+ All Categories
Home > Documents > M. Lozano, C. Fleta*, G. Pellegrini, M. Ullán, F. Campabadal, J. M. Rafí CNM-IMB (CSIC),...

M. Lozano, C. Fleta*, G. Pellegrini, M. Ullán, F. Campabadal, J. M. Rafí CNM-IMB (CSIC),...

Date post: 04-Jan-2016
Category:
Upload: noreen-dalton
View: 213 times
Download: 0 times
Share this document with a friend
31
M. Lozano, C. Fleta*, G. Pellegrini, M. Ullán, F. Campabadal, J. M. Rafí CNM-IMB (CSIC), Barcelona, Spain (*) Currently at University of Glasgow, UK S. Martí, C. García, C. Lacasta, M. Miñano IFIC (CSIC), Valencia, Spain Prague, 26th June 2006 IMB-CNM and IFIC activities in P-type detectors
Transcript

M. Lozano, C. Fleta*, G. Pellegrini, M. Ullán, F. Campabadal, J. M. Rafí

CNM-IMB (CSIC), Barcelona, Spain(*) Currently at University of Glasgow, UK

S. Martí, C. García, C. Lacasta, M. Miñano

IFIC (CSIC), Valencia, Spain

Prague, 26th June 2006

IMB-CNM and IFICactivities in P-type detectors

IMB-CNM and IFICactivities in P-type detectors

2006 RD50 Meeting, Prague 2

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Index Our first intention was to report only the "Development of

Moderated p-spray Isolation Techniques for P-type Detectors at CNM"

Unfortunately, the clean room process is not yet finished We will explain the activities of CNM and IFIC in P-type

detectors

TOPICSI. Finishing of RD50 processingII. Simulation and processing of moderated p-spray isolation techniquesIII. First module with 3 cm p-type strip detectors

2006 RD50 Meeting, Prague 3

IMB-CNM Barcelona, IFIC Valencia (CSIC)

I. Finishing of RD50 processing

2006 RD50 Meeting, Prague 4

IMB-CNM Barcelona, IFIC Valencia (CSIC)

RD50 process The p-spray technology is ready We have found a set of implant conditions that offer enough

strip insulation, keeping the breakdown voltage high enough Energy, E=100 keV, dose = 31012 cm-2

We checked with gamma irradiation that the insulation is kept after oxide charge saturation

A set of 22 wafers has been processed using RD50 microstrip mask set with the above implant conditions

Wafers are diced and will be stored at CERN for irradiation and/or collection

2006 RD50 Meeting, Prague 5

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Reminder of RD50 processTechnology Wafers

Growing method

TypeWafer origin

Comments

P-in-N4 MCZ N RD50 >500 ·cm, 300 µm

2 EPI N RD50 thickness ~ 150 µm

N-in-P

4 (+1) MCZ P RD50 >2 k·cm, 300 µm

4 FZ P CNM

4 (+1) FZ P CNM Oxygen enriched DOFZ

2 EPI P RD50 thickness ~ 150 µm

N-in-N 2 FZ N CNM Single side processing

TOTAL 22 (+2)

2006 RD50 Meeting, Prague 6

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Reminder of RD50 microstrip mask set

Technology• P-in-N and N-in-P

Mask set• Designed by the RD50

Collaboration• Double-side processing• One metal layer

Structures• 26 microstrip detectors

- Polysilicon biasing resistors- Capacitive coupling- P-spray insulation- No p-stops

• 20 pad detectors• 12 pixel detectors• 8 test structure sets

2006 RD50 Meeting, Prague 7

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Results IV plots of un-diced wafers

detector: solid line ring: dashed line Absolute current at 20ºC plotted Diode area = 1 cm2 aprox.

Good performance for most of the wafers

Irreversible breakdown in some wafers n-in-n & n-in-p. Oxide damage Always in guard ring VBD well above VFD, no problem for use, but care must be taken

2006 RD50 Meeting, Prague 8

IMB-CNM Barcelona, IFIC Valencia (CSIC)

N-in-P DOFZ3297-NP-DOFZ

300um, SILHRP(9/05) OXG

1.E-09

1.E-08

1.E-07

1.E-06

1.E-05

0 50 100 150 200 250 300 350 400

Vrev (V)

I@20

º (A

)

Wafer 5

Wafer 5

Wafer 6

Wafer 7Wafer 8

Wafer 9

2006 RD50 Meeting, Prague 9

IMB-CNM Barcelona, IFIC Valencia (CSIC)

N-in-P MCZ3297-NP-MCZ

300um, >2kohm.cmSENMCZP (4/04)

1.E-09

1.E-08

1.E-07

1.E-06

1.E-05

1.E-04

1.E-03

1.E-02

0 50 100 150 200 250 300 350 400

Vrev (V)

I@20

º (A

)

Wafer 10

Wafer 11Wafer 12

Wafer 13

Wafer 14

2006 RD50 Meeting, Prague 10

IMB-CNM Barcelona, IFIC Valencia (CSIC)

N-in-P EPI

3297-NP-EPI150um

1.E-09

1.E-08

1.E-07

1.E-06

1.E-05

1.E-04

1.E-03

0 50 100 150 200 250 300

Vrev (V)

I@20

º (A

)

Wafer 15

Wafer 16

2006 RD50 Meeting, Prague 11

IMB-CNM Barcelona, IFIC Valencia (CSIC)

N-in-P FZ

3297-NP-FZ300 um

SILHRP(9/05)1.E-10

1.E-09

1.E-08

1.E-07

1.E-06

0 50 100 150 200 250 300 350 400 450 500

Vrev (V)

I@20

º (A

)

Wafer 1-FZWafer 4-FZ

ruptura irreversible del anillo de guarda

Irreversiblebreakdown in guard ring

2006 RD50 Meeting, Prague 12

IMB-CNM Barcelona, IFIC Valencia (CSIC)

N-in-N FZ3297-NN280 um

SILHRN2C(9/05)

1.E-09

1.E-08

1.E-07

1.E-06

1.E-05

1.E-04

1.E-03

0 50 100 150 200 250 300 350 400

Vrev (V)

I@20

º (A

)

Wafer 17-FZ

Wafer 17-FZ

Wafer 18-FZ

ruptura irreversible de los anillos de guarda

Irreversiblebreakdown in guard ring

2006 RD50 Meeting, Prague 13

IMB-CNM Barcelona, IFIC Valencia (CSIC)

P-in-N MCZ3297-PN-MCZ

300 um, > 500 ohm.cm

1.E-09

1.E-08

1.E-07

1.E-06

0 100 200 300 400 500 600 700

Vrev (V)

I@20

º (A

)

Wafer 19

Wafer 20Wafer 21

Wafer 22

2006 RD50 Meeting, Prague 14

IMB-CNM Barcelona, IFIC Valencia (CSIC)

P-in-N EPI3297-PN-EPI

150 um

1.E-09

1.E-08

1.E-07

1.E-06

0 50 100 150 200 250 300

Vrev (V)

I@20

º (A

)

Wafer 23

Wafer 24

2006 RD50 Meeting, Prague 15

IMB-CNM Barcelona, IFIC Valencia (CSIC)

N-in-P FZ CV curve

0.00E+00

1.00E+20

2.00E+20

3.00E+20

4.00E+20

5.00E+20

6.00E+20

7.00E+20

0 20 40 60 80 100 120 140 160 180 200

VFD = 35 V

2006 RD50 Meeting, Prague 16

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Some comments Similar current levels for all substrates (10-7 A/cm2) Same for ring current in (almost all) p-n and n-p (10-8 A) That means that n-in-p are so well insulated that they

behave like p-in-n Wafers 13 and 14 (p-MCZ) and 15 and 16 (p-EPI) behave as

if they do not have p-spray. Ring current very high, diode current normal Not due to substrate type Consecutive wafers: problem with ion implanter? Dicing and irradiation will improve problem

N-in-n as expected No backside implant

2006 RD50 Meeting, Prague 17

IMB-CNM Barcelona, IFIC Valencia (CSIC)

II. Simulation and processing of moderated p-spray isolation techniques

2006 RD50 Meeting, Prague 18

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Moderated p-spray As already presented in February in Trento We have developed through simulation a technology for p-

type detectors with moderated p-spray insulation Boron implant parameters are selected from our previous

experience with microstrip with p-stops: 50 keV, 1013 cm-2, implant oxide thickness

With less p-spray implanted charge, we obtain: High VBD, Good insulation, Eliminate the high field corner in the p-stop causing

microdischarges

2006 RD50 Meeting, Prague 19

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Doping profile comparison

X

Y

20 30 40

-2

0

2

4

6

AcceptorConcentration2.2E+19

2.9E+09

4.0E-01

5.4E-11

7.4E-21

1.0E-30

diode_np_mdr.grd - n1_des_moderatedpspray400min_10um_Qox1e11_h1X

Y

20 30 40

-5

0

5

10

AcceptorConcentration2.2E+19

2.9E+09

4.0E-01

5.4E-11

7.4E-21

1.0E-30

diode_np_mdr.grd - n1_des_solopstop_10um_Qox1e11_h1000V.dat

P-stop only

Moderatedp-spray

N strip P-stop

P-spray

2006 RD50 Meeting, Prague 20

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Electric field comparison

X

Y

20 30 40

-2

0

2

4

6

ElectricField3.2E+05

2.5E+05

1.9E+05

1.3E+05

6.3E+04

0.0E+00

diode_np_mdr.grd - n1_des_moderatedpspray340min_10um_Qox1e11_h1

X

Y

20 30 40

-5

0

5

10

ElectricField3.2E+05

2.6E+05

1.9E+05

1.3E+05

6.4E+04

0.0E+00

diode_np_mdr.grd - n1_des_solopstop_10um_Qox1e11_h1000V.dat

P-stop only

Moderatedp-spray

microdischarges?N strip P-stop

P-spray

2006 RD50 Meeting, Prague 21

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Technology First: oxidation, photolitograpy p-stop regions, wet oxide

etching, re-oxidation, photoresist striping At this point there are two different oxide thicknesses

thin oxide in the p-stop area and a thicker oxide on the rest of the silicon surface (“p-spray area”)

P-implant (Energy 50 keV, dose 1013 cm-2) Finish with the usual fabrication process

First fabrication batch with mask set CNM275 pad detectors process with dummy poly deposition to have the same

thermal budget as in microstrips Finished in one week MCZ and FZ silicon with p-stop, p-spray and moderate p-spray.

2006 RD50 Meeting, Prague 22

IMB-CNM Barcelona, IFIC Valencia (CSIC)

CNM275 mask set New mask set to replace

old ROSE set 100 pad diodes with

improved guard ring Diodes are labelled from

00 to 99. Only one type of diodes Designed for simplicity

and fast dicing Other test structures

2006 RD50 Meeting, Prague 23

IMB-CNM Barcelona, IFIC Valencia (CSIC)

New mask design One additional layer

needed from RD50 microstrip mask set – is being laid out.

Common p-stops p-spray increases safety

Distance between n-strip and p-stop is maximized To achieve higher

breakdown voltages narrow p-stops

2006 RD50 Meeting, Prague 24

IMB-CNM Barcelona, IFIC Valencia (CSIC)

III. First modules with 3 cm p-type strip detectors

2006 RD50 Meeting, Prague 25

IMB-CNM Barcelona, IFIC Valencia (CSIC)

ATLAS SCTDAC readout for p-type sensors Aim: to read a 3 cm p-type detector using the ATLAS

SCTDAC readout. SCTDAC is optimised for n-type sensor. SCT readout: binary ABCD3T chip. We have assembled at IFIC-Valencia a “pseudo SCT

module” with a 3cm p-type sensor and a 3 cm n-type sensor (from CNM-Barcelona) to crosscheck, using all the assembly tools of the SCT end-cap module: assembly jigs, bonding jigs, fan-in adaptors, test box and frames, etc..

2006 RD50 Meeting, Prague 26

IMB-CNM Barcelona, IFIC Valencia (CSIC)

ATLAS SCT middle end-cap module

We have fabricated a support structure with the shape of a detector and the spine arms, to fit in the bonding jigs (same dimensions and highs of a SCT module).

The HV hybrid tab are cut. The detector depletion will not be done through the hybrid.

HV Hybrid tab

Spine HV line

2006 RD50 Meeting, Prague 27

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Support structureThe support structure has been manufactured using a circuit board, the 3cm detector will be hold in the cupper rectangles.

The height of the support structure fits in the assembling and bonding jigs

The structure fits in the transport frame

2006 RD50 Meeting, Prague 28

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Hybrid assembling Gluing of the hybrid in the

SCT assembly jig. The HV tab has been cut

2006 RD50 Meeting, Prague 29

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Fan-in and detector gluingFan-in gluing jig

Detector to fan-in and fan-in to chip bonding

n-type

p-type

2006 RD50 Meeting, Prague 30

IMB-CNM Barcelona, IFIC Valencia (CSIC)

p-type

n-type

Module in the test box

Cooling injecting cold air

Strips to ground HV to the back plane

The detectors are not read simultaneously.

Detector biasing:

+HV for n-type

HV for p-type

2006 RD50 Meeting, Prague 31

IMB-CNM Barcelona, IFIC Valencia (CSIC)

Work in progress: Modifying SCTDAC to read

negative pulses for p-type sensors.

Laser and source setups ready to do a full study.

Still place in this module for two more sensors.

Irradiated sensor available to be assembled at 1015

n/cm2 .

IFIC-Valencia automatic laser system with 3 staged and automatic focusing in 20 min.


Recommended