Local Planning Panel 7 August 2019 375 Glebe Point Road, Glebe D/2018/1586 Applicant: Environa Studio Owner: Lawrence Luk Architect: Environa Studio
Transcript
Page 1: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

Local Planning Panel7 August 2019375 Glebe Point Road, Glebe

D/2018/1586

Applicant: Environa Studio

Owner: Lawrence Luk

Architect: Environa Studio

Page 2: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

proposalalterations and additions to heritage building including:

• extension, including excavation works, of the existing ground level small bar

• internal alterations to the residential apartments

• addition of rear balconies to apartments within levels 2 and 3

• addition of front and rear dormers for an additional level with access to rooftop terraces

recommendationrefusal

Page 3: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

notification information• exhibition period 9 January to 25 January 2019

• 60 owners and occupiers notified

• 1 submission received

3

Page 4: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

submissions• privacy and noise impacts from the rooftop terraces

• unsympathetic additions to a heritage item

Page 5: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

subject site

submitters

submissions

Page 6: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

site

Page 7: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

site viewed from cnr of Glebe Point Road & Forsyth Street

site

Page 8: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

entrance to apartments entrance to

small bar

site viewed from Forsyth Street & entry points

Page 9: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

rear of site viewed from Forsyth Street

Page 10: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

rear of subject site & adjoining heritage items

site

Page 11: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

Charlton Way street view looking south

Page 12: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

existing level 2 terrace looking east (common open space & waste storage)

Page 13: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

perspective – 3D model

proposal

Page 14: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

perspective – 3D model

Page 15: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

proposal

level 1

Page 16: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

level 2

Page 17: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

level 3

Page 18: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

level 4

Page 19: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

section plan

Page 20: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

materials – level 2 and 3 balconies

clear glass balustrades

balcony flooring in Modwood‘silver gum’

aluminium sliding door in Dulux ‘monument’

Page 21: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

materials – dormers and rooftop terraces

aluminium sliding door in Dulux ‘monument’

terrace flooring in Modwood‘silver gum’

rooftop render planter boxes

Lysaght metal cladding in Colorbond ‘basalt’

Page 22: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

compliance with key LEP development standards

control existing proposed compliance

height 9m 12.9m works up to 12.1m

no – 34% variation

floor space 1.5:1 1.7:1 2.06:1 no – 37% variation

Page 23: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

compliance with key DCP development standards

control existing proposed compliance

height in storeys

2 3 4 no

Page 24: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

issues• height

• floor space

• heritage

• amenity

Page 25: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

height of building

Page 26: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

height of building• height non-compliance results from front and rear dormers, rooftop

terraces and level 3 balcony

• exacerbates existing height non-compliance

• adverse impacts on the heritage item

• clause 4.6 not supported

Page 27: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

height in storeys• New upper level and lower ground level addition results in 4 storeys

• non compliance with 2 storey height in storeys DCP control

1234

Page 28: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

floor space • floor space non-compliance results from the attic space and bar

extension

• exacerbates floor space non compliance

• adds uncharacteristic features / bulk to heritage item

• clause 4.6 not supported

Page 29: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

heritage• unsympathetic additions to a heritage item

• untraditional dormers with aluminium framed doors

• impact to side horizontal parapet wall

• extensive glazing

Page 30: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

amenity - privacy• rooftop terraces and balconies create privacy and overlooking impacts

• any further screening would add bulk

Page 31: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

amenity – waste management• existing communal waste storage removed

• removal of communal residential waste storage, no clear path of travel to street for collection

• commercial waste storage not demonstrated

Page 32: Local Planning Panel 7 August 2019 - City of Sydney · alterations and additions to heritage building including: • extension, including excavation works, of the existing ground

recommendation

refusal


Recommended