Project No. Project description Start Date Finish Date Client Main Client Location Project Type 953 Procurement, Construction and commissioning of electrical, instrumentation, Control systems and Calibration of equipments in Gas refinery of phases 15 & 16 (South pars) 09/20/2010 03/21/2015 POGC POGC IRAN/ Assaluye Construction 748 Procurement, Construction and PreCommissioning of Electrical, Instrumentation, Control Systems in Gas Refinery of Phases 22, 23 & 24 (South Pars) 10/04/2014 04/05/2016 POGC POGC IRAN/Kangan Construction 917 Installation and Precommissioning of Instrumentation and Electrical Equipments in South Pars Project, Phases 6,7,8 10/18/2004 04/03/2008 TIJD(ToyoIdroJGCDAELIM) P.O.G.C IRAN/ Assaluye Construction 406 CAPlant Control System & Field Instrument Revamping project 08/07/2012 03/21/2015 Kimia Co. BIPC IRAN/Mahshah r EPC 957 Electrical,Instrument and Telecommunication works of area No. 1 & 12 of South Pars Gas Field Development Phase 14 02/06/2013 09/20/2014 IPMI POGC IRAN/Kangan Construction 307/2 Instrumentation Work of Process unit of South Pars Gas Field Development Phase 12 10/21/2012 03/21/2014 Joint Venture of Daelim, Sazeh (DSCT) POGC IRAN/Kangan Construction Pars Hassas Experiences In Construction Services
Transcript
Page 1: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

953

Procurement, Construction and commissioning of electrical, instrumentation, Control systems and 

Calibration of equipments in Gas refinery of phases 15 & 16 (South pars)

09/20/2010 03/21/2015 POGC POGCIRAN/

AssaluyeConstruction

748Procurement, Construction and Pre‐Commissioning of Electrical, Instrumentation, Control Systems in Gas 

Refinery of Phases 22, 23 & 24 (South Pars)10/04/2014 04/05/2016 POGC POGC IRAN/Kangan Construction

917Installation and Precommissioning of Instrumentation and Electrical Equipments in South Pars Project, Phases 

6,7,810/18/2004 04/03/2008

TIJD(Toyo‐Idro‐JGC‐DAELIM)

P.O.G.CIRAN/

AssaluyeConstruction

406CA‐Plant Control System & Field Instrument Revamping 

project08/07/2012 03/21/2015 Kimia Co. BIPC

IRAN/Mahshahr

EPC

957Electrical,Instrument and Telecommunication works of area No. 1 & 12 of South Pars Gas Field Development 

Phase 1402/06/2013 09/20/2014 IPMI POGC IRAN/Kangan Construction

307/2Instrumentation Work of Process unit of South Pars Gas 

Field Development Phase 1210/21/2012 03/21/2014

Joint Venture of Daelim, Sazeh (DSCT)

POGC IRAN/Kangan Construction

Pars Hassas Experiences In Construction Services

Page 2: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

936Installation and Commissioning of Electrical and 

Instrumentation Equipments in Wide Roll Sheet factory 09/22/2007 09/20/2010

Khozestan Oksin Steal Co.

Khozestan Oksin Steal Co.

IRAN/Ahvaz Construction

303

Engineering, Designing,Integration, Installation and commissioning of DCS control system for  SULPHURIC ACID & GAS TREATMENT PLANT of Razi Pet. Co. and 

Installation of Anodic Protection System

07/21/2012 12/21/2014Razi

 Petroch. Co.Razi

 Petroch. Co.IRAN/Mahshah

rEPC

307/1Electrical Work of Process unit of South Pars Gas Field 

Development Phase 1210/06/2012 03/21/2014

Joint Venture of Daelim, Sazeh (DSCT)

POGC IRAN/Kangan Construction

959Instrumentation,Control and Telecommunication works of CCB Building and telecom system in South Pars Gas 

Field Development Phase 17,1804/10/2014 09/20/2014 IPMI POGC IRAN/Assaluye Construction

701Providing Electrical & InstrumentationTechnical 

Services(Engineering,Procurement,Construction) to all plants of BIPC 

10/18/1998 03/20/2008 BIPC BIPCIRAN/Mahshah

rEPC

728Engineering, Procurement, Construction and 

commissioning  Services of ASPC Co.10/17/2010 03/20/2016 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

Page 3: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

307/3Instrumentation Work of Utility Area of South Pars Gas 

Field Development Phase 1207/31/2013 03/21/2014

Joint Venture of Daelim, Sazeh (DSCT)

POGC IRAN/Kangan Construction

315Control System Revamping of 90 TON/H E&F Boilers of 

MARUN UT Plant09/21/2014 03/21/2015

Maroon Petrochemical 

Company

Maroon Petrochemical Companyl

IRAN/Mahshahr

EPC

913Installation and Commissioning of Instrumentation and Electrical Equipments in DOROUD Oil Fields Expansion 

Project in Kharg Island04/09/2003 01/19/2005

PETROFAC/TOTAL ELF

Total & ELFIRAN/

Kharg IslandConstruction

747Procurement, Construction and commissioning of 13 

flowmeters for metering system in unit NF1‐309/22/2014 09/22/2015 Faravaresh Co. BIPC

IRAN/Mahshahr

Procurement/Construction

958Construction, Installation, Precommissioning and Commissioning of Electrical and Instrumentation 

Systems in Phase 16 Platform02/19/2013 03/21/2014

Techno Energy Sepehr 

Co.(TESCO)POGC

IRAN/Bandar Abbas

Construction

401Engineering , Procurement , Installation , Commissioning and Start‐up of the Refinery Feed Skid Metering System

03/12/2006 03/12/2007Tehran OilRefinery Co.

Tehran OilRefinery Co.

IRAN/Tehran

EPC

Page 4: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

305DCS Control System for Seawater Intake System in Soth 

Pars Gas Field Development Phases 22‐2410/09/2012 02/09/2013

Arya Petrosina Co.

POGCIRAN/

AssaluyeProcurement/Construction

745 Electrification to UT2 substation (Via Second Line) 05/14/2014 09/10/2015 Ab Niroo Co. BIPCIRAN/Mahshah

rEPC

909Installation and Precommissioning of Instrumentation 

and Electrical Equipments in Olefin plant.05/07/2004 12/21/2003 ECC Co.

Amir Kabir Petroch. Co

IRAN/Mahshahr

Construction

948Installation & Precommissioning of Instrumentation an 

Electerical systems in TCF ( Tange Bijar )06/25/2009 03/19/2012 N.I.S.O.C N.I.S.O.C

IRAN/ILAM/

TANGBIJARConstruction

945Installation of all Electrical and Mechanical work in 

utility No.2 (kashan)01/27/2009 08/21/2010

Saipa Engineering Expansion Co.

Saipa Co.IRAN/Kashan

Construction

912Installation of Instrumentation and Electrical 

Equipments in HDPE Plant06/22/2003 07/21/2005

Mehvar Sazan Co.

Maroon Petrochemical Companyl

IRAN/Mahshahr

Construction

Page 5: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

956Installation, Pre‐commissioning and commissioning of electrical and instrumentation Equipments of propane 

and Bhutan Tank08/07/2011 03/21/2013 Darya Sahel Co.

Kharg 

Petrochemical.  Co.

IRAN/Kharg Island

Construction

937Installation & Commissioning of Electrical for Car Paint 

Saloon in Zamyad (2) Project10/13/2007 12/21/2009

Saipa Engineering Expansion Co.

Saipa Co.IRAN/Kashan

Procurement/Construction

915Installation and commissioning of Instrumentation and 

Electrical Equipments in EO/EG Plant10/31/2003 02/20/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

733Execution of Concrete Paving for LDPE Product 

Warehouse, Loading Area and North Road Modification of Future Area

10/06/2011 04/07/2012Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr

Construction

405Procurement and installation of Power cables for feeder 

"B" in 6KV substation of olefin cooling07/19/2011 01/18/2012

Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr

Procurement/Construction

907Installation and Commissioning of Instrumentation and 

Electrical Equipments in PTA1 Plant09/21/2001 03/21/2003 ECC Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

Page 6: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

954Installation of Electrical and Instrumentation 

Equipments in Unit 121 of South Pars  phases  15 and 1611/26/2010 01/20/2012

MAPNA BOILER Engineering & manufacturing

Sepanier Oil & Gas 

Engineering Company

IRAN/Assaluye

Construction

708Repairing and Calibration of Instrumentation and 

Electrical Equipment11/05/2004 02/05/2007

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

EPC

942Revamping & renovation Of Instrumentation & Control 

System in Sarcheshmeh Copper Coplex01/22/2008 03/21/2010

Tam Iran .Khodro Co

NICI COIRAN/Kerman

Engineering/Construction

403Electrical and Instrumentation Reconstruction of 

damaged areas in HD Plant of Bandar Imam Petrochemical Co. 

09/21/2010 03/21/2011 BIPC BIPCIRAN/Mahshah

rEPC

916Installation & Commissioning of Instrmentation & 

Control System in PP‐Plant11/05/2004 04/22/2007

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

402 reshadat Platform test separation unit revamping 11/22/2009 01/20/2011 I.O.O.C I.O.O.CIRAN/Lavan

EPC

Page 7: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

706Reparing and Calibration of Instrumentation & Electrical 

Equipment09/20/2004 09/21/2006

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Engineering/Construction

379PLC Control System renovation for 10 Oil Pumping 

Station in I.O.P.T.C09/01/2008 06/20/2011

I.O.P.T.C.Tehran Districted

I.O.P.T.CIRAN/Tehran

EPC

707Providing Electrical & InstrumentationTechnical 

Services(Engineering,Procurement,Construction) to various parts/plants of BIPC under an open Contract.

10/04/2004 10/05/2006 BIPC BIPCIRAN/Mahshah

rEPC

708/1CONSTRUCTION OF INSTRUMENT DEVICES IN PP PLANT 

OF MAROON COMPLEX08/21/2004

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

381

Engineering, Designing,Integration, Installation and commissioning of PLC control system for Material 

Handeling unit of Razi Petrochemical CO.01/10/2009 01/05/2010

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr

EPC

718Sepahan Oil Company detail / Procurement / 

Precommissioning /Construction /Engineering for Re‐Instrumentation from pnewmatic to Fcs/Dcs Project

11/10/2007 08/20/2008Sepahan Oil Refinery

Sepahan Oil Refinery

IRAN/Isfahan

Engineering/Construction

Page 8: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

312 Execution of Electrical Heat Tracing System 09/21/2013 01/22/2014

Joint Venture of Daelim, 

Sazeh, Kayson (DSK)

POGC IRAN/Kangan Construction

924Construction , Termination & Loop Checking of Instrument & Control system in Gas Refinery

09/05/2006 03/20/2007Ahwaz Rad mechanic co.

Parsian refinery

IRAN/Lamerd

Construction

390Cabling and installation of instruments and electrical 

equipment for 2MTPY Iron Ore Concentrate Plant in Gol Gohar iron Ore Co.

07/31/2010 09/20/2011Tehran Fakor Sanat CO.

Gol‐E‐Gohar Iron Ore Co.

IRAN/Tehran

Construction

949Installation & Precommissioning of Control system in 

MCR Area (SARP/SUB/C‐045 )04/14/2010 04/14/2011

Consortium of SAZEH,SEL and 

ODCC

Shazand Arak Refinery

IRAN/Arak Construction

827Instrumentation & electrical equipment installation for 

C3+ Project of Arya Sasol Polymer Company01/28/2014 02/26/2015 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

950Electrification to equipments of concentration factory in 

sarcheshme cooper03/30/2010 10/20/2011

Moshiran Company

NICI COIRAN/Kerman

Construction

Page 9: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

385Design, Engineering and Integration of 

SCADA/Telemetry Control system for Shiraz water and wastewater company (Mianrood region)

12/22/2009 09/20/2011Water and Wastewater Fars Province

Water and Wastewater Fars Province

IRAN/Shiraz

EPC

943 Loop test of olefin plant (BIPC)  01/12/2009 04/22/2009 BIPC BIPCIRAN/Mahshah

rConstruction

824Future Area Electrification for Arya Sasol Polymer 

Company11/21/2012 11/20/2013 ASPC CO. ASPC CO. IRAN/Assaluye

Procurement/Construction

919Installation and Commissioning of Fire Alarm and 

Fighting System08/25/2005 11/20/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

707/2Cable ladder /tray Installation for OL‐plant expantion & 

revamping project07/26/2005 01/26/2006 BIPC BIPC

IRAN/Mahshahr

Construction

901Revamping the Instrumentation and Renovation of 

Control System to DCS in Sulphuric Acid, Gas Purification and Sulphur Plants

03/17/1997 01/20/1998Razi

 Petroch. Co.Razi

 Petroch. Co.IRAN/Mahshah

rConstruction

Page 10: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

386PLC control system Integration and commissioning  for 2MTPY Iron Ore Concentrate Plant in Gole‐Gohar Iron 

ore Co.01/05/2010 07/06/2010

Tehran Fakor Sanat CO.

Gol Gohar Iron Stone Co.

IRAN/Tehran

EPC

743Cable Pulling, Procurement & Installation of Cable Tray  

/ Ladder  from AIS PowerPlant to Sub‐Station 5

08/13/2013 09/27/2013Sahel 

consultant Co.

Damavand Petrochemical 

ComplexIRAN/Assaluye Construction

953/3Installation and commisining of instrument and fire 

alarm system for 32'' line of 15 & 16 phases04/18/2013 07/21/2013

Sanat Gostar Kish

P.O.G.C IRAN/Assaluye Construction

391/1Engineering, Designing, Installation and commissioning of PLC control system and monitoring for water block of 

Fajr 2 petrochemical company (EC Contract)08/22/2010 10/19/2012 Zolal Iran Co.

Fajr Petroch. Co.

IRAN/Mahshahr

Engineering/Construction

952Installation of communication system in Pars 

petrochemical port08/22/2010 10/20/2013

Pars Petroch. Seaport

N.I.P.CIRAN/

AssaluyeConstruction

313Control and Monitoring System Modification for Urea Plant No.2 & Ammonia plant No.3 In Razi Petrochemical 

Co.03/06/2014 10/04/2014

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr

EPC

Page 11: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

735 3‐Phase Civil Project 11/22/2011 05/21/2012Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr

Construction

744Construction activities of online analyzers on Faravaresh 

plants stacks05/22/2014 12/22/2014 Faravaresh Co. BIPC

IRAN/Mahshahr

Procurement/Construction

906Installation and Precommissioning of Instrumentation 

and Electrical Equipments in AMMONIA Plant (Revamping project)

06/22/2001 01/24/2001Razi

 Petroch. Co.Razi

 Petroch. Co.IRAN/Mahshah

rConstruction

738E&I Engineering , Procurement , Construction & 

Commissioning for Absorbtion Chillers of CA/VC Units04/10/2012 12/11/2013 BIPC BIPC

IRAN/Mahshahr

EPC

905Installation and Commissioning of Instrumentation and 

Electrical Equipments in Urea/ammonia Plant08/31/2000 12/23/2000 Shakhes Co.

Razi Petroch. Co.

IRAN/Mahshahr

Construction

953/2Installation and commisining of instrument and fire 

alarm system for 32" line of 6,7 & 8 phases03/05/2013 05/20/2013

Sanat Gostar Kish

P.O.G.C IRAN/Assaluye Construction

Page 12: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

728/104 Civil  work and electrical Cable pulling for C3+ area 04/23/2013 12/22/2013 ASPC CO. ASPC CO.IRAN/

AssaluyeConstruction

941Procurment and Cable Laying for Power Transformers between fajr and Maroon Petrochemical Complex 

10/31/2007 03/21/2009Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

706/9INSTALLATION OF FIRE ALARM SYSTEM FOR KHOUZESTAN PETROCHEMICAL COMPLEX

10/21/2004KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Construction

810Design, Engineering, Procurement, Construction & Commissioning of Electrical & Intstrumentation 

equipments in Tang Bijar07/02/2007 04/08/2008 N.I.S.O.C I.C.O.F.C

Iran/Ilam/

Tange‐BijarEPC

929Installation , Commissioning & Start‐up of 

Instrumentation & Control System in Gas Refinery (Tabnac)

01/26/2007 08/21/2007 Payandan co.Parsian refinery

IRAN/Lamerd

Construction

951Performing Piping and bridging gasoline tanks to pump house in Saipa automobile manufacturing site in Kashan 

06/19/2010 01/20/2011 Saipa Co. Saipa Co.IRAN/Kashan

Construction

Page 13: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

599/31Procurement of Protection system‐surveillance camera 

(CCTV)08/06/2012 05/09/2013

Petrochemical Kala

BIPC (Basparan  Co. 

)

IRAN/Mahshahr

Procurement/Construction

910Engineering, Procurement Services,Installation and 

procommissioning  of Electrification of New units in 3rd ammonia plant.

04/25/2003 05/14/2004 P.I.D.E.M. Co.Razi

 Petroch. Co.IRAN/Mahshah

rConstruction

383Engineering , Procurement, Installation and 

commissioning of Electrical Distribution Panles for SINA Chemical Industry

10/04/2009 05/21/2010Sina

Petroch. Co.Sina

Petroch. Co.IRAN/Shiraz

EPC

701/63Procurement, Installation and Commissioning of Instrumentation and Electricalworks of Jetty No.2

09/18/2001 04/07/2002 Faravaresh Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

914Engineering , Procurement and Execution of 

Electrification of Sea Water Pumps10/30/2004 03/16/2005 P.I.D.E.M. Co.

Razi Petroch. Co.

IRAN/Mahshahr

Construction

918Engineering, Procurement, Installation and 

Commissioning of Analysers06/25/2005 11/11/2005

Isfahan Refinery Co.

Isfahan Refinery Co.

IRAN/Isfahan

Construction

Page 14: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

706/5CALIBRATION & LOOP CHECK OF INSTRUMENTS IN 

KHOUZESTAN PETROCHEMICAL COMPLEX11/06/2004

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Construction

706/10ELECTRICAL/ INSTRUMENT CONSTRUCTION & 

PRECOMMISSIONING ACTIVITIES OF KHOUZESTAN PETROCHEMICAL COMPLEX

10/21/2004KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Construction

736development of Utility Services to new administrative 

office04/06/2012 04/10/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Procurement/Construction

944 Installation of industrial sewage in kashan  01/21/2009 02/21/2010Saipa 

Engineering Expansion Co.

Saipa Co.IRAN/Kashan

Construction

928Installation , Commissioning & Star‐up of Fuel Cord 

System in 120 Gas Station12/02/2006 05/21/2007 I.T.I N.I.O.P.D.C

IRAN/Hormozgan,Booshehr,A

badanConstruction

911Procurement, Installation and Commissioning of 4th 

Dryer in Air & Nitrogen Plant05/25/2003 09/04/2004 Ab Niroo Co. BIPC

IRAN/Mahshahr

Construction

Page 15: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

723/5 DISMANTLING OF OBSOLETE PANELS OF OL PLANT 01/03/2010 03/05/2010 BIPC BIPCIRAN/Mahshah

rConstruction

728/212Upgrading of 'Human Interface System' computers at C2 

Cracker plant05/12/2012 03/21/2013 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

933Installation and commisioning of Cathodic Protection 

System in Oxydental Refinery (Oman)01/01/2007 06/16/2008 RITS Co. OXY Co. OMAN Construction

728/308Permanent Electrical Power Supply for PACK LINE 

Equipment06/05/2011 09/28/2011 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

928/1The Commisioning, Maintanance, Defect Removal and 

the Periodical Audit Services of Fuel Cord System04/20/2007 07/18/2007 I.T.I N.I.O.P.D.C

IRAN/Hormozgan,Booshehr,A

badanConstruction

701/241Revamping , Renovation and Commissioning of the 

Instrumentation06/27/2005 04/02/2006 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

Page 16: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

926 Construction & Commissioning of 4th Nitrugen Tank 10/05/2006 09/04/2007 Ab Niroo Co. BIPCIRAN/Mahshah

rConstruction

940Repair and Rearrangment of telephone cables between MDF to Communication Boxes of all Plants in Bandar 

Imam Petrochemical Complex11/22/2007 05/21/2008 Kharazmi Co. BIPC

IRAN/Mahshahr

Construction

939Procurement, Construction & Commissioning of 

Instrumentation Equipments of Tank FB‐ 201 in AR plant (Bandar Imam Petrochemical Complex)

11/10/2007 05/12/2008 Faravaresh Co. BIPCIRAN/Mahshah

rProcurement/Construction

728/219 Instr. Cable laying of C3+line extension 02/14/2013 07/16/2013 ASPC CO. ASPC CO.IRAN/

AssaluyeConstruction

728/301 Design, Supply of socket outlets on towers 12/27/2010 11/14/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/187Procurement, Installation and Commissioning of 

Instrumentation of Phase 1 of the OL Expansion Project09/07/2004 12/06/2006 BIPC BIPC

IRAN/Mahshahr

Construction

Page 17: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

728/339Installation of electrification system for open yard 

shelter of spare parts warehouse03/09/2014 08/31/2014 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

938Procurement, Construction & Commissioning of 

Instrumentation Equipments of Tank FB‐ 901 in AR plant (Bandar Imam Petrochemical Complex)

11/03/2007 09/19/2008 Faravaresh Co. BIPCIRAN/Mahshah

rProcurement/Construction

599/32Procurement ,Construction & commissioning  Services 

of Surveillance Camera for BD/SR Unit12/03/2012 06/03/2013 Basparan Co. BIPC

IRAN/Mahshahr

Procurement/Construction

706/1ENG./ CONSTRUCTION & COMMISSIONING SERVICES 

FOR SINCRONIZING OF THE DIESEL GENERATOR WITH POWER NETWORK

09/25/2004KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Engineering/Construction

728/325installation of waterproof electrical Socket across the 

Pipe way from area 1 to area 807/28/2012 11/20/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

396/2Design, procurement and commissioning of an operator work station computer for reshadat platform PLC system

12/04/2013 02/03/2014 EPC

Page 18: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/179Revamping and Renovation of Instrumentation for 

area's 900D,200B,250 A/B/C07/23/2004 02/01/2005 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

701/22  Installation and  Commissioning of the CA/VC Analysers 02/09/2000 08/08/2000 Kimia Co.  BIPCIRAN/Mahshah

rConstruction

378Design & Implementation  and Commissioning of  HMI  

& PLC  logic  for PET Pilot plant01/22/2008 01/04/2009

Pajohesh & Ffanavari 

Petrochemical Co.

Pajohesh & Ffanavari 

Petrochemical Co.

IRAN/Mahshahr

EPC

903Installation and Commissioning of Instrumentation and 

Electrical Equipments in Sulphunasion Unit09/21/1999 11/08/1999 Nasb Gostar Co. Paksan Co.

IRAN/Tehran

Construction

701/107Engineering , Construction and Commissioning of 

Neutralization Pond03/04/2003 07/13/2003 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

728/327Design of electrification system for new storage area in the north side of initiator storage building( LD‐Plant)

11/11/2012 07/13/2013 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

Page 19: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

707/27 INSTALLATION OF CATALYST PUMPS IN LD PLANT  03/15/2006 04/28/2006 Basparan Co. BIPCIRAN/Mahshah

rConstruction

708/8Installation of SAMPLE POINT for Lab with frame 

construct and installation03/08/2006 03/29/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

728/220Modification in channels of analog input Cards (C‐

501/502)04/12/2013 04/02/2014 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

380Engeeniring, Design, Software Development, installation  

 and commissioning of HMI for PSA plant in BARCO11/14/2008 08/15/2009

Bandar abbas Refinery Co.

Bandar abbas Refinery Co.

IRAN/Bandar Abbas

EPC

396/1 02/20/2013 05/22/2013Engineering/Co

nstruction

706/7INSTALLATION OF CABLE TRAY COVERS IN KHOUZESTAN 

PETROCHEMICAL COMPLEX02/02/2005

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Construction

Page 20: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

728/304

1‐ Sandwich panel office building in corner of PE‐warehouse building for SGS and chain people. 2‐ Drawing for power supply for Roll‐up Doors. 3‐ 

Additional load on LV1 & LV2 panel due to additional of 322 fans in product warehouse

12/30/2010 03/18/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/207Engineering, Procurement Services and Installation  of 

Closed Circuit Cameras11/09/2004 04/18/2005 Ab Niroo Co. BIPC

IRAN/Mahshahr

EPC

728/322 Test Board for 6 KV Motors 05/02/2012 09/29/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeEngineering/Co

nstruction

701/43 Engineering and Procurement Services for the Analysers 04/26/2001 09/30/2003 Faravaresh Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

701/177Engineering and Installation of Instrumentation and 

Electrical Equipment of Ethylene Tank07/10/2004 08/16/2004 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

947Repair and Rearrangment of telephone cables between MDF to Communication Boxes of all Plants in Bandar 

Imam Petrochemical Complex02/02/2009 06/27/2009 Kharazmi Co. BIPC

IRAN/Mahshahr

Construction

Page 21: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

404Procurement and installation of level gauge and Level 

Switch for Waste Oil Tank in PX Plant01/11/2011 07/21/2011 BIPC BIPC

IRAN/Mahshahr

EPC

707/17COMMUNICATION OF IMPORTANT SIGNALS OF LOAD 

SHEDING SYSTEM IND UT PLANT03/27/2006 12/25/2006 Ab Niroo Co. BIPC

IRAN/Mahshahr

Construction

708/22Electrical and instrumentation work associated with 

TRAICING و ANALYZER unit 05/03/2006 05/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

728/107Installation of Lighting modification of C2 cracker plant 

storage area11/15/2013 03/21/2014 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

701/249Instalation and Commissioning of Instrumentation of 

Condition Monitoring of the Compressors07/20/2005 12/16/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

707/6INSTALLATION OF INLINE FLOW METERS IN SR PLANT OF 

BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

Page 22: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/120Installation of Instrumentation and Electrical Equipment 

of PTA‐1 Project02/20/2003 05/21/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

701/111Installation and Testing the Electrical Devices of Diesel 

Gen. House and Main Workshop01/23/2003 01/23/2004

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

701/71Engineering, Installation and Commissioning of the 

Tanks Management System10/19/2001 03/07/2002 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/12Engineering, Procurement and Construction of LYNX‐

1000 Heptane Drying Unit05/14/1999 10/18/1999 Basparan Co. BIPC

IRAN/Mahshahr

EPC

728/305 Modification of PE WAREHOUSE Internal Lighting System 04/26/2011 08/14/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

706/12DETAIL ENGINEERING FOR PACKAGE'S INTERLOCKS IN 

KHOUZESTAN PETROCHEMICAL COMPLEX04/28/2005

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Engineering/Construction

Page 23: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/57  Installation of Qquipments in New Laboratory  08/07/2001 12/08/2001 Kimia Co.  BIPCIRAN/Mahshah

rConstruction

728/329Providing proper lighting facilities for CCTVs in offsite 

area08/22/2013 05/21/2014 ASPC CO. ASPC CO.

IRAN/Assaluye

Engineering/Construction

931Instrumentation Cable Laying in Parsian ‐ 2 Gas Refinery 

(lamerd)04/28/2007 05/24/2007 Payandan co.

Parsian refinery

IRAN/Lamerd

Construction

701/26 Monthly Maintenance of the Fire Fighting Vehicles 03/16/2000 03/11/2001 BIPC BIPCIRAN/Mahshah

rConstruction

728/102Instrument procurement engineering activities for new 

C3+ export pipeline01/04/2012 08/25/2015 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

728/217Transmission signals from PLC at gas station to DCS 

system at offsite control room11/13/2012 01/19/2013 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

Page 24: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/156 Rehabilitation of Instrumentation of Section 400 12/10/2003 01/11/2005 Basparan Co. BIPCIRAN/Mahshah

rConstruction

932Installation and commisioning  of Fire Alarm System in Karoon Petrochemical Company (Bandar Imam Free 

Zone )06/06/2007 12/21/2007

Karoon Petroch. Co.

Karoon Petroch. Co.

IRAN/Mahshahr

Construction

734Installation and Commissioning of Gas Detection System 

, LDPE Plant10/10/2011 11/25/2011

Amir Kabir Petroch. Co

Amir Kabir Petroch. Co

IRAN/Mahshahr

Construction

727 UT‐600 Neutralization pound control system 06/05/2010 08/05/2010 Ab Niroo Co. BIPCIRAN/Mahshah

rConstruction

904Installation and Commissioning of Instrumentation and Electrical Equipments in Automobile car Painting Saloon

07/17/2000 10/10/2001 Saipa Co. Saipa Co.IRAN/Tehran

Construction

701/16Engineering, Procurement and Construction of Silica 

Analyser08/03/1999 Ab Niroo Co. BIPC

IRAN/Mahshahr

EPC

Page 25: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

707/7 CABLE LAYING OF NEW COOLING TOWER OF NF PLANT 04/07/2006 06/05/2006 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

708/33Electrical and instrument work according to announced work such as Cabling,Gland & Termination,… related to  

TANKAGE AREA و PROCESS AREA of EO/EG unit05/03/2006 10/05/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

922Power Feeder Installation & Cable Laying for Explosion‐

Proof Air Condition System in Olefin Plant07/19/2006 08/13/2006 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/188Engineering, Installation and Commissioning of New 

Control Loops of Ethylene Tank09/10/2004 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

706/3CABLING/ TERMINATION OF UNIT 50 OF KHOUZESTAN 

PETROCHEMICAL COMPLEX10/15/2004

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Construction

728/316 Lighting Modification of C2 Cracker Plant Storage Area 12/17/2011 04/17/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

Page 26: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

728/224Adding temperature Control Valve on 4 MPS11201 A‐EA22‐H to E‐1107  for automatic control of bypass gas

11/25/2013 08/04/2014 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

924/1 Installation and cabling of 20/11 KV transformer 10/22/2006 11/20/2006 N.I.S.O.CParsian refinery

IRAN/Lamerd Construction

946Installation, test and precommisioning of Lood Sheding 

system in Bandar Imam01/05/2009 03/21/2010 Ab Niroo Co. BIPC

IRAN/Mahshahr

Construction

728/319Making induction loop and safety light barrier switch for 

big bag station (42w‐80003)02/21/2012 07/21/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

701/108Engineering, Installation and Commissioning of the 

Modified Parts of the LV Panels01/23/2003 05/13/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Engineering/Construction

701/157Repaire and Installation of the Instrument &  Electrical 

Equipment of Jetty NO.112/28/2003 06/05/2004 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

Page 27: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/103Installation and Commissioning of Instrumentation of 

NOXEL Project01/04/2003 03/16/2004 Basparan Co. BIPC

IRAN/Mahshahr

Construction

728/218installation acceleration sensors to pump 701 A/B 

forpreventing of overall pump damage12/22/2012 03/21/2013 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

706/14INSTALLATION OF PACKAGE'S INTERCONNECTION IN 

KHOUZESTAN PETROCHEMICAL COMPLEX12/05/2005

KhozestanPetroch. Co.

KhozestanPetroch. Co.

IRAN/Mahshahr

Engineering/Construction

708/28Electrical and instrumentation work associated with  ANALYZER , TRACING and P‐2020A, B‐2014,B Pumps 

Push button in EO/EG units05/19/2006 08/03/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/37F&G work such as Cabling,Device installation,Gland & Termination,… related to  TANKAGE AREA و PROCESS 

AREA of EO/EG unit07/22/2006 10/20/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/109Installation and Commerssioning of Electrical Facilities 

of BAGGING Building01/23/2003 05/13/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

Page 28: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

707/29INSTALLATION CM RELATED ACCESSORIES OF LD PLANT 

COMPRESSORS01/01/2006 02/01/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

707/14INSTALLATION OF INLINE FLOW METERS IN LD PLANT OF 

BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

920Installation & Commissioning of Ex‐Proof Electrical 

Equipments in the Catalyst Warehouse02/03/2006 04/26/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

728/303 Relocating of Diesel Generator's Batteries 04/26/2011 10/13/2011 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/214Engineering, Installation and Commissioning of New 

electrical Actuators of the Furnaces12/19/2004 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

728/311Engineering and Installation of Emergency Push Botton 

to Trip PE Warehouse lighting system09/02/2011 12/04/2011 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

Page 29: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

728/312 Heat Decreasing of the Chilled Water Panel 09/03/2011 01/05/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

728/204Changing The Mech. Switches Of C‐501/502 Stp1‐Mp1 

(Psl‐ 51410/51402) To Transmitters01/01/2011 08/29/2011 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

902 Installation of Tank Gauging System in Common Facilities 05/11/1999 09/12/1997 BIPC BIPCIRAN/Mahshah

rConstruction

701/48Cabling the New Route to COOLING TOWER  in NEW 

Urea Unit07/18/2001 08/05/2001

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr

Construction

707/26INSTALLATION OF INLINE FLOW METERS OF MASS & 

ENERGY BALANCE IN KIMIA COMPANY06/26/2006 10/26/2006 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

923Installation & Commissioning of Turbine Compressor 

Vibration System.06/11/2006 07/01/2006 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

Page 30: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/233 Installation and Commissioning of 7 Nos. Flowmeters 05/12/2005 04/26/2006 Faravaresh Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

701/28Engineering, Procurement and Installation of 11 Nos. 

Oxygen Analysers06/21/2000 12/01/2000 Faravaresh Co. BIPC

IRAN/Mahshahr

EPC

701/32Engineering and Installation of Catalyst Firing Remote 

Control for the DEAC Tanks01/04/2001 Basparan Co. BIPC

IRAN/Mahshahr

Construction

728/332 Upgrading of Relays protection 10/10/2013 03/20/2014 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

708/10STEAM TRACE TUBING OF EO/EG PLANT OF MAROON 

COMPLEX05/03/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

371Engineering, Designing,Integration, Installation and 

commissioning of PLC control system for fire extinguishing systems, station No 1,2

11/14/2006 06/14/2007Shiraz 

petroch. Co.Shiraz 

Petroch. Co.IRAN/Shiraz

EPC

Page 31: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/93 Installation and Commissioning of 8 Nos. Flowmeters 10/11/2002 04/20/2003 Faravaresh Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

701/146Engineering , Procurement Services and Construction Supervision Services for the Condition Manitoring 

System of Compressors08/19/2003 Basparan Co. BIPC

IRAN/Mahshahr

EPC

701/167 Installation and Commissioning of 6 Nos. Electric Pumps 04/09/2004 07/03/2006 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

701/113Installation and Testing the Electrical Devices of Analyser, Weighbridge (S&N) Buildings and HOSE 

STATIONS 1 &201/23/2003 04/17/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

728/105Installation of main input power cables for offsite data 

center08/07/2013 10/20/2013 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

728/313Paging system modification for Compressor Area, LDPE‐

plant09/10/2011 01/11/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

EPC

Page 32: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/206Engineering, Procurement, Installation and 

Commissioning of Instrumentation of Loading Arm of the Jetty No.1

11/06/2004 02/28/2006 Faravaresh Co. BIPCIRAN/Mahshah

rEPC

701/223 Installation of Instrumentation and Electrical Works of 

New Motors .03/15/2005 Basparan Co. BIPC

IRAN/Mahshahr

Engineering/Construction

728/321 Procurement & Installation of Eexd. Air Conditioner 04/17/2012 07/16/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeProcurement/Construction

701/159Engineering & Installation of Equipment on LV/MV 

Panels in the NF Plant01/06/2004 04/02/2004 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/46Procurement, Installation and Commissioning of 

Ultrasonic Flowmeters of Benzen and Propane Lines05/21/2001 10/05/2001 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

728/223 11/05/2013 01/05/2014 ASPC CO. ASPC CO.IRAN/

AssaluyeConstruction

Page 33: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/221  Installation of Local Control Units for the New Pumps 02/24/2005 05/26/2005 Basparan Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

701/190Engineering, Installation and Commissioning of Level 

Indicators on the IW Tanks09/10/2004 01/01/2007 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/208Installation and Commissioning of Level Control 

Instrumentation of Propylene Exchangers10/14/2004 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

728/340INSTALLATION AND WIRING OF LCS FOR 6KV FLARE'S 

MOTORS (FL‐BWM‐8010A/B)09/06/2014 10/22/2014 ASPC CO. ASPC CO. IRAN/Assaluye

Engineering/Construction

728/214 Installation of manual call points in storage area 06/05/2012 08/05/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeConstruction

728/103checking and construction new septic system for admin 

& restaurant bldg.04/11/2012 05/20/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

Page 34: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/224Engineering, Procurement and Commissioning of 

Loading System of EDC Line04/18/2005 04/07/2006 Kimia Co.  BIPC

IRAN/Mahshahr

EPC

701/39Procurement, Installation and Commissioning the 

Electrical Equipment of LATEX Project03/14/2001 07/06/2001 Basparan Co. BIPC

IRAN/Mahshahr

Construction

701/112Installation and Testing the Electrical Devices of Hot OIL, 

TICKET, CONTROL  and AUX. Rooms.01/23/2003 05/05/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

701/204 Installation of Flowmeter on the Treated Waste Line to 

Sea10/26/2004 03/28/2005 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/218 Installation & Commissioning oftachometers. 02/06/2005 04/28/2006 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

701/70 Installation and Commissioning of 5 Nos. Flowmeters. 10/19/2001 01/31/2002 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

Page 35: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

728/320 Replacement of W‐402 with New Dosage Pump 04/17/2012 07/16/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/77Procurement Services and Installation of Electrical Facilities of the Rest Room of SEA WATER Area.

03/03/2002 05/18/2002 Faravaresh Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

708/16TERMINATION & TEST OF FIRE ALARM SYSTEM FOR 

POLYPEXT & CATA PLANT04/23/2006 05/22/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/194Engineering, Procurement and Installationof the Flow 

Control Loops of the LATEX Project09/23/2004 01/25/2007 Basparan Co. BIPC

IRAN/Mahshahr

EPC

701/193 Electrification of Portable Air Compressors 08/14/2004 04/16/2005 Ab Niroo Co. BIPCIRAN/Mahshah

rConstruction

701/197Relocating and Commissioning of the CONTROL ROOM 

Computers10/03/2004 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

Page 36: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/191Engineering, Installation and Commissioning of Alarm 

System on MS Line.09/10/2004 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

708/4 Fire alarm cabling for HD unitMaroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/123Installation and Commissioning of Rotameters, Volume 

Tank, and Diesel Generator Electrification03/17/2003 06/19/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

701/184Installation and Commissioning of Flowmeter on the 

Water In‐take Line to the Complex07/03/2004 11/17/2004 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

711/4Installation and setup K402A/B و P‐201E/F to installed 

diesel generator in site09/26/2006 12/01/2006 Kimia Co.  BIPC

IRAN/Mahshahr

Engineering/Construction

707/11INSTALLATION OF INLINE FLOW METERS IN HD PLANT 

OF BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

Page 37: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/76Procurement Services and Construction of 2 Nos. Lift 

Electrical works.03/03/2002 05/12/2002 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/195Engineering, Istallationn and Commissioning of the CRA‐

609Analyser of Industrial Water Unit09/13/2004 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/58Engineering & Installation of the Instrumentation of 

New Tower C‐70108/11/2001 12/18/2001 Kimia Co.  BIPC

IRAN/Mahshahr

Engineering/Construction

728/222 Instrument modification on C2 & MDHD Plant 10/22/2013 11/22/2013 ASPC CO. ASPC CO.IRAN/

AssaluyeConstruction

701/153Engineering, Procurement Services and Installation of 4 

Nos. Level Transmitters in CA Plant11/30/2003 Kimia Co.  BIPC

IRAN/Mahshahr

EPC

728/106Installation of the Electrical Panel in northwest of future 

area10/28/2013 12/28/2013 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

Page 38: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

708/14CABLE LAYING BETWEEN PROCESS & TANKAGE AREA 

FOR EO/EG PLANT OF MAROON COMPLEX05/03/2006 05/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/135Installation and Testing of Instrument Devices of Modified (Pneumatic to Electronic) Control Loops

06/21/2003 05/17/2005 Kimia Co.  BIPCIRAN/Mahshah

rConstruction

701/136Installation and Testing the Instrumentation of CHILLING 

POND06/21/2003 10/19/2003 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

701/217Cabling and Termination of Compressor Governer 

System01/23/2005 04/15/2005 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/25Troubleshooting and Repairing the ACCELERATION UNIT 

of Fire Fighting Vehicle03/16/2000 08/17/2000 BIPC BIPC

IRAN/Mahshahr

Construction

708/38Electrical and instrument work such as Cabling,Device installation,Gland & Termination,… related to  TANKAGE 

AREA و PROCESS AREA of EO/EG unit10/01/2006 11/01/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

Page 39: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

921Cabling, Termination and Commissioning the Electrical 

Governer of GT‐1501 Compressor in NF Plant01/18/2006 02/02/2006 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

707/10INSTALLATION OF INLINE FLOW METERS IN BD PLANT OF 

BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

701/115Installation and Testing the Electrical Devices of 

WAREHOUSE & SUB‐STATION02/10/2003 04/02/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

708/29 Commisioning assistance in EO/EG unit 04/29/2006 07/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/237Engineering for Relocation  & Installation of Fire 

Extingnishers05/24/2004 08/13/2005 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

707/28ELECTRICAL/ INSTRUMENT INSTALLATION SERVICES OF 

LD PLANT CATALYST PUMPS02/05/2006 03/07/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

Page 40: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

707/15 COMMUNICATION OF ALARMS BETWEEN OL & UT PLANT 04/13/2006 05/22/2006 Ab Niroo Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

701/90Relocating and Commissioning the Instrument Air Piping 

of Purging System of Cell‐Room Panels.09/13/2002 04/15/2003 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

701/130Engineering, Procurement Services, Installation and Commissioning of Automatic Fire Fighting System

12/16/2003 Basparan Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

701/192Engineering, Installaton and Commissioning of Alarm 

System for the Feul and Steam Pumps08/10/2004 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

728/317 Fire alarm system execution for asset integrity building 01/10/2012 03/11/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeProcurement/Construction

701/166Construction and commissioning the Connection of Fire 

Fighting water Line to Cooling Tower Package04/07/2004 04/27/2005 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

Page 41: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

728/216Transmition fire and gas alarms signals from Flare 

substation to offsite control room07/21/2012 10/09/2012 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

701/236Installation and Commissioning of 4 Nos. Flowmeters on 

the HCL Line of Section 60005/25/2005 08/05/2005 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

701/180Installation and Commissioning of one totalizer on the 

Fire Fighting Water Line .06/16/2004 05/14/2006 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

708/35

Electrical and instrument work according to announced work such as Cabling,Device installation,Gland & 

Termination,… related to  TANKAGE AREA و PROCESS AREA of EO/EG unit

07/22/2006 09/05/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

728/314 F&G SENSORS ADDITION IN NEW OIL STORAGE 11/20/2011 03/01/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeEPC

701/183Installation and Commissioning of Totalizer on the HCL 

Line07/03/2004 10/04/2004 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

Page 42: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

707/13INSTALLATION OF INLINE FLOW METERS IN PP PLANT OF 

BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

701/222Installation and Commissioning of TOTAL HYDRO 

CARBON Analyser of Nitrogen Unit03/02/2005 05/07/2005 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

708/6 Termination and test of Fire alarm 01/15/2007 02/05/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/67Installation and Commissioning of 4 Nos. TOTALIZERS, ISOLATORS and Flowmeters in the Control Room Panels

10/01/2001 04/13/2002 Ab Niroo Co. BIPCIRAN/Mahshah

rConstruction

701/118Installation and Testing of Electrical Devices for the 

Mahshahr Export Storge Tanks02/09/2003 05/12/2006 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

728/215 transferring of 6 JB and 1 PT in the pipeline path 07/10/2012 08/09/2012 ASPC CO. ASPC CO.IRAN/

AssaluyeConstruction

Page 43: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

708/36

Electrical and instrument work according to announced work such as Cabling,Device installation,Gland & 

Termination,… related to  TANKAGE AREA و PROCESS AREA of EO/EG unit

07/22/2006 10/20/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/40Electrical and instrument work such as Cabling,Device installation,Gland & Termination,… related to  TANKAGE 

AREA و PROCESS AREA of EO/EG unit11/07/2006 12/08/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

370Design and implementaion of Thinkpac Control & 

Monitoring software09/29/2006 12/17/2006 Ventus S.A Ventus S.A Belgium EPC

701/100Engineering, Installation and Commissioning of Electrical works for New Rooms of Warehouse Mechanization 

System11/23/2002 01/29/2003 Basparan Co. BIPC

IRAN/Mahshahr

Engineering/Construction

708/9The cabling and its associated works for feeding pumps  

A,B‐2020,A,B  P‐2014

05/03/2006 05/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/34F&G work according to announced work such as 

Cabling,Gland & Termination,… related to  TANKAGE AREA و PROCESS AREA of EO/EG unit

06/22/2006 09/05/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

Page 44: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/140Installation of Vaccum Breaker and Safety Valve on the 

Condensate Storage Tanks07/02/2003 10/10/2003 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/182Installation and Commissioning of Alarms of NF1 & 2 

Units07/15/2004 10/01/2004 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

708/21Installation of the analyzers: AE/AT‐21002‐20701‐77001‐

20901 of EOEG unit05/02/2001 06/24/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/110Refurbishing and Testing the damaged Instrument & 

Electrical Panels01/23/2003 04/04/2003

Tondgooyan Petroch. Co.

Tondgooyan Petroch. Co.

IRAN/Mahshahr

Construction

701/68Installation and Commissioning of Instrumentation and 

Electrical works of New Turbo Pump OL‐GA‐7013010/11/2001 09/30/2003 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/125Procurement and Construction of Kiosk for Tower 

Monitoring of Jetty No.204/11/2003 07/10/2003 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

Page 45: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/88 Installation and Commissioning the Mass Flowmeters 08/24/2002 10/24/2002 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

707/12INSTALLATION OF INLINE FLOW METERS IN PVC PLANT 

OF BASPARAN COMPANY01/31/2006 04/02/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

701/89Installation and Commissioning for 2 Nos. Conductivity 

Meters08/24/2002 03/26/2003 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/44Engineering, Procurement Services and Installation of %6 Caustic Injection Package for QW and PW Lines

05/14/2001 05/07/2003 Faravaresh Co. BIPCIRAN/Mahshah

rEPC

728/226Installation of instrument equipment for unloading 

package system05/10/2014 06/07/2014 ASPC CO. ASPC CO.

IRAN/Assaluye

Construction

701/62Commpletion of Installation of Area Lighting of Granual 

Urea Unit08/05/2001 10/28/2001

Razi Petroch. Co.

Razi Petroch. Co.

IRAN/Mahshahr

Construction

Page 46: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/34 Installation of AL Analyser 12/21/2000 04/27/2001 Basparan Co. BIPCIRAN/Mahshah

rConstruction

701/227Engineering and Procurement Services for Electrical System and Air Conditioning Facilities of Central 

Electrical Workshop04/27/2005 Faravaresh Co. BIPC

IRAN/Mahshahr

EPC

701/163Engineering, Procurement and Installation of Pumps 

Ammeters in the Control Room02/06/2004 Faravaresh Co. BIPC

IRAN/Mahshahr

EPC

707/23INSTALLATION OF TEMPERATURE CONTROL DEVICES IN 

EDC PLANT05/19/2006 06/16/2006 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

701/230Execution of Instrument Air Piping for the Fans of 

Section 400.05/10/2005 05/11/2006 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/225Installation and Commissionig of Multi Temp. Indicators 

of Floating Roof Tanks04/26/2005 05/07/2006 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

Page 47: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

708/45Sunshade preparation and installation for 

instrumentation device10/29/2006 11/29/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/242 Installation and Commissioning of DR‐103 Density Meter 07/11/2005 08/10/2005 Faravaresh Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

927 Installation & Commissioning of CCTV System 12/22/2006 03/21/2007 Basparan Co. BIPCIRAN/Mahshah

rConstruction

701/143Installation and Commissioning of Instrumentation and 

Electrical Equipment of EDC Unit08/04/2003 11/04/2003 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/97 Installation and Commissioning of the AR‐201 Analyser 11/05/2002 05/08/2003 Faravaresh Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

701/243Installation and Commissioning of Instruments of Filters 

of Train 206/29/2005 07/06/2006 Basparan Co. BIPC

IRAN/Mahshahr

Engineering/Construction

Page 48: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

925 Cable Laying & Termination for Air Conditioning systems 10/29/2006 11/18/2006 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

708/20Installation, Cabling, Gland and termination of F&G 

system of EOEG unit04/28/2006 06/23/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/85Installation and Commissioning of Counters for Utility 

Measuring System08/02/2002 09/17/2002 Ab Niroo Co. BIPC

IRAN/Mahshahr

Construction

708/39F&G work such as Cabling,Device installation,Gland & Termination,… related to  TANKAGE AREA و PROCESS 

AREA of EO/EG unit10/14/2006 11/14/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/127Engineering, Installation and, Commissioning of the 

Lighting System in BD/SR Plant04/29/2003 07/27/2003 Basparan Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/235Installation and Commissioning of one GAMA RAY LEVEL 

Detector05/20/2005 05/21/2006 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

Page 49: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/137Engineering, Installation and Testing of the Pumps 

Control Circuits06/24/2003 09/23/2003 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/96 Installation and Commissioning of the TIC of Soil Tank 10/18/2002 Basparan Co. BIPCIRAN/Mahshah

rConstruction

707/4Installation and Commissioning of Thermostats and 

Alarm System in the Panles of Packing Unit11/20/2005 01/20/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

701/154Engineering , Procurement Services and Installation of 

BELT SCALER01/30/2004 Kimia Co.  BIPC

IRAN/Mahshahr

EPC

708/48Cabling from fire alarm panel to jb‐1‐b‐4000i inside of 

control roomin loading Area for Gas Detector

01/15/2007 02/15/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/82Installation and Commissioning 2 Nos. Ultrasonic 

Flowmeters on the Ethylane Line07/15/2002 07/13/2003 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

Page 50: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

708/7TEE CONNECTOR  installationn for Hook up typs L01 and 

plug installation03/16/2006 04/07/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/13INSTALLATION OF F&G SYSTEM IN CONTROL/ AUXILIARY 

ROOM & UPS ROOM OF MAROON COMPLEX03/16/2006 04/17/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/44Cabling from F&G PANEL to HVAC & from HVAC PANEL 

to HVAC Compressor in HDPE unit11/05/2006 12/06/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/199Engineering, Installation and Commissioning of 3 NOS Thermometers on the Liquid Nitrogen Line to FB Tanks

10/10/2004 10/11/2006 Ab Niroo Co. BIPCIRAN/Mahshah

rEngineering/Co

nstruction

701/98Installation and Commissioning of the Ex‐Proof 

Equipment of AL Analyser house.10/15/2002 11/04/2002 Basparan Co. BIPC

IRAN/Mahshahr

Construction

701/56 Installation and Commissioning of the OXYGEN Analyser 08/07/2001 10/25/2001 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

Page 51: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/205Installation of Pressure Gauge on Waste Water Line and 

Contruction of Shelfer for the Control Valves09/20/2004 05/12/2005 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/189 Installaton and Commissioningof two actuator. 09/10/2004 08/27/2004 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

701/181Installation and Commissioning of HIGH and LOW 

Alarms in  Control Loop PRC‐70106/16/2004 09/16/2004 Ab Niroo Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/54Engineering and Installation of NF‐FQ‐101 Accessories in 

the Metering Station08/07/2001 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

701/134 Electrification and Testing of the Vaccum‐Pump Motor 06/14/2003 07/15/2003 Basparan Co. BIPCIRAN/Mahshah

rConstruction

701/234 Installation and Commissioning of 2 Intercom Sations 05/19/2005 05/20/2006 Basparan Co. BIPCIRAN/Mahshah

rConstruction

Page 52: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/117Procurement and Installation of one CLAMP‐ON 

Flowmeter on the 24" Salt Line.02/10/2003 03/18/2003 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

701/84Engineering and Installation of Interlock System for LPG 

Transfer Unit07/27/2002 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

708/41Cabling for EBC‐20‐MCC‐HVAC from C.R to S.STAK AREA 

&Sunshade installation for GAS DETECTOR of EO/EG unit

11/04/2006 12/02/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/198Installation and Commissionoing of the GAMA RAY 

LEVEL INDICATOR.10/17/2004 10/18/2006 Basparan Co. BIPC

IRAN/Mahshahr

Construction

708/43Device,Gland,Tube,…installation number FT‐99002‐

FT99001,PT‐99002 & PT‐9900110/29/2006 11/18/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/32Electrical and instrument work according to announced work such as Cabling,Hook Up,Gland & Termination…

07/02/2006 07/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

Page 53: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/79Installation and Commissioning the Ultrasonic 

Flowmeter on the Flare Line05/17/2002 08/19/2002 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/239Installation and Commissioning of the Flowmeter of 

Buthane Line to CF  Unit06/09/2005 07/24/2005 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/59Installation and Commissioning of One PH METER in 

Unit 30008/22/2001 10/20/2001 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/238Installation of Commissioning two Nos. Totalizers for 

FRQ‐004 & FRQ‐401A Loops05/31/2005 05/31/2006 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

708/5 Hand switch installation 01/15/2007 02/05/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/244Engineering, Electrification and Commissioning of Power 

Feed to 110V Distribution Panel of the Analysers08/09/2005 10/14/2005 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

Page 54: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/148 Installation of Alarm System on HD Control Panel. 09/28/2003 10/19/2003 Basparan Co. BIPCIRAN/Mahshah

rConstruction

701/128Installation and Testing of Cables & Control Room 

Equipment for New Ultrasonic Flowmeter of OL Plant Flare Line

05/06/2003 06/03/2003 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

701/87Relocating and Commissioning the Electrification of 

Main Office Airconditioning Package(Electrical works)

08/20/2002 09/05/2002 Kimia Co.  BIPCIRAN/Mahshah

rConstruction

701/95 Revamping in Main Office Building 10/29/2002 11/29/2002 Kimia Co.  BIPCIRAN/Mahshah

rConstruction

708/26FT‐50305 magnetic Installation and setup an additional  

PT for map05/29/2006 05/23/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/41Installation & Commissioning of the Instrumentation of 

LATEX Project03/14/2001 06/28/2001 Basparan Co. BIPC

IRAN/Mahshahr

Construction

Page 55: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/42 Installation and Commissioning of the Mass Flowmeters 03/14/2001 06/13/2001 Basparan Co. BIPCIRAN/Mahshah

rConstruction

701/40Installation and Commissioning of Two OXYGEN 

Analysers03/13/2001 06/12/2001 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

701/92  Installation and Commissioning for 5 Nos. KWH Meters 09/22/2002 09/22/2005 Faravaresh Co. BIPCIRAN/Mahshah

rConstruction

701/155  Installation of Flowmeter on Cooling Water Line 11/30/2003 04/08/2004 Kimia Co.  BIPCIRAN/Mahshah

rConstruction

708/25Cable and Conduit Performing of PT‐00550 / FQI‐3060 

related to HD unit05/19/2006 06/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/11 INSTALLATION OF DETECTORS & ALARMS 04/27/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

Page 56: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

708/15GENERAL CONSTRUCTION SERVICES FOR CABLE/ GLAND 

& TERMINATION05/03/2006 05/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/74Troubleshooting the Electronic Cards of Switching Unit 

device of RS‐24 unit01/06/2002 03/18/2002 BIPC BIPC

IRAN/Mahshahr

Construction

701/248Installation and Testing of Circuit Breakersof Power 

feeders of the Analysers08/29/2005 09/17/2005 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

611/2Functional Test of fire alarm  and Instrumentation Systems in PP plant of Maroon Petrochemical Co.

08/05/2007 08/12/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/17ERECTION & CONSTRUCTION OF SAMPLE CONNECTION 

FOR HDPE PLANT04/14/2006 05/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/30Installation of Gland and Termination for F&G system 

and PVC installation of EO/EG unit05/25/2006 07/21/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

Page 57: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/226Engineering , Installation and Commissioning of Alarm 

for Loop TRC‐30104/27/2005 Faravaresh Co. BIPC

IRAN/Mahshahr

Engineering/Construction

708/31Changing the PT‐00601 Cable route from FJBIF‐0424 to 

FJBIF‐044907/08/2006 08/06/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/60Installation of Gas Detectors, Cabling, Termination and 

Commissioning the System08/10/2001 09/10/2001 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

701/72Engineering and Installation of Digital Pressure and 

Temprature Indicators of Meter Prover Panel12/15/2001 02/27/2002 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

708/18 Moving X‐HSH‐50315 according to the request 05/04/2006 05/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/42 Cabling for HVAC system of analizer room (No.2) 10/29/2006 11/01/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

Page 58: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/152Installation and Commissioning of two PDI Meters on 

the Chillers I/O Lines11/30/2003 03/17/2004 Kimia Co.  BIPC

IRAN/Mahshahr

Construction

708/19 Changing the cable and conduit roth of TV‐30109 05/02/2006 05/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/144 Installation of two TOTALIZER on DM Water panels. 08/11/2003 09/11/2003 Kimia Co.  BIPCIRAN/Mahshah

rConstruction

701/132Troubleshooting and Repair of Electronic Cards of PLC in 

PVC Plant07/29/2003 Basparan Co. BIPC

IRAN/Mahshahr

Construction

708/24 Insallation of HAND SWITCH related to XVY‐10203 of HD 

unit05/21/2006 06/20/2006

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/139 Installation and Testing the TOTALIZER & P/I for FQ‐203 . 07/25/2003 07/27/2003 Kimia Co.  BIPCIRAN/Mahshah

rConstruction

Page 59: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

701/203 Construction of Fresh Air Ducting for the Containers 11/07/2004 Ab Niroo Co. BIPCIRAN/Mahshah

rConstruction

708/49process related to F&G system such as 

Gland,Termination,… for  Pro. Area and Tk. Area01/15/2007 02/05/2007

Maroon Petrochemical 

Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/23 Control room Cabling from FACP01 to FACP02 in HD unit 05/21/2006 06/21/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

701/55Procurement and Installation of the Electric Actuator of 

Reflav Valve08/07/2001 08/07/2003 Faravaresh Co. BIPC

IRAN/Mahshahr

Construction

708/47 Gas Detector,Gland and...installation in gas station 01/22/2007 02/06/2007Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

708/46Installation of JB,Gland,Termination,Tray and Ladder in 

electrical zonearea 7 & 8

11/15/2006 11/20/2006Maroon 

Petrochemical Company

Maroon Petrochemical 

Company

IRAN/Mahshahr

Construction

Page 60: ParsHassasExperiencesInCon · PDF filePetrochemical Company Maroon ... Amir Kabir Petroch. Co IRAN ... Handeling unit of Razi Petrochemical CO. 01/10/2009 01/05/2010 Razi Petroch.

Project No.

Project description Start Date Finish Date Client Main Client Location Project Type

Pars Hassas Experiences In Construction Services

934Installation and commisioning of Instrumentation 

Equipments in RAK Lube Oil Refinery (UAE)06/19/2007 09/20/2007 RITS Co.

RAK Lube Oil Co.

UAE Construction


Recommended