Date post: | 04-Jan-2016 |
Category: |
Documents |
Upload: | lynette-horton |
View: | 216 times |
Download: | 0 times |
M. Gilchriese
ATLAS
DoE Review
May 2003
M. Gilchriese2
ATLAS LBNL GroupM. Barnett, V. Chang, A. Ciocio, A. Clark, D. Costanzo, S. Dardin, A. Deisher, M. Dobbs, K. Einsweiler, R. Ely, M. Garcia-Sciveres,
M. Gilchriese, F. GoozenF. Goozen, C. Haber, A. Haim, I. Hinchliffe, K. Huang, S. Lee, S. Loken, J. Lys, R. Madaras, F. McCormack, J. Muelmenstaedt,
J. RichardsonJ. Richardson, A. Saavedra, M. Shapiro, H. Spieler, G. Stavropoulos, G. Trilling, J. Virzi, T. Weber, R. Witharm
Physics Division and UC Berkeley
E. Anderssen, L. Blanquart, E. Anderssen, L. Blanquart, A. Das, T. DoolinT. Doolin,, N. Hartman, N. Hartman, J. HellmersJ. Hellmers,, T. JohnsonT. Johnson,, J. Joseph, E. Mandelli, G. MeddelerJ. Joseph, E. Mandelli, G. Meddeler, R. Powers,
A. Smith,A. Smith, C. Tran, J. Wirth, G. ZizkaEngineering Division
P. Calafiura, W. Lavrijsen, C. Leggett, M. Marino, D. Quarrie, C. TullP. Calafiura, W. Lavrijsen, C. Leggett, M. Marino, D. Quarrie, C. TullNERSC
Physicist Postdoc Grad Student Undergraduate EngineerEngineer Technician
M. Gilchriese3
ATLAS Overview• ATLAS is fully into production and many final components
have been delivered to CERN. Substantial progress in last year.
• Installation underground will begin later this year and continue into global commissioning at the end of 2006.
• Although many schedules are tight, it is feasible for ATLAS to be ready for first LHC beam as planned in 2007.
M. Gilchriese4
ATLAS Detector
Inner Tracking Detector
M. Gilchriese5
ATLAS Tracking
SCT
Pixels
M. Gilchriese6
Silicon Strip Detector(SCT)
• About 6x106 channels, 60m2
• Radiation hardness up to 10 MRad(roughly a decade at 1034 luminosity).
• About 4000 modules to be built world-wide, production is underway.
• Integration with mechanical structures, cables etc to begin later this year.
Silicon detector
Hybrid
Inte
grat
ed c
ircu
its
SCT Barrel Module
Strip pitch 80(barrel), 12cm long, noise about 1500e-
M. Gilchriese7
Pixel Detector• LHC radiation levels at 1034cm-2sec-1 prevent long-term operation of silicon strip
detectors for R< 25 cm.
• Pixel detectors have much smaller cell size, lower capacitance and thus noise, that results in signal-to-noise(unirradiated) about 10 times better than silicon strip detectors..
• Critical for tracking and finding secondary vertices(b-tagging)
• New technology for hadron colliders.
Pixel size 50x400About 108 channelsAbout 1,000 modulesNoise about 150e-
M. Gilchriese8
Current LBNL Roles in ATLAS• Silicon strip detector
– Test system for integrated circuits(ICs) completed and nearly all ICs tested.– Module production for barrel region underway– Strong collaboration with UC Santa Cruz in ICs and module production– Producing all readout boards for SCT(and pixels) in collaboration with Wisconsin.
• Pixel detector– Leadership roles in electronics, modules and mechanics– Production underway of mechanical supports, silicon detectors, ICs and hybrids– Module prototypes under test, module production to begin in a few months.– Collaborate with Albany, Iowa State, New Mexico, Ohio State, Oklahoma
• Software, computing and physics simulation– Lead role in the development of the Athena framework code(the “operating
system” for ATLAS software)– Lead role in development and maintenance of physics simulation tools– Overall ATLAS software coordinator is D. Quarrie, resident at CERN
M. Gilchriese9
SCT at LBNL• LBNL originated, designed and built custom, high-speed test systems for the
SCT integrated circuits (ABCDs). This has made it possible to keep up with delivery of wafers(more than 1000 wafers have been or will be fabricated)
• Test systems are at UCSC(2 stations), RAL(1 station) and CERN(1 station). Nearly all of the total ICs needed have been tested, mostly over the last year.
• LBNL is responsible in the US for module assembly and testing. We are in the process of transferring hybrid assembly/testing to Santa Cruz to speed up the production rate.
• Production of modules began late last year and 8% are complete. 500 modules to be produced.
• The SCT(and pixel) systems are read out using VME boards located about 100m from the experiment.
• The design work is largely done by LBNL engineering funded through the University of Wisconsin but there is also involvement of Phys. Div. Staff. The final production of the SCT boards will begin in a few months, to be followed afterwards by the pixel boards.
M. Gilchriese10
SCT Module Production in Cleanrooms
• A second precision measuring machine and 2nd wire bonder recently added with Division funding to improve production rate.
Module Metrology Electrical Testing
Wire Bonding
M. Gilchriese11
Hybrid and Module Production
As of May 19, 2003
0
20
40
60
80
100
120
140
160
180
200
Date
Nu
mb
er
Hybrids up to Fanouts
Modules Started
Modules Completed
Hybrids Started
Hybrids up to fanout bondingCompletely tested modules
M. Gilchriese12
Service and Beampipe Support
Service and Beampipe Support
Pixel Detector
Pixel and Beam Pipe Assembly
About 7m long package
assembled on surface and lowered
into collision hall for insertion
into detector in early 2006
LBNL responsible for support frame, disk region, service panels and beampipe support structures
M. Gilchriese13
Pixels InstalledLBNL responsible for support tube..
Services andBeam Pipe Support Structure
SCT Barrel
TRT Forward
Side C Side A
Services andBeam Pipe Support Structure
Pixel Detector
TRT Forward
Beam Pipe Support Wire
ID Endplug
PP1
PST Support Flexures
Insertion Trolley
Beam Pipe
Pixel Support Tube
Package Insertion Riders
Z=848 – Wire SupportZ=3092 – PP1
Z=3120 – Adjustors
PP1 Bellows/Temporary Support
Z=~3200 – Bellows/Temp. Support
M. Gilchriese14
Composite Structures• We have developed the
capability to make custom composite structures.
• Combined thermal, structural and electrical properties to meet the pixel needs.
Autoclave at LBNL
Prototype Support Tube Section and Rails
M. Gilchriese15
Support/Cooling Structures
• Fabrication of pixel support structures is well advanced.
Global Support FrameDisk Support Rings
Disk Module Support/Cooling
M. Gilchriese16
Pixel Hybrids and Modules• M. Garcia-Sciveres from LBNL is the overall ATLAS module
coordinator,
Schematic Cross Section(through here)
Bumps
Flex Hybrid
Sensor
Wirebonds
ASICs
Pigtail (beyond)
To electrical-to-optical transition
About 1/3 of sensors(detectors) have been produced.
Flex hybrid production underway
About 250 modules(25%) to be assembled at LBNL
M. Gilchriese17
Pixel Electronics
• K. Einsweiler from LBNL is the overall ATLAS pixel electronics coordinator.
• The strong LBNL IC group allows us to lead the pixel electronics effort, in particular the design of the front-end chip that is on the critical path for the project.
• In addition, we are responsible for providing most of the IC and module tests systems for the collaboration, and these have also been designed and implemented by LBNL.
• First full integrated circuit prototypes were delivered about a year ago and exhaustively tested.
• Chips worked well.
M. Gilchriese18
Pixel Integrated Circuits• The lab and test beam studies in the last year were led by LBNL,
and we achieved the first demonstration that pixel technology will work at the LHC.
• Fabrication of dozens of prototype modules complete, more in progress
• Production versions of all chips have been submitted to IBM, first delivery just received.
Doric(from PIN diode to decoded LVDS)
VDC array(from LVDS to laser diodes)
Front End Chip2880 channels
Module Control ChipManages data & control between module’s 16 chips
Optical interface chips
M. Gilchriese19
Test Beam Efficiencies
Unirradiated moduleNoise occupancy is< 6x10-9 per pixel
Single-chip assemblies irradiated to about 65MRaddose with differentsensors and bump bonds.Different chip configurations.
A
B
A and B are different configurations
M. Gilchriese20
Charge Collection After Irradiation
M. Gilchriese21
Pixel System Tests• System tests underway at LBNL, again leading collaboration.
• Will grow to long-term test of section of detector soon.
Pixel Modules on Support/Cooling Structure
Before After
M. Gilchriese22
ATLAS Computing Organization
LBNL
New organization since last year
M. Gilchriese23
Data Challenges and Milestones• Data challenges completed or underway
– DC0 – a “continuity” test of system. Completed– DC1(Phase I) – simulated events to study high-level triggers(for preparation
of Technical Design Report) and to advance system. Completed.• Events simulated ~107 ,18 countries, 39 institutions involved, completed in
August 2002• LBNL provided about 30% of US computing power.
– DC1(Phase II) – underway. 70 Tb goal. More countries, more Grid
• Future data challenges and milestones– DC2: mid-2004, like DC1 in scale– Computing Technical Design Report by mid-2005– DC3: end 2005. 5 x DC2– Physics Readiness Report by mid-2006
• Continued development of Athena by LBNL a critical element to meet these milestones.
M. Gilchriese24
LBNL Software Expertise• Software Project Leader (David Quarrie)
– Leads all software development activities and is the Chief Architect. Resident at CERN.
• Physics Generators Coordinator (Ian Hinchliffe)– Provides support for all particle generators (Isajet, Pythia, etc.) and integrates them into the overall
control framework. U.S. ATLAS Physics Coordinator.
• Framework Coordinator (Paolo Calafiura)– In charge of the Athena framework and the collaboration with the LHCb developers– Responsible for coordinating software development for the core services associated with the
framework
• ATLAS software training coordinator (Massimo Marino)– Arranges tutorials and other training courses and is also responsible for detailed design of parts of an
LCG common project which will be shared by ATLAS, CMS & LHCb. Resident at CERN.
• Scripting support (Wim Lavrijsen)– Responsible for making Athena an interactive framework based and for GUI & command line shell
designed as a beginners aid
• Calibration/Alignment Infastructure (Charles Leggett)– Responsible for providing a transparent mechanism whereby time varying data may be automatically
tracked by an application code (I.e. the correct geometry for each event is automatically present with no explicit manipulations of the databases by the application code. Also responsible for ROOT histogram & n-tupe support and Geant4 integration into Athena
• GRID Integration (Craig Tull)– Responsible for the integration of GRID services into Athena (e.g. monitoring, file access, etc.)– Responsible for definition of Data Dictionary that allows for run-time interrogation of arbitrary objects
M. Gilchriese25
Computing Summary• Collectively LBNL provides a nucleus of experienced
Object Oriented designers around which much of the ATLAS software development is based.
• They coordinate many critical development activities• They leverage NERSC strengths and provide a core
competency within LBNL that can be (and is) applied to other programs (BaBar, SNAP, IceCube, SN-Factory)
• Close collaboration with physics simulation(and later analysis).
• This experience and expertise will be needed well beyond LHC turn-on in 2007, as the avalanche of LHC data arrives.
M. Gilchriese26
On to First Beam• Complete the fabrication of SCT modules and deliver them to
the UK by end 2004.
• Complete fabrication and testing of pixel components and deliver them to CERN by early 2005.
• Then assemble, install and commission pixel detector, which will require continuous presence at CERN with support from the US ATLAS Research Program.
• Continue to make ATLAS software work for data challenges and then ready for first data.
• Increase LBNL participation in physics analysis, as part of data challenge activity, and be ready for first data.
• New physics possible with very little integrated luminosity!
M. Gilchriese27
Beyond The Initial Detector
• ATLAS has been staged to meet funding realities.
• Pixel system(one layer) staged, current plan is to insert in long shutdown after 1st “physics run”. Would likely use current technology.
• Innermost layer of pixels will die after few years at 1034. Must be replaced, critical for b-tagging. Replacement would use new technology (improved ICs, better detectors, lower mass structures, etc) for improved pixel performance.
• Continued software development will be essential as the luminosity increases towards the design value and to respond to the actual data environment.
M. Gilchriese28
Major Upgrades
• A luminosity upgrade to 1035(SLHC) will require the complete replacement of the tracking detectors.
• Tracking is hard at 1034 and has required extensive R&D for over 15 years.
• Tracking will be harder at 1035 and will require a similar R&D effort => should have started R&D already!
• LBNL plans to remain leader in silicon(pixel) detectors for SLHC
M. Gilchriese29
ATLAS Personnel• Budget exigencies in the past year or so have prevented
us from hiring postdoctoral staff or other new physicists.
• We have added three retirees and redirected senior staff in an attempt to meet our construction commitments. Still short of physicists to meet current commitments.
• We are now nearly at the time when we MUST also ramp up our effort in physics simulation/analysis AND begin upgrade R&D.
• We cannot continue to meet our commitments to the construction projects, software and computing and have a role in physics analysis and the challenging upgrades without additional physicist staff.
M. Gilchriese30
Physicists Today
Se
nio
r
Re
tire
es
Po
std
ocs
Physics simulation/analysis 0.5 0 0.7Software and computing 0.5 0 0.5Pixel project 2.5 0.5 1.0SCT project 2.3 1.0 0Upgrades 0 0 0
Totals 5.8 1.5 2.2
M. Gilchriese31
Goal By LHC Turn On
Requires new Divisional. Fellow + new Facultyand expected migration of existing physicistsfrom CDF and D0.
Steady ramp upof postdocs
Se
nio
r
Re
tire
es
Po
std
ocs
Physics simulation/analysis 4.6 0.3 3.1Software and computing 1.7 0.2 3.1Commissioning/operations 4.2 0 1.8Upgrades 1.9 0.0 1.0
Totals 12.4 0.5 9.0
M. Gilchriese32
Implications for 2004
• Two postdoc slots have been created by slashing CDF and D0.
• But we will also lose two postdocs during 2004. • Need minimum of one more postdoc search
launched in 2004 and then must ramp up steadily.
• Existing senior personnel are (over)saturated with existing commitments.
• Additional leadership needed – Divisional Fellow.Want to launch search by this Fall.
M. Gilchriese33
Concluding Remarks
• ATLAS is on its way to be ready for first LHC beam.• LBNL is a world-wide leader in silicon detector
technology and leads the development of the ATLAS pixel detector.
• We are providing critical leadership in software and physics simulation, the keys to successful data analysis.
• We look forward to first physics with ATLAS!
• Physicists staff must grow soon to meet our ongoing commitments and to participate in physics analysis at the energy frontier after decades of work.