HRTPO Transportation Technical Advisory Committee Meeting – May 5, 2021 M. FY 2021-2024 TIP Amendment to Transfer TAP Funds: Virginia Beach: UPC 106154: Buckner Boulevard Shared Use Path (VDOT Grouped Project) UPC 109053: Independence Boulevard/Baxter Road Sidewalk Attached is a request letter from the City of Virginia Beach to amend the Fiscal Year (FY) 2021- 2024 Transportation Improvement Program (TIP) to add a previously approved project and to transfer a total of $33,303 in Transportation Alternatives (TA) Set-Aside funds (previously known as TAP funds) from a completed grouped project to another eligible TA Set-Aside project. The specifics of the request are described below: UPC 109053 – Independence Boulevard and Baxter Road Sidewalk o Add project to TIP o Description: Construct a five-foot concrete sidewalk, including curb and gutter, along the west side of Independence Boulevard from the I-264 on-ramp to Baxter Road and the north side of Baxter Road from Independence Boulevard to Alicia Drive. o Project Length: 0.4 miles o Cost Estimate as follows: Preliminary Engineering (PE): $158,011 Right of Way (RW): $0 Construction (CN): $1,972,700 Total Cost Estimate: $2,130,711 o Schedule as follows: PE Start: 9/1/2017; End: 6/30/2020 RW: N/A CN: 10/1/2020; End: 3/1/2022 o Allocations as follows: Receive FY 2015 Transportation Alternatives Program (TAP) allocation of $18,385 from completed grouped project UPC 106154 (Buckner Boulevard Shared Use Path) previously approved by the HRTPO Board on July 16, 2020 Add FY 2015 Local Match (LOM) allocation of $4,5956 previously approved by the HRTPO Board on July 16, 2020 Receive FY 2015 TAP allocation of $44,404 from completed grouped project UPC 106154 (Buckner Boulevard Shared Use Path) Add FY 2015 Local Match (LOM) allocation of $8,326 Add FY Previous TAP allocation of $749,477 Add FY Previous LOM allocation of $198,619 Add FY Previous Local (LOC) allocation of $1,118,005 This amendment is to add the project to the Hampton Roads FY 2021-2024 TIP and it is consistent with the Hampton Roads 2040 LRTP; however, the facility is not considered regionally significant and the project is exempt from conformity under the following provision contained in section 93.126 of the conformity rule, Table 2 Exempt Projects under “Air Quality”, as it is a bicycle and pedestrian facility project.
Transcript
Page 1: M. FY 2021-2024 TIP Amendment to Transfer TAP Funds ...

HRTPO Transportation Technical Advisory Committee Meeting – May 5, 2021

M. FY 2021-2024 TIP Amendment to Transfer TAP Funds: Virginia Beach: UPC 106154: Buckner Boulevard Shared Use Path (VDOT Grouped Project) UPC 109053: Independence Boulevard/Baxter Road Sidewalk Attached is a request letter from the City of Virginia Beach to amend the Fiscal Year (FY) 2021-2024 Transportation Improvement Program (TIP) to add a previously approved project and to transfer a total of $33,303 in Transportation Alternatives (TA) Set-Aside funds (previously known as TAP funds) from a completed grouped project to another eligible TA Set-Aside project. The specifics of the request are described below:

• UPC 109053 – Independence Boulevard and Baxter Road Sidewalk o Add project to TIP o Description: Construct a five-foot concrete sidewalk, including curb and gutter,

along the west side of Independence Boulevard from the I-264 on-ramp to Baxter Road and the north side of Baxter Road from Independence Boulevard to Alicia Drive.

o Project Length: 0.4 miles o Cost Estimate as follows:

▪ Preliminary Engineering (PE): $158,011 ▪ Right of Way (RW): $0 ▪ Construction (CN): $1,972,700 ▪ Total Cost Estimate: $2,130,711

o Schedule as follows: ▪ PE Start: 9/1/2017; End: 6/30/2020 ▪ RW: N/A ▪ CN: 10/1/2020; End: 3/1/2022

o Allocations as follows: ▪ Receive FY 2015 Transportation Alternatives Program (TAP) allocation

of $18,385 from completed grouped project UPC 106154 (Buckner Boulevard Shared Use Path) previously approved by the HRTPO Board on July 16, 2020

▪ Add FY 2015 Local Match (LOM) allocation of $4,5956 previously approved by the HRTPO Board on July 16, 2020

▪ Receive FY 2015 TAP allocation of $44,404 from completed grouped project UPC 106154 (Buckner Boulevard Shared Use Path)

▪ Add FY 2015 Local Match (LOM) allocation of $8,326 ▪ Add FY Previous TAP allocation of $749,477 ▪ Add FY Previous LOM allocation of $198,619 ▪ Add FY Previous Local (LOC) allocation of $1,118,005

This amendment is to add the project to the Hampton Roads FY 2021-2024 TIP and it is consistent with the Hampton Roads 2040 LRTP; however, the facility is not considered regionally significant and the project is exempt from conformity under the following provision contained in section 93.126 of the conformity rule, Table 2 Exempt Projects under “Air Quality”, as it is a bicycle and pedestrian facility project.

Page 2: M. FY 2021-2024 TIP Amendment to Transfer TAP Funds ...

HRTPO Transportation Technical Advisory Committee Meeting – May 5, 2021

This request is being made available for public review and comment from March 31, 2021 through April 14, 2021. Mr. Phil Pullen, Virginia Beach City Engineer, will be available to answer questions on this item. Attachment 4M RECOMMENDED ACTION:

Recommend HRTPO Board approval of the funding transfer and the TIP amendment.

Page 3: M. FY 2021-2024 TIP Amendment to Transfer TAP Funds ...

April 23, 2021

Robert A. Crum, Jr. Executive Director Hampton Roads Transportation Planning Organization The Regional Building 723 Woodlake Drive Chesapeake, VA 23320

Subject: Hampton Roads FY2021-2024 Transportation Improvement Program (TIP) Amendment - TAP Funding Transfer from UPC 106154 – Buckner Boulevard Shared Use Path to UPC 109053 – Independence Boulevard / Baxter Road Sidewalk

Dear Mr. Crum:

The City of Virginia Beach requests to add a previously approved project and transfer TAP funding from one completed project to this added project. The City requests that the following be placed on the May 2021 Transportation Technical Advisory Committee (TTAC) and subsequent Hampton Roads Transportation Planning Organization (HRTPO) agendas as an amendment to the FY 2021-2024 Transportation Improvement Program (TIP).

The donor project UPC 106154 – Bucker Boulevard Shared Use Path, is a completed grouped TAP project with a remaining balance. The recipient project, UPC 109053 – Independence Boulevard/Baxter Road Sidewalk, is an active TAP project that requires additional funding for construction.

MUNICIPAL CENTER BUILDING 23

2473 N. LANDING ROAD VIRGINIA BEACH, VA 23456

DEPARTMENT OF PUBLIC WORKS OFFICE OF THE CITY ENGINEER (757)385-4131 FAX (757) 467-5602

Attachment 4M

Page 4: M. FY 2021-2024 TIP Amendment to Transfer TAP Funds ...

Robert A. Crum, Jr. Hampton Roads FY2021-2024 Transportation Improvement Program (TIP) Amendment - TAP Funding Transfer from UPC 106154 – Buckner Boulevard Shared Use Path to UPC 109053 – Independence Boulevard / Baxter Road Sidewalk April 23, 2021

2 | P a g e

x UPC 109053 – Independence Boulevard and Baxter Road Sidewalk o Add project to TIP.o Description: Construct a five-foot concrete sidewalk, including curb and

gutter, along the west side of Independence Boulevard from the I-264 on-rampto Baxter Road and the north side of Baxter Road from IndependenceBoulevard to Alicia Drive.

o Project Length: 0.4 mileso Cost Estimate as follows:

� Preliminary Engineering (PE): $158,011� Right of Way (RW): $0� Construction (CN): $1,972,700� Total Cost Estimate: $2,130,711

o Schedule as follows:� PE Start: 9/1/2017; End: 6/30/2020� RW: N/A� CN Start: 10/1/2020; End: 3/1/2022

o Allocations� Receive FY 2015 Transportation Alternatives Program (TAP)

allocation of $18,385 from completed grouped project BucknerBoulevard Shared Use Path (UPC 106154)

� Add FY 2015 Local Match (LOM) of $4,596� Receive FY 2015 Transportation Alternatives Program (TAP)

allocation of $33,303 from completed grouped project BucknerBoulevard Shared Use Path (UPC 106154)

� Add FY 2015 Local Match (LOM) of $8,326� Add FY Previous TAP Funding $749,477� Add FY Previous LOM $198,619� Add FY Previous Local Funds $1,118,005

The required local match will be provided using existing local funding within the recipient project – UPC 109053 – Independence Boulevard/Baxter Road Sidewalk.

Current cost estimates, allocations, obligations, expenditures, and funds available for transfer associated with the affected projects have been confirmed with VDOT. We request that the Transportation Technical Advisory Committee (TTAC) and the Transportation Planning Organization (TPO) consider this TIP amendment request at the May 2021 meetings.

Attachment 4M

Page 5: M. FY 2021-2024 TIP Amendment to Transfer TAP Funds ...

Robert A. Crum, Jr. Hampton Roads FY2021-2024 Transportation Improvement Program (TIP) Amendment - TAP Funding Transfer from UPC 106154 – Buckner Boulevard Shared Use Path to UPC 109053 – Independence Boulevard / Baxter Road Sidewalk April 23, 2021

3 | P a g e

Please do not hesitate to contact me if you have any questions or need additional information at 757-385-4131, or email me at [email protected].

Sincerely,

David S. Jarman, P.E. Transportation Division Manager

DSJ/kes

C: John Mihaly, Hampton Roads Transportation Planning Organization Sonya Hallums-Ponton, Virginia Department of Transportation Susan Wilson, Virginia Department of Transportation Phillip D. Pullen, P.E., Public Works/Engineering Katie E. Shannon, P.E., Public Works/Engineering

Attachment 4M


Recommended