN/MahshahrEngineering/Procurement/Manufacturing

203Special Training for manufacturing, 

procurement,installation &Commissioning, Electrical ,Control & Instrument of NIOPDC

10/04/2008 05/26/2009 N.I.O.P.D.C N.I.O.P.D.CIRAN/Shiraz

Training

918Engineering, Procurement, Installation and 

Commissioning of Analysers06/25/2005 11/11/2005

Isfahan Refinery Co.

Isfahan Refinery Co.

IRAN/Isfahan

Construction

Page 22: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

706/5CALIBRATION & LOOP CHECK OF INSTRUMENTS IN 

KHOUZESTAN PETROCHEMICAL COMPLEX11/06/2004

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Construction

706/10ELECTRICAL/ INSTRUMENT CONSTRUCTION & 

PRECOMMISSIONING ACTIVITIES OF KHOUZESTAN PETROCHEMICAL COMPLEX

10/21/2004KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Construction

701/160 Maintenance Supervision Services 01/22/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

736development of Utility Services to new administrative 

office04/06/2012 04/10/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Procurement/Construction

504 Interface Management 10/27/2009 07/21/2010 Imensazan Co

Sepanier Oil & Gas 

Engineering Company

IRAN/Tehran

Engineering

721 Light End Hydrotreatment Project 03/02/2008 07/30/2008 Bou Ali Sina Petrochemical 

Co.

 Bou Ali Sina Petrochemical 

Co.

IRAN/Tehran

Engineering

Page 23: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

711Providing Consulting Services of Electerical and Instrumentation To Kimia Petrochemical Co.

01/22/2006 07/22/2007 Kimia Co.  BIPC IRAN/Mahshahr Engineering

599/13 Supply of Instrument and Electrical Bulk Material 06/10/2009 02/18/2011Eni Iran Tehran 

branchEni Iran 

Tehran branchIRAN/Tehran

Procurement

944 Installation of industrial sewage in kashan  01/21/2009 02/21/2010Saipa 

Engineering Expansion Co.

Saipa Co.IRAN/Kashan

Construction

928Installation , Commissioning & Star‐up of Fuel Cord 

System in 120 Gas Station12/02/2006 05/21/2007 I.T.I N.I.O.P.D.C

IRAN/Hormozgan,Booshehr,Abadan

Construction

911Procurement, Installation and Commissioning of 4th 

Dryer in Air & Nitrogen Plant05/25/2003 09/04/2004 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

723/5 DISMANTLING OF OBSOLETE PANELS OF OL PLANT 01/03/2010 03/05/2010 BIPC BIPC IRAN/Mahshahr Construction

Page 24: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

643Calibration Services of Hydrostatic gauges of Arak 

Shazand Refinery 06/25/2011 03/20/2012

Consortium of SAZEH,SEL and 

ODCC

Shazand Arak Refinery

IRAN/Arak Calibration

500/2 Supply of  Instrument Bulk Material 05/18/2006 06/20/2006Karoon 

Petrochemical Complex

Karoon Petrochemical 

ComplexIRAN/Mahshahr Procurement

330PDesign, manufacturing and commissioning of process 

data recording computer system ( 400 channel )

01/26/2000 10/26/2001 BIPC BIPC IRAN/MahshahrDesign & 

Manufacturing

599/37Supplying  of Cartridge Suction for Bid Boland Gas 

Refinery Co.01/22/2014 03/07/2014

Bid Boland Gas Refinery Co.

Bid Boland Gas Refinery 

Co.Omidiyeh Procurement

701/61Engineering and Procurement Services for the 

Flowmeters09/05/2001 04/23/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

933Installation and commisioning of Cathodic Protection 

System in Oxydental Refinery (Oman)01/01/2007 06/16/2008 RITS Co. OXY Co. OMAN Construction

Page 25: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/38Engineering and procurement Services for the U.M.S. 

Project01/21/2001 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Procurement

728/308Permanent Electrical Power Supply for PACK LINE 

Equipment06/05/2011 09/28/2011 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

701/220 As_builting the P & IDs 02/16/2005 02/10/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

928/1The Commisioning, Maintanance, Defect Removal and 

the Periodical Audit Services of Fuel Cord System04/20/2007 07/18/2007 I.T.I N.I.O.P.D.C

IRAN/Hormozgan,Booshehr,Abadan

Construction

726 Design & manufacturing of Filling Panel of HD unit 04/13/2010 08/11/2010 ISC Company BIPC IRAN/Mahshahr Procurement

648Calibration Services for Maroon Petrochemical Co. 

during the overhaul period05/06/2014 06/20/2014

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Calibration

Page 26: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

603 Calibration Services for Instrumentation Devices 05/22/2005 05/23/2010Navid zarshimi industrial co.

Navid zarshimi industrial co.

IRAN/Mahshahr Calibration

701/241Revamping , Renovation and Commissioning of the 

Instrumentation06/27/2005 04/02/2006 Kimia Co.  BIPC IRAN/Mahshahr Construction

704Detail Engineering To Control System and F&G of NFL 

Refinery05/02/2002 07/19/2003

Engineering International Co. (Eritec)

Engineering International Co. (Eritec)

IRAN/Mahshahr Engineering

706/8DETAIL ENGINEERING FOR KHOUZESTAN 

PETROCHEMICAL COMPLEX07/12/2004

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Engineering

712/4INSTRUMENT SITE SUPERVISION FOR OL PLANT 

(EXPANSION PROJECT)08/22/2006 09/19/2008 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

926 Construction & Commissioning of 4th Nitrugen Tank 10/05/2006 09/04/2007 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

Page 27: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

599/34Supplying of spare part and required software of Silvani 

fire truck06/06/2013 09/06/2013

Pazargad Nonindustrial Operations Co.

Pazargad Nonindustrial Operations Co.

IRAN/Assaluye

Procurement

940Repair and Rearrangment of telephone cables between MDF to Communication Boxes of all Plants in Bandar 

Imam Petrochemical Complex11/22/2007 05/21/2008 Kharazmi Co. BIPC IRAN/Mahshahr Construction

305PDesign & Integration of DMTI  indicator system Model 

No. A300  (2 Sets)01/14/1996 04/15/1996 Faravaresh Co. BIPC IRAN/Mahshahr

Design & Manufacturing

701/119Commissioning & loop checking of control system of 

PTA‐1 project02/20/2003 04/07/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Commissioning

364Design & Integration of Calibration Bench Model No. CB‐

504 (10 Sets)10/02/2004 10/03/2005

Technical & Vocational 

Education Fars Office

Technical & Vocational 

Education Fars Office

IRAN/Shiraz

Design & Manufacturing

741Engineering and Technical Services for Damavand 

Petrochemical Complex according to Owner requestes10/19/2012 01/19/2013

Damavand Petrochemical 

Complex

Damavand Petrochemical 

ComplexIRAN/Assaluye Engineering

Page 28: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

502 Risk Management 06/06/2009 07/21/2010 Imensazan Co

Sepanier Oil & Gas 

Engineering Company

IRAN/Tehran

Engineering

715Consulting Services in Physical Servey of 

Instrumentation Equipment in site12/03/2006 01/20/2007

Tam Iran .Khodro Co

NICI COIRAN/Kerman

Engineering

811Collection of technical data of Kharg onshore and 

offshore instrumentation equipments11/01/2007 04/22/2008 I.O.O.C I.O.O.C

Iran/Kharg Island

Maintenance

701/53Engineering and Procurement Services for the 

Flowmeters08/05/2001 04/23/2007 Basparan Co. BIPC IRAN/Mahshahr

Engineering/Procurement

939Procurement, Construction & Commissioning of 

Instrumentation Equipments of Tank FB‐ 201 in AR plant (Bandar Imam Petrochemical Complex)

11/10/2007 05/12/2008 Faravaresh Co. BIPC IRAN/MahshahrProcurement/Construction

821 Service Contract for Plant Outage in Barakah power plant 01/01/2012 07/12/2012Arabian Control 

Systems Company L.L.C

Nomac ( National 

operation and maintenance company )

Oman Maintenance

Page 29: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

345PDesign & Integration of ACPD/PTC Model No. 998‐3 

Electronic Card (30 Set)08/21/2001 08/21/2002 Kimia Co.  BIPC IRAN/Mahshahr

Design & Manufacturing

377Repair of  4 types of Electronic modules  for CA plant in 

BIPC12/09/2007 05/12/2009 Kimia Co.  BIPC IRAN/Mahshahr Maintenance

728/301 Design, Supply of socket outlets on towers 12/27/2010 11/14/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/187Procurement, Installation and Commissioning of 

Instrumentation of Phase 1 of the OL Expansion Project09/07/2004 12/06/2006 BIPC BIPC IRAN/Mahshahr Construction

731Instrumentation Engineering Services for Incinerator of 

Fajr Petrochemical Co.01/09/2011 09/19/2012 KSS

Fajr Petroch. Co.

IRAN/Shiraz

Engineering/Procurement

503 Cost Management 08/25/2009 07/21/2010 Imensazan Co

Sepanier Oil & Gas 

Engineering Company

IRAN/Tehran

Engineering

Page 30: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

728/302 Designing of Electrical System for Workshop Building 12/22/2010 08/27/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEngineering

938Procurement, Construction & Commissioning of 

Instrumentation Equipments of Tank FB‐ 901 in AR plant (Bandar Imam Petrochemical Complex)

11/03/2007 09/19/2008 Faravaresh Co. BIPC IRAN/MahshahrProcurement/Construction

599/32Procurement ,Construction & commissioning  Services 

of Surveillance Camera for BD/SR Unit12/03/2012 06/03/2013 Basparan Co. BIPC IRAN/Mahshahr

Procurement/Construction

599/2 Procurement Services for Instrumentation (Relay) 05/16/2008 11/10/2008KAroon 

OIL AND GASN.I.S.O.C

IRAN/Ahvaz 

Procurement

706/1ENG./ CONSTRUCTION & COMMISSIONING SERVICES 

FOR SINCRONIZING OF THE DIESEL GENERATOR WITH POWER NETWORK

09/25/2004KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/MahshahrEngineering/Co

nstruction

605 Calibration Services for Instrumentation Devices 04/27/2004 04/28/2006Fajr 

Petroch. Co.Fajr 

Petroch. Co.IRAN/Mahshahr Calibration

Page 31: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/23Engineering and Procurement Services for the Fire 

Alarm System02/10/2000 02/10/2002

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/MahshahrEngineering/Pro

curement

728/325installation of waterproof electrical Socket across the 

Pipe way from area 1 to area 807/28/2012 11/20/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

389PLC control system Integration and commissioning for 

Chadormalu Tailing Recovery Plant06/02/2010 02/10/2011 FST CO.

Chadormalu Mining & 

Industrial CO.IRAN/Chadormalu

Engineering/Procurement/Manufacturing

365Design & Integration of  calibration bench  Model No.CB‐503, CB‐504 , CB‐505 (9 Sets) ( Pneumatic & Analyzer )

09/03/2004 02/02/2006Mesbah Energi 

Co.Mesbah

 Energi Co.IRAN/Shiraz

Design & Manufacturing

396/2Design, procurement and commissioning of an operator work station computer for reshadat platform PLC system

12/04/2013 02/03/2014 EPC

501 Desing & Manufacturing of Electerical & Control Panel 09/23/2007 11/10/2007N.I.S.O.C

( Aghajary Oil & Gas) Co.

N.I.S.O.C IRAN/Omidiyeh Procurement

Page 32: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/179Revamping and Renovation of Instrumentation for 

area's 900D,200B,250 A/B/C07/23/2004 02/01/2005 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/22  Installation and  Commissioning of the CA/VC Analysers 02/09/2000 08/08/2000 Kimia Co.  BIPC IRAN/Mahshahr Construction

314P Design & Integration of SAM Alarm Cards (711 Sets) 05/14/1997 08/13/1997 BIPC BIPC IRAN/MahshahrDesign & 

Manufacturing

378Design & Implementation  and Commissioning of  HMI  

& PLC  logic  for PET Pilot plant01/22/2008 01/04/2009

Pajohesh & Ffanavari 

Petrochemical Co.

Pajohesh & Ffanavari 

Petrochemical Co.

IRAN/Mahshahr EPC

605/2Repair , maintenance and calibration services for Safety 

Valves09/21/2006 04/28/2007

Fajr Petroch. Co.

Fajr Petroch. Co.

IRAN/Mahshahr Calibration

709/1 04/27/2005 04/28/2006 IRAN/Mahshahr Engineering

Page 33: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

599/26Procurement of Cable Ladder for South Pars refinery 

phases 15 & 1603/15/2012 03/20/2012

Arya Shahab oil Co.

POGC IRAN/Assaluye Procurement

903Installation and Commissioning of Instrumentation and 

Electrical Equipments in Sulphunasion Unit09/21/1999 11/08/1999 Nasb Gostar Co. Paksan Co.

IRAN/Tehran

Construction

701/178Engineering Services for Equipment Installation of 

Perchlorine Production Unit instrumentation.07/12/2004 09/11/2004

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Engineering

616Procurement and commissioning of Calib. Temp. Ovens 

for 9th. Olefin Plant09/14/2007 10/31/2007 Technip Technip

IRAN/Assaluye

Calibration

701/107Engineering , Construction and Commissioning of 

Neutralization Pond03/04/2003 07/13/2003 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

707/27 INSTALLATION OF CATALYST PUMPS IN LD PLANT  03/15/2006 04/28/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

Page 34: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

708/8Installation of SAMPLE POINT for Lab with frame 

construct and installation03/08/2006 03/29/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

344PDesign & Integration of ACPD/PTC 729 Electronic Card 

(15 Sets)09/14/2001 10/10/2002 Kimia Co.  BIPC IRAN/Mahshahr

Design & Manufacturing

701/142Engineering and Procurement Services for Spare Parts of 

Electrical, Instrument & Analysers 06/30/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/MahshahrEngineering/Pro

curement

380Engeeniring, Design, Software Development, installation  

 and commissioning of HMI for PSA plant in BARCO11/14/2008 08/15/2009

Bandar abbas Refinery Co.

Bandar abbas Refinery Co.

IRAN/Bandar Abbas

EPC

396/1 02/20/2013 05/22/2013Engineering/Co

nstruction

701/51Engineering and Procurement Services for the 

Flowmeters07/18/2001 Kimia Co.  BIPC IRAN/Mahshahr

Engineering/Procurement

Page 35: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

599/29Procurement of Lighting Distribution Panels for South 

Pars refinery phases 15 & 1605/21/2012 06/17/2012

Arya Shahab oil Co.

POGCIRAN/

AssaluyeProcurement

706/7INSTALLATION OF CABLE TRAY COVERS IN KHOUZESTAN 

PETROCHEMICAL COMPLEX02/02/2005

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Construction

728/304

1‐ Sandwich panel office building in corner of PE‐warehouse building for SGS and chain people. 2‐ Drawing for power supply for Roll‐up Doors. 3‐ 

Additional load on LV1 & LV2 panel due to additional of 322 fans in product warehouse

12/30/2010 03/18/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/207Engineering, Procurement Services and Installation  of 

Closed Circuit Cameras11/09/2004 04/18/2005 Ab Niroo Co. BIPC IRAN/Mahshahr EPC

606 Calibration Services for Instrumentation Devices 02/21/2006 04/23/2007Saze 

engineering consulting co.

Saze endineering consulting co.

IRAN/Mahshahr Calibration

307PDesign & Integration of Computerized DMTI (temperature indicator) (TI‐Desk) (2 Sets)

10/10/1996 05/13/1997 BIPC BIPC IRAN/MahshahrDesign & 

Manufacturing

Page 36: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

621Calibration Services for Instrumentation/Elecrtical 

Measurement Equipment of Fanavaran Petrochemical Co.

12/17/2007 12/17/2010 Fanavaran Co. Fanavaran Co. IRAN/Mahshahr Calibration

599/10 Supply of spare part for GE (General Electric) System  02/10/2009 03/19/2009 Mashahir Co. Mashahir Co.IRAN/Tehran

Procurement

701/213Installation and Commissioning of Instrumentation and 

Electrical Equipment of Centrol Loading Terminal01/06/2005 06/07/2005 Faravaresh Co. BIPC IRAN/Mahshahr Commissioning

599/1 Supply of Instrumentation 07/04/2007 05/17/2008 P.I.D.E.M. Co.Razi 

Petrochemical Complex

IRAN/Mahshahr Procurement

342PDesign & Integration of ACPD/PTC 1002 Electronic Card

 (45 Sets)09/27/2001 12/28/2001 Kimia Co.  BIPC IRAN/Mahshahr

Design & Manufacturing

701/43 Engineering and Procurement Services for the Analysers 04/26/2001 09/30/2003 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

Page 37: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/177Engineering and Installation of Instrumentation and 

Electrical Equipment of Ethylene Tank07/10/2004 08/16/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

319PDesign & Integration of Computerized Process recorder 

Model CPR‐100 (1 Sets)10/03/1998 10/13/1999 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

384 Repair of electronic cards for  CA Plant in BIPC  (100 sets) 12/22/2009 03/21/2010 Kimia Co.  BIPC IRAN/Mahshahr Maintenance

313PDesign & Integration of ACPD/PTC729 Electronic Card 

(15 Sets)02/19/1997 02/15/1999 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

947Repair and Rearrangment of telephone cables between MDF to Communication Boxes of all Plants in Bandar 

Imam Petrochemical Complex02/02/2009 06/27/2009 Kharazmi Co. BIPC IRAN/Mahshahr Construction

404Procurement and installation of level gauge and Level 

Switch for Waste Oil Tank in PX Plant01/11/2011 07/21/2011 BIPC BIPC IRAN/Mahshahr EPC

Page 38: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

316P Design & Integration of Control & Interlock Panels 06/01/1998 08/31/1998  Dena Tire Co.  Dena Tire Co.IRAN/Shiraz

Design & Manufacturing

707/17COMMUNICATION OF IMPORTANT SIGNALS OF LOAD 

SHEDING SYSTEM IND UT PLANT03/27/2006 12/25/2006 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

701/131Design of Earthing System for the Computer Network of 

BIPC Office Buildings03/11/2004 03/07/2005 Kharazmi Co.

BIPC( Kharazmi  Co. 

)IRAN/Mahshahr Engineering

632Calibration Services of Instrumentation  Equipment for 

Paydar Project11/29/2009 01/20/2010 OEID Co. OEID Co. IRAN/Shoosh Calibration

701/185Engineering Services for the Instrumentation of the 

Central Loading Terminal09/07/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/121Construction Supervision Services for Cable modification 

Project of BIPC.04/10/2003 08/08/2003 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

Page 39: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

708/22Electrical and instrumentation work associated with 

TRAICING و ANALYZER unit 05/03/2006 05/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

372 Design & integration of Stablizer Package Local Panel 12/18/2006 03/18/2007Tehran Keyhan

 Ide co.BIPC IRAN/Mahshahr

Engineering/Procurement

647Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Navid Zar Chemi Co.

04/23/2013 04/24/2014Navid zarshimi industrial co.

Navid zarshimi industrial co.

IRAN/Mahshahr Calibration

701/249Instalation and Commissioning of Instrumentation of 

Condition Monitoring of the Compressors07/20/2005 12/16/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

310PDesign & Integration of ACPD/PTC 998‐3 Electronic Card  

(1 Set)02/18/1997 05/21/1997 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

382Commissioning of ESD System for NOORABAD GAS 

COMPRESSOR STATION 04/13/2009 07/21/2009 NIGC NIGC IRAN/Noorabad Commissioning

Page 40: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

815Offshore and Onshore Instrumention data collection 

and equipment Tagging in Kharg Island04/05/2008 06/02/2008 I.O.O.C I.O.O.C

Iran/Kharg Island

Maintenance

707/6INSTALLATION OF INLINE FLOW METERS IN SR PLANT OF 

BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

725Engineering and manufacturing of HD plant flaker control panel in Bandar Imam petrochemical factory

04/13/2010 04/23/2010

International Services 

Corporation ( ISC )

BIPC IRAN/Mahshahr Procurement

701/120Installation of Instrumentation and Electrical Equipment 

of PTA‐1 Project02/20/2003 05/21/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

701/111Installation and Testing the Electrical Devices of Diesel 

Gen. House and Main Workshop01/23/2003 01/23/2004

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

703Detailed design and supply of electricity to the new unit 

of Razi petrochemical complex10/17/2001 10/17/2002

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr Engineering

Page 41: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/71Engineering, Installation and Commissioning of the 

Tanks Management System10/19/2001 03/07/2002 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/12Engineering, Procurement and Construction of LYNX‐

1000 Heptane Drying Unit05/14/1999 10/18/1999 Basparan Co. BIPC IRAN/Mahshahr EPC

611/1Repair , Maintenance and Calibration Services for 

Maroon Petrochemical Co.05/30/2007 05/22/2010

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Calibration

728/305 Modification of PE WAREHOUSE Internal Lighting System 04/26/2011 08/14/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

706/12DETAIL ENGINEERING FOR PACKAGE'S INTERLOCKS IN 

KHOUZESTAN PETROCHEMICAL COMPLEX04/28/2005

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/MahshahrEngineering/Co

nstruction

317PDesign & Integration of Signal Isolator Model SI‐1018 (3 

Sets)05/27/1998 08/27/1998 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

Page 42: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/57  Installation of Qquipments in New Laboratory  08/07/2001 12/08/2001 Kimia Co.  BIPC IRAN/Mahshahr Construction

646Calibration Services for Instrumentation/Elecrtical 

Measurement Equipment of Rojin Sanat Co.  02/21/2012 06/21/2012 Rozhin Co. Rozhin Co. Calibration

331P Design & Integration  of P/I Transducer (78 Sets) 01/30/2000 01/05/2002 BIPC BIPC IRAN/MahshahrDesign & 

Manufacturing

931Instrumentation Cable Laying in Parsian ‐ 2 Gas Refinery 

(lamerd)04/28/2007 05/24/2007 Payandan co.

Parsian refinery

IRAN/Lamerd

Construction

615Repair and Calibration of Instrumentation and Electrical 

Equipment for Khoozestan Petrochemical Co.08/17/2007 08/17/2007

KhoozestanPetrochemical 

Co.

KhoozestanPetroch. Co.

IRAN/Mahshahr Calibration

640Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Navid Zar Chemi Co.  

04/24/2011 04/23/2013Navid zarshimi industrial co.

Navid zarshimi industrial co.

IRAN/Mahshahr Calibration

Page 43: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

746Preparation of Scope of work for designing and 

engineering phasesof DCS project

05/20/2014 08/17/2014Tabriz Oil Refinery Company

Tabriz Oil Refinery Company

Iran/Tabriz Engineering

706/13RELAY TESTING OF 850 LV FEEDERS IN SUBSTATIONS OF 

KHOUZESTAN PETROCHEMICAL COMPLEX11/11/2005

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Calibration

701/26 Monthly Maintenance of the Fire Fighting Vehicles 03/16/2000 03/11/2001 BIPC BIPC IRAN/Mahshahr Construction

334PDesign & manufacturing of ACPD/PTC

 998‐3 Electronic Card (15 Sets)09/24/2000 04/27/2001 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

728/217Transmission signals from PLC at gas station to DCS 

system at offsite control room11/13/2012 01/19/2013 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

701/171Engineering and Procurement Services for Condition 

Monitoring of Reciprocating Compressors05/25/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

Page 44: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

711/5 ELECTRICAL SUPERVISION OF LAND FILL PROJECT 10/05/2006 03/07/2007 Kimia Co.  BIPC IRAN/Mahshahr Engineering

701/156 Rehabilitation of Instrumentation of Section 400 12/10/2003 01/11/2005 Basparan Co. BIPC IRAN/Mahshahr Construction

701/186Engineering Services for the Electrical Equipment of the 

Central Loading Terminal08/06/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

932Installation and commisioning  of Fire Alarm System in Karoon Petrochemical Company (Bandar Imam Free 

Zone )06/06/2007 12/21/2007

Karoon Petroch. Co.

Karoon Petroch. Co.

IRAN/Mahshahr Construction

734Installation and Commissioning of Gas Detection System 

, LDPE Plant10/10/2011 11/25/2011

Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr Construction

613Calibration Services for Instrumentation/Elecrtical 

Measurement Equipment of Ramin Power Generation 11/22/2007 03/18/2008 K.E.P.D.C K.E.P.D.C

IRAN/Ahvaz 

Calibration

Page 45: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

320P Production Spare Parts for TI‐DESK 02/18/1999 02/17/2001 BIPC BIPC IRAN/MahshahrDesign & 

Manufacturing

727 UT‐600 Neutralization pound control system 06/05/2010 08/05/2010 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

707/3ACPD electrial cords troubleshooting( Anode control protection Device )

11/20/2005 03/22/2006 Kimia Co.  BIPC IRAN/Mahshahr Maintenance

904Installation and Commissioning of Instrumentation and Electrical Equipments in Automobile car Painting Saloon

07/17/2000 10/10/2001 Saipa Co. Saipa Co.IRAN/Tehran

Construction

701/66Engineering and Procurement Services for New 

Exchangers of Saline Water System09/24/2001 04/02/2002 Kimia Co.  BIPC IRAN/Mahshahr

Engineering/Procurement

701/16Engineering, Procurement and Construction of Silica 

Analyser08/03/1999 Ab Niroo Co. BIPC IRAN/Mahshahr EPC

Page 46: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

599/17 Supply of Solonoid Valve 02/20/2010 08/21/2010 P.K.CMobin 

Petriochemical Co

IRAN/Mahshahr Procurement

707/7 CABLE LAYING OF NEW COOLING TOWER OF NF PLANT 04/07/2006 06/05/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/122 Installation and Commissioning of Fire Alarm System 03/17/2003 05/13/2003Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Engineering

610MOV Rehabilitation & Calibration 

For NIOPDC06/09/2007 08/06/2007 N.I.O.P.D.C N.I.O.P.D.C IRAN/Arak Calibration

306PDesign & Integration Calibration Bench Model CB‐501 

(10 Set)08/24/1996 12/24/1996 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

708/33Electrical and instrument work according to announced work such as Cabling,Gland & Termination,… related to  

TANKAGE AREA و PROCESS AREA of EO/EG unit05/03/2006 10/05/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

Page 47: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

922Power Feeder Installation & Cable Laying for Explosion‐

Proof Air Condition System in Olefin Plant07/19/2006 08/13/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/73Procurement Services, Overhauling and Commissioning the Electrical Equipment of Mahshar Export Storage 

Tanks01/12/2002 05/05/2002 Faravaresh Co. BIPC IRAN/Mahshahr Maintenance

701/188Engineering, Installation and Commissioning of New 

Control Loops of Ethylene Tank09/10/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

359Design & Integration of Liebert System Control Card (10 

Sets)08/24/2003 08/23/2004 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

706/3CABLING/ TERMINATION OF UNIT 50 OF KHOUZESTAN 

PETROCHEMICAL COMPLEX10/15/2004

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Construction

604 Calibration Services for Instrumentation Devices 05/22/2004 08/22/2004Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Ahvaz 

Calibration

Page 48: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

628Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Gas Transferring Co.

08/22/2009 11/20/2009 NIGC NIGCIRAN/Shiraz

Calibration

311PDesign & Integration of ACPD/PTC 998‐3 Electronic Card 

(15 Set)12/22/1996 04/25/1997 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

728/306 Upgrading of Relay Protection Units 04/26/2011 02/01/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeEngineering/Pro

curement

924/1 Installation and cabling of 20/11 KV transformer 10/22/2006 11/20/2006 N.I.S.O.CParsian refinery

IRAN/Lamerd Construction

946Installation, test and precommisioning of Lood Sheding 

system in Bandar Imam01/05/2009 03/21/2010 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

701/164Engineering Services for Optimization of Area Lighting 

System of the Complex03/07/2004 Kharazmi Co.

BIPC( Kharazm Co. )

IRAN/Mahshahr Engineering

Page 49: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/108Engineering, Installation and Commissioning of the 

Modified Parts of the LV Panels01/23/2003 05/13/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/MahshahrEngineering/Co

nstruction

328PDesign & Integration of RPM‐Monitoring System (11 

Sets)02/13/2000 06/12/2000 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

304 Design & Integration of  Calibration Banch (3 set) 06/17/2012 09/17/2012Laleh 

Petrochemical CO.

Laleh Petrochemical 

CO.Iran/Mahshahr

Design & Manufacturing

701/157Repaire and Installation of the Instrument &  Electrical 

Equipment of Jetty NO.112/28/2003 06/05/2004 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/103Installation and Commissioning of Instrumentation of 

NOXEL Project01/04/2003 03/16/2004 Basparan Co. BIPC IRAN/Mahshahr Construction

599/8Desing , Manufacturing & Supply of Electrical  Panel

 Electerical Panel11/18/2008 01/29/2009

Fajr Petrochemical 

Complex

Fajr Petrochemical 

ComplexIRAN/Mahshahr Procurement

Page 50: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/37Engineering and Procurement Services for the Instrumentation of NOXOL Injection PACKAGE

01/01/2001 05/14/2001 Basparan Co. BIPC IRAN/MahshahrEngineering/Pro

curement

354 Production of Spare parts for RPM‐Monitoring System 04/25/2003 07/23/2003 BIPC BIPC IRAN/MahshahrDesign & 

Manufacturing

706/14INSTALLATION OF PACKAGE'S INTERCONNECTION IN 

KHOUZESTAN PETROCHEMICAL COMPLEX12/05/2005

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/MahshahrEngineering/Co

nstruction

708/28Electrical and instrumentation work associated with  ANALYZER , TRACING and P‐2020A, B‐2014,B Pumps 

Push button in EO/EG units05/19/2006 08/03/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

708/37F&G work such as Cabling,Device installation,Gland & Termination,… related to  TANKAGE AREA و PROCESS 

AREA of EO/EG unit07/22/2006 10/20/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

728/205Transfering the  Bearing data of C‐501&502 from PLC to 

DCS06/25/2011 08/27/2011 ASPC CO. ASPC CO.

IRAN/Assaluye

Engineering

Page 51: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/109Installation and Commerssioning of Electrical Facilities 

of BAGGING Building01/23/2003 05/13/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

329PDesign & Integration of Mercury Flow Amplifier (35 Sets) 

& 1 Set of Simulator01/11/2000 03/16/2001 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

710Repairing and Calibration of Instrumentation and 

Electrical Equipment11/16/2005 09/13/2007

Karoon Petroch. Co.

Karoon Petroch. Co.

IRAN/Mahshahr Engineering

701/33Engineering and Installation of Fire Alarm System for 

Dehydration Unit of Masjedsoleymaan11/21/2000 07/01/2001

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr Engineering

607Pressure Safety‐Relief Valves Rehabilitation & 

Calibration services09/10/2006 09/10/2007

Fajr Petroch. Co.

Fajr Petroch. Co.

IRAN/Mahshahr Calibration

724Engineering and defining of important signals for Load 

Shadding system12/22/2009 04/23/2010 BIPC BIPC IRAN/Mahshahr Engineering

Page 52: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

728/213 Speed protection system for C‐401A/B 05/29/2012 05/25/2013 ASPC CO. ASPC CO.IRAN/

AssaluyeEngineering/Pro

curement

599/11 Maintenance of  Nuovo pignone Electronic cards 08/25/2009 11/07/2009 NIGC NIGCIRAN/Shiraz

Maintenance

707/29INSTALLATION CM RELATED ACCESSORIES OF LD PLANT 

COMPRESSORS01/01/2006 02/01/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

701/29Engineering and Procurement Services for 12 Nos. 

Flowmeters & Counters07/12/2000 Kimia Co.  BIPC IRAN/Mahshahr

Engineering/Procurement

388Design & Integration of two calibration Bench, Model 

No. CB‐503,50401/29/2010 04/30/2010 I.O.O.C I.O.O.C

IRAN/Shiraz

Design & Manufacturing

701/69Engineering and Procurement Services for replacement 

of (HOKUSHIN) Magnetic Flowmeters10/18/2001 Kimia Co.  BIPC IRAN/Mahshahr Engineering

Page 53: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

728/208 Modification in analog input channels (C‐501/502) 09/04/2011 10/20/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEngineering

707/14INSTALLATION OF INLINE FLOW METERS IN LD PLANT OF 

BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

920Installation & Commissioning of Ex‐Proof Electrical 

Equipments in the Catalyst Warehouse02/03/2006 04/26/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

341P Design & Integration of Flow Computer (6 Sets) 06/17/2001 06/17/2003 Kimia Co.  BIPC IRAN/MahshahrDesign & 

Manufacturing

728/303 Relocating of Diesel Generator's Batteries 04/26/2011 10/13/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/214Engineering, Installation and Commissioning of New 

electrical Actuators of the Furnaces12/19/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

Page 54: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

629Calibration/Maintenance Services for 

Instrumentation/Elecrtical Measurement Equipment of Khoozestan Petrochemical Co.

11/22/2009 11/22/2011KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Calibration

701/52Engineering and Procurement Services for the 

Flowmeters08/05/2001 Kharazmi Co. BIPC IRAN/Mahshahr Engineering

728/312 Heat Decreasing of the Chilled Water Panel 09/03/2011 01/05/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/47Commissioning & Start up the Instrumentation and 

Electrical Equipment of Urea Unit05/22/2001 06/22/2001

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr Commissioning

337PDesign & Integration of P/I Transducer & Flow Computer 

(5 Sets Each)04/24/2001 04/26/2003 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

701/116Engineering and Procurement Services for the Electrical 

Maintenance workshop01/22/2003 12/02/2003 Kharazmi Co. BIPC IRAN/Mahshahr

Engineering/Procurement

Page 55: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

728/204Changing The Mech. Switches Of C‐501/502 Stp1‐Mp1 

(Psl‐ 51410/51402) To Transmitters01/01/2011 08/29/2011 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

902 Installation of Tank Gauging System in Common Facilities 05/11/1999 09/12/1997 BIPC BIPC IRAN/Mahshahr Construction

701/201Engineering Services for the Lighting System 

modification09/20/2004 Kimia Co.  BIPC IRAN/Mahshahr Engineering

701/48Cabling the New Route to COOLING TOWER  in NEW 

Urea Unit07/18/2001 08/05/2001

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr Construction

707/26INSTALLATION OF INLINE FLOW METERS OF MASS & 

ENERGY BALANCE IN KIMIA COMPANY06/26/2006 10/26/2006 Kimia Co.  BIPC IRAN/Mahshahr Construction

617 Applied Calibration Training Services 10/27/2007 12/03/2007 K.E.P.D.C K.E.P.D.CIRAN/Ahvaz 

Calibration

Page 56: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/174Engineering and Procurement Services for the 

Transformer Oil Analyser06/23/2004 10/04/2004 Basparan Co. BIPC IRAN/Mahshahr Engineering

701/245 Design and Engineering of the Paging System 07/20/2005 05/21/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

343P Design & Integration of Mercury Flow Amplifier (25Sets) 09/27/2001 09/27/2002 Kimia Co.  BIPC IRAN/MahshahrDesign & 

Manufacturing

701/147Repair and Maintenance Services for the CPR‐300 

Package10/22/2003 11/12/2004 Kimia Co.  BIPC IRAN/Mahshahr Engineering

641Calibration Services for Instrumentation/Elecrtical 

Measurement Equipment of Fan Niroo Co.  06/18/2011 08/17/2011

Fan Niroo Company

Fan Niroo Company

IRAN/Assaluye

Calibration

923Installation & Commissioning of Turbine Compressor 

Vibration System.06/11/2006 07/01/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 57: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/233 Installation and Commissioning of 7 Nos. Flowmeters 05/12/2005 04/26/2006 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

701/28Engineering, Procurement and Installation of 11 Nos. 

Oxygen Analysers06/21/2000 12/01/2000 Faravaresh Co. BIPC IRAN/Mahshahr EPC

701/151Engineering and Procurement Services for Vibration 

Monitoring System of GB‐301 A‐D11/29/2003 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Procurement

701/32Engineering and Installation of Catalyst Firing Remote 

Control for the DEAC Tanks01/04/2001 Basparan Co. BIPC IRAN/Mahshahr Construction

335PDesign & Integration of Calibration Bench Model No.CB‐

502 (3 Sets)10/01/2000 05/04/2001 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

708/10STEAM TRACE TUBING OF EO/EG PLANT OF MAROON 

COMPLEX05/03/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

Page 58: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

323PDesign & Integration of P/I Transducer 

(25 Sets)02/18/1999 02/15/2000 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

701/91 Detail Technical Surveying of Instrumentation  09/21/2002 04/02/2003 Kimia Co.  BIPC IRAN/Mahshahr Engineering

711/2DETAIL & PROCUREMENT ENGINEERING OF 

INSTRUMENT DEVICES FOR METHANOL TANK IN MTBE PLANT

08/15/2006 10/15/2006 Kimia Co.  BIPC IRAN/Mahshahr Engineering

701/27 Engineering & Procurement Services for H2S Detector. 05/31/2000 12/01/2000Razi

 Petroch. Co.Razi

 Petroch. Co.IRAN/Mahshahr

Engineering/Procurement

371Engineering, Designing,Integration, Installation and 

commissioning of PLC control system for fire extinguishing systems, station No 1,2

11/14/2006 06/14/2007Shiraz 

petroch. Co.Shiraz 

Petroch. Co.IRAN/Shiraz

EPC

599/24 Procurement of Earthing Copper pieces 01/15/2012 01/23/2012Arya Shahab oil 

Co.POGC

IRAN/Assaluye

Procurement

Page 59: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/17Engineering and Procurement Services for Propane 

Recovery Unit09/10/1999 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

711/3DETAIL & PROCUREMENT ENGINEERING OF CENTRAL 

MONITORING SYSTEM FOR MASS & ENERGY BALANCE IN KIMIA COMPANY

08/15/2006 07/20/2008 Kimia Co.  BIPC IRAN/Mahshahr Engineering

712/3 DETAIL ENGINEERING OF POWER CABLE FOR LPG PLANT 09/28/2006 10/15/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

325PDesign & Integration of Temperature Monitoring System 

Model No. DMTS‐32 (1 Set )09/24/1999 11/26/1999

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/MahshahrDesign & 

Manufacturing

701/93 Installation and Commissioning of 8 Nos. Flowmeters 10/11/2002 04/20/2003 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

713Providing Consulting Services of Electerical and 

Instrumentation To Ab Niroo Petrochemical Co.

01/22/2006 01/21/2007 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

Page 60: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/146Engineering , Procurement Services and Construction Supervision Services for the Condition Manitoring 

System of Compressors08/19/2003 Basparan Co. BIPC IRAN/Mahshahr EPC

338PDesign & Integration of ACPD/PTC Electronic Card 

Model No.1002 (15 Sets)04/24/2001 07/24/2001 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

362Design & Integration of Calibration Bench Model No.CB‐

505 (1 Set Each)

05/04/2004 08/01/2004Fajr 

Petroch. Co.Fajr 

Petroch. Co.IRAN/Mahshahr

Design & Manufacturing

701/200 Consulting services for the Jetty Electrification Project 10/25/2004 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

701/251Engineering Services for Checking the Design of Lighting 

and Small Power System of Engineering Offices01/14/2006 05/17/2006 Kimia Co.  BIPC IRAN/Mahshahr Engineering

701/167 Installation and Commissioning of 6 Nos. Electric Pumps 04/09/2004 07/03/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 61: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

712/2FEASIBILITY STUDY OF NEW BUILDING OF PX PLANT IN 

BANDAR IMAM PETROCHEMICAL COMPLEX09/16/2006 09/21/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

728/307 Modification of Site Telephone stations 06/06/2011 09/27/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEngineering/Pro

curement

701/113Installation and Testing the Electrical Devices of Analyser, Weighbridge (S&N) Buildings and HOSE 

STATIONS 1 &201/23/2003 04/17/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

728/105Installation of main input power cables for offsite data 

center08/07/2013 10/20/2013 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

728/313Paging system modification for Compressor Area, LDPE‐

plant09/10/2011 01/11/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

701/206Engineering, Procurement, Installation and 

Commissioning of Instrumentation of Loading Arm of the Jetty No.1

11/06/2004 02/28/2006 Faravaresh Co. BIPC IRAN/Mahshahr EPC

Page 62: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/49Engineering Services for the Modification of Control 

Loops07/17/2001 Kimia Co.  BIPC IRAN/Mahshahr Engineering

701/223 Installation of Instrumentation and Electrical Works of 

New Motors .03/15/2005 Basparan Co. BIPC IRAN/Mahshahr

Engineering/Construction

728/321 Procurement & Installation of Eexd. Air Conditioner 04/17/2012 07/16/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeProcurement/Construction

701/159Engineering & Installation of Equipment on LV/MV 

Panels in the NF Plant01/06/2004 04/02/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/46Procurement, Installation and Commissioning of 

Ultrasonic Flowmeters of Benzen and Propane Lines05/21/2001 10/05/2001 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/50Engineering and Procurement Services for the Control 

Loop Instruments of CHILLING POND07/18/2001 Kimia Co.  BIPC IRAN/Mahshahr

Engineering/Procurement

Page 63: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/221  Installation of Local Control Units for the New Pumps 02/24/2005 05/26/2005 Basparan Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

701/126Electrical Engineering Services for PASKARANEH JETTY of 

petrochemical Special Economic Zone04/24/2003 06/06/2003 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

701/114Installation and Testing the Electrical Devices of 

LABORATORY Building01/23/2003 04/04/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Engineering

355 Production of Spare Parts for CPR‐300 05/17/2003 08/14/2003 Ab Niroo Co. BIPC IRAN/MahshahrDesign & 

Manufacturing

712/7INSTRUMENT ENG. & PROCUREMENT OF 6" PROPYLENE 

LINE FROM OL TO REJAL PLANT10/19/2006 04/21/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

711/10 Work on diesel generator 04/19/2007 05/20/2007 Kimia Co.  BIPC IRAN/Mahshahr Engineering

Page 64: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

500/3 Supply of Vibration Probes 07/02/2006 10/01/2006 TABRIZ GAS Co. TABRIZ GAS Co. IRAN/Tabriz Procurement

633Calibration Services for Standard/Reference Instrument 

Equipment of  Aghajari Oil & Gas Co.12/22/2009 01/20/2010 NISOC Oil Co. NISOC Oil Co.

IRAN/Aghajari

Calibration

728/202 Engineering & procurement of flow transmitters for 

Dilution Steam12/19/2010 03/16/2011 ASPC CO. ASPC CO.

IRAN/Assaluye

Engineering/Procurement

303P Design & Integration of Control Panel (2 Sets) 09/26/1995 11/27/1995 ECC Co.Abadan Refinery

IRAN/AbadanDesign & 

Manufacturing

637Calibration Training Services Pressure and Temperature 

Instruments08/22/2010 09/20/2010

owjenasr Technical & engineering

pars petrochemical 

co.

IRAN/Shiraz

Calibration

644Calibration Services of Metering Stations for Gas 

Transferring Co.09/21/2011 10/22/2011 N.I.G.C N.I.G.C IRAN/Mahshahr Calibration

Page 65: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

353 Production of Spare Parts for CPR‐300 03/12/2003 06/18/2003 Kimia Co.  BIPC IRAN/MahshahrDesign & 

Manufacturing

701/133Engineering and Procurement Services for Vibration 

Monitoring of Compressors in NF/AR Plants06/09/2003 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

638Calibration Services for 

Instrumentation/Elecrtical/Reference Measurement Equipment of Firmco  

01/22/2011 03/07/2011 FIRMCO COAmir Kabir Petroch. Co

IRAN/Mahshahr Calibration

706/2DATA SHEET PREPARATION FOR INSTRUMENT DEVICES 

OF CHILLERS IN KHOUZESTAN PETROCHEMICAL COMPLEX

10/06/2004KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Engineering

701/190Engineering, Installation and Commissioning of Level 

Indicators on the IW Tanks09/10/2004 01/01/2007 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/208Installation and Commissioning of Level Control 

Instrumentation of Propylene Exchangers10/14/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

Page 66: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/231  Lighting System engineering. 05/20/2005 06/18/2005 Kimia Co.  BIPC IRAN/Mahshahr Engineering

619Fire Fighting System Completion of Ethane Retrieval 

Plant 10/22/2007 01/20/2008

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Calibration

701/165Engineering and Procurement Services for the Electrification of the Field Air Compressors

03/14/2004 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Pro

curement

599/36 Purchasing of Spare battery for Simtronics LTU 600 12/10/2013 03/19/2014 N.G.S.C. N.G.S.C. Procurement

712/1ENG. & PROCUREMENT OF WASTE OIL VESSEL'S 

INSTRUMENT FOR AR PLANT10/14/2006 12/09/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

728/214 Installation of manual call points in storage area 06/05/2012 08/05/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeConstruction

Page 67: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

728/103checking and construction new septic system for admin 

& restaurant bldg.04/11/2012 05/20/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

326P Production of Spare parts for CPR‐100 07/07/1999 09/14/1999 BIPC BIPC IRAN/MahshahrDesign & 

Manufacturing

701/224Engineering, Procurement and Commissioning of 

Loading System of EDC Line04/18/2005 04/07/2006 Kimia Co.  BIPC IRAN/Mahshahr EPC

315PDesign & Integration of Calibration Bench Model No.

CB‐501 (4 Sets)03/01/1998 06/09/1998 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

701/39Procurement, Installation and Commissioning the 

Electrical Equipment of LATEX Project03/14/2001 07/06/2001 Basparan Co. BIPC IRAN/Mahshahr Construction

701/101Construction Supervision Services for the Electrical 

Works of Ethylane Tank12/08/2002 04/19/2003 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

Page 68: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/112Installation and Testing the Electrical Devices of Hot OIL, 

TICKET, CONTROL  and AUX. Rooms.01/23/2003 05/05/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

701/204 Installation of Flowmeter on the Treated Waste Line to 

Sea10/26/2004 03/28/2005 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/218 Installation & Commissioning oftachometers. 02/06/2005 04/28/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/70 Installation and Commissioning of 5 Nos. Flowmeters. 10/19/2001 01/31/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction

627Calibration Services of Instrumentation and Laboratory 

Equipment for Amir Kabir Petroch. Co.07/04/2009 08/03/2009

Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr Calibration

728/320 Replacement of W‐402 with New Dosage Pump 04/17/2012 07/16/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

Page 69: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

626Calibration Services for Measurement Equipment of Fars 

Electrical Distribution Co.05/18/2009 06/08/2009

Fars Distribution

 Elec. Company

Fars Distribution Elec. Company

IRAN/Shiraz

Calibration

701/77Procurement Services and Installation of Electrical Facilities of the Rest Room of SEA WATER Area.

03/03/2002 05/18/2002 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

708/16TERMINATION & TEST OF FIRE ALARM SYSTEM FOR 

POLYPEXT & CATA PLANT04/23/2006 05/22/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/194Engineering, Procurement and Installationof the Flow 

Control Loops of the LATEX Project09/23/2004 01/25/2007 Basparan Co. BIPC IRAN/Mahshahr EPC

701/193 Electrification of Portable Air Compressors 08/14/2004 04/16/2005 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

701/197Relocating and Commissioning of the CONTROL ROOM 

Computers10/03/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

Page 70: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/191Engineering, Installation and Commissioning of Alarm 

System on MS Line.09/10/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

710/3DETAIL ENGINEERING  OF INSTRUMENT DEVICES FOR 

CHILLERS OF UNIT 70307/29/2007 09/18/2007

Karoon Petroch. Co.

Karoon Petroch. Co.

IRAN/Mahshahr Engineering

701/3Engineering and Procument Services for the Compressors Vibrtion Monitoring System

12/13/1998 12/12/2000 Kharazmi Co. BIPC IRAN/MahshahrEngineering/Pro

curement

708/4 Fire alarm cabling for HD unitMaroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/123Installation and Commissioning of Rotameters, Volume 

Tank, and Diesel Generator Electrification03/17/2003 06/19/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

706/4DETAIL/ SITE ENGINEERING FOR F&G SYSTEM OF WAREHOUSE IN KHOUZESTAN PETROCHEMICAL 

COMPLEX11/04/2004

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Engineering

Page 71: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/184Installation and Commissioning of Flowmeter on the 

Water In‐take Line to the Complex07/03/2004 11/17/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

711/4Installation and setup K402A/B و P‐201E/F to installed 

diesel generator in site09/26/2006 12/01/2006 Kimia Co.  BIPC IRAN/Mahshahr

Engineering/Construction

387Design & Integration of one calibration Bench, Model 

No. CB‐504(1 Set )

12/22/2009 03/21/2010Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Shiraz

Design & Manufacturing

713/2 INSTRUMENT DETAIL ENGINEERING OF 4TH NITROGEN 

VESSEL12/22/2006 01/20/2007 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

707/11INSTALLATION OF INLINE FLOW METERS IN HD PLANT 

OF BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

701/76Procurement Services and Construction of 2 Nos. Lift 

Electrical works.03/03/2002 05/12/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 72: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/20 Engineering and Procurement for Flowmeters  09/11/1999 05/19/2000 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Pro

curement

301PDesign & Integration of Calibrator System Model No. PC‐

501 (15 Sets)07/21/1995 10/20/1995 Faravaresh Co. BIPC IRAN/Mahshahr

Design & Manufacturing

312PDesign & Integration of 128 Channel DMTI Indicator 

System (2 Sets)02/18/1997 05/20/1997 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

701/195Engineering, Istallationn and Commissioning of the CRA‐

609Analyser of Industrial Water Unit09/13/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/78Commissioningof Control System of Neuralization Pool 

of the Water Treatment Unit03/12/2002 04/27/2002 Ab Niroo Co. BIPC IRAN/Mahshahr Commissioning

701/58Engineering & Installation of the Instrumentation of 

New Tower C‐70108/11/2001 12/18/2001 Kimia Co.  BIPC IRAN/Mahshahr

Engineering/Construction

Page 73: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/153Engineering, Procurement Services and Installation of 4 

Nos. Level Transmitters in CA Plant11/30/2003 Kimia Co.  BIPC IRAN/Mahshahr EPC

708/14CABLE LAYING BETWEEN PROCESS & TANKAGE AREA 

FOR EO/EG PLANT OF MAROON COMPLEX05/03/2006 05/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/135Installation and Testing of Instrument Devices of Modified (Pneumatic to Electronic) Control Loops

06/21/2003 05/17/2005 Kimia Co.  BIPC IRAN/Mahshahr Construction

352Design & Integration of Operator Station

 (2 Sets)08/29/2002 01/08/2003 Faravaresh Co. BIPC IRAN/Mahshahr

Design & Manufacturing

599/35Supplying Required Material For Bid Boland Gas 

Refinery Co.07/13/2013 08/23/2013

Bid Boland Gas Refinery Co.

Bid Boland Gas Refinery 

Co.Omidiyeh Procurement

701/136Installation and Testing the Instrumentation of CHILLING 

POND06/21/2003 10/19/2003 Kimia Co.  BIPC IRAN/Mahshahr Construction

Page 74: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/102Construction Supervision Services for the Instrument 

Works of Ethylane Tank12/08/2002 03/30/2003 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/217Cabling and Termination of Compressor Governer 

System01/23/2005 04/15/2005 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/65Engineering Services for Process Control of Saline Water 

System09/24/2001 12/25/2001 Kimia Co.  BIPC IRAN/Mahshahr Engineering

701/25Troubleshooting and Repairing the ACCELERATION UNIT 

of Fire Fighting Vehicle03/16/2000 08/17/2000 BIPC BIPC IRAN/Mahshahr Construction

708/38Electrical and instrument work such as Cabling,Device installation,Gland & Termination,… related to  TANKAGE 

AREA و PROCESS AREA of EO/EG unit10/01/2006 11/01/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

710/1TECHNICAL EVALUATION OF DIFF. PROPOSALS FOR 

LIGHTING ACCESSORIES 10/13/2005 10/29/2005

Karoon Petroch. Co.

Karoon Petroch. Co.

IRAN/Mahshahr Engineering

Page 75: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

921Cabling, Termination and Commissioning the Electrical 

Governer of GT‐1501 Compressor in NF Plant01/18/2006 02/02/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

374 Design & Integration of one  calibration Bench 05/17/2007 07/15/2007Aeen Talash Tabrize.Co

Aeen Talash Tabrize.Co

IRAN/TabrizDesign & 

Manufacturing

707/10INSTALLATION OF INLINE FLOW METERS IN BD PLANT OF 

BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

624Calibration Services for Instrumentation/Elecrtical 

Measurement Equipment of National Gas Co.09/20/2008 10/21/2008 N.I.G.C N.I.G.C

IRAN/Omidiyeh ( Miyan koh )

Calibration

701/250Engineering and Procurement Services for Control Valve 

on the Input Line to GB‐910 C/D compressor09/05/2005 12/11/2005 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

367Design & Integration of Calibration Bench Model No.

CB‐505 (1 Set )P.K.C P.K.C

IRAN/Shiraz

Design & Manufacturing

Page 76: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

623Calibration Services of Instrumentation and Laboratory 

Equipment for Amir Kabir Petroch. Co.06/21/2008 07/21/2008

Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr Calibration

706/11CALIBRATION & COMMISSIONING OF ANALYZERS IN 

KHOUZESTAN PETROCHEMICAL COMPLEX04/21/2005

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Calibration

701/115Installation and Testing the Electrical Devices of 

WAREHOUSE & SUB‐STATION02/10/2003 04/02/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

701/232ENGINEERING of electrical facilities of 

LAND FILL area.05/20/2005 06/13/2005 Kimia Co.  BIPC IRAN/Mahshahr Engineering

701/8Engineering and Procurement Services for the H2S 

DETECTOR05/08/1999 10/16/1999 Kharazmi Co. BIPC IRAN/Mahshahr

Engineering/Procurement

321PDesign & Integration of SAM Alarm Cards

 (36 Sets)02/18/1999 02/09/2000 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

Page 77: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

366Design & Integration of Calibration Bench Model No.CB‐

503 (1 Set)P.K.C P.K.C

IRAN/Shiraz

Design & Manufacturing

701/4Engineering and Procurement Services for the Oxygen 

Analysers01/05/1999 01/06/2001 Kimia Co.  BIPC IRAN/Mahshahr

Engineering/Procurement

708/29 Commisioning assistance in EO/EG unit 04/29/2006 07/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/237Engineering for Relocation  & Installation of Fire 

Extingnishers05/24/2004 08/13/2005 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

707/28ELECTRICAL/ INSTRUMENT INSTALLATION SERVICES OF 

LD PLANT CATALYST PUMPS02/05/2006 03/07/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

701/14 Design and Engineering for the Utilities metering system. 07/06/1999 07/25/1999 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

Page 78: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

707/15 COMMUNICATION OF ALARMS BETWEEN OL & UT PLANT 04/13/2006 05/22/2006 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

701/90Relocating and Commissioning the Instrument Air Piping 

of Purging System of Cell‐Room Panels.09/13/2002 04/15/2003 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/130Engineering, Procurement Services, Installation and Commissioning of Automatic Fire Fighting System

12/16/2003 Basparan Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

701/192Engineering, Installaton and Commissioning of Alarm 

System for the Feul and Steam Pumps08/10/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

620Rent of Temperature Calibration Ovens for Thermocouples Testing of Poly ‐Etilen Unit

12/09/2007 12/19/2007 ASPC CO. ASPC CO. IRAN/Mahshahr Calibration

728/317 Fire alarm system execution for asset integrity building 01/10/2012 03/11/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeProcurement/Construction

Page 79: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/166Construction and commissioning the Connection of Fire 

Fighting water Line to Cooling Tower Package04/07/2004 04/27/2005 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

369Design & Integration of one  calibration Bench ,  Model 

No. CB‐504 (1 Set)09/05/2005 11/15/2005

Parsian Gas Refinery

Parsian Gas Refinery

IRAN/LamerdDesign & 

Manufacturing

622Calibration Services for Measurement Equipment of Fars 

Electrical Distribution Co.03/11/2008 05/10/2008

Fars Distribution

 Elec. Company

Fars Distribution Elec. Company

IRAN/Shiraz

Calibration

728/216Transmition fire and gas alarms signals from Flare 

substation to offsite control room07/21/2012 10/09/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

701/236Installation and Commissioning of 4 Nos. Flowmeters on 

the HCL Line of Section 60005/25/2005 08/05/2005 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/176Engineering and ProcUnit Rateement Services for 12 

Nos. ON‐OFF Valves06/21/2004 Basparan Co. BIPC IRAN/Mahshahr Engineering

Page 80: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/7Engineering and Procurement Services for the ORP and 

PH METER05/08/1999 05/11/2000 Kharazmi Co. BIPC IRAN/Mahshahr

Engineering/Procurement

309PDesign & Integration of 16 Channel RTD‐DMTI Indicator 

System (2 Sets)11/12/1996 04/17/1997 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

701/180Installation and Commissioning of one totalizer on the 

Fire Fighting Water Line .06/16/2004 05/14/2006 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

340PDesign & Integration of Solenoid‐Valve Packs for Fire‐

Fighting Vehicles02/07/2001 03/01/2001 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

322PDesign & Integration of Calibration Bench Model No. CB‐

501 (2 Sets)

02/21/1999 05/30/1999Kharg

 Petrochemical. Co.

Kharg 

Petrochemical.  Co.

IRAN/Kharg Island

Design & Manufacturing

701/1Preparation of Technical Drawings and Documents for 

Construction of CPR‐10010/18/1998 12/19/1998 Basparan Co. BIPC IRAN/Mahshahr Engineering

Page 81: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

708/35

Electrical and instrument work according to announced work such as Cabling,Device installation,Gland & 

Termination,… related to  TANKAGE AREA و PROCESS AREA of EO/EG unit

07/22/2006 09/05/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/183Installation and Commissioning of Totalizer on the HCL 

Line07/03/2004 10/04/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

707/13INSTALLATION OF INLINE FLOW METERS IN PP PLANT OF 

BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

306Preparation of Tender package for Khavaran facilities 

No.4 PMS System08/30/2012 09/27/2012

National Iranian Gas Company

National Iranian Gas Company

IRAN/Khavaran Engineering

701/222Installation and Commissioning of TOTAL HYDRO 

CARBON Analyser of Nitrogen Unit03/02/2005 05/07/2005 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

599/25 Desing & Manufacturing of Electerical & Control Panel 02/23/2012 04/25/2012Fajr

 Petroch. Co.Fajr 

Petroch. Co.IRAN/Mahshahr Procurement

Page 82: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

707/9AUTOMATIC CONTROL OF NITROGEN VENT IN ABNIROO 

CO.03/15/2006 12/14/2006 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

701/240Installation and Commissioning of the Flowmeter of 

Buthane Line to CF  Unit06/15/2005 07/11/2005 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

599/3 Supply of Electrical Equipment 03/11/2008 06/30/2008 TABRIZ GAS Co. TABRIZ GAS Co. IRAN/Tabriz Procurement

708/6 Termination and test of Fire alarm 01/15/2007 02/05/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

318PDesign & Integration of Calibration Bench Model No.

 CB‐501 (2 Sets)10/02/1998 12/17/1998

Razi & KhargPetrochemical. 

Co.

Razi & KhargPetrochemical. 

 Co.IRAN/Mahshahr

Design & Manufacturing

701/215 Engineering and Procurement Services for the STEP Under Progress STEP Under Progress Transformer of 

power Generation Unit01/04/2005 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Procurement

Page 83: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/6Engineering and Procurement Services for the Hydrogen 

Analysers05/08/1999 05/02/2000 Kharazmi Co. BIPC IRAN/Mahshahr Engineering

701/67Installation and Commissioning of 4 Nos. TOTALIZERS, ISOLATORS and Flowmeters in the Control Room Panels

10/01/2001 04/13/2002 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

701/118Installation and Testing of Electrical Devices for the 

Mahshahr Export Storge Tanks02/09/2003 05/12/2006 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

728/215 transferring of 6 JB and 1 PT in the pipeline path 07/10/2012 08/09/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeConstruction

708/36

Electrical and instrument work according to announced work such as Cabling,Device installation,Gland & 

Termination,… related to  TANKAGE AREA و PROCESS AREA of EO/EG unit

07/22/2006 10/20/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

639Calibration Services for Instrumentation Equipment of 

Gas Trnsferring Co.  04/12/2011 05/26/2011 NIGC NIGC

IRAN/Shiraz

Calibration

Page 84: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/94basic design of Condition Monitoring for the 

Compressors in LD plant.10/07/2002 12/08/2002 Basparan Co. BIPC IRAN/Mahshahr Engineering

728/201Engineering & Procurement of Magnetic type level 

gauges for E‐403 & E‐404 at C2 cracker plant12/21/2010 10/18/2011 ASPC CO. ASPC CO.

IRAN/Assaluye

Engineering/Procurement

708/40Electrical and instrument work such as Cabling,Device installation,Gland & Termination,… related to  TANKAGE 

AREA و PROCESS AREA of EO/EG unit11/07/2006 12/08/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

711/8ELECTRICAL / INSTRUMENT DETAIL ENGINEERING OF 

NEW ABSORPTION CHILLER OF VC PLANT12/06/2006 03/05/2007 Kimia Co.  BIPC IRAN/Mahshahr Engineering

370Design and implementaion of Thinkpac Control & 

Monitoring software09/29/2006 12/17/2006 Ventus S.A Ventus S.A Belgium EPC

701/100Engineering, Installation and Commissioning of Electrical works for New Rooms of Warehouse Mechanization 

System11/23/2002 01/29/2003 Basparan Co. BIPC IRAN/Mahshahr

Engineering/Construction

Page 85: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

708/9The cabling and its associated works for feeding pumps  

A,B‐2020,A,B  P‐2014

05/03/2006 05/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

708/34F&G work according to announced work such as 

Cabling,Gland & Termination,… related to  TANKAGE AREA و PROCESS AREA of EO/EG unit

06/22/2006 09/05/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

373Design & Production  of electronic cards for trip amplifier and temperature converter of DCS

03/30/2007 08/22/2007Bandar abbas Refinery Co.

Bandar abbas Refinery Co.

IRAN/Bandar Abbas

Design & Manufacturing

701/140Installation of Vaccum Breaker and Safety Valve on the 

Condensate Storage Tanks07/02/2003 10/10/2003 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/182Installation and Commissioning of Alarms of NF1 & 2 

Units07/15/2004 10/01/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/13 Preparation of Detail Engineering drawings for CPR‐300 07/06/1999 10/05/1999 Kimia Co.  BIPC IRAN/Mahshahr Engineering

Page 86: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

614Calibration Services for Elecrtical Measurement 

Equipment 08/17/2007 12/17/2007 K.E.P.D.C K.E.P.D.C

IRAN/Khozestan

Calibration

712/6DETAIL ENGINEERING OF INSTRUMENT INSTALLATION 

OF JET MIXING PLANT10/07/2006 11/08/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/81 Modification and Commissioning of CPR‐300 System 07/09/2002 10/03/2002 Kimia Co.  BIPC IRAN/Mahshahr Commissioning

635Calibration Services for Instrumentation Equipment of 

Exir Sanat Co.  05/22/2010 08/22/2010 Exirsanat Co. Exirsanat Co.

IRAN/Tehran

Calibration

708/21Installation of the analyzers: AE/AT‐21002‐20701‐77001‐

20901 of EOEG unit05/02/2001 06/24/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/110Refurbishing and Testing the damaged Instrument & 

Electrical Panels01/23/2003 04/04/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Construction

Page 87: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/68Installation and Commissioning of Instrumentation and 

Electrical works of New Turbo Pump OL‐GA‐7013010/11/2001 09/30/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction

636Calibration Services for Standard/Reference Instrument 

Equipment of Gachsaran Oil & Gas Co.06/22/2010 07/21/2010

Gachsaran gas & oil co.

(NIOC)

Gachsaran gas & oil co.

(NIOC)

IRAN/Gachsaran 

Calibration

361Design & Integration of Operator Station device

 (1 Set)12/27/2003 03/06/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Design & Manufacturing

701/125Procurement and Construction of Kiosk for Tower 

Monitoring of Jetty No.204/11/2003 07/10/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction

599/15 Desing & Manufacturing of Electerical & Control Panel 09/27/2009 11/07/2009Fajr 

Petrochemical Complex

Fajr Petrochemical 

ComplexIRAN/Mahshahr Procurement

701/88 Installation and Commissioning the Mass Flowmeters 08/24/2002 10/24/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 88: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

707/12INSTALLATION OF INLINE FLOW METERS IN PVC PLANT 

OF BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

701/75Engineering and Procurement Services for New 

Utilization of Tank T252X02/21/2004 Kimia Co.  BIPC IRAN/Mahshahr

Engineering/Procurement

711/6FEASIBILITY STUDY OF ELECTRICAL CONSUMERS IN LIME 

STONE AREA OF VC PLANT10/09/2006 12/01/2006 Kimia Co.  BIPC IRAN/Mahshahr Engineering

701/89Installation and Commissioning for 2 Nos. Conductivity 

Meters08/24/2002 03/26/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/44Engineering, Procurement Services and Installation of %6 Caustic Injection Package for QW and PW Lines

05/14/2001 05/07/2003 Faravaresh Co. BIPC IRAN/Mahshahr EPC

630Calibration Services for Standard/Reference Instrument 

Equipment of Gachsaran Oil & Gas Co.11/23/2009 12/23/2009

Gachsaran gas & oil co.

(NIOC)

Gachsaran gas & oil co.

(NIOC)

IRAN/Gachsaran 

Calibration

Page 89: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

707/20ELECTRICAL/ INSTRUMENT ENGINEERING SERVICES OF 

LD1,2 CATALYST PUMPS04/11/2006 05/14/2006 Basparan Co. BIPC IRAN/Mahshahr Engineering

701/170Engineering and Procurement Services for Vibration 

Switches of Cooling Tower Fans05/25/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

701/229Engineering and Procurement Servicesfor High Pressure 

Alarm of the New Compressor04/27/2005 05/08/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/62Commpletion of Installation of Area Lighting of Granual 

Urea Unit08/05/2001 10/28/2001

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr Construction

701/150Engineering and Procurement Services for Flowmeters 

of Flare Lines11/18/2003 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

609Calibration Services for Standard/Reference Instrument 

Equipment02/01/2007 02/11/2007

Gachsaran gas & oil co.

(NIOC)

Gachsaran gas & oil co.

(NIOC)

IRAN/Shiraz

Calibration

Page 90: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/34 Installation of AL Analyser 12/21/2000 04/27/2001 Basparan Co. BIPC IRAN/Mahshahr Construction

706/6CALIBRATION OF INSTRUMENTS IN KHOUZESTAN 

PETROCHEMICAL COMPLEXKhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr Calibration

707/22PROCUREMENT ENGINEERING SERVICES FOR F&G 

SYSTEM OF OL PLANT04/28/2006 05/26/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

728/209TRANSFERRING OF  FAULT SIGNAL (COMMON ALARM) 

FOR FIRE AND GAS SYSTEM TO DCS12/18/2011 02/17/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Engineering/Procurement

711/7DETAIL ENGINEERING OF ELECTRICAL PANELS FOR CPVC 

& KIMIA WORKSHOPS IN KIMIA COMPANY10/09/2006 10/31/2006 Kimia Co.  BIPC IRAN/Mahshahr Engineering

339PDesign & Integration of ON‐OFF Controller Device

 (4 Sets )02/22/2001 05/24/2001 BIPC BIPC IRAN/Mahshahr

Design & Manufacturing

Page 91: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/216Engineering, Procurement Services and Installation of Pressure Transmitter on the Sodium Hypochlorite Line

01/12/2005 Kharazmi Co. BIPC IRAN/MahshahrEngineering/Pro

curement

701/227Engineering and Procurement Services for Electrical System and Air Conditioning Facilities of Central 

Electrical Workshop04/27/2005 Faravaresh Co. BIPC IRAN/Mahshahr EPC

701/163Engineering, Procurement and Installation of Pumps 

Ammeters in the Control Room02/06/2004 Faravaresh Co. BIPC IRAN/Mahshahr EPC

707/23INSTALLATION OF TEMPERATURE CONTROL DEVICES IN 

EDC PLANT05/19/2006 06/16/2006 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/10 Troubleshooting and Repairing the DCS Electronic Cards 04/02/1999 04/01/2000 Kharazmi Co. BIPC IRAN/Mahshahr Engineering

701/230Execution of Instrument Air Piping for the Fans of 

Section 400.05/10/2005 05/11/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 92: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/225Installation and Commissionig of Multi Temp. Indicators 

of Floating Roof Tanks04/26/2005 05/07/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

708/45Sunshade preparation and installation for 

instrumentation device10/29/2006 11/29/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/168Engineering and Procurement Services for H2s Analyser 

of Area 20004/21/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

707/31

ENGINEERING SERVICES FOR ELECTRICAL AS‐BUILT DRAWINGS & FEASIBILITY STUDY OF SUPPLY 

ELECTRICAL POWER FOR EXPLOSION PROOF COOLERS IN OL PLANT

08/12/2006 09/10/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/149 Design of Electrification route to Restaurant Building 11/16/2003 04/19/2004 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

701/242 Installation and Commissioning of DR‐103 Density Meter 07/11/2005 08/10/2005 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

Page 93: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/210Engineering and Procurement Services of FRQ‐004 and 

ERCQ‐401A Counters12/05/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Procurement

927 Installation & Commissioning of CCTV System 12/22/2006 03/21/2007 Basparan Co. BIPC IRAN/Mahshahr Construction

642Calibration Services for Standard/Reference Instrument 

Equipment of Gachsaran Oil & Gas Co.07/22/2011 08/28/2011

Gachsaran gas & oil co.

(NIOC)

Gachsaran gas & oil co.

(NIOC)

IRAN/Gachsaran 

Calibration

701/18 Engineering and Procurement Services for Flowmeters 05/10/1999 Kimia Co.  BIPC IRAN/MahshahrEngineering/Pro

curement

701/143Installation and Commissioning of Instrumentation and 

Electrical Equipment of EDC Unit08/04/2003 11/04/2003 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/158 Consulting services for Modifications in FARAVARESH Co. 02/10/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

Page 94: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/141Repair and Installation of the Instrumentation and Electrical Equipment of Jetty No.1(Modification)

08/04/2003 10/04/2003 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/97 Installation and Commissioning of the AR‐201 Analyser 11/05/2002 05/08/2003 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

327PDesign & Integration of Calibrator System Model No. PC‐

501 (3 Sets)

06/19/1999 09/19/1999Kharg

 Petrochemical. Co.

Kharg 

Petrochemical.  Co.

IRAN/Kharg Island

Design & Manufacturing

713/1PROCUREMENT SERVICES FOR P/I CONVERTERS & 

TOTALIZERS12/08/2006 03/24/2007 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

701/243Installation and Commissioning of Instruments of Filters 

of Train 206/29/2005 07/06/2006 Basparan Co. BIPC IRAN/Mahshahr

Engineering/Construction

707/30ENGINEERING SERVICES FOR SUPPLY ELECTRICAL 

POWER OF EXPLOSION PROOF COOLERS IN NF PLANT05/23/2006 06/23/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

Page 95: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

925 Cable Laying & Termination for Air Conditioning systems 10/29/2006 11/18/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

634Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Gas Transferring Co.  

01/22/2010 02/20/2010 NIGC NIGCIRAN/Shiraz

Calibration

707/16ENGINEERING SERVICES FOR LIGHTING, F&G, 

TELEPHONE & PAGGING SYSTEM OF MAINTENANCE WAREHOUSE OF FARAVARESH CO.

04/20/2006 04/24/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

708/20Installation, Cabling, Gland and termination of F&G 

system of EOEG unit04/28/2006 06/23/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

599/20 Supply of Flow Computer 03/11/2010 06/09/2010Petrochemical 

KalaBIPC 

(KIMIA Co. )IRAN/Mahshahr Procurement

701/85Installation and Commissioning of Counters for Utility 

Measuring System08/02/2002 09/17/2002 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

Page 96: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

708/39F&G work such as Cabling,Device installation,Gland & Termination,… related to  TANKAGE AREA و PROCESS 

AREA of EO/EG unit10/14/2006 11/14/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/212Engineering & Procurement Services for the Installation 

of Alarm System (Low) for the Levels of RECTIFIER TOWERS

12/05/2004 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Pro

curement

701/211Engineering & Procurement Services for the Installation 

of PDIA  on the FA‐429A &B Beds12/05/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Procurement

701/127Engineering, Installation and, Commissioning of the 

Lighting System in BD/SR Plant04/29/2003 07/27/2003 Basparan Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/138Engineering and Procurement Services for the Electrification Project of Welding Workshop

07/13/2003 09/12/2003 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Pro

curement

625Calibration Services for Standard/Reference Instrument 

Equipment of Gachsaran Oil & Gas Co.11/07/2008 12/07/2008

Gachsaran gas & oil co.

(NIOC)N.I.S.O.C

IRAN/Gachsaran 

Calibration

Page 97: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

360Design & Integration of Liebert System Temperature / 

Humidity Transmitter electronic card (10 Sets )12/15/2003 08/13/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Design & Manufacturing

701/219Engineering Services for the Lighting System 

Modification of Chemical Stores02/17/2005

BIPC ( Faravaresh 

Co. )

BIPC( Faravaresh 

Co. )IRAN/Mahshahr Engineering

701/104Engineering and Procurement Services for the 

Modification works of FP‐103 Tank12/29/2002 12/30/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

701/235Installation and Commissioning of one GAMA RAY LEVEL 

Detector05/20/2005 05/21/2006 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/137Engineering, Installation and Testing of the Pumps 

Control Circuits06/24/2003 09/23/2003 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/99Engineering and Procurement Services for N2 Blankets 

of Caustic Storage Tank11/26/2002 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

Page 98: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/209Engineering and Procurement Services of two Nos. PCV 

for the GT‐12A & B Valves12/05/2004 12/06/2006 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Procurement

712/8EARTH FAULT RELAY INSTALLATION FOR MTBE'S FEEDER 

IN CF PLANT12/05/2006 02/11/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

618Calibration Services for Instrumentation/Elecrtical Measurement Equipment of Gas Transferring Station  

11/28/2007 12/05/2007 NIGC NIGCIRAN/Shiraz

Calibration

701/5As_Builting the Instrumentation Drawings and 

Documents02/10/1999 01/10/2000 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

719Detail / Procurement Engineering for instrumentation of 

Ethylene Loading Line No.102/21/2008 11/08/2008 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

599/33 Hook Up material supplying for Fajr Petrochemical Co. 10/26/2012 12/30/2012Fajr

 Petroch. Co.Fajr 

Petroch. Co.IRAN/Mahshahr Procurement

Page 99: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

599/4 Procurement & Supply of Vibration Sensor 08/01/2008 08/01/2008 NIOEC NIOECIRAN/Bandar 

AbbasProcurement

701/96 Installation and Commissioning of the TIC of Soil Tank 10/18/2002 Basparan Co. BIPC IRAN/Mahshahr Construction

707/4Installation and Commissioning of Thermostats and 

Alarm System in the Panles of Packing Unit11/20/2005 01/20/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

701/162 Construction Supervision Services in  Instrument & Electrical Devisions for Central Loading Terminal 

01/28/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/154Engineering , Procurement Services and Installation of 

BELT SCALER01/30/2004 Kimia Co.  BIPC IRAN/Mahshahr EPC

708/48Cabling from fire alarm panel to jb‐1‐b‐4000i inside of 

control roomin loading Area for Gas Detector

01/15/2007 02/15/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

Page 100: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/82Installation and Commissioning 2 Nos. Ultrasonic 

Flowmeters on the Ethylane Line07/15/2002 07/13/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction

631 Rent of Loop Check equipment  for Abadan Oil Refinery 11/29/2009 12/06/2009 Taraz star Co. Taraz star Co.IRAN/Abadan

Calibration

708/7TEE CONNECTOR  installationn for Hook up typs L01 and 

plug installation03/16/2006 04/07/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

708/13INSTALLATION OF F&G SYSTEM IN CONTROL/ AUXILIARY 

ROOM & UPS ROOM OF MAROON COMPLEX03/16/2006 04/17/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

347P Production of Spare Parts for TI‐DESK 07/24/2001 07/24/2002 Faravaresh Co. BIPC IRAN/MahshahrDesign & 

Manufacturing

701/64Troubleshooting of Electronic Cards of RTD Converter  

for DCS system (7 sets)09/23/2001 12/24/2001 Basparan Co. BIPC IRAN/Mahshahr Engineering

Page 101: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/24Engineering and Procurement Services for the Spare 

Parts of Fire fighting Vehicles03/16/2000 02/14/2001 BIPC BIPC IRAN/Mahshahr

Engineering/Procurement

708/44Cabling from F&G PANEL to HVAC & from HVAC PANEL 

to HVAC Compressor in HDPE unit11/05/2006 12/06/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/199Engineering, Installation and Commissioning of 3 NOS Thermometers on the Liquid Nitrogen Line to FB Tanks

10/10/2004 10/11/2006 Ab Niroo Co. BIPC IRAN/MahshahrEngineering/Co

nstruction

930 Installation and Commisioning of Quicksilver Storage 

Weightening System in CA Plant11/15/2006 03/09/2007 Kimia Co.  BIPC IRAN/Mahshahr Commissioning

701/98Installation and Commissioning of the Ex‐Proof 

Equipment of AL Analyser house.10/15/2002 11/04/2002 Basparan Co. BIPC IRAN/Mahshahr Construction

711/1PROCUREMENT ENGINEERING OF LCD MONITORS FOR 

MTBE PLANT08/15/2006 10/15/2006 Kimia Co.  BIPC IRAN/Mahshahr Engineering

Page 102: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

707/34GENERATION OF INSTRUMENT WIRING DIAGRAM AND 

AS‐BUILT OF EXISTING DOCUMENT 07/22/2006 08/22/2006 Basparan Co. BIPC IRAN/Mahshahr Engineering

701/56 Installation and Commissioning of the OXYGEN Analyser 08/07/2001 10/25/2001 Faravaresh Co. BIPC IRAN/Mahshahr Construction

599/14 Desing & Manufacturing of Electerical & Control Panel 09/07/2009 10/20/2009Fajr 

Petrochemical Complex

Fajr Petrochemical 

ComplexIRAN/Mahshahr Procurement

701/205Installation of Pressure Gauge on Waste Water Line and 

Contruction of Shelfer for the Control Valves09/20/2004 05/12/2005 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

732Preparing the executive documents for new LT & PT in 

CF Plant05/31/2011 07/01/2011 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/189 Installaton and Commissioningof two actuator. 09/10/2004 08/27/2004 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 103: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/9Engineering and Procurement Services for the 

Gaschromatograph Spare Parts05/08/1999 05/07/2000 Kharazmi Co. BIPC IRAN/Mahshahr

Engineering/Procurement

707/35ENGINEERING SERVICES FOR SUPPLY ELECTRICAL 

POWER OF WELDING WORKSHOP FANS IN CF PLANT05/24/2006 06/20/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/181Installation and Commissioning of HIGH and LOW 

Alarms in  Control Loop PRC‐70106/16/2004 09/16/2004 Ab Niroo Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/54Engineering and Installation of NF‐FQ‐101 Accessories in 

the Metering Station08/07/2001 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/134 Electrification and Testing of the Vaccum‐Pump Motor 06/14/2003 07/15/2003 Basparan Co. BIPC IRAN/Mahshahr Construction

701/234 Installation and Commissioning of 2 Intercom Sations 05/19/2005 05/20/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

Page 104: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/117Procurement and Installation of one CLAMP‐ON 

Flowmeter on the 24" Salt Line.02/10/2003 03/18/2003 Kimia Co.  BIPC IRAN/Mahshahr Construction

304PDesign & Integration of Calibration bench Model No. CB‐

501 (1 Set)

04/07/1996 07/06/1996 F.I.R.M Co. F.I.R.M Co. IRAN/MahshahrDesign & 

Manufacturing

701/84Engineering and Installation of Interlock System for LPG 

Transfer Unit07/27/2002 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

708/41Cabling for EBC‐20‐MCC‐HVAC from C.R to S.STAK AREA 

&Sunshade installation for GAS DETECTOR of EO/EG unit

11/04/2006 12/02/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/198Installation and Commissionoing of the GAMA RAY 

LEVEL INDICATOR.10/17/2004 10/18/2006 Basparan Co. BIPC IRAN/Mahshahr Construction

708/43Device,Gland,Tube,…installation number FT‐99002‐

FT99001,PT‐99002 & PT‐9900110/29/2006 11/18/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

Page 105: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

708/32Electrical and instrument work according to announced work such as Cabling,Hook Up,Gland & Termination…

07/02/2006 07/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/79Installation and Commissioning the Ultrasonic 

Flowmeter on the Flare Line05/17/2002 08/19/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/239Installation and Commissioning of the Flowmeter of 

Buthane Line to CF  Unit06/09/2005 07/24/2005 Faravaresh Co. BIPC IRAN/Mahshahr Construction

599/30 Supply of Pressure Switch 05/21/2012 05/23/2012Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr Procurement

376Design and production of  Electronic Cards for  battery 

Charger12/11/2007 02/09/2008 I.O.P.T.C I.O.P.T.C

IRAN/Shiraz

Design & Manufacturing

701/59Installation and Commissioning of One PH METER in 

Unit 30008/22/2001 10/20/2001 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 106: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

599/12 Desing & Manufacturing of  Electerical & Control Panel 05/04/2009 06/02/2009Fajr 

Petrochemical Complex

Fajr Petrochemical 

ComplexIRAN/Mahshahr Procurement

701/238Installation of Commissioning two Nos. Totalizers for 

FRQ‐004 & FRQ‐401A Loops05/31/2005 05/31/2006 Faravaresh Co. BIPC IRAN/Mahshahr Construction

708/5 Hand switch installation 01/15/2007 02/05/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/244Engineering, Electrification and Commissioning of Power 

Feed to 110V Distribution Panel of the Analysers08/09/2005 10/14/2005 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/148 Installation of Alarm System on HD Control Panel. 09/28/2003 10/19/2003 Basparan Co. BIPC IRAN/Mahshahr Construction

701/128Installation and Testing of Cables & Control Room 

Equipment for New Ultrasonic Flowmeter of OL Plant Flare Line

05/06/2003 06/03/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 107: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/87Relocating and Commissioning the Electrification of 

Main Office Airconditioning Package(Electrical works)

08/20/2002 09/05/2002 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/95 Revamping in Main Office Building 10/29/2002 11/29/2002 Kimia Co.  BIPC IRAN/Mahshahr Construction

708/26FT‐50305 magnetic Installation and setup an additional  

PT for map05/29/2006 05/23/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

608Calibration Services for Elecrtical Measurement 

Equipment 01/20/2007 01/28/2007

Fars Distribution

 Elec. Company

Fars Distribution Elec. Company

IRAN/Shiraz

Calibration

701/36Engineering and Procurement Services for the Safety Valve and V.B. of Condensate and Pure Water Tanks

01/31/2001 04/17/2002 Faravaresh Co. BIPC IRAN/MahshahrEngineering/Pro

curement

701/41Installation & Commissioning of the Instrumentation of 

LATEX Project03/14/2001 06/28/2001 Basparan Co. BIPC IRAN/Mahshahr Construction

Page 108: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/42 Installation and Commissioning of the Mass Flowmeters 03/14/2001 06/13/2001 Basparan Co. BIPC IRAN/Mahshahr Construction

701/83 Engineering and Procurement Services for the 

Instrumentation of Steam Injection to Tower DA‐10407/13/2002 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

712/9INSTRUMENT ENGINEERING SERVICES FOR OL PLANT 

FLARE01/09/2007 05/12/2007 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/40Installation and Commissioning of Two OXYGEN 

Analysers03/13/2001 06/12/2001 Kimia Co.  BIPC IRAN/Mahshahr Construction

333P Production of Spare Parts for DMTS‐32 06/24/2000 09/22/2000Razi

 Petroch. Co.Razi

 Petroch. Co.IRAN/Mahshahr

Design & Manufacturing

701/92  Installation and Commissioning for 5 Nos. KWH Meters 09/22/2002 09/22/2005 Faravaresh Co. BIPC IRAN/Mahshahr Construction

Page 109: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/155  Installation of Flowmeter on Cooling Water Line 11/30/2003 04/08/2004 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/35Engineering and Procurement Services for the H2S 

FLARING PACKAGE12/30/2000 12/14/2002 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

707/19PROCUREMENT ENGINEERING SERVICES FOR 3 

CONTROL VALVES & 4 BYPASS VALVES05/10/2006 06/07/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

708/25Cable and Conduit Performing of PT‐00550 / FQI‐3060 

related to HD unit05/19/2006 06/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

708/11 INSTALLATION OF DETECTORS & ALARMS 04/27/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

708/15GENERAL CONSTRUCTION SERVICES FOR CABLE/ GLAND 

& TERMINATION05/03/2006 05/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

Page 110: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

599/6 Design and Procurement of  Mounting Support 09/03/2008 10/03/2008TAVAN TADBIR FANAVAR CO.

BIPC IRAN/Mahshahr Procurement

701/74Troubleshooting the Electronic Cards of Switching Unit 

device of RS‐24 unit01/06/2002 03/18/2002 BIPC BIPC IRAN/Mahshahr Construction

701/248Installation and Testing of Circuit Breakersof Power 

feeders of the Analysers08/29/2005 09/17/2005 Faravaresh Co. BIPC IRAN/Mahshahr Construction

300P Design & Integration of Calibrator system model No. PC‐

501 (2 Sets)

09/25/1995 11/26/1995 F.I.R.M Co. F.I.R.M Co.IRAN/Shiraz

Design & Manufacturing

611/2Functional Test of fire alarm  and Instrumentation Systems in PP plant of Maroon Petrochemical Co.

08/05/2007 08/12/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

375Design and production of  Electronic Cards for MOV 

integral Module08/18/2007 11/17/2007

Bandar abbas Refinery Co.

Bandar abbas Refinery Co.

IRAN/Bandar Abbas

Design & Manufacturing

Page 111: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

708/17ERECTION & CONSTRUCTION OF SAMPLE CONNECTION 

FOR HDPE PLANT04/14/2006 05/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

708/30Installation of Gland and Termination for F&G system 

and PVC installation of EO/EG unit05/25/2006 07/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

599/9 Supply of electronical equipment 01/06/2009 03/19/2009 Keyhan Ide co. Keyhan Ide co.IRAN/Tehran

Procurement

302PDesign & Integration of Calibrator System Model No. PC‐

501 (2 Sets)10/06/1995 12/07/1995 ECC Co. E.C.C.

IRAN/Shiraz

Design & Manufacturing

701/226Engineering , Installation and Commissioning of Alarm 

for Loop TRC‐30104/27/2005 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Construction

701/228Engineering and Procurement Services for Control Valve 

on the Input Line to GB‐910 C/D Compressor04/27/2005 05/26/2005 Faravaresh Co. BIPC IRAN/Mahshahr

Engineering/Procurement

Page 112: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/247Checking the Requisition Documents of Safety Valves of 

the New Pumps08/27/2005 09/26/2005 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

708/31Changing the PT‐00601 Cable route from FJBIF‐0424 to 

FJBIF‐044907/08/2006 08/06/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

728/309 Solve the Problem on Switch gear 6 Kv Olefin Plant 10/17/2010 11/09/2010 ASPC CO. ASPC CO.IRAN/

AssaluyeProcurement

308PDesign & Integration of Flame Detector Electronic Card 

(10 Sets)10/04/1996 12/05/1996 F.I.R.M Co.

Shiraz Petroch. Co.

IRAN/MahshahrDesign & 

Manufacturing

701/19Engineering and Procurement for AMONIA DETECTOR 

Spare Parts11/10/1999 04/11/2000 Kharazmi Co. BIPC IRAN/Mahshahr

Engineering/Procurement

707/8GENERATION OF PANEL DIGRAMS FOR MONITORING 

SYSTEM OF NF PLANT COMPRESSORS04/18/2006 05/19/2006 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

Page 113: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/246Checking the Operation of the Flowmeter of Nitrogen 

Lines of all Units08/27/2005 09/26/2005 Ab Niroo Co. BIPC IRAN/Mahshahr Commissioning

710/2 TECHNICAL INSPECTION OF LIGHTING ACCESSORIES 12/11/2005 12/31/2005Karoon 

Petroch. Co.Karoon 

Petroch. Co.IRAN/Mahshahr Engineering

701/161Consulting services for Instrumentation & Electrical 

modifications. 01/25/2004 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

701/60Installation of Gas Detectors, Cabling, Termination and 

Commissioning the System08/10/2001 09/10/2001 Faravaresh Co. BIPC IRAN/Mahshahr Construction

701/72Engineering and Installation of Digital Pressure and 

Temprature Indicators of Meter Prover Panel12/15/2001 02/27/2002 Faravaresh Co. BIPC IRAN/Mahshahr Construction

708/12COMMISSIONING ASSISTANCE OF F&G SYSTEM FOR 

EO/EG PLANT OF MAROON COMPLEX04/16/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Commissioning

Page 114: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

708/18 Moving X‐HSH‐50315 according to the request 05/04/2006 05/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

599/7Desing , Manufacturing & Supply of Electrical / Control 

Panel Electerical Panel

08/01/2008 09/01/2008Fajr 

Petrochemical Complex

Fajr Petrochemical 

ComplexIRAN/Mahshahr Procurement

358Design & Integration  of SAM Alarm Cards 

(6 Sets)09/14/2003 01/14/2004 Faravaresh Co. BIPC IRAN/Mahshahr

Design & Manufacturing

708/42 Cabling for HVAC system of analizer room (No.2) 10/29/2006 11/01/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/152Installation and Commissioning of two PDI Meters on 

the Chillers I/O Lines11/30/2003 03/17/2004 Kimia Co.  BIPC IRAN/Mahshahr Construction

714 Inspecting Wiring and Cabling Documents 10/22/2006 11/25/2006Parsian Gas Refinery

Parsian Gas Refinery

IRAN/Lamerd

Engineering

Page 115: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

357Production of Spare Parts for 

CPR‐30009/13/2003 01/13/2004 Kimia Co.  BIPC IRAN/Mahshahr

Design & Manufacturing

701/11 Repairing the Electronic cards of VCM Analyser  04/02/1999 04/08/2000 Kharazmi Co.BIPC

( Kharazmi Co. )

IRAN/Mahshahr Engineering

708/19 Changing the cable and conduit roth of TV‐30109 05/02/2006 05/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/30 Troubleshooting and Repairing of SW POWER SUPPLY 10/08/2000 11/08/2000Razi 

Petroch. Co.Razi 

Petroch. Co.IRAN/Mahshahr Engineering

701/144 Installation of two TOTALIZER on DM Water panels. 08/11/2003 09/11/2003 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/132Troubleshooting and Repair of Electronic Cards of PLC in 

PVC Plant07/29/2003 Basparan Co. BIPC IRAN/Mahshahr Construction

Page 116: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/31Troubleshouting and Repiring of SWITCHING POWEWR 

SUPPLY11/06/2000 12/07/2000

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr Engineering

708/24 Insallation of HAND SWITCH related to XVY‐10203 of HD 

unit05/21/2006 06/20/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

701/139 Installation and Testing the TOTALIZER & P/I for FQ‐203 . 07/25/2003 07/27/2003 Kimia Co.  BIPC IRAN/Mahshahr Construction

701/203 Construction of Fresh Air Ducting for the Containers 11/07/2004 Ab Niroo Co. BIPC IRAN/Mahshahr Construction

708/49process related to F&G system such as 

Gland,Termination,… for  Pro. Area and Tk. Area01/15/2007 02/05/2007

Maroon Petrochemical 

Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

708/23 Control room Cabling from FACP01 to FACP02 in HD unit 05/21/2006 06/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

Page 117: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

701/129consulting services for Control System of Cooling Tower 

Fans05/20/2003 05/20/2003 Faravaresh Co. BIPC IRAN/Mahshahr Engineering

348P Production of Spare Parts for TI‐DESK 04/20/2002 08/18/2002 Faravaresh Co. BIPC IRAN/MahshahrDesign & 

Manufacturing

701/21Troubleshooting and Repairing the Electronic Cards of 

the Amplifier Unit (3 Sets)10/25/1999 04/09/2000 Ab Niroo Co. BIPC IRAN/Mahshahr Engineering

701/55Procurement and Installation of the Electric Actuator of 

Reflav Valve08/07/2001 08/07/2003 Faravaresh Co. BIPC IRAN/Mahshahr Construction

708/47 Gas Detector,Gland and...installation in gas station 01/22/2007 02/06/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

708/46Installation of JB,Gland,Termination,Tray and Ladder in 

electrical zonearea 7 & 8

11/15/2006 11/20/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

CompanyIRAN/Mahshahr Construction

Page 118: ListofCompleted Projects - Pars · PDF fileof Amir Kabir Petrochemical Company ... "B" in 6KV substation of olefin cooling 07/19/2011 01/18/2012 Amir Kabir ... Handeling unit of Razi

List of Completed Projects

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

728/310 Purchase of one MCCB 01/12/2011 01/18/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeProcurement

702 Engineering

728/324Design of electrification system for open yard shelter of 

spare parts warehouses06/09/2012 10/09/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Engineering

934Installation and commisioning of Instrumentation 

Equipments in RAK Lube Oil Refinery (UAE)06/19/2007 09/20/2007 RITS Co.

RAK Lube Oil Co.

UAE Construction