LUAS Cross City Brendan O’Brien Roads & Traffic Department. Issues. Six Major Car parks Affected by the LUAS Construction and Operation. Parnell Street Reduced from Four Lanes to Two. Access Arrangement for Ilac needs to be in place. - PowerPoint PPT Presentation
Popular Tags:
25
LUAS Cross City Brendan O’Brien Roads & Traffic Department
Transcript
Page 1: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

LUAS Cross City Brendan O’Brien Roads & Traffic Department

Page 2: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 3: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 4: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 5: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

Issues • Six Major Car parks Affected by the LUAS Construction and Operation. •Parnell Street Reduced from Four Lanes to Two.• Access Arrangement for Ilac needs to be in place.•New Egress arrangements from Jervis Street Car Parks and Imax Car parks needs to planned. •These Car Parks provide over 3,000 Car Spaces for Shoppers.

Page 6: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 7: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 8: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

Removal of Lane to accommodate Luas Stop

Shared running around Trinity College :- Operational issues

College Green

Page 9: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 10: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

•Highest capacity Public Transport link in the

Country

•400 Buses an Hour Peak

•High numbers of Cyclists and Taxis

•Very Busy at night time especially Weekends

•Removal of one Lane during Construction.

• Outside Bus Corridor Hours 2000 vehs Hour

• Possible extension of Bus Corridor Hours

Page 11: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

•Two Way LUAS Operation with one shared lane past the Provost House.

•In Operation Public Transport only

Lr Grafton Street

Page 12: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

For Periods of Construction this is one way from Grafton Street to Dawson Street Only.

Nassau Street Dawson Street

Page 13: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 14: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

During Construction number of Lanes reduced need to protect Buses.

High Volume of Vehicles on Dawson Street going to Merrion Row or Westland Row.

Dawson Street

Page 15: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 16: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 17: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

Kildare Street Stephens Green

Introduce Two way running on Kildare Street.

Page 18: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

Kildare Street

Westland Row

Page 19: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 20: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

Stephens Green

North West Corner.

Luas construction and operation will reduce lane capacity in half.

Page 21: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 22: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 23: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 24: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department
Page 25: LUAS  Cross City  Brendan O’Brien  Roads & Traffic Department

LUAS Cross City

• Roads & Traffic Department will bring forward Traffic

Proposals as outlined over the next number of Months.

•It is intended to put in place Traffic arrangements which

will work both in the Construction and Operational Phases

of Luas Cross City.

•Access to car parks, provision for Public Transport and

Cyclists will be a key priority.

Protect the retail and commercial activities along the route.