Grays Harbor County | Lower Satsop LOWER SATSOP ASSESSMENT & DESIGN DRAFT PRELIMINARY DESIGN May 16, 2019
Transcript
Page 1: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

LOWER SATSOP ASSESSMENT & DESIGNDRAFT PRELIMINARY DESIGN

May 16, 2019

Page 2: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Existing Conditions

Bank Erosion

Revetments

Keys Road

Port Well

WDFW Restoration Project

2018 Avulsion

1

Page 3: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Erosion Risks – Historical occupation zone

Areas where the river has already been pose the highest erosion risk because we know that they are capable of being eroded

Delineated river locations for period of aerial photography record from 1940-2017

Combined locations to form Historical River Occupation Zone

2

Active Channel Locations – 1940-

2017

Page 4: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Historic Context

1953 2019

Page 5: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Geomorphic Context

4

Page 6: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Geomorphic Context

5

Meander belt is moving west.

Erosion hazard zone includes lands not occupied by the river in thousand years or more.

Page 7: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Projected Erosion without Treatment

6

Page 8: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Bank Stabilization – Why Not?

7

Prohibitively Expensive > 2MM/bank

Does it improve aquatic habitat?

Does it support geomorphic process?

Source: Pierce County Dolosse & Dolotimberstm fact sheet

Page 9: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Case Studies

8

Page 10: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

DRAFT Preliminary Design

9

Page 11: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

DRAFT Preliminary Design

10

Page 12: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

DRAFT Preliminary Design

11

Page 13: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

DRAFT Preliminary Design

12

Page 14: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

DRAFT Preliminary Design

13

Page 15: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

DRAFT Preliminary Design

14

Page 16: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1

Grays Harbor County | Lower Satsop

Proposed Action Phases Flow deflection to abandoned meander.

Partial removal of WDFW left bank revetment.

Installation of ELJ’s to improve fish habitat and deflect flows from property and infrastructure.

15

Phase I2020

Phase II2021

Phase III2030. . .

Install Deflector jams along eroding banks in conjunction with flood fencing

Coordinate with WDFW on possible side channel enhancement based on river evolution.

Install setback revetments to establish protected forest buffer along Keys Road.

Setback infrastructure restricting Lower Satsop meander belt, Keys Road and Port Well.

Page 17: LOWER SATSOP ASSESSMENT & DESIGN · Existing Conditions Bank Erosion Revetments Keys Road Port Well WDFW Restoration Project 2018 Avulsion 1