LPSC Status. Assembly Hall. Removal starts and is in progress. Main infrastructure work will be done in November. (floor and wall painting, services installation). LPSC Status. Strip Modules handling tool. Hydraulic strike ordered and delivered in next few days. - PowerPoint PPT Presentation
6
EMCal Meeting CERN – July 2 nd 2007 LPSC Status 1 J-F Muraz LPSC Status LPSC Status. Assembly Hall. - Removal starts and is in progress. - Main infrastructure work will be done in November. (floor and wall painting, services installation).
Transcript
Page 1: LPSC Status .

EMCal Meeting CERN – July 2nd 2007 LPSC Status 1 J-F Muraz

LPSC StatusLPSC Status.

Assembly Hall.

- Removal starts and is in progress.

- Main infrastructure work will be done in November.

(floor and wall painting, services installation).

Page 2: LPSC Status .

EMCal Meeting CERN – July 2nd 2007 LPSC Status 2 J-F Muraz

Strip Modules handling tool.

- Hydraulic strike ordered and delivered in next few days.

- Structure scheduled for July in our mechanical workshop.

- We do a dummy strip module (real size and weight) in order to test

this tool and the SM assembly procedure.

LPSC StatusLPSC Status.

Page 3: LPSC Status .

EMCal Meeting CERN – July 2nd 2007 LPSC Status 3 J-F Muraz

LPSC StatusLPSC Status.

SM Platform.

- Detailed drawings are in progress.

- Scheduled in our mechanical workshop for December

Page 4: LPSC Status .

EMCal Meeting CERN – July 2nd 2007 LPSC Status 4 J-F Muraz

LPSC StatusLPSC Status.

SM tilt over mechanism. (needed in vertical Cosmic tests design)

- Basic design is in progress.

Winch

Tilt platform

Cable

Page 5: LPSC Status .

EMCal Meeting CERN – July 2nd 2007 LPSC Status 5 J-F Muraz

LPSC StatusLPSC Status.

SM tilt over mechanism. (needed in vertical Cosmic tests design)

- Conceptual design is in progress.

Page 6: LPSC Status .

EMCal Meeting CERN – July 2nd 2007 LPSC Status 6 J-F Muraz

LPSC StatusLPSC Status.

Test beam Scintillators paddles:

- Done and tested.